Professional Documents
Culture Documents
UBICACIN:
CONTRATISTA:
Total de conceptos
85.00
94.12%
Avance
General
acumulado
D E S C R I P C I o N
100
PRELIMINARES.
102
UNIDAD
CANT.
2.33
FECHA ESTIMACION:
PERIODO DEL:
AL:
Acumulado
100.00%
105
124
133
ml
28.90
12.50
100.00%
100.00%
Pza
1.00
0.00%
134
138
140
147
Pza
Pza
Pza
1.00
0.00%
2.00
100.00%
1.00
100.00%
8.03
100.00%
151
165
169
170
Jgo.
Pza
1.00
Pza
2.00
2.00
100.00%
1.00
100.00%
100.00%
100.00%
171
Pza
2.00
100.00%
173
Pza
2.00
100.00%
177
178
180
182
Pza
Pza
1.00
Pza
1.00
Pza
1.00
100.00%
100.00%
0.00%
2.00
100.00%
183
184
Pza
1.00
100.00%
ml
7.80
100.00%
187
ml
100.00%
200
ALBAILERA.
222
ml
223
226
236
32.60
2.50
100.00%
31.94
100.00%
29.28
100.00%
17.85
100.00%
242
2.50
100.00%
Suministro y fabricacin de lambrn a base de panel de cemento acabado
1 cara de 7.62 cm., incluye: tablacemento de 13 mm. MARCA DUROCK o
similar en calidad, canal de amarre de 6.35 cm. cal. 22, poste de 6.35 cm.
cal. 20 @40.6 cm., esquineros plsticos en aristas expuestas, calafateado
con malla de fibra de vidrio (cinta de refuerzo) y compuesto Basecoat o
similar en calidad, tornillos Tek Plano para sujecin de postes a canal y
tornillos DS-1@20cm., emboquillados, mano de obra, herramienta, equipo,
acarreos a 1a estacin 20 m, limpieza y todo lo necesario para su correcta
ejecucin. ESTO PARA DARLE BASE AL CANCEL 60 CM HACIA ADENTRO
6.80
100.00%
300
CERRAJERA
305
306
Pza
1.00
50.00%
Pza
1.00
50.00%
312
314
400
Pza
Pza
HERRERA.
1.00
50.00%
5.00
0.00%
407
Pza
1.00
50.00%
500
CANCELERA.
505
600
601
Pza
1.00
0.00%
Pza
1.00
Pza
2.00
100.00%
100.00%
602
0.45
100.00%
700
701
Pza
1.00
100.00%
702
Pza
1.00
100.00%
703
709
Jgo.
1.00
100.00%
Pza
1.00
100.00%
710
712
Pza
1.00
100.00%
Pza
3.00
100.00%
714
Pza
3.00
100.00%
717
800
INSTALACIN ELCTRICA
801
ml
0.50
100.00%
Pza
2.00
100.00%
802
Pza
2.00
100.00%
805
Pza
3.00
100.00%
806
Pza
3.00
100.00%
809
812
Pza
1.00
100.00%
Pza
11.00
100.00%
814
815
Pza
3.00
100.00%
Pza
10.00
100.00%
817
818
819
820
821
Pza
3.00
0.00%
Pza
Pza
Pza
Pza
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
831
834
842
843
847
848
850
851
856
Pza
Pza
Pza
Pza
Pza
Pza
ml
ml
1.00
100.00%
1.00
100.00%
2.00
100.00%
3.00
100.00%
1.00
100.00%
1.00
100.00%
85.60
100.00%
17.10
100.00%
ml
5.55
100.00%
859
863
ml
28.90
100.00%
Pza
1.00
100.00%
865
866
867
868
869
873
900
ml
ml
ml
51.30
100.00%
48.90
100.00%
178.90
100.00%
ml
17.10
100.00%
ml
24.45
100.00%
Pza
2.00
100.00%
901
175.20
100.00%
902
51.95
100.00%
904
908
911
20.08
100.00%
0.45
100.00%
65.20
100.00%
916
917
18.00
2.33
100.00%
100.00%
6.70
100.00%
919
ml
52.80
100.00%
Pza
Kg
2.00
100.00%
4.00
100.00%
Pza.
1.00
Sal.
4.00
100.00%
1200 SEGURIDAD
1201 Salida guiada para Instalacin de Dispositivos de Seguridad, con
interconexin independiente al closet de seguridad, incluye: suministro y
colocacin de tubera poliducto de 13 mm POLIFLEX o similar en calidad,
codos, coples, conexiones, cajas de conexin en extremos, gua de
alambre galvanizado cal. 14, material, mano de obra, herramienta,
equipo, andamiaje y todo lo necesario para su correcta instalacin y
funcionamiento (Distancia 10 m., variable segn catalogo particular).
100.00%
1400 LIMPIEZA
1401 Limpieza fina, profunda y detallada de la obra general, incluye: lavado de
vidrios, pisos, retiro de escombro, sobrantes de material, acarreos a 1a
estacin 20 m., mano de obra, equipo y todo lo necesario para su correcta
ejecucin.
Jor.
2.00
100.00%
4.00