Professional Documents
Culture Documents
Final draft
SUBMITTED BY
Nischay malik
Taranpreet kaur
Raja thalapathy
Abhi chandela
Harsh sharma
DECLARATION
I hereby declare that the project work entitled
NTCC
Submitted to RICS SCHOOL OF BUILT ENVIORMENT, is a
record of an original work done by me under the
guidance of
Mr.Niham Nanyam
RICS School of Built Environment f u l f i l l m e n t o f t h e
requirements for the award of the degree of bachelors in
business administration . The results embodied in this
thesis have not been submitted to any other University
or Institute for the award of any degree or diploma.
Acknowledgement
I am using this opportunity to express my gratitude to everyone who
supported me throughout the course of this NTCC project. I am
thankful for their aspiring guidance, invaluably constructive criticism
and friendly advice during the project work. I am sincerely grateful to
them for sharing their truthful and illuminating views on a number of
issues related to the project.
I express my warm thanks to Mr. abhishek nath their support and
guidance at DELHI ONE PROJECT.
I would also like to thank my project guide Mr. Nihar nanyam and Mr.
Ameet Sao and all the people who provided me with the facilities being
required and conductive conditions for my MBA project.
In addition, a thank you to our Dean Mr. K.T Ravindaran of Amity
University who introduced this program as an Internship which will be
helpful for field work and thanking him for his enthusiasm for the
underlying structures had lasting effect.
Thank you,
Table of Contents
Administration
Levels of hierarchy in the project
Structural components of construction site
Types of equipment used and their uses
Safety measures
Learning from the project through NTCC
Objectives and learning outcomes
Case Study (Delhi one)
Administration
Construction administration basically means to manage the construction of the
building.Construction administration includes delineation of scope, budgeting,
scheduling, setting performance requirements, and selecting project participants.
Administration also maximise the resource through labour, material and
equipment. Construction administration also check implementation on various
things like
Proper coordination
Control of planning
Design of the building or structure
Estimating
Contracting in the entire process
Proper coordination
if there is no proper coordination between the peoples . the people working on
that site will do not able to work properly
Control of planning
Due to control of planning we are able to face any problem which may come
because we planned for that
Project executive
Project manager
Planning engineer
Project coordinator
Design manager
Field engineer
Office engineer
Quantity surveyor
Project engineer
Area superintendent
Project superintendent
Estimator
Lead estimator
Senior estimator
Chief estimator
Site Manager
They obtain the aim challenged face by administration to obtain the
project ,they obtain the project by bids .
Bids
A bid is given to the owner by construction managers that are willing to
complete their construction project. A bid tells the owner how much
money they should expect to pay the construction management company
in order for them to complete the project.
There are two types of bids
Open bids : this bids for public projects
Close bids : this bids for private projects
Payments contracts
Administration also look to payments which is going out side
There are four types of payments
Lum sum
Cost plus free
Guaranteed maximum price
Unitprice
Lum sum
This is the most common type of contract in which construction
manager and the owner agree on the overall cost of the construction
project and the owner is responsible for paying that amount whether
the construction project exceeds or falls below the agreed price of
payment .
Cost plus free
This contract provides payment for the contractor including the total
cost of the project as well as a fixed fee or percentage of the total
cost. This contract is beneficial to the contractor since any additional
costs will be paid for even though they were unexpected for the
owner
Guaranteed maximum price
This contract is the same as the cost-plus-fee contract although
there is a set price that the overall cost and fee do not go above
Unit price
This contract is used when the cost cannot be determined ahead of
time. The owner provides materials with a specific unit price to limit
spending
All this things are managed by administration of construction.
Business Development/Marketing
The business improvement/showcasing office is in charge of:
Planning recommendations in light of a Requests for Proposals (Rfps)
Making formal presentations to managers Understanding, arranging
and composing contracts for all tasks.
Preconstruction
The preconstruction division that aids in preplanning of undertakings
and discovering answers for potential issues before development
starts. A portion of the obligations include:
Logistics arranging, for example, site access, material conveyances,
impermanent derricks, and lifts
Advancement of expert timetables including material and labor
accessibility, nearby laws and site conditions Constructability surveys
Staging of work Worth designing Help in readiness of acquiring
orders and subcontract contract surveys .
The preconstruction staff meets expectations nearly with the task
chief or undertaking official on the venture and with different offices
also.
Purchasing
The estimating office dissects undertaking arrangements and
determinations to focus the general evaluated expense of a task. This
division is talented at both amount take-off and applied assessing.
Estimators increase involvement in engineering, structural,
mechanical, electrical and common work.
Estimators are included with undertakings all through
preconstruction and even into the development stage. Some of their
obligations include:
Giving capabilities and composed suspicions that can be talked about
with the engineer or manager when auditing our evaluations
Creating an agenda for acquiring to use before recompensing work
Verifying our evaluations are finished, when ensuring the expense of
a venture (GMP)
Altogether understanding the extent of the undertaking
Supporting deals in securing new work
Creating associations with planners and specialists in the group
Aiding building in surveying change requests
Accounting
The accounting division creates and keeps up associations with
subcontractors and suppliers. This incorporates assessing
subcontractor capabilities and budgetary capacities. The acquiring
office for the most part plans, arranges and grants all subcontracts,
and buy requests.
Before development, the obtaining division audits contract drawings
including drawings, determinations and uncommon necessities built
by the venture supervisor or undertaking official. This division then
decides how the work ought to be softened down and acquired up
request to get focused evaluating. The obtaining chief must have
great information of the commercial center, potential work or
material deficiencies, and assets of every subcontractor.
The obtaining office likewise lives up to expectations nearly with the
venture director and undertaking architect and gives help all through
the course of the task by:
to verify all merchants are paid appropriately and protection and bonds are
kept up present.
Cost
The expense division gets ready Indicated Outcome Reports (Iors)
that screen the expense for all dynamic development ventures and
gives convenient budgetary information that is needed for Turner's
Forecasting System (TFS). This division is personally included with a
large number of the accompanying things:
Security
Security guarantees that legitimate arrangements are set up and that
everybody is educated about how to make a more secure workplace.
The accompanying regulations are set up for occupation site
wellbeing:
mandatory hardhats
fall insurance
Hazard Management
Turner's incorporated danger administration division comprises of
submitted experts devoted to the coordination of wellbeing and
misfortune control, obtaining, protection, and cases and legitimate
administrations. The office underpins the specialties units in
amplifying Turner's capacity to control and oversee hazard on our
ventures for the profit of Turner, our customers, our subcontractors
and our laborers. Our concentrated methodology to hazard
administration gives assets, accomplices and guides who support in
alleviating Turner's danger through particular projects.
Turner Logistics
Turner Logistics, LLC, is an entirely possessed subsidiary of Turner
Construction Company. Turner Logistics is an immediate supplier of
gear to development ventures. Its essential product offering is
mechanical/electrical supplies, for example, chillers, cooling tower,
generators, and switchgear. Extra items, for example, light
installations and healing center supplies have as of late been added
to the product offering.
Community Affairs
Community Affairs is the establishment for building nearby and
national key cooperations for the extension of Turner's business
advancement opportunities. It keeps on being a basic part of the
organization's society. The system incorporates group administration
ventures, Minority- and Women-possessed Business Enterprise
(M/WBE) projects and Youthforce 2020.
Technology Services
The Technology Services (TS) division oversees and helps the data
frameworks for the organization. The majority of this office
comprises of Systems Engineers who are appointed to every Business
Unit.
A percentage of the primary obligations of TS are:
construction engineer and many more. The construction job hierarchy is defined
as below in brief with a little description.
Civil Engineer
Safety Director
Construction Engineer
Quantity Surveyor
Project Manager
Architect
Construction Assistant
Structural Engineer
Building Inspector
Purchasing Coordinator
Construction Coordinator
Project Assistant
Project Manager
Site Manager
Superintendent
Safety Manager
Lower Level Skilled Workers
Construction is a vast field that needs professionals with different specializations.
There are several lower level employees who are required to carry out the
construction based diverse activities in numerous ways. These are the skilled
workers who are not required to possess mandatory academics but need specific
experience in particular construction-oriented fields. The job profiles at this level
range from a general mason to a skilled apprentice. The workers at this level are
often hired on daily payment basis.
Apprentice
Carpenter
Concrete Labor
Contract Manager
Construction Manager
Construction Foreman
Construction Worker
Construction Supervisor
Crane Operator
Contract Administrator
Estimator
Electrician
Field Engineer
Equipment Operator
Framing Carpenter
Inspector
General Laborer
Iron Worker
Laborer
Joiner
Master Plumber
Master Electrician
Painter
Planner
Pipe Fitter
Plumber
Signal Worker
Roofer
Surveyor
Scheduler
Welder
Managing director
Project director
Quality manager
Financial team
Designing team
Legal manager
Project supervisor
Project Coordinator
President/Chief Executive Officer
This is the top level in the hierarchy in Construction Company. This person is
responsible for overall business growth. He deals with clients and stake holders.
President/CEO of the Construction Company is answerable to the board of
directors and companys owner.
Managing Director
Managing director of the Construction Company acts as a leader for the
employees. For a successful business companies requires a dynamic managing
director who reaches the heights and achieves the companys goal. He also
supervises the operational management team of all projects undertaken by
company. For getting the productive results, managing director works with other
senior management professionals in the right direction. His role also includes
creating and executing the strategic plans. He also discusses the annual business
plans and budget with senior people.
Project Director
A project director always tries to complete the project in the given budget and
given time. He always keeps an eye on the project team and gives them proper
guidance. Project director discuss the all project related issues in the meetings
and sort out them. He has given the responsibility to hire the technical officials to
smooth execution of project.
Quality Manager
The role of the quality manager in the Construction Company is to use the
statistical methods to control the quality. He is responsible for maintaining testing
data records and construction reports.
Financial Team
Hierarchy in the construction company also possesses a financial team which has
its own importance. Their main job is to maintain the cash flow which is quite
helpful for smooth operation of construction project.
Designing Team
This team is the team of dedicated and skillful professional designer those are
responsible for making the designs for future projects as per clients requirement.
Legal manager
He keeps an eye on the project so that the project runs smoothly and must fit in
to legal framework.
Project supervisor
Project supervisors main role in the construction company is to supervise and
arrange the construction material and the labors.
Project Coordinator
Project Coordinator is the professional who is responsible for executing the day to
day operations and for getting the work done from low level staff. This personnel
coordinates with the working staff and the construction management.
Super structure:
The part above plinth level is called super structure. Super structurecontains many
other structural components. Such as
Wall
Floor/Slab
Lintel and sunshade
Step and stair
Roof
Wall: Wall is used to separate the usable area of floor for different purpose. Such
as bedroom, bathroom, kitchen, living etc. Other prime purpose of wall is to
provide privacy and security.
Floor: The main purpose of floor is to provide better living space and support of
occupants, furniture and other equipment of a building. The purpose of making
different floor in different level of a building is to create
more accommodation within limited space. Floor should be strong, durable, damp
prove and heat protected.
Lintel and Sunshade: Lintel is provided for the purpose of supporting wall above
door or window opening. Sunshade is generally combined with lintel above
window opening to protect rain and sun.
Step and Stair: Stair is made for easy communication among various floors of a
building. Stair consists of steps. steps height should be comfortable enough
for vertical movement.
Roof: The top most part of a building is the roof. Roof is build for the purpose of
enclosing and protect the living area/floor area from weathereffect. Roof should
be stable, durable and weather resistant.
There are also others structural parts of a building. Such as water tank, septic tank
and parapet etc. Septic tank and under ground water tank is completely separate
structural part and not included in building structure. But, parapet and overhead
water tank are parts of building structure.
Its used to shift large amount of Earth. Types of Earth moving equipments
include excavators, compressor and loaders.
Excavation and Trenching: The equipments under this category includes machines that are used in
digging excavations and in trenching operations.
An operation that involves digging material could be called an excavation.
Back hoe
Clam shell
Trenching machine
Scrappers
Bull dozer
Power shovel
It is to excavate the Earth and load the trucks.
Its capable of digging very hard materials.
It can remove huge sized boulders.
It is used in various types of works like digging in the gravel bank, digging
cuts in road works , road side berms, etc.
Back hoe
Its known as hoe and pull shovel
Its used to excavate below the natural surface, were it rests.
Dumpers
High speed pneumatic wheeled trucks
It has short chase
It has very Strong bodies
The process of adding, hauling and dumping are done fast as compared to
other equipments.
HOISTING EQUIPMENTS
Hoisting equipments are the equipments which is used for lifting weights
from one location to another location at a reasonable distance.
This is only used for big constructions like while constructing a dam.
The following are some of the machines under hoisting equipments
Cranes
Winches
Crane
Cranes are the only machines which are able to move in any direction or also have
the ability of three dimensional movement of a weight.
The cranes are also classified into different types
Derick cranes
Mobile cranes
Overhead cranes
Tower cranes
Derick Cranes
These cranes have a mast a boom and a bull wheel where the boom rotates
vertically
The boom can revolve into 360 degrees.
These cranes are commonly used for heavy weights
These cranes have the ability of carrying weights up to 200 tons
Mobile Cranes
These cranes are usually mounted on a truck or crawler.
These are highly mobility because it is easy for transportation, but it moves
slowly.
These have the capability to move in a rough terrain.
Tower Cranes
These are Derick cranes which is mounted on a steel tower.
These are mainly used in industrial and residential high rise towers or
building.
Under carriage, slewing platform are some of the main parts in a tower
crane
CONVEYING EQUIPMENTS
The equipments which are used to transport materials from one place to
another over a stationary structure is known as conveying equipments.
The transports can be in a chained or belt manner.
This can be done in horizontal or vertical.
The horizontal conveying is known as conveyor whereas the vertical
conveying is known as elevator.
These equipments are mainly used in mining.
These are largely used for connecting purpose in construction industry
USES OF CONVEYING EQUIPMENTS
It increases the output of the construction.
It helps in time management i.e., it helps in time saving.
There will be no waiting time.
It facilitates in continuity operation.
SOME CONVEYING EQUIPMENTS
The following are some of the conveying
BELT CONVEYOR
SCREW CONVEYOR
BUCKET CONVEYOR
AERIAL CONVEYOR
BELT CONVEYOR
These are used when the materials should be passed (conveyed) over a
long distance and at a fast speed.
It has a belt running over a pair of end drums or pulley and it is also
supported by series of rollers in a regular intervals called idlers.
The idlers are supported on a conveyor frame.
It can carry light and heavy materials
It can carry dry or wet materials
It is very weight less as compared to other conveyors
It can carry materials inclined and also horizontally.
SCREW CONVEYOR
Its commonly used for handling granular materials.
Materials conveyed in this are less as compared to other conveyors
whereas the cost is also less.
The materials enter from one and an exits from another end in a screwing
action of helix.
The length of the conveyor is around 65m.
BUCKET CONVEYOR
These are of V shape which opens at the top.
They are dragged in an vertical movement
The length is generally limited in these conveyors.
These are mainly used in coal handling where the bucket elevators carries
the materials vertically.
AERIAL CONVEYOR
These are through cableways, rope-ways and tram ways.
Its often used in hilly region because it has an advantage in transportation
of materials.
It reduces the distance of transportation
It reduces the cost of transportation.
3.
4.
5.
6.
7.
8.
Lack of experience
A worker with less or no experience may not be able to recognize and notice the
hazards related to the duty he or she is performing. In order to ensure that the
worker is performing properly, he should first work under an experienced
individual to gain the experience and to increase its knowledge.
Inadequate enforcement of safety
Sometimes a worker donot follow proper procedures for minimizing the hazards.
Even the best cannot prevent all the accidents. To make the things work
effectively the worker must analize the work systematically knowing the relevant
safety tasks and must have the formal and informal entry to command the actions
of workers.
Wrong safety gears
Sometimes all the safety equipments are not present at the location. To control
this, the worker must know about all the safety equipments ,how to use them
and the regular maintainance of them.
Unsafe techniques
Deviation from the safe techniques of the task can make it more dangerous
because the ways and techniques donot match fairly with the actual site
conditions of that time. In order to overcome this, the worker must work in
proper sequence and must be able to know wheather the sequence he or she is
following is safe or not .
Unsafe site surroundings
This include accidents related to atmospheric conditions and electrical hazards. In
order to prevent electrical hazards safety sign boards and knowledge related to it
Case study
This 12.5 section of land blended area utilization venture is nearby the DND
flyway, in part 16 B, Noida. The organization will be creating this venture in
relationship with Red Fort Capital.
Delhi One is visualized as the end of the line for the advantaged few.
Contemporary chic plan and close inner parts will be the boss components of
the new extend in noida, a multi-utility cutting edge complex. The outstanding
outline prompts consistent joining of different verticals- private, business,
friendliness and retail - into one forcing visual bonanza. 3c Delhi One is certain
to change the way NCR has been seen till now. Credit will go to the 3c new
extend in Noida, specifically Delhi One.
Delhi One (Delh1) is characterized as a minimized, blended use, urban and a
green advancement. Further, "Delh1" is isolated into diverse zones- to be
specific Domicile, Entertainment, Leisure, Hospitality and Business First.
D : Domicile- Privileged Living/ Serviced Residencies - Within 3c Delhi One,
there will be 150 completely outfitted, roomy and impressive adjusted condo
with top of the line extravagance enhancements. A few gimmicks of the
excellent extend by 3c Company in Noida incorporate disguised stopping,
walker inviting, rec center and spa, concierge administration and house
keeping, selective business territories, Wi-fi integration, games courts and
swimming pools and so forth.
E : Entertainment- Amphitheater/shopping/fine eating - High road retail,
subject shopping avenues, top of the line restaurants, wine lounge, stogie
parlor, stay store, sustenance court, games courts, swimming pools and so
forth are just a portion of the gimmicks.
L : Leisure Art exhibition/ Culture Center - Delhi One will play host to the
socially rich occasions like Art exhibitions,classical exhibitions, theater, library
and book shops.
H : Hospitality- 2five star Hotels/ Sky Bar - Delhi one will showcase one of the
finest chains of hotelsproviding five star extravagance benefits alongside
administration condo. Delhi One will likewise offer helpful and revival
medications focused around customary Indian Ayurveda and oriental spa
customs will supplement the same.health club and exercise rooms will come
as a connection to all the verticals in Delhi one.
1 : Business first- office towers/ Business suites - Well composed office floors,
extensive stopping terminal, tremendous chamber of a five star hall are a
percentage of the fine gimmicks. The business space at Delhi One comes
joined with a helipad and a therapeutic touch point. An inbuilt wellbeing club
and exercise room alongside the housetop will permit every one of those at
work here to have some unwinding hours.
Characteristics:
privileged Living
serviced Residencies
amphitheatre
shopping
fine eating
art exhibition
culture Center
sky Bar
office towers
business suites
Characteristics
luxury Features
power Back-up
water Softner
security Features
security Guards
electronic Security
fire Alarm
interior Features
exterior Features
visitor Parking
recreation
swimming Pool
park
commercial Features
land Features
clear Title
corner Plot
water Connection
electric Connection
close to Hospital
There are certain phases of every students professional development that cannot
be effectively taught in the academic environment. These facets can only be
learned through direct, on-the-job experience working with successful
professionals and experts in the field.
References
1. Sturgis, Russell. "Construction def. B. and "Building" def. A.Sturgis' illustrated dictionary
of architecture and building: an unabridged reprint of the 1901-2 edition. Mineola, N.Y.:
Dover, 1989. Print.
2. Davies, Nikolas, and Erkki Jokiniemi. "Construction" def. 1-5.Dictionary of architecture
and building construction. Amsterdam: Elsevier/Architectural Press, 2008. 93. Print.
3. b "Construction" def. 1.a. 1.b. and 1.c. Oxford English DictionarySecond Edition on CDROM (v. 4.0) Oxford University Press 2009
4. "Construction". Online Etymology
Dictionaryhttp://www.etymonline.com/index.php?term=construction accessed
3/6/2014
5. Behrohk Khoshnevis- TEDx Feb 2012 Ojai California onYouTube
6. Diaz, Jesus (2013-01-31). "This Is What the First Lunar Base Could Really Look
Like". Gizmodo. Retrieved 2013-02-01.
7. "The Worlds First 3D-Printed Building Will Arrive In 2014".TechCrunch. 2012-01-20.
Retrieved 2013-02-08.
8. Charter of the New Urbanism
9. "Beauty, Humanism, Continuity between Past and Future". Traditional Architecture
Group. Retrieved 23 March 2014.
10.Issue Brief: Smart-Growth: Building Livable Communities. American Institute of
Architects. Retrieved on 2014-03-23.
11.School districts increasingly seek alternate financing : North County Times Californian
12.Cronin, Jeff (2005). "S. Carolina Court to Decide Legality of Design-Build Bids".
Construction Equipment Guide. Retrieved 2008-01-04.
13.Value of Construction Put in Place at a Glance. Unite