You are on page 1of 9

Gulf Cooperation Council

Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

P122

Bay Ref:
Substation:
REVISION
PAGES 0
1

SUMMARY
1

PURPOSE OF TESTS

REFERENCE DOCUMENT

SCOPE

RELAY TERMINLOGY

TEST EQUIPMENT

PRE-REQUISTES

PROCEDURES

RECORD TEST SHEET

8.1 RELAY INFORMATION


8.2 CT DATA:
8.3 PRODUCT CHECKS
8.4 MEASURMENT VALUE TEST:
8.5 87B HIGH IMPEDANCE DIFFERENTIAL PROTECTION
8.6 EXTERNAL STABILIZING RESITANCE MEASURMENT
8.7 EXTERNAL NON LINEAR RESITANCE MEASURMENT
8.8 CT SECONDARY RESISTANCE MEASURMENT :
8.9 BINARY INPUT TEST :
8.10

BINARY OUTPUT TEST:

8.11

FIXED LED INDICATIONS TEST:

8.12

LED INDICATIONS TEST:

8.13

FINAL CHECK

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 1 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122
1

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

Bay Ref:
Substation:

PURPOSE OF TESTS

The purpose of the tests is to check the full functionality of the protection relay.
This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or
SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning
procedures.
2

REFERENCE DOCUMENTS
DOCUMENT
REFERENCE

DOCUMENT

VERSION/
DATE

REMARKS

Protection Line Diagram


Schematic Drawing
Service Manual
Operation Manual
Protection Relay Coordination Principles
Relay setting Calculation
LED Display Configuration

SCOPE

Substation Name :Diameter:


Bay :
Panel Number :
Relay Denomination in Scheme
Scheme to be Checked

Relay Functionality Test.

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 2 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122
4

Bay Ref:
Substation:

TERMINOLOGY

Code ( ANSI)
87B

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

Terminology
Busbar High Impedance Differential Protection

TEST EQUIPMENT USED

Sl No
1.

Description

Make

Equipment
Sl No.

Calibration
date

2.

Secondary
Injection Kit
Multimeter

3.

Laptop

NA

Setting software

Type
: MICOM S1 Studio
Version : 2.14

Calibration due
date

PRE - REQUISITES
PRE-REQUISITES

REMARKS

All Safety Condition Are Ok


All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 3 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122
7

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

Bay Ref:
Substation:

TEST PROCEDURES

The following procedures are written for demonstrating the main protection functions of the P821
relay using an Omicron test set or similar. The tests do not test the boundaries of all available function
characteristics. They do test that the function is operating at a point on one chosen characteristic. This
document is to be referred to when performing commissioning tests in association with the
commissioning section of the service manual.
NOTE :
All the Test are performed in the Test Switch.
Omicron CMC156 Test Equipment or Any Equivalent To Be Used

7.1 87RB High Impedance Differential Relay (TEE Protection)


- Inject Secondary Voltage across the metrosell (Phase R), and increase voltage until the relay operates.
- Record the operating Voltage and current at both the relay terminal and metrosell.
-Repeat same procedure above for phase Y and B.
7.2 Testing of Binary Inputs :
This test checks that all the opto-isolated inputs on the relay are functioning correctly. (3 opto-isolated
inputs for the P122).
The opto-isolated inputs should be energized one at a time. Ensuring correct polarity, connect the
auxiliary voltage to the appropriate terminals for the input being tested.
The line "INPUTS" in the "OP. PARAMETERS" menu gives the state of each input, a '1' indicating an
energized input and a '0' indicating a de-energized input. When each input is energized one of the digits
on the bottom line of the display will change to indicate the new state of the inputs.
7.3 Testing of Binary Outputs :
This test checks that all the output relays are functioning correctly. (6 output relays for the P122).The
output relays should be energised one at a time. Connect a continuity tester across the terminals
corresponding to output relay 1 .
In the following window in the "Relay Satus" sub-menu of the "OP PARAMETERS" menu:
Relay 8 7 6 5 4 3 2 1
Status 0 0 0 0 0 0 0 1
Repeat the test for each relay.
Operation will be confirmed by the continuity tester operating for a normally open contact and ceasing
to operate for a normally closed contact.
NOTE: It should be ensured that thermal ratings of anything connected to the output relays during the
test procedure is not exceeded by the associated output relay being operated for too long. It is therefore
advised that the time between application and removal of relay testing kept to the minimum.
If the Outputs are assigned for function this will be tested along with Functional test of relays.
AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 4 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122
8

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

Bay Ref:
Substation:

RECORD TEST SHEET

8.1 RELAY INFORMATION


Type No.:

Designation :

P122

Nominal Current :

Model No :
Serial Number
Firmware Version :

Nominal Voltage` :
Aux. Volts :

8.2 CT DATA:
CT rated primary current set as
CT rated secondary current set as
Ignd-CT rated primary current set as
Ignd-CT rated secondary current set as
8.3 PRODUCT CHECKS
Relay damaged?
Rating information correct for installation?
Case earth installed?
External wiring checked against diagram?
Test block connections checked?
Measured auxiliary supply
LCD front panel display
Clock set to local time?
Time maintained when aux. supply removed?
8.4 MEASURMENT VALUE TEST:
Current Measurement
Current
Phase injected
injected
(Amps)
PH-N
L1-E

1.0

V dc

Current read on relay display (A)


IR

IY

IB

AREVA T&D

IN

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 5 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

L2-E

1.0

L3-E

1.0

L1-L2-L3

1.0

Bay Ref:
Substation:
0
0
0

8.5 HIGH IMPEDANCE DIFF CURRENT 87B:


Measured
Operating
Voltage

Phase

Measured
Current at
Metrosell

Measured
Current at
Relay

Current
Setting of
Relay

Time
setting

Operating
Time at 2*
Oper.V

R
Y
B
8.6 EXTERNAL STABILIZING RESITANCE MEASURMENT :

Designation In
Drawing
R211

R221

R231

Phase

Theoretical Value

AREVA T&D

Measured Value

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 6 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

P122

Bay Ref:
Substation:

8.7 EXTERNAL NON LINEAR (MERTCIL) RESITANCE MEASURMENT :

Designation In
Drawing
R4

R5

R6

Phase

Theoretical Value

Measured Value

8.8 CT SECONDARY RESISTANCE MEASURMENT :


Theoretical Value

Phase

Measured Value

R
Y
B

8.9 BINARY INPUT TEST :


Input No.
Terminal No.

Active

Function Assigned

22-24

High

NOT USED**

26-28

High

NOT USED**

17-19

High

NOT USED**

sheet

Result

* SPARE: wired up to terminal blocks.


** NOT USED: Not wired.
8.10

BINARY OUTPUT TEST:

Output No.
1

Terminal No.

Type

2-6

NO

2-4

NC

Function Assigned
(Aux relay operated)

sheet

Result

NOT USED**

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 7 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

Bay Ref:
Substation:

8-12

NO

8-10

NC

14-16

NO

TO BUS 2A GROUP-B

18-20

NO

NOT USED**

1-3

NO

SPARE*

284

5-7

NO

SPARE*

284

NOT USED**

282

* SPARE: wired up to terminal blocks.


** NOT USED: Not wired.
8.11
FIXED LED INDICATIONS TEST:
LED No.
LED Label

Color

Result

Trip

Red

Alarm

Yellow

Warning

Yellow

healthy

Green

8.12
LED INDICATIONS TEST: ( LEFT SIDE LED)
LED No.
LED Label
1

Color

Result

2
3
4

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 8 of 9

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P122
8.13
Item

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P122
87B2-B

Bay Ref:
Substation:

FINAL CHECKS
Description

Result

All test equipment, leads, shorts and test block removed safely?

Disturbed customer wiring re-checked?

All commissioning tests disabled?

Circuit breaker operations counter reset?

Current counters reset?

Event records reset?

Fault records reset?

Disturbance records reset?

Alarms reset?

10

LEDs reset?

11

Secondary front cover replaced? (If applicable)

REMARKS

END OF REPORT

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV- 1

Page 9 of 9