Romfor International Ltd.

Backup Hand

CUT AND SLIP DRILLING LINE

CUT AND SLIP


DRILLING LINE

Romfor International Ltd.

Backup Hand
CUT AND SLIP
DRILLING LINE

Romfor International Ltd.

Backup Hand

CUT AND SLIP DRILLING LINE


BACKUP HAND

DRILLING LINE

STEP

SUB

PROCEDURE

PPE Requirements - Hardhat, Safety Glasses, Full


Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.

Review rig specific JSAs on cutting and slipping


drilling line and hoisting personnel.

JSAs should be rig specific.


Rig manager is required on the
floor when using bosuns chair.

Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.

Use fall protection, 100% tie off


and avoid pinch points.

REMARKS

READY TO HANG BLOCKS


(Assuming drill pipe is in rotary table)
Drill String should be positioned at bottom of last
casing string and well secured.

Operational issues may


change position of drill string.

Ensure that well bore is static.

Assist in setting slips (with drill string at proper height).

Ensure that proper lifting


techniques are used.

After blocks are lowered, stand clear while elevators


are unlatched.

Avoid pinch points and stay out


of Drillers view.

Assist as directed in inspecting drilling line, while


Driller is raising blocks.

Keep hands clear while line is


spooling on drum.

After blocks are raised to proper position, assist in


using air / hydraulic hoist for installing safety valve.

Use full open lifting eye for


hoisting safety valve.

Assist as directed in tightening drill pipe safety valve


to the proper make up torque (do not put tongs on
open / close area of drill pipe safety valve).

Avoid pinch points and ensure


floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).

Stand clear while blocks are moved to the proper


position for installation of block hanging line.

Ensure brake handle is locked


down after positioning blocks.

Assist Derrickman, in attaching harness / bosuns


chair to air / hydraulic hoist.

Attach directly to shackle.

Romfor International Ltd.

Backup Hand

CUT AND SLIP DRILLING LINE


BACKUP HAND
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

10

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified person.

11

While Derrickman is lifted, use tag line to position


Derrickman properly.

Ensure Derrickmans feet and


hands are clear of catch points.

12

While Derrickman is lowered, use tag line to position


Derrickman properly.

Ensure Derrickmans feet and


hands are clear of catch points.

13

Assist in removing air / hydraulic winch from harness


/ bosuns chair and store for later use.
1

Assist with removal of guards from front of


drawworks.

Avoid pinch points and store


guards in safe position.

Assist with removal of automatic driller / weight


indicator load cells off dead line.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

15

Assist with removal of secondary safety clamp and


drilling line anchor clamp.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

16

Assist in securing tag line to drilling line, use tag line


to pull initial drilling line from drum.

Avoid pinch points.

17

Assist in taping drilling line area being cut.

Watch for burs / wickers.

18

Assist in placing drilling line in line cutter properly.

Watch for burs / wickers, cover


line cutter.

19

Ensure drilling line is secured prior to cutting, to


avoid any recoil in line.

14

READY TO CUT DRILLING LINE


20

Assist in cutting drilling line, operate cutter from the


proper side (closed/pump side).

Use proper PPE, Full-face


shield and avoid pinch points.

21

Assist in storing cutter properly.

Avoid pinch points.

22

Assist in pulling drilling line off drum and guide line


out V-door / beaver slide.

Watch for burs / wickers and


avoid pinch points. Do not let
drilling line slide through hands.

Romfor International Ltd.

Backup Hand

CUT AND SLIP DRILLING LINE


BACKUP HAND

DRILLING LINE

STEP

SUB

PROCEDURE

REMARKS

23

Assist in attaching air/hydraulic hoist to drilling line


when there is three wraps left on drum.

Watch for burs / wickers and


avoid pinch points.

Assist in pulling remaining drilling line off drum with


air / hydraulic hoist.

Watch for burs / wickers and


avoid pinch points.

24

Assist with proper removal of drilling line clamp and


inspect for wear.

Watch for burs / wickers and


avoid pinch points. Use proper
hand tools to remove clamp.

25

Assist in removing the remainder of drilling line from


drum using air/hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

26

Assist in lowering cut off drilling line down beaverslide / Vdoor and store properly for disposal.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

27

Assist in Installation of drilling line in drum.

Avoid pinch points and use


proper tools.

28

Stand clear while drum rotates forward to proper


position for installation of drilling line clamp.

29

Assist in installation of drilling line clamp.

Ensure brake handle is locked


down. Watch for burs / wickers
and avoid pinch points. Use
proper hand tools to install
clamp.

30

Assist in attaching snatch block to fast line and raise


with air / hydraulic hoist to keep proper tension on
drilling line while spooling drilling line on drum.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

31

Assist with removal of snatch block and air / hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

32

Ensure line is slipping through anchor properly.


Have adequate communications from rig floor to
drilling line stand / anchor area (use mechanical
assist to feed line off of drilling line spool).

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

Romfor International Ltd.

Backup Hand

CUT AND SLIP DRILLING LINE


BACKUP HAND
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

33

Assist in installing drilling line anchor clamp and


secondary anchor safety clamp.

34

Stand clear while blocks are raised to proper height


for removal of block hanging line.

35

Assist Derrickman, in attaching harness / bosuns


chair to air/hydraulic hoist.

Attach directly to shackle.

36

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified personnel.

37

While Derrickman is being lifted to proper position,


pay attention to hand signals and verbal direction
from the Derrickman.

Ensure Derrickmans feet and


hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.

38

Ensure block hanging line is disconnected from top


of the blocks and placed in stored position.

Use verbal communication.

39

Assist in lowering Derrickman to proper position,


paying attention to hand signals and verbal direction.

Ensure Derrickmans feet and


hands are clear of catch points.

40

Assist in removing air / hydraulic winch from harness


/ bosuns chair and store properly.

Store under Rig Managers


control.

41

Assist with removal of drill pipe safety valve. Lift drill


pipe safety valve with air / hydraulic hoist.

Avoid pinch points and ensure


floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Use full open lifting eye for
hoisting safety valve.

42

Assist Driller in checking crown-o-matic for proper


setting on first stand of tubulars.

Inspect all clamping devices on


anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.

END OF PROCEDURE

Romfor International Ltd.

Derrickman

CUT AND SLIP DRILLING LINE

CUT AND SLIP


DRILLING LINE

Romfor International Ltd.

Derrickman
CUT AND SLIP
DRILLING LINE

Romfor Internatinal Ltd.

Derrickman

CUT AND SLIP DRILLING LINE


DERRICKMAN
STEP

SUB

PROCEDURE

PPE Requirements Hardhat, Safety Glasses, Full


Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.

Review rig specific JSAs on cutting and slipping


drilling line and hoisting personnel.

JSAs should be rig specific.


Rig manager is required on the
floor when using bosuns chair.

Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.

Use fall protection, 100% tie off


and avoid pinch points.

REMARKS

READY TO HANG BLOCKS


(Assuming drill pipe is in rotary table)

Notify Rig Manager that


personnel will be lifted by air/
hydraulic hoist and that drill
line is ready to be cut.

Drill String should be positioned at bottom of last


casing string and well secured.

Operational issues may


change position of drill string.

Assist Driller to ensure that well bore is static.

Assist as directed in inspecting drilling line, while


Driller is raising blocks.

Keep hands clear while line is


spooling on drum.

Prepare to secure hanging line to top of blocks.

Locate proper tools for job.

Tools should be 100% tied off.

Inspect and put on proper size lifting harness /


bosuns chair.

Use proper lifting device. Use


100% tie off (refer to JSA on
lifting personnel with air/
hydraulic hoist).

Attach harness / bosuns chair to air/hydraulic hoist.

Attach directly to shackle.

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified person.

Direct hoist operator to lift to proper position, use


hand signals and verbal direction.

Keep feet and hands clear of


catch points.

Disconnect block hanging line from stored position.

DRILLING LINE

Derrickman

Romfor International Ltd.


CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

Attach block-hanging line to top of blocks.

Block hanging line should be


attached at the crown. Use
verbal communication. Do not
use stationary cable and
clamps on block hanging eye.

Direct hoist operator to lower to proper position, use


hand signals and verbal direction.

Keep feet and hands clear of


catch points.

10

Remove harness / bosuns chair and store for later


use.

11

Assist with proper removal of guards from front of


drawworks.

Avoid pinch points and store


guards in safe position.

Assist with proper removal of automatic Driller/


weight indicator load cells off dead line.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

Stand clear while blocks are lowered slowly (hanging line takes full weight of blocks).

Ensure blocks slowly rest on


backside of derrick.

Use derrick climber assist to visually inspect the


blocks to ensure that blocks are hung properly.

Ensure tie off line and shackle


is properly aligned and secure.
Use 100% tie off.

13

Assist in securing tag line to drilling line, use tag line


to pull drilling line from drum.

Avoid pinch points.

14

Assist in taping drilling line area being cut.

Watch for burs / wickers.

15

Assist in placing drilling line in line cutter properly.

Watch for burs / wickers, cover


line cutter.

16

Assist in securing drilling line prior to cutting, to


avoid any recoil in line.

12

READY TO CUT DRILLING LINE


Assist in pulling drilling line off drum and guide line
out V-door/beaver slide.

Watch for burs / wickers and


avoid pinch points. Do not let
drilling line slide through hands.

Assist in attaching air/hydraulic hoist to drilling line


when there is three wraps left on drum.

Watch for burs / wickers and


avoid pinch points.

Stand clear while remaining drilling line is pulled off


drum with air / hydraulic hoist.

Watch for burs / wickers and


avoid pinch points.

17

18

Derrickman

Romfor International Ltd.


CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP

SUB

DRILLING LINE
PROCEDURE

REMARKS

19

Inform Driller to stop drum when drilling line clamp is


accessible for removal.

Ensure brake handle is locked


down.

20

Assist with proper removal of drilling line clamp and


inspect for wear.

Watch for burs / wickers and


avoid pinch points. Use proper
hand tools to remove clamp.

21

Assist in pulling remainder of drilling line from drum


using air / hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

22

Assist in slowly lowering cut off drilling line down


beaver-slide / Vdoor and store properly for disposal.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

23

Assist in positioning drum for drilling line installation.

24

Assist in proper Installation of drilling line in drum.

Ensure brake is locked down.


Watch for pinch points and
watch for burs / wickers.

25

Inform Driller to rotate drum forward to proper


position for installation of drilling line clamp.

Ensure brake handle is locked


down.

26

Assist with proper installation of drilling line clamp.

Watch for burs / wickers and


avoid pinch points. Use proper
hand tools to install clamp.

27

Assist in keeping proper tension on drilling line while


drill line is spooled on drum (for tension attach
snatch block to fast line and raise with air/hydraulic
hoist until proper tension is on line).

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

28

Assist in proper removal of snatch block and air/


hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

29

Inform Driller, when proper amount of drilling line is


on drum according to rig design.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Ensure
brake is locked down.

Derrickman

Romfor International Ltd.


CUT AND SLIP DRILLING LINE
DERRICKMAN
STEP SUB

DRILLING LINE
PROCEDURE

30

Assist with proper installation of drawworks guards,


load cells, drilling line anchor clamp and secondary
anchor safety clamp.

31

Stand clear while blocks are raised to proper height


for removal of block hanging line.

32

REMARKS
Inspect all clamping devices on
anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.

Inspect and put on proper size lifting harness /


bosuns chair.

Use proper lifting device. Use


100% tie off (refer to JSA on
lifting personnel with air /
hydraulic hoist).

Attach harness / bosuns chair to air/hydraulic hoist.

Attach directly to shackle.

33

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified personnel.

34

Direct hoist operator to lift to proper position, use


hand signals and verbal direction.

Keep feet and hands clear of


catch points.

35

Disconnect block hanging line from top of blocks.

36

Secure block-hanging line in proper position.

37

Direct hoist operator to lower to proper position, use


hand signals and verbal direction.

Keep feet and hands clear of


catch points.

38

Remove harness / bosuns chair and store properly.

Store under Rig Managers


control.

39

Prepare to finish trip.

Review JSA on 100% tie off.


Verbally confirm 100% tied off
with Driller (use radio).

END OF PROCEDURE

Romfor International Ltd.

Driller

CUT AND SLIP DRILLING LINE

CUT AND SLIP


DRILLING LINE

Romfor International Ltd.

Driller
CUT AND SLIP
DRILLING LINE

Romfor International Ltd.

Driller

CUT AND SLIP DRILLING LINE


DRILLER

DRILLING LINE

STEP

SUB

PROCEDURE

PPE Requirements - Hardhat, Safety Glasses, Full


Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.

Review rig specific JSAs on cutting and slipping drilling


line and hoisting personnel. Notify Rig Manager that
bosuns chair is needed for lifting employees.

JSAs should be rig specific.


Rig manager is required on the
floor when using bosuns chair.

Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles, block slings, line cutter and hand
tools used for the job.

Use fall protection, 100% tie off


and avoid pinch points.

READY TO HANG BLOCKS


(Assuming drill pipe is in rotary table)

Notify Rig Manager that


personnel will be lifted by air/
hydraulic hoist and that drill
line is ready to be cut.

Drill String should be positioned at bottom of last


casing string and well secured.

Operational issues may


change position of drill string.

Ensure that well bore is static.

Ensure slips are set (with drill string at proper height).

Lower blocks for unlatching elevators.

Ensure that elevators are unlatched using proper


handles.

REMARKS

Ensure that proper lifting


techniques are used

Avoid pinch points.

Raise blocks to proper position for installing safety


valve in drill pipe, using low drum clutch.

Install safety valve using air/hydraulic lifting hoist.

Use full open lifting eye for


hoisting safety valve.

Ensure drill pipe safety valve is tightened to proper


make up torque.

Avoid pinch points and ensure


floor is clear of trip hazards.
Ensure safety valve is in the
open position.

Raise blocks slowly while inspecting drilling line on


drum for bad spots in the line.

If line damage is found, slip


extra line (as required) before
cutting.

Romfor International Ltd.

Driller

CUT AND SLIP DRILLING LINE


DRILLER

DRILLING LINE

STEP SUB
9

PROCEDURE
Move blocks to proper position for installation of
block hanging line.

Ensure brake handle is locked


down after positioning blocks.

Ensure that Derrickman is raised to the top of the


blocks.

Use proper lifting device. Use


100% tie off. (Refer to JSA on
lifting personnel with air/
hydraulic hoist).

Ensure block-hanging line is properly attached to top


of blocks.

Block hanging line should be


attached at the crown. Use
verbal communication with the
Derrickman. Do not use
stationary cable and clamps on
block hanging eye.

Ensure Derrickman is lowered to floor and is disconnected from hoist line.

Ensure proper removal of guards from front of


drawworks.

Avoid pinch points and store


guards in safe position.

Ensure proper removal of automatic driller / weight


indicator load cells off dead line.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

Unlock brake handle and lower blocks slowly until


hanging line takes full weight of blocks.

Ensure blocks slowly rest on


backside of derrick.

Instruct Derrickman to use derrick assist to visually


inspect blocks and ensure that blocks are hung
properly.

Ensure 100% tie off.

Visually inspect brake linkages and brake bands.

Ensure proper removal of secondary safety clamp


and drilling line anchor clamp.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

Ensure tag line is secured to drilling line, use tag line


to pull initial drilling line from drum.

Avoid pinch points.

Slowly reverse proper amount of drilling line off the


drawworks drum according to ton mileage program.

Avoid pinch points. If using


drawworks to reverse drilling
line, ensure that drawworks is
in reverse before clutching.

10

11

12

13

14

REMARKS

Romfor International Ltd.

Driller

CUT AND SLIP DRILLING LINE


DRILLER
STEP

DRILLING LINE
SUB

PROCEDURE

REMARKS

15

Tape drilling line area being cut.

Watch for burs / wickers.

16

Ensure drilling line is placed in line cutter properly.

Watch for burs / wickers.

17

Secure drilling line prior to cutting to avoid any recoil


in line.
READY TO CUT DRILLING LINE

18

Instruct motorman to cut drilling line, operating from


the proper side (closed/pump side) of the cutter.

Ensure proper PPE, Full-face


shield and avoid pinch points.
Cover line cutter.

19

Ensure line cutter is released and stored properly.

Avoid pinch points.

20

Reverse drilling line off drum and guide line out Vdoor / beaver slide.

Watch for burs / wickers and


avoid pinch points.

Ensure air/hydraulic hoist is attached to drilling line


when there is three wraps left on drum.

Watch for burs / wickers and


avoid pinch points.

Using air/hydraulic hoist pull remaining drilling line


off drum.

Watch for burs / wickers and


avoid pinch points.

22

Stop drum when drilling line clamp is accessible for


removal. Lock down brake handle.

Ensure brake handle is locked


down.

23

Ensure proper removal of drilling line clamp and


inspect for wear.

Watch for burs / wickers and


avoid pinch points. Use proper
hand tools to remove clamp.

24

Ensure that remainder of drilling line is pulled from


drum using air / hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

25

Slowly lower cut off drilling line down beaver-slide /


Vdoor and store properly for disposal.

Watch for overhead loads.


Watches for burs / wickers and
avoid pinch points. Use tag line.

26

Unlock brake handle and position drum for drilling


line installation.

27

Ensure proper Installation of drilling line in drum.

28

Rotate drum forward to proper position for installation of drilling line clamp. Lock down brake handle.

21

Romfor International Ltd.

Driller

CUT AND SLIP DRILLING LINE


DRILLER

DRILLING LINE

STEP SUB

PROCEDURE

REMARKS

29

Ensure proper installation of drilling line clamp.

Ensure drawworks is shut


down completely. Watch for
burs / wickers and avoid pinch
points. Use proper hand tools
to install clamp.

30

Unlock brake handle. Ensure proper tension is kept on


drilling line while spooling drilling line on drum (for
tension attach snatch block to fast line and raise with
air/hydraulic hoist until proper tension is on line).

Watch for overhead loads.


Watches for burs / wickers and
avoid pinch points.

31

Ensure proper removal of snatch block and air/


hydraulic hoist.

Watch for overhead loads.


Watches for burs / wickers and
avoid pinch points.

32

Spool proper amount of drilling line on drum according to rig design (use mechanical assist to feed line
off of drilling line spool). Drilling line spool should be
equipped with brake.

Watch for overhead loads.


Watches for burs / wickers and
avoid pinch points.

33

Lock brake handle and ensure proper installation of


drawworks guards, load cells, drilling line anchor
clamp and secondary anchor safety clamp.

Inspect all clamping devices on


anchor (brass inserts Anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.

34

Unlock brake handle and raise blocks to proper


height for removal of block hanging line.

35

36

Lock brake handle down. Raise Derrickman to top of


blocks.

Use proper lifting device. Use


100% tie off (refer to JSA on
lifting personnel with air /
hydraulic hoist).

Ensure block-hanging line is properly removed and


secured to derrick.

Watch for overhead loads.


Watches for burs / wickers and
avoid pinch points.

Ensure Derrickman is lowered to floor and is disconnected from hoist line.


Unlock brake handle and raise blocks to proper
position for removal of drill pipe safety valve.

Ensure weight indicator is


working properly.

Romfor International Ltd.

Driller

CUT AND SLIP DRILLING LINE


DRILLER
STEP

DRILLING LINE
SUB

PROCEDURE

REMARKS

37

Ensure proper removal of drill pipe safety valve.

Watch pinch points. Use full


opening lifting eye and air /
hydraulic hoist (store in proper
position).

38

Ensure Derrickman is 100% tied off before raising


blocks, to run first stand of tubulars.

Verbally confirm (with radio)


that Derrickman is 100% tied
off.

39

Check crown-o-matic for proper setting on first stand


of tubulars.
END OF PROCEDURE

Romfor International Ltd.

Lead Tong

CUT AND SLIP DRILLING LINE

CUT AND SLIP


DRILLING LINE

Romfor International Ltd.

Lead Tong
Hand
CUT AND SLIP
DRILLING LINE

Romfor International Ltd.

Lead Tong Hand

CUT AND SLIP DRILLING LINE


LEAD TONG HAND

DRILLING LINE

STEP

SUB

PROCEDURE

PPE Requirements - Hardhat, Safety Glasses, Full


Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.

Review rig specific JSAs on cutting and slipping


drilling line and hoisting personnel.

JSAs should be rig specific.


Rig manager is required on the
floor when using bosuns chair.

Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.

Use fall protection, 100% tie off


and avoid pinch points.

REMARKS

READY TO HANG BLOCKS


(Assuming drill pipe is in rotary table)
Drill String should be positioned at bottom of last
casing string and well secured.

Operational issues may


change position of drill string.

Ensure that well bore is static.

Assist in setting slips (with drill string at proper


height).

Ensure that proper lifting


techniques are used.

After blocks are lowered, stand clear while elevators


are unlatched.

Avoid pinch points and stay out


of Drillers view.

Assist as directed in inspecting drilling line, while


Driller is raising blocks.

Keep hands clear while line is


spooling on drum.

After blocks are raised to proper position, assist in


using air / hydraulic hoist for installing safety valve.

Use full open lifting eye for


hoisting safety valve.

Assist as directed in tightening drill pipe safety valve


to the proper make up torque.

Avoid pinch points and ensure


floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).

Stand clear while blocks are moved to the proper


position for installation of block hanging line.

Ensure brake handle is locked


down after positioning blocks.

Assist Derrickman, in attaching harness / bosuns


chair to air/hydraulic hoist.

Attach directly to shackle.

Romfor International Ltd.

Lead Tong Hand

CUT AND SLIP DRILLING LINE


LEAD TONG HAND
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

10

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified person.

11

While Derrickman is lifted, use tag line to position


Derrickman properly.

Ensure Derrickmans feet and


hands are clear of catch points.

12

While Derrickman is lowered, use tag line to position


Derrickman properly.

Ensure Derrickmans feet and


hands are clear of catch points.

13

Assist in removing air / hydraulic winch from harness


/ bosuns chair and store for later use.

14

Assist with removal of guards from front of


drawworks.

Avoid pinch points and store


guards in safe position.

Assist with removal of automatic driller / weight


indicator load cells off dead line.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

15

Assist with removal of secondary safety clamp and


drilling line anchor clamp.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

16

Assist in securing tag line to drilling line, use tag line


to pull initial drilling line from drum.

Avoid pinch points.

17

Assist in taping drilling line area being cut.

Watch for burs / wickers.

18

Assist in placing drilling line in line cutter properly.

Watch for burs / wickers, cover


line cutter.

19

Ensure drilling line is secured prior to cutting, to


avoid any recoil in line.
READY TO CUT DRILLING LINE

20

Assist in cutting drilling line, operate cutter from the


proper side (closed/pump side).

Use proper PPE, Full-face


shield and avoid pinch points.

21

Assist in storing cutter properly.

Avoid pinch points.

22

Assist in pulling drilling line off drum and guide line


out V-door / beaver slide.

Watch for burs / wickers and


avoid pinch points. Do not let
drilling line slide through hands.

Romfor International Ltd.

Lead Tong Hand

CUT AND SLIP DRILLING LINE


LEAD TONG HAND

DRILLING LINE

STEP

SUB

PROCEDURE

REMARKS

23

Assist in attaching air/hydraulic hoist to drilling line


when there is three wraps left on drum.

Watch for burs / wickers and


avoid pinch points.

Assist in pulling remaining drilling line off drum with


air / hydraulic hoist.

Watch for burs / wickers and


avoid pinch points.

24

Assist with proper removal of drilling line clamp and


inspect for wear.

Watch for burs / wickers and


avoid pinch points. Use proper
hand tools to remove clamp.

25

Assist in removing the remainder of drilling line from


drum using air/hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

26

Assist in lowering cut off drilling line down beaverslide / Vdoor and store properly for disposal.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

27

Assist in Installation of drilling line in drum.

Avoid pinch points and use


proper tools.

28

Stand clear while drum rotates forward to proper


position for installation of drilling line clamp.

29

Assist in installation of drilling line clamp.

Ensure brake handle is locked


down. Watch for burs / wickers
and avoid pinch points. Use
proper hand tools to install
clamp.

30

Assist in attaching snatch block to fast line and raise


with air / hydraulic hoist to keep proper tension on
drilling line while spooling drilling line on drum.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

31

Assist with removal of snatch block and air / hydraulic


hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

32

Ensure line is slipping through anchor properly.


Have adequate communications from rig floor to
drilling line stand / anchor area (use mechanical
assist to feed line off of drilling line spool).

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

Romfor

Lead Tong Hand

CUT AND SLIP DRILLING LINE


LEAD TONG HAND
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

33

Assist in installing drilling line anchor clamp and


secondary anchor safety clamp.

34

Stand clear while blocks are raised to proper height


for removal of block hanging line.

35

Assist Derrickman, in attaching harness / bosuns


chair to air/hydraulic hoist.

Attach directly to shackle.

36

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified personnel.

37

While Derrickman is being lifted to proper position,


pay attention to hand signals and verbal direction
from the Derrickman.

Ensure Derrickmans feet and


hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.

38

Ensure block hanging line is disconnected from top


of the blocks and placed in stored position.

Use verbal communication.

39

Assist in lowering Derrickman to proper position,


paying attention to hand signals and verbal direction.

Ensure Derrickmans feet and


hands are clear of catch points.

40

Assist in removing air / hydraulic winch from harness


/ bosuns chair and store properly.

Store under Rig Managers


control.

41

Assist with removal of drill pipe safety valve (do not


put tongs on open / close area of drill pipe safety
valve). Lift drill pipe safety valve with air / hydraulic
hoist.

Avoid pinch points and ensure


floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Use full open lifting eye for
hoisting safety valve.

42

Assist Driller in checking crown-o-matic for proper


setting on first stand of tubulars.

Inspect all clamping devices on


anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.

END OF PROCEDURE

Romfor International Ltd.

Motorman

CUT AND SLIP DRILLING LINE

CUT AND SLIP


DRILLING LINE

Romfor International Ltd.

Motorman
CUT AND SLIP
DRILLING LINE

Romfor International Ltd.

Motorman

CUT AND SLIP DRILLING LINE


MOTORMAN

DRILLING LINE

STEP

SUB

PROCEDURE

PPE Requirements - Hardhat, Safety Glasses, Full


Face Shield, Work Gloves, Steel Toe Shoes, Back
Support and Fall Protection.

Review rig specific JSAs on cutting and slipping


drilling line and hoisting personnel.

JSAs should be rig specific.


Rig manager is required on the
floor when using bosuns chair.

Inspect Equipment:
Anti-Fall equipment, block hanging line, bosuns
chair, shackles ,block slings, line cutter and hand
tools used for the job.

Use fall protection, 100% tie off


and avoid pinch points.

REMARKS

READY TO HANG BLOCKS


(Assuming drill pipe is in rotary table)
Drill String should be positioned at bottom of last
casing string and well secured.

Operational issues may


change position of drill string.

Ensure that well bore is static.

Assist in setting slips (with drill string at proper


height).

Ensure that proper lifting


techniques are used.

After blocks are lowered, unlatch elevators using


proper handles.

Avoid pinch points.

After blocks are raised to proper position, use air /


hydraulic hoist for installing safety valve.

Use full open lifting eye for


hoisting safety valve.

Assist as directed in tightening drill pipe safety valve


to the proper make up torque.

Avoid pinch points and ensure


floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).

Assist as directed in inspecting drilling line, while


Driller is raising blocks.

Keep hands clear while line is


spooling on drum.

Assist Derrickman, in attaching harness / bosuns


chair to air/hydraulic hoist.

Attach directly to shackle.

Ensure tag line is attached to bosuns chair.

Ensure tag line is manned by


qualified person.

Romfor International Ltd.

Motorman

CUT AND SLIP DRILLING LINE


MOTORMAN
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

10

Operate hoist to lift Derrickman to proper position,


pay attention to hand signals and verbal direction
from the Derrickman.

11

Ensure block hanging line is disconnected from


stored position.

12

Ensure block-hanging line is attached to top of the


blocks.

Block hanging line should be


attached at the crown. Use
verbal communication. Do not
use stationary cable and
clamps on block hanging eye.

13

Lower Derrickman to proper position, pay attention


to hand signals and verbal direction.

Ensure Derrickmans feet and


hands are clear of catch points.

14

Assist in removing air / hydraulic winch from harness


/ bosuns chair and store for later use.

Ensure Derrickmans feet and


hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.

Assist with removal of guards from front of


drawworks.

Assist Driller in visually inspecting brake linkages


and brake bands.

Assist with removal of automatic driller / weight


indicator load cells off dead line.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

16

Assist with removal of secondary safety clamp and


drilling line anchor clamp.

Avoid pinch points; ensure


100% tie off. Use proper hand
tools.

17

Assist in securing tag line to drilling line, use tag line


to pull initial drilling line from drum.

Avoid pinch points.

18

Tape drilling line area being cut.

Watch for burs / wickers.

19

Assist in placing drilling line in line cutter properly.

Watch for burs / wickers, cover


line cutter.

20

Ensure drilling line is secured prior to cutting, to


avoid any recoil in line.

15

Avoid pinch points and store


guards in safe position.

Romfmor International Ltd.

Motorman

CUT AND SLIP DRILLING LINE


MOTORMAN
STEP

SUB

DRILLING LINE
PROCEDURE

REMARKS

READY TO CUT DRILLING LINE


21

Cut drilling line, operating from the proper side


(closed/pump side) of the cutter.

Use proper PPE, Full-face


shield and avoid pinch points.

22

Release line cutter and store properly.

Avoid pinch points.

23

Assist in pulling drilling line off drum and guide line


out V-door / beaver slide.

Watch for burs / wickers avoid


pinch points. Do not let drilling
line slide through hands.

Assist in attaching air/hydraulic hoist to drilling line


when there is three wraps left on drum.

Watch for burs / wickers and


avoid pinch points.

Operate air / hydraulic hoist to pull remaining drilling


line off drum.

Watch for burs / wickers avoid


pinch points.

25

Assist with proper removal of drilling line clamp and


inspect for wear.

Watch for burs / wickers and


avoid pinch points. Use proper
hand tools to remove clamp.

26

Remove the remainder of drilling line from drum


using air/hydraulic hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

27

Slowly lower cut off drilling line down beaver-slide /


Vdoor and store properly for disposal.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points. Use tag line.

28

Assist in Installation of drilling line in drum.

Avoid pinch points and use


proper tools.

29

Stand clear while drum rotates forward to proper


position for installation of drilling line clamp.

30

Assist in installation of drilling line clamp.

Ensure brake handle is locked


down. Watch for burs / wickers
and avoid pinch points. Use
proper hand tools to install
clamp.

31

Attach snatch block to fast line and raise with air /


hydraulic hoist to keep proper tension on drilling line
while spooling drilling line on drum.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

24

Romfor International Ltd.

Motorman

CUT AND SLIP DRILLING LINE


MOTORMAN
STEP SUB

DRILLING LINE
PROCEDURE

REMARKS

32

Assist with removal of snatch block and air / hydraulic


hoist.

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

33

Have enough excess drill line available for slipping


onto drum according to JSA and rig design.

Watch for burs / wickers and


avoid pinch points.

34

Ensure line is slipping through anchor properly.


Have adequate communications from rig floor to
drilling line stand / anchor area (use mechanical
assist to feed line off of drilling line spool).

Watch for overhead loads.


Watch for burs / wickers and
avoid pinch points.

35

Install drilling line anchor clamp and secondary


anchor safety clamp.

Inspect all clamping devices on


anchor (brass inserts, anchor
bolts and nuts) tighten to
proper torque in sequence (use
torque wrench). After initial trip
in re-torque anchor clamping
device.

36

Stand clear while blocks are raised to proper height


for removal of block hanging line.

37

Assist Derrickman, in attaching harness / bosuns


chair to air/hydraulic hoist.

Attach directly to shackle.

38

Ensure tag line is attached to back D ring of


harness / bosuns chair.

Ensure tag line is manned by


qualified personnel.

39

Operate hoist to lift Derrickman to proper position,


pay attention to hand signals and verbal direction
from the Derrickman.

Ensure Derrickmans feet and


hands are clear of catch points.
Spool line on air / hydraulic
winch properly to prevent
fouling.

40

Ensure block hanging line is disconnected from top


of the blocks and placed in stored position.

Use verbal communication. Do


not use stationary cable and
clamps on block hanging eye.

41

Lower Derrickman to proper position, pay attention


to hand signals and verbal direction.

Ensure Derrickmans feet and


hands are clear of catch points.

42

Assist in removing air / hydraulic winch from harness


/ bosuns chair and store properly.

Store under Rig Managers


control.

Romfor International Ltd.

Motorman

CUT AND SLIP DRILLING LINE


MOTORMAN
STEP

SUB

DRILLING LINE
PROCEDURE

43

Assist with removal of drill pipe safety valve. Lift drill


pipe safety valve with air / hydraulic hoist.

44

Assist Driller in checking crown-o-matic for proper


setting on first stand of tubulars.

REMARKS
Avoid pinch points and ensure
floor is clear of trip hazards.
Ensure safety valve is in the
open position. Stay out of the
red zone (between rig tongs).
Use full open lifting eye for
hoisting safety valve.

END OF PROCEDURE