Structure of ZRA
l Major Functions of ZRA
l Highlights of ZRA Activities and
Achievements.
l Project Opportunities on Common
Zambezi River.
l Batoka Hydro Electric Project.
l Conclusion.
l Council
l Developed
l Carried
SCHEME
Batoka Gorge
Devils Gorge
Victoria Falls
South
Mupata Gorge
Katombora
Installed
Estimated
Capacity (MW) Project Costs.
(Million US $)
1 600
2 500
1 200
1 450
390
440
1 085
2 040
Regulation Dam
295
SCHEME
RATIO:
AVERAGE
(O&M)/(INST.CAP) SPECIFIC
GENERATION
COSTS
(US$/MW)
(USc/kWh)
Batoka Gorge
5 700
1.78
Devils Gorge
7 000
1.93
Victoria Falls
South
Mupata Gorge
6 400
2.10
8 600
2.02
l In
l Batoka
l Power
Stations:
l Two Underground Power Caverns (one North
and one South)
l Installed Capacity 1600 MW (2X 800MW)
l Generation Efficiency 86%.
l Other Infrastructure:
l Transmission Lines
l Access Roads and Housing.
l Social Amenities.
l Total Project Costs US$ 2 500 Million.
l The
l The
l The
l Conjunctive
l ZRA