You are on page 1of 33

DATOS GENERALES

Nombre del Proyecto:


CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA
CODIGO SNIP N
Fecha
Presupuesto Base al
Plazo de Ejecucin
Costo Directo del Proyecto

:
:
:
S/. :

ESTRUCTURAS:
Costo de Mano de Obra
Descrip. Unidad

MARZO 2007
2/1/2007
75.00
Das
68,964.72

:
Cantidad

OP.DE EQUIPO

HH

553.10

TOPOGRAFO

HH

27.59

CAPATAZ

HH

724.36

OPERARIO

HH

5,500.89

OFICIAL

HH

4,152.40

PEON

HH

7,043.98

Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales

S/. :
S/. :
S/. :

CostUnit Sub Total


2704.66
4.89
165.54
6
4346.16
6
26899.35
4.89
18062.94
4.35
27753.28
3.94
TOTAL S/.
79931.93
277217.58
11680.17
2704.38
371534.06

TOTAL SUB PPTO

ARQUITECTURA:
Costo de Mano de Obra
Descrip. Unidad

:
Cantidad

CostUnit

186.61

4.89

HH

1,470.92

6.00

HH

15,021.74

4.89

OFICIAL

HH

3,971.76

4.35

PEON

HH

7,586.68

OP.DE EQUIPO

HH

TOPOGRAFO

HH

CAPATAZ
OPERARIO

3.94

TOTAL S/.
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales

S/. :
S/. :
S/. :

188316.21
6472.60
4226.93

TOTAL SUB PPTO

INSTALACIONES SANITARIAS:
Costo de Mano de Obra
Descrip. Unidad
OP.DE EQUIPOHH
TOPOGRAFO HH

Sub Total
912.52
0.00
8825.52
73456.31
17277.16
29891.52
130363.03

:
Cantidad
8.40

329378.77

CostUnit Sub Total


41.08
4.89
0.00

CAPATAZ
OPERARIO
OFICIAL
PEON

HH
HH
HH
HH

96.88
843.80
232.91
527.30

581.28
4126.18
1013.16
2077.56
7839.26

6
4.89
4.35
3.94
TOTAL S/.

6,385.50

Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales

S/. :
S/. :
S/. :

13655.57
247.2
241.47
21983.50

TOTAL SUB PPTO

INSTALACIONES ELECTRICAS:
Costo de Mano de Obra
Descrip. Unidad
HH
OP.DE EQUIPO
HH
TOPOGRAFO
HH
CAPATAZ
HH
OPERARIO
HH
OFICIAL
HH
PEON

:
Cantidad

124.83
1,411.10
40.00
354.71

Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales

S/. :
S/. :
S/. :

CostUnit

37628.05
110
272.31
47231.18
770,127.50

TOTAL PPTO

PORCENTAJE DE MANO DE OBRA (%):

329.67

PLAZO DE EJECUCION RECOMENDADO (MESES):

7.83

Total Da
39.12
48.00
391.20
174.00
315.20

Mano de Obra
Costo de Materiales
Costo de Equipo y Herramientas
Costo de Herramientas Manuales

S/.
S/. :
S/. :
S/. :

PTO TOTAL
COSTO DIRECTO

0.00
0.00
748.98
6900.28
174.00
1397.56
9220.82

6
4.89
4.35
3.94
TOTAL S/.

TOTAL SUB PPTO

Descripcin Cuad. Min. Costo H.H.


1
Op.Eq. Liv
4.89
Topgrafo
1
6.00
Operario
10
4.89
Oficial
5
4.35
Peon
10
3.94
27

Sub Total

DIAS:

Total Mes
1173.60
1440.00
11736.00
5220.00
9456.00

Total

227355.03
516817.41
18509.97
7445.09

770,127.50
68,964.72

29025.60

25955.06

GASTOS GENERALES (10%)


GASTOS DE SUPERVISION (2%)

6896.47
1379.29
77,240.48
730,612.69

64225.23
OJO

UANCA

87890

125,853.05
5,673.16
3,426.15
234,902.38

12,054.61
62.40
207.38
18,710.16

35,268.77
70.00
271.96
44,729.10

235

701,162.78

-57328.76
equipamiento

INSUMOS REQUERIDOS EN EL PRESUPUESTO


OBRA
: CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA
COD SNIP N: CODIGO
0147000024
0147000032
0147010001
0147010002
0147010003
0147010004

DESCRIPCIN
Mano de Obra
OPERADOR DE EQUIPO
TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON

UND
HH
HH
HH
HH
HH
HH

CANT.

PRECIO

1,893.7458

4.51
5.20
5.20
4.51
4.17
3.66

98.1914
9.6210

0.00
720.2201
690.5476

Materiales de Construccin
0202010005

CLAVOS PARA MADERA C/C 3"

kg

129.1104

4.00

0202040009

ALAMBRE NEGRO N16

kg

269.7692

4.00

0202040010

ALAMBRE NEGRO N8

kg

159.6544

4.00

0203030020

FIERRO CORRUGADO GRADO 60

kg

4,486.3174

2.90

0204000000

ARENA FINA

m3

0.1190

35.00

0204000006

ARENA GRUESA

m3

24.1962

30.00

0205000003

PIEDRA CHANCADA DE 1/2"

m3

48.9685

35.00

0205020020

PIEDRA MEDIANA

m3

30.1650

30.00

0221000000

CEMENTO PORTLAND IP (42.5KG)

bol

968.9664

21.00

0221000092

CEMENTO PORTLAND TIPO I (EN FCA.)S-PUB

bol

0.2390

21.00

0229030002

YESO EN BOLSAS DE 25 KG

bol

2.6725

6.00

0229040005

CINTA TEFLON

pza

5.0000

1.50

0229550097

SOLDADURA CELLOCORD PUNTO AZUL 1/8"

kg

0.3048

8.00

0230460019

PEGAMENTO PLASTICO P/PVC

gln

0.1250

46.00

0230520000

OCRE

kg

4.0088

15.00

0230990007

CORDEL

90.8650

0.25

0232000029

FLETE TRANSPORTE LOCAL

kg

10.1580

0.05

0238000000

HORMIGON

m3

114.3703

20.00

0239040092

ENERGIA ELECTRICA

glb

1.0000

150.00

0239050000

AGUA

m3

29.6688

0.50

0239130001

CASETA Y ALMACEN

glb

1.0000

250.00

0239900095

CARTEL DE OBRA INC. INSTALACION Y TRANSPORTE

glb

1.0000

500.00

0243110015

MADERA AGUANO

p2

2,846.5352

2.90

0251010001

FIERRO ANGULAR 1" x 1" x 1/8" x 6m

pza

5.7912

20.00

0251040000

PLATINA DE FIERRO 1/8" x 1/2" x 6m

pza

9.6088

6.30

0253100003

PETROLEO

gln

14.6576

11.00

0269000029

TUBERIA CO.SIMP.NORM. U.F. 6"

6.0000

110.00

0272000016

TUB. PVC SAP PRESION C-10 EC DE 1/2" x 5m

und

4.5000

10.00

0272000031

TUB. PVC SAP PRESION C-10 R 1" x 5m

und

4.0000

25.00

0272120020

CODOS PVC SAP ROSCADOS 1/2" X 90

pza

30.0000

0.90

0272130001

TUB. PVC SAL P/DESAGUE DE 2" x 3 m

und

5.2500

14.50

0272170040

UNION PVC SAP ROSCADO 1/2"

pza

20.0000

0.90

Costo Operacin y/o Alquiler de Maquinaria y/o Equipo


0348010004

MEZCLADORA CONCRETO TROMPO 8HP-9P3

hm

59.7886

20.00

0348040023

CAMION VOLQUETE 4x2 140-210 HP 6 M3

hm

9.8515

70.00

PARCIAL
13,551.76
442.84
50.03
0.00
3,248.19
2,879.58
6,931.11
51,782.66
516.44
1,079.08
638.62
13,010.32
4.17
725.89
1,713.90
904.95
20,348.29
5.02
16.04
7.50
2.44
5.75
60.13
22.72
0.51
2,287.41
150.00
14.83
250.00
500.00
8,254.95
115.82
60.54
161.23
660.00
45.00
100.00
27.00
76.13
18.00

3,231.99
1,195.77
689.61

0348210005

MOTOSOLDADORA DE 250 AMPERIOS

hm

2.5400

8.00

0349040008

CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3

hm

9.8515

80.00

0349070004

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

38.4086

8.00

0349190001

TEODOLITO

hm

9.6210

12.00

0349880002

NIVEL TOPOGRAFICO

hm

9.6210

10.00

0349880007

MIRA TOPOGRAFICA DE 4M

hm

9.6210

2.00

20.32
788.12
307.27
115.45
96.21
19.24

370101

Herramientas
HERRAMIENTAS MANUALES

%MO

366.37

1.00

366.37

TOTAL C.D.

COLOCAR EL COSTO DIRECTO DEL S-10


DIFERENCIA PARA LAS HERRAMIENTAS MANUALES

68,932.78

68964.72
-31.94

Clasificador
10
11
13
18
Cargo
Retribucion y Obligaciones Gastos Variables Gratificaciones
Clasificado
Complemento Empleador y Ocasionales y Aguinaldos
Ope. Equipo
325.26
39.62
54.21
23.87
Topografo
36.97
4.46
6.16
2.34
Capataz
0.00
0.00
0.00
0.00
Operario
2385.73
290.59
397.62
175.05
Oficial
2104.44
257.74
350.74
167.84
Peon
5018.43
620.95
836.40
460.29
9870.83
1213.35
1645.14
829.38

TOTAL
S/.
13558.70
442.95
49.93
0.00
3248.99
2880.76
6936.06
13558.70

HH
4.51
5.19
5.19
4.51
4.17
3.66

COSTO INDIRECTO
###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

###

COD SNIP N : -

###

C.DIRECTO. : S/. 68,964.72

###

1.- GASTOS GENERALES


###
10 RETRIBUCIONES Y COMPLEMENTOS

###

DESCRIPCION

CANT

MES

PARTICIPACION
OBRA

P.U.

PARCIAL (S/.)

Personal Profesional y Tecnico GG

###

Ing. Residente de Obra

1.00

2.50

0.50

1,800.00

2,250.00

Ing. Proyectista

1.00

1.00

0.30

1,800.00

540.00

Asistente Administrativo de Obra

1.00

2.50

0.50

900.00

1,125.00

Topografo

1.00

0.50

0.50

1,000.00

250.00

Maestro de Obra

1.00

2.50

1.00

1,075.00

2,687.50

Sub Total de Personal Profesional y Tcnico

6,852.50

TOTAL RETRIBUCIONES Y COMPLEMENTOS

6,852.50
###

11 OBLIGACIONES DEL EMPLEADOR

###

DESCRIPCION

MES

PREST.
SALUD
(9%)

S.C.T.R.S.
(1.53%)

P.U. TOTAL

PARCIAL (S/.)

Personal Profesional y Tecnico GG

###

Ing. Residente de Obra

2.50

9.00%

Ing. Proyectista

1.00

9.00%

540.00

48.60

Asistente Administrativo de Obra

2.50

9.00%

1,125.00

253.13

Topografo

0.50

9.00%

Maestro de Obra

2.50

9.00%

2,250.00

506.25

250.00

11.25

2,687.50

707.48

Sub Total de Personal Profesional y Tcnico

1,526.71

TOTAL OBLIGACIONES DEL EMPLEADOR

1,526.71

1.53%

###
13 GASTOS VARIABLES Y OCASIONALES

###
VACAC.
TRUNCAS

DESCRIPCION
Personal Profesional y Tecnico

PARCIAL (S/.)

571.04

571.04

TOTAL GASTOS VARIABLES Y OCASIONALES

571.04
###

18 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


DESCRIPCION

###
CANT

MES

PARTICIPACION
OBRA

ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)

Personal Profesional y Tecnico GG

###

Ing. Residente de Obra

1.00

2.50

0.50

58.33

72.92

Ing. Proyectista

1.00

1.00

0.30

58.33

17.50

Asistente Administrativo de Obra

1.00

2.50

0.50

58.33

72.92

Topografo

1.00

0.50

0.50

58.33

14.58

Maestro de Obra

1.00

2.50

1.00

58.33

145.83

Sub Total de Personal Profesional y Tcnico

323.75

TOTAL ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES

323.75
###

20 VIATICOS Y ASIGNACIONES
Descripcin
Personal Profesional y Tecnico

###
Und
Glb

Cantidad

Precio
1.00

Parcial

50.00

50.00

TOTAL VIATICOS Y ASIGNACIONES

50.00
###

22 VESTUARIO

###

COSTO INDIRECTO
###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

###

COD SNIP N : -

###

C.DIRECTO. : S/. 68,964.72

###
Descripcin

Und

Cantidad

Precio

Parcial

Cascos de Proteccin

Und

5.00

11.00

55.00

Guantes de cuero reforzado 1ra.

Par

3.00

8.00

24.00

TOTAL VESTUARIO

79.00
###

23 COMBUSTIBLE Y LUBRICANTES
Descripcin

###
Und

Cantidad

Precio

Parcial

Petroleo

Gln

1.00

11.60

11.60

Gasolina

Gln

3.00

12.50

37.50

TOTAL COMBUSTIBLE Y LUBRICANTES

49.10
###

30 BIENES DE CONSUMO
Descripcin

###
Und

Cantidad

Precio

Parcial

Cinta para impresora LQ-2180

Und

1.00

80.00

Pilas AA alcalinas

Und

2.00

3.00

80.00
6.00

TOTAL BIENES DE CONSUMO

86.00
###

39 OTROS SERVICIOS DE TERCEROS


Descripcin

###
Und

Cantidad

Precio

Parcial

Servicio de Fotocopiado

Und

564

0.10

56.37

Legalizacion de Cuaderno de Obra

Und

1.00

25.00

25.00

TOTAL OTROS SERVICIOS DE TERCEROS

81.37
###

49 MATERIALES DE ESCRITORIO
Descripcin

###
Und

Cantidad

Precio

Parcial

Cuaderno de Obra

Und

1.00

15.00

15.00

Folder Manila A4

Und

10.00

0.50

5.00

Papel Carbon

Pqt

0.50

12.00

6.00

Resaltadores

Und

4.00

1.07

4.28

TOTAL MATERIALES DE ESCRITORIO

30.28
###

51 EQUIPAMIENTO Y BIENES DURADEROS


Descripcin

###
Und

Cantidad

Precio
4.50

Parcial

Archivador de Palanca

Und

4.00

18.00

Flexmetro de 7.5 m

Und

1.00

8.00

8.00

Placa Recordatoria

Und

1.00

200.00

200.00

TOTAL EQUIPAMIENTO Y BIENES DURADEROS

226.00
###
###

TOTAL GASTOS GENERALES

14.32%

S/. 9,875.75

GASTO POR SUPERVISION

3.73%

S/. 2,572.38

GASTO POR LIQUIDACION

1.39%

S/. 958.61

###
###
###
###
###

COSTO INDIRECTO
#
PROYECTO:

CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

COD SNIP N:

C.D. :

S/. 68,964.72

2.- GASTOS DE SUPERVISION


#
10 RETRIBUCIONES Y COMPLEMENTOS

###

DESCRIPCION

CANT

MES

PARTICIPACION
OBRA

P.U.

PARCIAL (S/.)

Personal Profesional y Tecnico GS

###

Ing. Supervisor de Obra

1.00

2.50

0.33

2,000.00

1,650.00

Sub Total de Personal Profesional y Tcnico

1,650.00

Personal Auxiliar GS

###

Secretaria de la Supervision

1.00

2.50

0.25

700.00

437.50

Sub Total de Personal Auxiliar

437.50

TOTAL RETRIBUCIONES Y COMPLEMENTOS

2,087.50
###

11 OBLIGACIONES DEL EMPLEADOR

###

DESCRIPCION

MES

PREST.
SALUD
(9%)

S.C.T.R.S. (1.53%)

P.U. TOTAL

PARCIAL (S/.)

Personal Profesional y Tecnico GS

###

Ing. Supervisor de Obra

0.83

9.00%

2,000.00

148.50

Sub Total de Personal Profesional y Tcnico

148.50

TOTAL OBLIGACIONES DEL EMPLEADOR

148.50
###

13 GASTOS VARIABLES Y OCASIONALES

###
VACAC.
TRUNCAS

DESCRIPCION
Personal Profesional y Tecnico

137.50

Personal Auxiliar

PARCIAL (S/.)
137.50

36.46

36.46

TOTAL GASTOS VARIABLES Y OCASIONALES

173.96
###

18 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


DESCRIPCION

###
CANT

MES

PARTICIPACION
OBRA

ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)

Personal Profesional y Tecnico GS


Ing. Supervisor de Obra

###
1.00

2.50

0.33

58.33

48.13

Sub Total de Personal Profesional y Tcnico

48.13

Personal Auxiliar GS

###

Secretaria de la Supervision

1.00

2.50

58.33

36.46

Sub Total de Personal Auxiliar

0.25

36.46

TOTAL ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES

84.58
###

23 COMBUSTIBLE Y LUBRICANTES
Descripcin
Gasolina

###
Und
Gln

Cantidad

Precio
2.00

Parcial

12.50

25.00

TOTAL COMBUSTIBLE Y LUBRICANTES

25.00
###

39 OTROS SERVICIOS DE TERCEROS


Descripcin
Servicio de Fotocopiado

###
Und

Cantidad

Und

Precio
268

Parcial

0.10

26.84

TOTAL OTROS SERVICIOS DE TERCEROS

26.84
###

49 MATERIALES DE ESCRITORIO
Descripcin

###
Und

Cantidad

Precio

Parcial

Folder Manila A4

Und

6.00

0.50

3.00

Papel Bond 75 gr

Mil

1.00

23.00

23.00

TOTAL MATERIALES DE ESCRITORIO

26.00
###
###

GASTO POR SUPERVISION

3.73%

S/. 2,572.38

###

COSTO INDIRECTO
PROYECTO:

CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

COD SNIP N:

C.D. :

S/. 68,964.72

3.- GASTOS DE LIQUIDACION


10 RETRIBUCIONES Y COMPLEMENTOS
DESCRIPCION

CANT

PARTICIPACION
OBRA

MES

P.U.

PARCIAL (S/.)

Personal Profesional y Tecnico GL


Ing. Liquidador de obra

1.00

1.00

0.25

1,800.00

450.00

Contador Publico Colegiado

1.00

1.00

0.25

1,200.00

300.00

Sub Total de Personal Profesional y Tcnico

750.00

TOTAL RETRIBUCIONES Y COMPLEMENTOS

750.00

11 OBLIGACIONES DEL EMPLEADOR


DESCRIPCION

MES

PREST.
SALUD
(9%)

S.C.T.R.S. (1.53%)

P.U. TOTAL

PARCIAL (S/.)

Personal Profesional y Tecnico GL


Ing. Supervisor de Obra

0.25

9.00%

1,800.00

40.50

Asistente Tecnico de Supervision

0.25

9.00%

1,200.00

27.00

Sub Total de Personal Profesional y Tcnico

67.50

TOTAL OBLIGACIONES DEL EMPLEADOR

67.50

13 GASTOS VARIABLES Y OCASIONALES


VACAC.
TRUNCAS

DESCRIPCION
Personal Profesional y Tecnico

PARCIAL (S/.)

62.50

62.50

TOTAL GASTOS VARIABLES Y OCASIONALES

62.50

18 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


DESCRIPCION

CANT

MES

PARTICIPACION
OBRA

ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)

Personal Profesional y Tecnico GL


Ing. Liquidador de obra

1.00

1.00

0.25

58.33

14.58

Contador Publico Colegiado

1.00

1.00

0.25

58.33

14.58

Sub Total de Personal Profesional y Tcnico

29.17

TOTAL ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES

29.17

39 OTROS SERVICIOS DE TERCEROS


Descripcin
Servicio de Fotocopiado

Und

Cantidad

Und

Precio
379

Parcial

0.10

37.95

TOTAL OTROS SERVICIOS DE TERCEROS

37.95

49 MATERIALES DE ESCRITORIO
Descripcin
Papel Bond 75 gr

Und
Mil

Cantidad

Precio
0.50

Parcial

23.00

11.50

TOTAL MATERIALES DE ESCRITORIO

11.50

GASTO POR LIQUIDACION

1.39%

S/. 958.61
1.3900030%

Mostrar

Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar

Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar

Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar

Mostrar

CRONOGRAMA VALORIZADO
PROYECTO:

CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

PRESUPUESTO BASE A:
DESCRIPCION

ITEM

S/.
UND

82,371.46
%

1er MES

2do MES

3er TERCER

CANTIDAD

1.00

OBRAS PROVISIONALES

%
S/.

100.00%
1,103.66

2.00

TRABAJOS PRELIMINARES

%
S/.

100.00%
507.78

100%
507.78

3.00

MOVIMIENTO DE TIERRA

%
S/.

100.00%
4,403.83

100%
4,403.83

4.00

OBRAS DE CONCRETO SIMPLE

%
S/.

100.00%
24,564.03

80%
19,651.22

5.00

TAPA DE CANAL

%
S/.

1.00
36,783.95

6.00

SUMIDEROS

%
S/.

100.00%
130.95

100%
130.95

7.00

CAJAS COLECTORAS

%
S/.

100.00%
527.17

100%
527.17

8.00

VARIOS

%
S/.

GASTOS GENERALES 14.32%


GASTOS GENERALES 3.73%
GASTOS DE SUPERVISION 1.39%

%
S/.
S/.
S/.
S/.

100.00%
943.35
100.00%
68,964.72
9,875.75
2,572.38
958.61

37.22%
25,666.49
3,675.44
957.36
356.76

49.79%
34,339.97
4,917.48
1,280.88
477.33

100%
943.35
12.99%
8,958.26
1,282.82
334.14
124.52

TOTAL GENERAL

S/.

82,371.46

30,656.06

41,015.66

10,699.75

TOTAL COSTO DIRECTO

100%
1,103.66

20%
4,912.81
80%
29,427.16

20%
7,356.79

100.00%

100.00%

0.00%

110366.00%
0.00%
0.00%

110366.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

50778.00%
0.00%
0.00%

50778.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

440383.00%
0.00%
0.00%

440383.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

2456403.00%
0.00%
0.00%

2456403.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

3678395.00%
0.00%
0.00%

3678395.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

13095.00%
0.00%
0.00%

13095.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

52717.00%
0.00%
0.00%

52717.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%

100.00%

0.00%

94335.00%

94335.00%

0.00%

100.00%

100.00%

0.00%

6896472.00%

6896472.00%

0.00%

987574.79%

987574.79%

0.00%

95860.96%

0.00%

257238.41%
95860.96%
#REF!

CRONOGRAMA DE ADQUISICIONES
PROYECTO :

CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

COD. SNIP N : ITEM

: CANALIZACION JR SEOR DE HUANCA

CODIGO
0202010005
0202040009
0202040010
0203030020
0204000000
0204000006
0205000003
0205020020
0221000000
0229030002
0229040005
0229550097
0230460019
0230520000
0230990007
0238000000
0239040092
0239050000
0239130001
0239900095
0243110015
0251010001
0251040000
0253100003
0269000029
0272000016
0272000031
0272120020
0272130001
0272170040

DESCRIPCION DEL MATERIAL


CLAVOS PARA MADERA C/C 3"
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
FIERRO CORRUGADO GRADO 60
ARENA FINA
ARENA GRUESA
PIEDRA CHANCADA DE 1/2"
PIEDRA MEDIANA
CEMENTO PORTLAND IP (42.5KG)
YESO EN BOLSAS DE 25 KG
CINTA TEFLON
SOLDADURA CELLOCORD PUNTO AZUL 1/8"
PEGAMENTO PLASTICO P/PVC
OCRE
CORDEL
HORMIGON
ENERGIA ELECTRICA
AGUA
CASETA Y ALMACEN
CARTEL DE OBRA INC. INSTALACION Y TRANSPORTE
MADERA AGUANO
FIERRO ANGULAR 1" x 1" x 1/8" x 6m
PLATINA DE FIERRO 1/8" x 1/2" x 6m
PETROLEO
TUBERIA CO.SIMP.NORM. U.F. 6"
TUB. PVC SAP PRESION C-10 EC DE 1/2" x 5m
TUB. PVC SAP PRESION C-10 R 1" x 5m
CODOS PVC SAP ROSCADOS 1/2" X 90
TUB. PVC SAL P/DESAGUE DE 2" x 3 m
UNION PVC SAP ROSCADO 1/2"

FECHA : MARZO 2007


UNIDAD
kg
kg
kg
kg
m3
m3
m3
m3
bol
bol
pza
kg
gln
kg
m
m3
glb
m3
glb
glb
p2
pza
pza
gln
m
und
und
pza
und
pza

CANTIDAD

129.11
269.77
159.65
4,486.32
0.12
24.20
48.97
30.17
969.21
2.67
5.00
0.30
0.13
4.01
90.87
114.37
1.00
29.67
1.00
1.00
2,846.54
5.79
9.61
14.66
6.00
4.50
4.00
30.00
5.25
20.00

P.U.
4.00
4.00
4.00
2.90
35.00
30.00
35.00
30.00
21.00
6.00
1.50
8.00
46.00
15.00
0.25
20.00
150.00
0.50
250.00
500.00
2.90
20.00
6.30
11.00
110.00
10.00
25.00
0.90
14.50
0.90

1er MES
CANT
PRECIO
129.11
100.00
159.65
1,500.00
0.12
24.20
48.97
30.17
400.00
2.67

516.44
400.00
638.62
4,350.00
4.17
725.89
1,713.90
904.95
8,400.00
16.04

4.01
90.87
60.00

60.13
22.72
1,200.00

29.67
1.00
1.00
2,000.00
5.79
9.61
14.66
6.00
4.50
4.00
30.00
5.25
20.00

14.83
250.00
500.00
5,800.00
115.82
60.54
161.23
660.00
45.00
100.00
27.00
76.13
18.00

2do MES
CANT
PRECIO

3er MES
CANT
PRECIO

169.77

679.08

1,500.00

4,350.00

1,486.32

4,310.32

400.00

8,400.00

169.21

3,553.31

5.00
0.30

7.50
2.44
0.13

5.75

54.37
1.00

1,087.41
150.00

846.54

2,454.95

DESAGREGADO DEL PRESUPUESTO ANALITICO


###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

###

COD SNIP N : -

###

C.DIRECTO. : S/. 68,964.72

###
###

10 RETRIBUCIONES Y COMPLEMENTOS
DESCRIPCION

###
CANT

MES

PARTICIPACION
OBRA

P.U.

Personal Profesional y Tecnico GG

PARCIAL (S/.)
###

Ing. Residente de Obra

1.00

2.50

0.50

1,800.00

Ing. Proyectista

1.00

1.00

0.30

1,800.00

540.00

Asistente Administrativo de Obra

1.00

2.50

0.50

900.00

1,125.00

Topografo

1.00

0.50

0.50

1,000.00

250.00

Maestro de Obra

1.00

2.50

1.00

1,075.00

2,687.50

1.00

2.50

0.33

2,000.00

1,650.00

Ing. Liquidador de obra

1.00

1.00

0.25

1,800.00

450.00

Contador Publico Colegiado

1.00

1.00

0.25

1,200.00

300.00

Sub Total de Personal Profesional y Tcnico

9,252.50

Personal Profesional y Tecnico GS


Ing. Supervisor de Obra

###

Personal Profesional y Tecnico GL

###

Personal Auxiliar GS
Secretaria de la Supervision

2,250.00

###
1.00

2.50

0.25

700.00

437.50

Sub Total de Personal Auxiliar

437.50

OPERADOR DE EQUIPO

325.26

TOPOGRAFO

36.97

OPERARIO

2,385.73

OFICIAL

2,104.44

PEON

5,018.43
Sub Total de Personal Obrero

9,870.83

TOTAL RETRIBUCIONES Y COMPLEMENTOS

19,560.83
###

11 OBLIGACIONES DEL EMPLEADOR


DESCRIPCION

###
MES

PREST.
SALUD
(9%)

S.C.T.R.S.
(1.53%)

P.U. TOTAL

Personal Profesional y Tecnico GG

PARCIAL (S/.)
###

Ing. Residente de Obra

2.50

0.09

2,250.00

Ing. Proyectista

1.00

0.09

540.00

48.60

Asistente Administrativo de Obra

2.50

0.09

1,125.00

253.13

Topografo

0.50

0.09

250.00

11.25

Maestro de Obra

2.50

0.09

0.02

2,687.50

707.48

0.83

0.09

2,000.00

148.50

Ing. Supervisor de Obra

0.25

0.09

1,800.00

40.50

Asistente Tecnico de Supervision

0.25

0.09

1,200.00

27.00

Sub Total de Personal Profesional y Tcnico

1,742.71

Personal Profesional y Tecnico GS


Ing. Supervisor de Obra

506.25

###

Personal Profesional y Tecnico GL

###

OPERADOR DE EQUIPO

39.62

TOPOGRAFO

4.46

OPERARIO

290.59

OFICIAL

257.74

PEON

620.95
Sub Total de Personal Obrero

1,213.35

TOTAL OBLIGACIONES DEL EMPLEADOR

2,956.06
###

DESAGREGADO DEL PRESUPUESTO ANALITICO


###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

###

COD SNIP N : -

###

C.DIRECTO. : S/. 68,964.72

###
###

13 GASTOS VARIABLES Y OCASIONALES

###
VACAC.
TRUNCAS

DESCRIPCION
Personal Profesional y Tecnico

771.04

PARCIAL (S/.)
771.04

Personal Auxiliar

36.46

36.46

Personal Obrero

1,645.14

1,645.14

TOTAL GASTOS VARIABLES Y OCASIONALES

2,452.64
###

18 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


DESCRIPCION

###
CANT

PARTICIPACION
OBRA

MES

ESC, AGUIL Y
PARCIAL (S/.)
GRAT (MES)

Personal Profesional y Tecnico GG

###

Ing. Residente de Obra

1.00

2.50

0.50

58.33

72.92

Ing. Proyectista

1.00

1.00

0.30

58.33

17.50

Asistente Administrativo de Obra

1.00

2.50

0.50

58.33

72.92

Topografo

1.00

0.50

0.50

58.33

14.58

Maestro de Obra

1.00

2.50

1.00

58.33

145.83

1.00

2.50

0.33

58.33

48.13

Ing. Liquidador de obra

1.00

1.00

0.25

58.33

14.58

Contador Publico Colegiado

1.00

1.00

0.25

58.33

14.58

Sub Total de Personal Profesional y Tcnico

401.04

Personal Profesional y Tecnico GS


Ing. Supervisor de Obra

###

Personal Profesional y Tecnico GL

###

Personal Auxiliar GS

###

Secretaria de la Supervision

1.00

2.50

58.33

36.46

Sub Total de Personal Auxiliar

0.25

36.46

OPERADOR DE EQUIPO

23.87

TOPOGRAFO

2.34

OPERARIO

175.05

OFICIAL

167.84

PEON

460.29
Sub Total de Personal Obrero

829.38

TOTAL ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES

1,266.88
###

20 VIATICOS Y ASIGNACIONES
Descripcin
Personal Profesional y Tecnico

###
Und

Cantidad

Glb

Precio
1.00

Parcial

50.00

50.00

TOTAL VIATICOS Y ASIGNACIONES

50.00
###

22 VESTUARIO

###
Descripcin

Und

Cantidad

Precio

Parcial

Cascos de Proteccin

Und

5.00

11.00

55.00

Guantes de cuero reforzado 1ra.

Par

3.00

8.00

24.00

TOTAL VESTUARIO

79.00
###

23 COMBUSTIBLE Y LUBRICANTES
Descripcin

###
Und

Cantidad

Precio

Parcial

Petroleo

Gln

1.00

11.60

11.60

Gasolina

Gln

3.00

12.50

37.50

Gasolina

Gln

2.00

12.50

25.00

Gasolina

Gln

2.00

12.50

25.00

DESAGREGADO DEL PRESUPUESTO ANALITICO


###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

###

COD SNIP N : -

###

C.DIRECTO. : S/. 68,964.72

###
###
TOTAL COMBUSTIBLE Y LUBRICANTES

99.10
###

DESAGREGADO DEL PRESUPUESTO ANALITICO


###
PROYECTO : CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

###

COD SNIP N : -

###

C.DIRECTO. : S/. 68,964.72

###
###

29 MATERIALES DE CONSTRUCCION

51,782.66

30 BIENES DE CONSUMO

###

Descripcin

Und

Cantidad

Precio

Parcial

Cinta para impresora LQ-2180

Und

1.00

80.00

Pilas AA alcalinas

Und

2.00

3.00

80.00
6.00

TOTAL BIENES DE CONSUMO

86.00
###

39 OTROS SERVICIOS DE TERCEROS

###

Descripcin

Und

Cantidad

Precio

Parcial

Servicio de Fotocopiado

Und

563.70

0.10

56.37

Legalizacion de Cuaderno de Obra

Und

1.00

25.00

25.00

Servicio de Fotocopiado

Und

268.43

0.10

26.84

Servicio de Fotocopiado

Und

379.45

0.10

37.95

TOTAL OTROS SERVICIOS DE TERCEROS

146.16
###

49 MATERIALES DE ESCRITORIO

###

Descripcin

Und

Cantidad

Precio

Parcial

Cuaderno de Obra

Und

1.00

15.00

15.00

Folder Manila A4

Und

10.00

0.50

5.00

Papel Carbon

Pqt

0.50

12.00

6.00

Resaltadores

Und

4.00

1.07

4.28

Folder Manila A4

Und

6.00

0.50

3.00

Papel Bond 75 gr

Mil

1.00

23.00

23.00

Papel Bond 75 gr

Mil

0.50

23.00

11.50

TOTAL MATERIALES DE ESCRITORIO

67.78
###

51 EQUIPAMIENTO Y BIENES DURADEROS

###

Descripcin

Und

Cantidad

Precio

Parcial

Archivador de Palanca

Und

4.00

4.50

Flexmetro de 7.5 m

Und

1.00

8.00

18.00
8.00

Placa Recordatoria

Und

1.00

200.00

200.00

Herramientas manuales

%MO

1.00

366.37

366.37

TOTAL EQUIPAMIENTO Y BIENES DURADEROS

592.37
###

52 ALQUILER DE BIENES

###

Descripcin

Und

Cantidad

Precio

Parcial

MEZCLADORA CONCRETO TROMPO 8HP-9P3

hm

59.7886

20.0000

1,195.77

CAMION VOLQUETE 4x2 140-210 HP 6 M3

hm

9.8515

70.0000

689.61

MOTOSOLDADORA DE 250 AMPERIOS

hm

2.5400

8.0000

20.32

CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3

hm

9.8515

80.0000

788.12

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

38.4086

8.0000

307.27

TEODOLITO

hm

9.6210

12.0000

115.45

NIVEL TOPOGRAFICO

hm

9.6210

10.0000

96.21

MIRA TOPOGRAFICA DE 4M

hm

9.6210

2.0000

19.24

TOTAL ALQUILER DE BIENES

3,231.99
###

TOTAL

S/.

82,371.46

PRESUPUESTO ANALITICO
PROYECTO :

CONSTRUCCION DE CANALIZACION JR SEOR DE HUANCA

COD SNIP N :

C.DIRECTO. :

S/. 68,964.72

10 RETRIBUCIONES Y COMPLEMENTOS
Sub Total de Personal Profesional y Tcnico
Sub Total de Personal Auxiliar
11 OBLIGACIONES DEL EMPLEADOR
Sub Total de Personal Profesional y Tcnico

19,560.83
9,252.50
437.50
2,956.06
1,742.71

13 GASTOS VARIABLES Y OCASIONALES


Personal Profesional y Tecnico
Personal Auxiliar

771.04
36.46

18 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


Sub Total de Personal Profesional y Tcnico
Sub Total de Personal Auxiliar

401.04
36.46

20 VIATICOS Y ASIGNACIONES
Personal Profesional y Tecnico

2,452.64

1,266.88

50.00
50.00

22 VESTUARIO

79.00

23 COMBUSTIBLE Y LUBRICANTES

99.10

29 MATERIALES DE CONSTRUCCION
30 BIENES DE CONSUMO
39 OTROS SERVICIOS DE TERCEROS
49 MATERIALES DE ESCRITORIO
51 EQUIPAMIENTO Y BIENES DURADEROS
52 ALQUILER DE BIENES
TOTAL PRESUPUESTO S/.

51,782.66
86.00
146.16
67.78
592.37
3,231.99
82,371.46

Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar
Mostrar

82371.46

-0.00

COSTO HH
Cargo
Clasificado

Remuneraciones

C.T.S.
Rem mensual

Vacaciones
truncas

Monto
Aguinaldo

Maestro de Obr

29.00

1.74

2.42

0.15

2.56

1.94

3.17

0.54

41.52

5.19

Operario

25.00

1.50

2.08

0.13

2.21

1.94

2.76

0.47

36.09

4.51

Oficial

23.00

1.38

1.92

0.12

2.03

1.94

2.55

0.43

33.37

4.17

Peon

20.00

1.20

1.67

0.10

1.77

1.94

2.24

0.38

29.30

3.66

S.C.T.R.S.

Seguro Com. Trabajador Riesgo Sal.

Cargo
Clasificado
M.O.
Operario
Oficial
Peon

Clasificador
Cargo
Clasificado
M.O.
Operario
Oficial
Peon

Remuneraciones
Rem. Hora
B.C.C (6%)
3.63
0.22
3.13
0.19
2.88
0.17
2.50
0.15

10
Retribucion y
Complemento
3.84
3.31
3.05
2.65

11
Obligaciones
Empleador
0.46
0.40
0.37
0.33

C.T.S.
Vacaciones
truncas
Rem mensual
B.C.C. (6%)
0.30
0.02
0.32
0.26
0.02
0.28
0.24
0.01
0.25
0.21
0.01
0.22

13
Gastos Variables
y Ocasionales
0.64
0.55
0.51
0.44

18
Gratificaciones
y Aguinaldos
0.24
0.24
0.24
0.24

HH
5.19
4.51
4.17
3.66

S.C.T.R.S. (1.53%)

HH

B.C.C (6%)

Bonificacion por Construccin Civil

Prest. Salud (9%)

TOTAL

Rem. Diaria

B.C.C.

B.C.C. (6%)

Obligaciones del Empleador

Obligaciones del Empleador


Monto
Aguinaldo Prest. Salud (9%) S.C.T.R.S. (1.53%)
0.24
0.40
0.07
0.24
0.34
0.06
0.24
0.32
0.05
0.24
0.28
0.05

DIARIO

HH
5.19
4.51
4.17
3.66

JORNAL
M.O
OPRERARIO
OFICIAL
PEON

29
25
23
20

MENSUAL
BCC 6%
CTS
870
52.2
750
45
690
41.4
600
36

72.5
62.5
57.5
50

BCC.CTS6 VT
4.35
3.75
3.45
3

76.85
66.25
60.95
53

OE9%
96.83
83.48
76.80
66.78

SCTR 1.
16.46
14.19
13.06
11.35

AGUIN.70
58.33
58.33
58.33
58.33

RB
1,075.90
927.50
853.30
742.00

RT
1,247.53
1,083.50
1,001.49
878.47
1,092.36

HH
5.20
4.51
4.17
3.66

MAQUINARIA REQUERIDA EN EL PRESUPUESTO


Descripcion

Und

Cant

Precio

Parcial

Cargador Sobre Llantas

HM

#REF!

110.00

#REF!

Tractor Sobre Orugas

HM

#REF!

140.00

#REF!

Retroexcavadora Sobre Orugas

HM

#REF!

120.00

#REF!

Motoniveladora

HM

#REF!

100.00

#REF!

Rodillo Liso Autopropulsado

HM

#REF!

70.00

#REF!

Camion Volquete

HM

#REF!

100.00

#REF!

Compresora Neumatica

HM

#REF!

60.00

#REF!

Camion Cisterna 4x2

HM

#REF!

80.00

#REF!

Rodillo Neumatico

HM

#REF!

60.00

#REF!

Calentador de Aceite

HM

#REF!

70.00

#REF!

Planta de Asfalto

HM

#REF!

220.00

#REF!

Plancha compactadora

HM

#REF!

10.00

#REF!

Mezcladora de concreto

HM

#REF!

20.00

#REF!

Vibrador de concreto

HM

#REF!

8.00

#REF!

Chancadora

HM

#REF!

200.00

#REF!

Martillo Neumatico

HM

#REF!

9.00

#REF!

Pavimentadora

HM

#REF!

80.00

#REF!

TOTAL MAQUINARIA Y/O EQUIPO

#REF!

DESAGREGADO DE MAQUINARIA
Descripcion

Und

Cant

Precio

Parcial

Petrleo

gln

#REF!

11.60

#REF!

Gasolina

gln

#REF!

12.50

#REF!

Aceite

gln

#REF!

#REF!

#REF!

Grasa

lbs

#REF!

7.00

#REF!

Filtros

Glb

1.00

#REF!

#REF!

Neumaticos

Glb

1.00

#REF!

#REF!

Repuestos

Glb

1.00

#REF!

#REF!

Operador

hh

#REF!

#REF!

#REF!

Energa Electrica

Glb

1.00

#REF!

#REF!

#REF!

Alquiler de maquinaria

glb

1.00

#VALUE!

#VALUE!

TOTAL MAQUINARIA DESAGREGADO

#VALUE!

#REF!

CUADROS REFERENCIALES
AGREGADOS REQUERIDOS EN EL PRESUPUESTO
Descripcion

Und

Cantidad

Precio

Parcial

Hormign

m3

#REF!

29.00

#REF!

Arena Fina

m3

#REF!

29.00

#REF!

Arena Gruesa

m3

#REF!

29.00

#REF!

Grava

m3

#REF!

29.00

#REF!

Piedra Chancada de 1/2"

m3

#REF!

15.60

#REF!

Piedra Chancada de 3/4"

m3

#REF!

47.00

#REF!

Piedra Chancada Fina

m3

#REF!

47.00

#REF!

Piedra mediana

m3

#REF!

30.00

#REF!

Piedra grande

m3

#REF!

30.00

#REF!

TOTAL AGREGADOS

#REF!

DESAGREGADO POR INSUMOS


Descripcion

Und

Cantidad

Precio

Parcial

Capataz

HH

#REF!

#REF!

#REF!

Operario

HH

#REF!

#REF!

#REF!

Oficial

HH

#REF!

#REF!

#REF!

Peon

HH

#REF!

#REF!

#REF!

Petrleo

gln

#REF!

Gasolina

gln

Aceite

gln

Grasa

11.60

#REF!

12.50

0.00

#REF!

#REF!

#REF!

lbs

#REF!

7.00

#REF!

Filtros

Glb

1.00

#REF!

#REF!

Neumaticos

Glb

1.00

#REF!

#REF!

Repuestos

Glb

1.00

#REF!

#REF!

Dinamita

Kg

#REF!

#REF!

#REF!

Fulminante

und

#REF!

#REF!

#REF!

Anfo

kg

#REF!

#REF!

#REF!

Gua seguridad

ml

#REF!

#REF!

#REF!

Cordon Detonante

ml

#REF!

#REF!

#REF!

Barrenos

und

#REF!

#REF!

#REF!

Energa Electrica

glb

1.00

#REF!

#REF!
0.00
0.00

Herramientas

Glb

1.00

#REF!
Total

#REF!