S/. :
ESTRUCTURAS:
Costo de Mano de Obra
Descrip. Unidad
MARZO 2007
2/1/2007
75.00
Das
68,964.72
:
Cantidad
OP.DE EQUIPO
HH
553.10
TOPOGRAFO
HH
27.59
CAPATAZ
HH
724.36
OPERARIO
HH
5,500.89
OFICIAL
HH
4,152.40
PEON
HH
7,043.98
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales
S/. :
S/. :
S/. :
ARQUITECTURA:
Costo de Mano de Obra
Descrip. Unidad
:
Cantidad
CostUnit
186.61
4.89
HH
1,470.92
6.00
HH
15,021.74
4.89
OFICIAL
HH
3,971.76
4.35
PEON
HH
7,586.68
OP.DE EQUIPO
HH
TOPOGRAFO
HH
CAPATAZ
OPERARIO
3.94
TOTAL S/.
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales
S/. :
S/. :
S/. :
188316.21
6472.60
4226.93
INSTALACIONES SANITARIAS:
Costo de Mano de Obra
Descrip. Unidad
OP.DE EQUIPOHH
TOPOGRAFO HH
Sub Total
912.52
0.00
8825.52
73456.31
17277.16
29891.52
130363.03
:
Cantidad
8.40
329378.77
CAPATAZ
OPERARIO
OFICIAL
PEON
HH
HH
HH
HH
96.88
843.80
232.91
527.30
581.28
4126.18
1013.16
2077.56
7839.26
6
4.89
4.35
3.94
TOTAL S/.
6,385.50
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales
S/. :
S/. :
S/. :
13655.57
247.2
241.47
21983.50
INSTALACIONES ELECTRICAS:
Costo de Mano de Obra
Descrip. Unidad
HH
OP.DE EQUIPO
HH
TOPOGRAFO
HH
CAPATAZ
HH
OPERARIO
HH
OFICIAL
HH
PEON
:
Cantidad
124.83
1,411.10
40.00
354.71
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales
S/. :
S/. :
S/. :
CostUnit
37628.05
110
272.31
47231.18
770,127.50
TOTAL PPTO
329.67
7.83
Total Da
39.12
48.00
391.20
174.00
315.20
Mano de Obra
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales
S/.
S/. :
S/. :
S/. :
PTO TOTAL
COSTO DIRECTO
0.00
0.00
748.98
6900.28
174.00
1397.56
9220.82
6
4.89
4.35
3.94
TOTAL S/.
Sub Total
DIAS:
Total Mes
1173.60
1440.00
11736.00
5220.00
9456.00
Total
227355.03
516817.41
18509.97
7445.09
770,127.50
68,964.72
29025.60
25955.06
6896.47
1379.29
77,240.48
730,612.69
64225.23
OJO
UANCA
87890
125,853.05
5,673.16
3,426.15
234,902.38
12,054.61
62.40
207.38
18,710.16
35,268.77
70.00
271.96
44,729.10
235
701,162.78
-57328.76
equipamiento
DESCRIPCIN
Mano de Obra
OPERADOR DE EQUIPO
TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON
UND
HH
HH
HH
HH
HH
HH
CANT.
PRECIO
1,893.7458
4.51
5.20
5.20
4.51
4.17
3.66
98.1914
9.6210
0.00
720.2201
690.5476
Materiales de Construccin
0202010005
kg
129.1104
4.00
0202040009
kg
269.7692
4.00
0202040010
ALAMBRE NEGRO N8
kg
159.6544
4.00
0203030020
kg
4,486.3174
2.90
0204000000
ARENA FINA
m3
0.1190
35.00
0204000006
ARENA GRUESA
m3
24.1962
30.00
0205000003
m3
48.9685
35.00
0205020020
PIEDRA MEDIANA
m3
30.1650
30.00
0221000000
bol
968.9664
21.00
0221000092
bol
0.2390
21.00
0229030002
YESO EN BOLSAS DE 25 KG
bol
2.6725
6.00
0229040005
CINTA TEFLON
pza
5.0000
1.50
0229550097
kg
0.3048
8.00
0230460019
gln
0.1250
46.00
0230520000
OCRE
kg
4.0088
15.00
0230990007
CORDEL
90.8650
0.25
0232000029
kg
10.1580
0.05
0238000000
HORMIGON
m3
114.3703
20.00
0239040092
ENERGIA ELECTRICA
glb
1.0000
150.00
0239050000
AGUA
m3
29.6688
0.50
0239130001
CASETA Y ALMACEN
glb
1.0000
250.00
0239900095
glb
1.0000
500.00
0243110015
MADERA AGUANO
p2
2,846.5352
2.90
0251010001
pza
5.7912
20.00
0251040000
pza
9.6088
6.30
0253100003
PETROLEO
gln
14.6576
11.00
0269000029
6.0000
110.00
0272000016
und
4.5000
10.00
0272000031
und
4.0000
25.00
0272120020
pza
30.0000
0.90
0272130001
und
5.2500
14.50
0272170040
pza
20.0000
0.90
hm
59.7886
20.00
0348040023
hm
9.8515
70.00
PARCIAL
13,551.76
442.84
50.03
0.00
3,248.19
2,879.58
6,931.11
51,782.66
516.44
1,079.08
638.62
13,010.32
4.17
725.89
1,713.90
904.95
20,348.29
5.02
16.04
7.50
2.44
5.75
60.13
22.72
0.51
2,287.41
150.00
14.83
250.00
500.00
8,254.95
115.82
60.54
161.23
660.00
45.00
100.00
27.00
76.13
18.00
3,231.99
1,195.77
689.61
0348210005
hm
2.5400
8.00
0349040008
hm
9.8515
80.00
0349070004
hm
38.4086
8.00
0349190001
TEODOLITO
hm
9.6210
12.00
0349880002
NIVEL TOPOGRAFICO
hm
9.6210
10.00
0349880007
MIRA TOPOGRAFICA DE 4M
hm
9.6210
2.00
20.32
788.12
307.27
115.45
96.21
19.24
370101
Herramientas
HERRAMIENTAS MANUALES
%MO
366.37
1.00
366.37
TOTAL C.D.
68,932.78
68964.72
-31.94
Clasificador
10
11
13
18
Cargo
Retribucion y Obligaciones Gastos Variables Gratificaciones
Clasificado
Complemento Empleador y Ocasionales y Aguinaldos
Ope. Equipo
325.26
39.62
54.21
23.87
Topografo
36.97
4.46
6.16
2.34
Capataz
0.00
0.00
0.00
0.00
Operario
2385.73
290.59
397.62
175.05
Oficial
2104.44
257.74
350.74
167.84
Peon
5018.43
620.95
836.40
460.29
9870.83
1213.35
1645.14
829.38
TOTAL
S/.
13558.70
442.95
49.93
0.00
3248.99
2880.76
6936.06
13558.70
HH
4.51
5.19
5.19
4.51
4.17
3.66
COSTO INDIRECTO
###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA
###
COD SNIP N : -
###
###
###
DESCRIPCION
CANT
MES
PARTICIPACION
OBRA
P.U.
PARCIAL (S/.)
###
1.00
2.50
0.50
1,800.00
2,250.00
Ing. Proyectista
1.00
1.00
0.30
1,800.00
540.00
1.00
2.50
0.50
900.00
1,125.00
Topografo
1.00
0.50
0.50
1,000.00
250.00
Maestro de Obra
1.00
2.50
1.00
1,075.00
2,687.50
6,852.50
6,852.50
###
###
DESCRIPCION
MES
PREST.
SALUD
(9%)
S.C.T.R.S.
(1.53%)
P.U. TOTAL
PARCIAL (S/.)
###
2.50
9.00%
Ing. Proyectista
1.00
9.00%
540.00
48.60
2.50
9.00%
1,125.00
253.13
Topografo
0.50
9.00%
Maestro de Obra
2.50
9.00%
2,250.00
506.25
250.00
11.25
2,687.50
707.48
1,526.71
1,526.71
1.53%
###
13 GASTOS VARIABLES Y OCASIONALES
###
VACAC.
TRUNCAS
DESCRIPCION
Personal Profesional y Tecnico
PARCIAL (S/.)
571.04
571.04
571.04
###
###
CANT
MES
PARTICIPACION
OBRA
ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)
###
1.00
2.50
0.50
58.33
72.92
Ing. Proyectista
1.00
1.00
0.30
58.33
17.50
1.00
2.50
0.50
58.33
72.92
Topografo
1.00
0.50
0.50
58.33
14.58
Maestro de Obra
1.00
2.50
1.00
58.33
145.83
323.75
323.75
###
20 VIATICOS Y ASIGNACIONES
Descripcin
Personal Profesional y Tecnico
###
Und
Glb
Cantidad
Precio
1.00
Parcial
50.00
50.00
50.00
###
22 VESTUARIO
###
COSTO INDIRECTO
###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA
###
COD SNIP N : -
###
###
Descripcin
Und
Cantidad
Precio
Parcial
Cascos de Proteccin
Und
5.00
11.00
55.00
Par
3.00
8.00
24.00
TOTAL VESTUARIO
79.00
###
23 COMBUSTIBLE Y LUBRICANTES
Descripcin
###
Und
Cantidad
Precio
Parcial
Petroleo
Gln
1.00
11.60
11.60
Gasolina
Gln
3.00
12.50
37.50
49.10
###
30 BIENES DE CONSUMO
Descripcin
###
Und
Cantidad
Precio
Parcial
Und
1.00
80.00
Pilas AA alcalinas
Und
2.00
3.00
80.00
6.00
86.00
###
###
Und
Cantidad
Precio
Parcial
Servicio de Fotocopiado
Und
564
0.10
56.37
Und
1.00
25.00
25.00
81.37
###
49 MATERIALES DE ESCRITORIO
Descripcin
###
Und
Cantidad
Precio
Parcial
Cuaderno de Obra
Und
1.00
15.00
15.00
Folder Manila A4
Und
10.00
0.50
5.00
Papel Carbon
Pqt
0.50
12.00
6.00
Resaltadores
Und
4.00
1.07
4.28
30.28
###
###
Und
Cantidad
Precio
4.50
Parcial
Archivador de Palanca
Und
4.00
18.00
Flexmetro de 7.5 m
Und
1.00
8.00
8.00
Placa Recordatoria
Und
1.00
200.00
200.00
226.00
###
###
14.32%
S/. 9,875.75
3.73%
S/. 2,572.38
1.39%
S/. 958.61
###
###
###
###
###
COSTO INDIRECTO
#
PROYECTO:
COD SNIP N:
C.D. :
S/. 68,964.72
###
DESCRIPCION
CANT
MES
PARTICIPACION
OBRA
P.U.
PARCIAL (S/.)
###
1.00
2.50
0.33
2,000.00
1,650.00
1,650.00
Personal Auxiliar GS
###
Secretaria de la Supervision
1.00
2.50
0.25
700.00
437.50
437.50
2,087.50
###
###
DESCRIPCION
MES
PREST.
SALUD
(9%)
S.C.T.R.S. (1.53%)
P.U. TOTAL
PARCIAL (S/.)
###
0.83
9.00%
2,000.00
148.50
148.50
148.50
###
###
VACAC.
TRUNCAS
DESCRIPCION
Personal Profesional y Tecnico
137.50
Personal Auxiliar
PARCIAL (S/.)
137.50
36.46
36.46
173.96
###
###
CANT
MES
PARTICIPACION
OBRA
ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)
###
1.00
2.50
0.33
58.33
48.13
48.13
Personal Auxiliar GS
###
Secretaria de la Supervision
1.00
2.50
58.33
36.46
0.25
36.46
84.58
###
23 COMBUSTIBLE Y LUBRICANTES
Descripcin
Gasolina
###
Und
Gln
Cantidad
Precio
2.00
Parcial
12.50
25.00
25.00
###
###
Und
Cantidad
Und
Precio
268
Parcial
0.10
26.84
26.84
###
49 MATERIALES DE ESCRITORIO
Descripcin
###
Und
Cantidad
Precio
Parcial
Folder Manila A4
Und
6.00
0.50
3.00
Papel Bond 75 gr
Mil
1.00
23.00
23.00
26.00
###
###
3.73%
S/. 2,572.38
###
COSTO INDIRECTO
PROYECTO:
COD SNIP N:
C.D. :
S/. 68,964.72
CANT
PARTICIPACION
OBRA
MES
P.U.
PARCIAL (S/.)
1.00
1.00
0.25
1,800.00
450.00
1.00
1.00
0.25
1,200.00
300.00
750.00
750.00
MES
PREST.
SALUD
(9%)
S.C.T.R.S. (1.53%)
P.U. TOTAL
PARCIAL (S/.)
0.25
9.00%
1,800.00
40.50
0.25
9.00%
1,200.00
27.00
67.50
67.50
DESCRIPCION
Personal Profesional y Tecnico
PARCIAL (S/.)
62.50
62.50
62.50
CANT
MES
PARTICIPACION
OBRA
ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)
1.00
1.00
0.25
58.33
14.58
1.00
1.00
0.25
58.33
14.58
29.17
29.17
Und
Cantidad
Und
Precio
379
Parcial
0.10
37.95
37.95
49 MATERIALES DE ESCRITORIO
Descripcin
Papel Bond 75 gr
Und
Mil
Cantidad
Precio
0.50
Parcial
23.00
11.50
11.50
1.39%
S/. 958.61
1.3900030%
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
CRONOGRAMA VALORIZADO
PROYECTO:
PRESUPUESTO BASE A:
DESCRIPCION
ITEM
S/.
UND
82,371.46
%
1er MES
2do MES
3er TERCER
CANTIDAD
1.00
OBRAS PROVISIONALES
%
S/.
100.00%
1,103.66
2.00
TRABAJOS PRELIMINARES
%
S/.
100.00%
507.78
100%
507.78
3.00
MOVIMIENTO DE TIERRA
%
S/.
100.00%
4,403.83
100%
4,403.83
4.00
%
S/.
100.00%
24,564.03
80%
19,651.22
5.00
TAPA DE CANAL
%
S/.
1.00
36,783.95
6.00
SUMIDEROS
%
S/.
100.00%
130.95
100%
130.95
7.00
CAJAS COLECTORAS
%
S/.
100.00%
527.17
100%
527.17
8.00
VARIOS
%
S/.
%
S/.
S/.
S/.
S/.
100.00%
943.35
100.00%
68,964.72
9,875.75
2,572.38
958.61
37.22%
25,666.49
3,675.44
957.36
356.76
49.79%
34,339.97
4,917.48
1,280.88
477.33
100%
943.35
12.99%
8,958.26
1,282.82
334.14
124.52
TOTAL GENERAL
S/.
82,371.46
30,656.06
41,015.66
10,699.75
100%
1,103.66
20%
4,912.81
80%
29,427.16
20%
7,356.79
100.00%
100.00%
0.00%
110366.00%
0.00%
0.00%
110366.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
50778.00%
0.00%
0.00%
50778.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
440383.00%
0.00%
0.00%
440383.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
2456403.00%
0.00%
0.00%
2456403.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
3678395.00%
0.00%
0.00%
3678395.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
13095.00%
0.00%
0.00%
13095.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
52717.00%
0.00%
0.00%
52717.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
94335.00%
94335.00%
0.00%
100.00%
100.00%
0.00%
6896472.00%
6896472.00%
0.00%
987574.79%
987574.79%
0.00%
95860.96%
0.00%
257238.41%
95860.96%
#REF!
CRONOGRAMA DE ADQUISICIONES
PROYECTO :
CODIGO
0202010005
0202040009
0202040010
0203030020
0204000000
0204000006
0205000003
0205020020
0221000000
0229030002
0229040005
0229550097
0230460019
0230520000
0230990007
0238000000
0239040092
0239050000
0239130001
0239900095
0243110015
0251010001
0251040000
0253100003
0269000029
0272000016
0272000031
0272120020
0272130001
0272170040
CANTIDAD
129.11
269.77
159.65
4,486.32
0.12
24.20
48.97
30.17
969.21
2.67
5.00
0.30
0.13
4.01
90.87
114.37
1.00
29.67
1.00
1.00
2,846.54
5.79
9.61
14.66
6.00
4.50
4.00
30.00
5.25
20.00
P.U.
4.00
4.00
4.00
2.90
35.00
30.00
35.00
30.00
21.00
6.00
1.50
8.00
46.00
15.00
0.25
20.00
150.00
0.50
250.00
500.00
2.90
20.00
6.30
11.00
110.00
10.00
25.00
0.90
14.50
0.90
1er MES
CANT
PRECIO
129.11
100.00
159.65
1,500.00
0.12
24.20
48.97
30.17
400.00
2.67
516.44
400.00
638.62
4,350.00
4.17
725.89
1,713.90
904.95
8,400.00
16.04
4.01
90.87
60.00
60.13
22.72
1,200.00
29.67
1.00
1.00
2,000.00
5.79
9.61
14.66
6.00
4.50
4.00
30.00
5.25
20.00
14.83
250.00
500.00
5,800.00
115.82
60.54
161.23
660.00
45.00
100.00
27.00
76.13
18.00
2do MES
CANT
PRECIO
3er MES
CANT
PRECIO
169.77
679.08
1,500.00
4,350.00
1,486.32
4,310.32
400.00
8,400.00
169.21
3,553.31
5.00
0.30
7.50
2.44
0.13
5.75
54.37
1.00
1,087.41
150.00
846.54
2,454.95
###
COD SNIP N : -
###
###
###
10 RETRIBUCIONES Y COMPLEMENTOS
DESCRIPCION
###
CANT
MES
PARTICIPACION
OBRA
P.U.
PARCIAL (S/.)
###
1.00
2.50
0.50
1,800.00
Ing. Proyectista
1.00
1.00
0.30
1,800.00
540.00
1.00
2.50
0.50
900.00
1,125.00
Topografo
1.00
0.50
0.50
1,000.00
250.00
Maestro de Obra
1.00
2.50
1.00
1,075.00
2,687.50
1.00
2.50
0.33
2,000.00
1,650.00
1.00
1.00
0.25
1,800.00
450.00
1.00
1.00
0.25
1,200.00
300.00
9,252.50
###
###
Personal Auxiliar GS
Secretaria de la Supervision
2,250.00
###
1.00
2.50
0.25
700.00
437.50
437.50
OPERADOR DE EQUIPO
325.26
TOPOGRAFO
36.97
OPERARIO
2,385.73
OFICIAL
2,104.44
PEON
5,018.43
Sub Total de Personal Obrero
9,870.83
19,560.83
###
###
MES
PREST.
SALUD
(9%)
S.C.T.R.S.
(1.53%)
P.U. TOTAL
PARCIAL (S/.)
###
2.50
0.09
2,250.00
Ing. Proyectista
1.00
0.09
540.00
48.60
2.50
0.09
1,125.00
253.13
Topografo
0.50
0.09
250.00
11.25
Maestro de Obra
2.50
0.09
0.02
2,687.50
707.48
0.83
0.09
2,000.00
148.50
0.25
0.09
1,800.00
40.50
0.25
0.09
1,200.00
27.00
1,742.71
506.25
###
###
OPERADOR DE EQUIPO
39.62
TOPOGRAFO
4.46
OPERARIO
290.59
OFICIAL
257.74
PEON
620.95
Sub Total de Personal Obrero
1,213.35
2,956.06
###
###
COD SNIP N : -
###
###
###
###
VACAC.
TRUNCAS
DESCRIPCION
Personal Profesional y Tecnico
771.04
PARCIAL (S/.)
771.04
Personal Auxiliar
36.46
36.46
Personal Obrero
1,645.14
1,645.14
2,452.64
###
###
CANT
PARTICIPACION
OBRA
MES
ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)
###
1.00
2.50
0.50
58.33
72.92
Ing. Proyectista
1.00
1.00
0.30
58.33
17.50
1.00
2.50
0.50
58.33
72.92
Topografo
1.00
0.50
0.50
58.33
14.58
Maestro de Obra
1.00
2.50
1.00
58.33
145.83
1.00
2.50
0.33
58.33
48.13
1.00
1.00
0.25
58.33
14.58
1.00
1.00
0.25
58.33
14.58
401.04
###
###
Personal Auxiliar GS
###
Secretaria de la Supervision
1.00
2.50
58.33
36.46
0.25
36.46
OPERADOR DE EQUIPO
23.87
TOPOGRAFO
2.34
OPERARIO
175.05
OFICIAL
167.84
PEON
460.29
Sub Total de Personal Obrero
829.38
1,266.88
###
20 VIATICOS Y ASIGNACIONES
Descripcin
Personal Profesional y Tecnico
###
Und
Cantidad
Glb
Precio
1.00
Parcial
50.00
50.00
50.00
###
22 VESTUARIO
###
Descripcin
Und
Cantidad
Precio
Parcial
Cascos de Proteccin
Und
5.00
11.00
55.00
Par
3.00
8.00
24.00
TOTAL VESTUARIO
79.00
###
23 COMBUSTIBLE Y LUBRICANTES
Descripcin
###
Und
Cantidad
Precio
Parcial
Petroleo
Gln
1.00
11.60
11.60
Gasolina
Gln
3.00
12.50
37.50
Gasolina
Gln
2.00
12.50
25.00
Gasolina
Gln
2.00
12.50
25.00
###
COD SNIP N : -
###
###
###
TOTAL COMBUSTIBLE Y LUBRICANTES
99.10
###
###
COD SNIP N : -
###
###
###
29 MATERIALES DE CONSTRUCCION
51,782.66
30 BIENES DE CONSUMO
###
Descripcin
Und
Cantidad
Precio
Parcial
Und
1.00
80.00
Pilas AA alcalinas
Und
2.00
3.00
80.00
6.00
86.00
###
###
Descripcin
Und
Cantidad
Precio
Parcial
Servicio de Fotocopiado
Und
563.70
0.10
56.37
Und
1.00
25.00
25.00
Servicio de Fotocopiado
Und
268.43
0.10
26.84
Servicio de Fotocopiado
Und
379.45
0.10
37.95
146.16
###
49 MATERIALES DE ESCRITORIO
###
Descripcin
Und
Cantidad
Precio
Parcial
Cuaderno de Obra
Und
1.00
15.00
15.00
Folder Manila A4
Und
10.00
0.50
5.00
Papel Carbon
Pqt
0.50
12.00
6.00
Resaltadores
Und
4.00
1.07
4.28
Folder Manila A4
Und
6.00
0.50
3.00
Papel Bond 75 gr
Mil
1.00
23.00
23.00
Papel Bond 75 gr
Mil
0.50
23.00
11.50
67.78
###
###
Descripcin
Und
Cantidad
Precio
Parcial
Archivador de Palanca
Und
4.00
4.50
Flexmetro de 7.5 m
Und
1.00
8.00
18.00
8.00
Placa Recordatoria
Und
1.00
200.00
200.00
Herramientas manuales
%MO
1.00
366.37
366.37
592.37
###
52 ALQUILER DE BIENES
###
Descripcin
Und
Cantidad
Precio
Parcial
hm
59.7886
20.0000
1,195.77
hm
9.8515
70.0000
689.61
hm
2.5400
8.0000
20.32
hm
9.8515
80.0000
788.12
hm
38.4086
8.0000
307.27
TEODOLITO
hm
9.6210
12.0000
115.45
NIVEL TOPOGRAFICO
hm
9.6210
10.0000
96.21
MIRA TOPOGRAFICA DE 4M
hm
9.6210
2.0000
19.24
3,231.99
###
TOTAL
S/.
82,371.46
PRESUPUESTO ANALITICO
PROYECTO :
COD SNIP N :
C.DIRECTO. :
S/. 68,964.72
10 RETRIBUCIONES Y COMPLEMENTOS
Sub Total de Personal Profesional y Tcnico
Sub Total de Personal Auxiliar
11 OBLIGACIONES DEL EMPLEADOR
Sub Total de Personal Profesional y Tcnico
19,560.83
9,252.50
437.50
2,956.06
1,742.71
771.04
36.46
401.04
36.46
20 VIATICOS Y ASIGNACIONES
Personal Profesional y Tecnico
2,452.64
1,266.88
50.00
50.00
22 VESTUARIO
79.00
23 COMBUSTIBLE Y LUBRICANTES
99.10
29 MATERIALES DE CONSTRUCCION
30 BIENES DE CONSUMO
39 OTROS SERVICIOS DE TERCEROS
49 MATERIALES DE ESCRITORIO
51 EQUIPAMIENTO Y BIENES DURADEROS
52 ALQUILER DE BIENES
TOTAL PRESUPUESTO S/.
51,782.66
86.00
146.16
67.78
592.37
3,231.99
82,371.46
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
82371.46
-0.00
COSTO HH
Cargo
Clasificado
Remuneraciones
C.T.S.
Rem mensual
Vacaciones
truncas
Monto
Aguinaldo
Maestro de Obr
29.00
1.74
2.42
0.15
2.56
1.94
3.17
0.54
41.52
5.19
Operario
25.00
1.50
2.08
0.13
2.21
1.94
2.76
0.47
36.09
4.51
Oficial
23.00
1.38
1.92
0.12
2.03
1.94
2.55
0.43
33.37
4.17
Peon
20.00
1.20
1.67
0.10
1.77
1.94
2.24
0.38
29.30
3.66
S.C.T.R.S.
Cargo
Clasificado
M.O.
Operario
Oficial
Peon
Clasificador
Cargo
Clasificado
M.O.
Operario
Oficial
Peon
Remuneraciones
Rem. Hora
B.C.C (6%)
3.63
0.22
3.13
0.19
2.88
0.17
2.50
0.15
10
Retribucion y
Complemento
3.84
3.31
3.05
2.65
11
Obligaciones
Empleador
0.46
0.40
0.37
0.33
C.T.S.
Vacaciones
truncas
Rem mensual
B.C.C. (6%)
0.30
0.02
0.32
0.26
0.02
0.28
0.24
0.01
0.25
0.21
0.01
0.22
13
Gastos Variables
y Ocasionales
0.64
0.55
0.51
0.44
18
Gratificaciones
y Aguinaldos
0.24
0.24
0.24
0.24
HH
5.19
4.51
4.17
3.66
S.C.T.R.S. (1.53%)
HH
B.C.C (6%)
TOTAL
Rem. Diaria
B.C.C.
B.C.C. (6%)
DIARIO
HH
5.19
4.51
4.17
3.66
JORNAL
M.O
OPRERARIO
OFICIAL
PEON
29
25
23
20
MENSUAL
BCC 6%
CTS
870
52.2
750
45
690
41.4
600
36
72.5
62.5
57.5
50
BCC.CTS6 VT
4.35
3.75
3.45
3
76.85
66.25
60.95
53
OE9%
96.83
83.48
76.80
66.78
SCTR 1.
16.46
14.19
13.06
11.35
AGUIN.70
58.33
58.33
58.33
58.33
RB
1,075.90
927.50
853.30
742.00
RT
1,247.53
1,083.50
1,001.49
878.47
1,092.36
HH
5.20
4.51
4.17
3.66
Und
Cant
Precio
Parcial
HM
#REF!
110.00
#REF!
HM
#REF!
140.00
#REF!
HM
#REF!
120.00
#REF!
Motoniveladora
HM
#REF!
100.00
#REF!
HM
#REF!
70.00
#REF!
Camion Volquete
HM
#REF!
100.00
#REF!
Compresora Neumatica
HM
#REF!
60.00
#REF!
HM
#REF!
80.00
#REF!
Rodillo Neumatico
HM
#REF!
60.00
#REF!
Calentador de Aceite
HM
#REF!
70.00
#REF!
Planta de Asfalto
HM
#REF!
220.00
#REF!
Plancha compactadora
HM
#REF!
10.00
#REF!
Mezcladora de concreto
HM
#REF!
20.00
#REF!
Vibrador de concreto
HM
#REF!
8.00
#REF!
Chancadora
HM
#REF!
200.00
#REF!
Martillo Neumatico
HM
#REF!
9.00
#REF!
Pavimentadora
HM
#REF!
80.00
#REF!
#REF!
DESAGREGADO DE MAQUINARIA
Descripcion
Und
Cant
Precio
Parcial
Petrleo
gln
#REF!
11.60
#REF!
Gasolina
gln
#REF!
12.50
#REF!
Aceite
gln
#REF!
#REF!
#REF!
Grasa
lbs
#REF!
7.00
#REF!
Filtros
Glb
1.00
#REF!
#REF!
Neumaticos
Glb
1.00
#REF!
#REF!
Repuestos
Glb
1.00
#REF!
#REF!
Operador
hh
#REF!
#REF!
#REF!
Energa Electrica
Glb
1.00
#REF!
#REF!
#REF!
Alquiler de maquinaria
glb
1.00
#VALUE!
#VALUE!
#VALUE!
#REF!
CUADROS REFERENCIALES
AGREGADOS REQUERIDOS EN EL PRESUPUESTO
Descripcion
Und
Cantidad
Precio
Parcial
Hormign
m3
#REF!
29.00
#REF!
Arena Fina
m3
#REF!
29.00
#REF!
Arena Gruesa
m3
#REF!
29.00
#REF!
Grava
m3
#REF!
29.00
#REF!
m3
#REF!
15.60
#REF!
m3
#REF!
47.00
#REF!
m3
#REF!
47.00
#REF!
Piedra mediana
m3
#REF!
30.00
#REF!
Piedra grande
m3
#REF!
30.00
#REF!
TOTAL AGREGADOS
#REF!
Und
Cantidad
Precio
Parcial
Capataz
HH
#REF!
#REF!
#REF!
Operario
HH
#REF!
#REF!
#REF!
Oficial
HH
#REF!
#REF!
#REF!
Peon
HH
#REF!
#REF!
#REF!
Petrleo
gln
#REF!
Gasolina
gln
Aceite
gln
Grasa
11.60
#REF!
12.50
0.00
#REF!
#REF!
#REF!
lbs
#REF!
7.00
#REF!
Filtros
Glb
1.00
#REF!
#REF!
Neumaticos
Glb
1.00
#REF!
#REF!
Repuestos
Glb
1.00
#REF!
#REF!
Dinamita
Kg
#REF!
#REF!
#REF!
Fulminante
und
#REF!
#REF!
#REF!
Anfo
kg
#REF!
#REF!
#REF!
Gua seguridad
ml
#REF!
#REF!
#REF!
Cordon Detonante
ml
#REF!
#REF!
#REF!
Barrenos
und
#REF!
#REF!
#REF!
Energa Electrica
glb
1.00
#REF!
#REF!
0.00
0.00
Herramientas
Glb
1.00
#REF!
Total
#REF!
#REF!
#REF!