Gulf Cooperation Council

Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

MX3-EG1

Bay Ref:
Substation:
REVISION
PAGES 0
1

SUMMARY
1

PURPOSE OF TESTS

REFERENCE DOCUMENT

SCOPE

RELAY TERMINLOGY

TEST EQUIPMENT

PRE-REQUISTES

PROCEDURES

RECORD TEST SHEET

8.1 RELAY INFORMATION


8.2 VT DATA
8.3 PRODUCT CHECKS
8.4 MEASURMENT VALUE TEST:
8.5 SYNCHRONIZING CHECK
8.6 BINARY INPUT TEST :
8.7 BINARY OUTPUT TEST:
8.8 FIXED LED INDICATIONS TEST:
8.9 LED INDICATIONS TEST:
8.10

FINAL CHECK

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 1 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

MX3-EG1
1

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

Bay Ref:
Substation:

PURPOSE OF TESTS

The purpose of the tests is to check the full functionality of the protection relay.
This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or
SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning
procedures.
This procedure does not intend to check all tripping matrix and PSL logic tests, this, when applicable,
are described into a separate document, dedicated to the specific substation and feeder type.
2

REFERENCE DOCUMENTS
DOCUMENT
REFERENCE

DOCUMENT

VERSION/
DATE

REMARKS

Protection Line Diagram


Schematic Drawing
Service Manual
Operation Manual
Protection Relay Coordination Principles
Relay setting Calculation
LED Display Configuration

SCOPE

Substation Name :Diameter:


Bay :
Panel Number :
Relay Denomination in Scheme
Scheme to be Checked

Relay Functionality Test.

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 2 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

MX3-EG1
4

Terminology
Manual Synchronizing Relay

TEST EQUIPMENT USED

Sl No
1.

Description

Make

Equipment
Sl No.

Calibration
date

Calibration due
date

Secondary
Injection Kit
Multimeter

2.

Bay Ref:
Substation:

TERMINOLOGY

Code ( ANSI)
25A

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

PRE - REQUISITES
PRE-REQUISITES

REMARKS

All Safety Condition Are Ok


All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 3 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

MX3-EG1
7

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

Bay Ref:
Substation:

TEST PROCEDURES
The following procedures are written for demonstrating the main protection functions of the MX3EG1
relay using an Omicron test set or similar. The tests do not test the boundaries of all available function
characteristics. They do test that the function is operating at a point on one chosen characteristic. This
document is to be referred to when performing commissioning tests in association with the
commissioning section of the service manual.

NOTE :
All the Test are performed in the Test Switch.
Omicron CMC156 Test Equipment or Any Equivalent To Be Used.
7.1 Auto Synch Check
Use QUICK CMC for these checks.
Simulate Circuit breaker open condition (this is very important)
7.2.1 Differential voltage check:
Apply Vg and Vb as above with 0 angle between them.
Gradually increase/decrease magnitude of one voltage (to create voltage difference). Note down value of
voltage difference at which relay operates.
7.2.2 Differential frequency check:
This feature can be checked by STATE SEQUENCER module.
Uncheck the box for Link frequencies of all generators to set different frequencies for two voltages.
Apply Vg and Vb as above with 0 angle between them.
Gradually increase/decrease frequency of one voltage (to create freq. difference). Note down value of
freq difference at which relay operates,
7.2.3 Interaction check
Apply Vg and Vb as above with 0 angle between them ( Healthy condition) .
Then check the following cases
Voltage Under threshold , relay should give Voltage Increase order.
Voltage Over threshold , relay should give Voltage Decrease order
Frequency Under threshold, relay should give Frequency Increase order
Frequency Over threshold , relay should give Frequency Decrease order.
Check if all orders are given accordingly. And record the result.

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 4 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

MX3-EG1

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

Bay Ref:
Substation:

7.2 Testing of Binary Inputs:


Apply nominal Voltage on respective Relay terminal and Check the Healthiness of the BI is used in the
scheme this BI will be tested along with scheme..
Caution : please make sure of Nominal voltage and Polarity of Terminal before apply the voltage to
relay.
7.3 Testing of Binary Outputs :
This test checks that all the output relays are functioning correctly.
the device offers, in the TEST mode, the possibility of testing output relays. The relay test allows the
output relays from X1 to X5 to be sequentially selected and checked for correct operation.
Choose TEST mode, then select the relevant output to be activated.
TEST MENU
By pressing the two keys for at least two seconds anywhere in the main reading menu, the TEST
function, which is highlighted by the blinking of the green LED (RUN), is
enabled.
[TEST RELAY X1]
[ YES>] TEST of relay X1
[TEST RELAY X2]
[ YES>] TEST of relay X2
[TEST RELAY X3]
[ YES>] TEST of relay X3
[TEST RELAY X4]
[ YES>] TEST of relay X4
[TEST RELAY X5]
[ YES>] TEST of relay X5
The test foreseen for X.. auxiliary relay caused the tripping of the same. The associated command and/or
signaling can therefore be sent. This is why, before running it, the system prompts you to further
confirm:
[ CONFIRM? ]
[< NO YES>]
AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 5 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

MX3-EG1

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

Bay Ref:
Substation:

if, upon confirming the execution, LB or DB synchronization cycles are already present, the test is not
performed and this condition is signalled by the following example:
[TEST ]
[NOT AVAILABLE ]
The test on leds and display makes these light up for two seconds and can be carried out during any
operating condition.
By pressing the two keys for two seconds
anywhere in the test menu, the TEST function is disabled; the green LED (RUN) stops blinking and the
system goes back to the main reading menu.
The tested relay remains energized for 150 and 200 ms. If commands are already present, the test cannot
be carried out and a message appears on the display unit. The test on auxiliary relays does not affect
counters, event logs and LEDs.
Note : If the Outputs are assigned for function this will be tested along with Functional test of
relays.

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 6 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

MX3-EG1
8

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

Bay Ref:
Substation:

RECORD TEST SHEET

8.1 RELAY INFORMATION


Type No.:
MX3-EG1

Designation :
Nominal Current :

Model No :
Serial Number
Firmware Version :

Nominal Voltage` :
Aux. Volts :

8.2 VT DATA:
VT 1
Rated primary voltage set as
Rated secondary voltage set as
VT2
Rated primary voltage set as
Rated secondary voltage set as
8.3 PRODUCT CHECKS
Relay damaged?
Rating information correct for installation?
Case earth installed?
External wiring checked against diagram?
Test block connections checked?
Measured auxiliary supply
LCD front panel display
Clock set to local time?
Time maintained when aux. supply removed?

V dc

8.4 MEASURMENT VALUE TEST:


Voltage Measurement
Phase injected
Vg

Voltage
applied
(Volts)
63.5

Primary Voltage read on relay display in kV

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 7 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

MX3-EG1
Vb

Bay Ref:
Substation:

63.5

8.5 SYNCHRONIZING CHECK


6.1 Relay Setting
D>
DU>

LL/LB
U<

LL/DB
t

Sec

6.2 Frequency Unit Test


Df
Actual

6.3 Voltage Unit Test


U<
Actual
Measured

Measured

U<<
Actual

DU
Measured

Actual

Measured

6.4 Delay Unit Test


Seconds
Actual

6.5 Interaction Test:


Condition

Measured

Output to be active

Voltage Under threshold

Voltage Increase order

Voltage Over threshold

Voltage Decrease order

Frequency Under threshold

Frequency Increase order

Frequency Over threshold

Frequency Decrease order

AREVA T&D

Results

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 8 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

MX3-EG1

8.6 BINARY INPUT TEST :


Input No.
Terminal No.

Active

Bay Ref:
Substation:

Function Assigned

15-13

high

NOT USED*

15-14

high

CB QA31 CLOSE
STATUS

18-19

high

NOT USED*

15-5

high

START ON SYNCRO
FROM BCU

15-6

high
high

NOT USED*

sheet

Result

204

204

NOT USED* : Not wired.


8.7 BINARY OUTPUT TEST: (Please Be Careful With Common Terminals)
Function Assigned
Output No. Terminal No.
Type
(Aux relay operated)
X1

X2

X3

X4

X5

21-20

NO

23-22

NO

21-25

NO

23-24

NO

27-26

NC

27-28

NO

30-29

NO

30-31

NO

33-34

NC

33-32

NO

30-35

NO

37-38

NC

37-36

NO

AREVA T&D

sheet

Result

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 9 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

MX3-EG1
X6

40-39

NC

30-41

NO

Bay Ref:
Substation:

NOT USED*= Not wired.


8.8 FIXED LED INDICATIONS TEST:
LED No.
LED Label
1

Uaux

RUN

NOT RUN

Rx Tx

8.9 LED INDICATIONS TEST: ( LEFT SIDE LED)


LED No.
LED Label

Color

Result

Color

Result

1
2
3
4
5
6
7
8
8.10

FINAL CHECKS

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 10 of 11

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MX3-EG1
25A

MX3-EG1

Bay Ref:
Substation:

Item
1

Description
All test equipment, leads, shorts and test block removed safely?

Disturbed customer wiring re-checked?

All commissioning tests disabled?

Alarms reset?

LEDs reset?

10

Secondary front cover replaced? (If applicable)

Result

REMARKS

END OF REPORT

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 11 of 11