Interconnection Authority
GCCIA
Engineer
P544
Bay Ref:
Substation:
REVISION
PAGES 2
3
2
X
SUMMARY
1
PURPOSE OF TESTS
REFERENCE DOCUMENT
SCOPE
RELAY TERMINLOGY
TEST EQUIPMENT
PRE-REQUISTES
PROCEDURES
11
8.11
8.12
8.13
8.14
8.15
8.16
FINAL CHECK
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 1 of 21
P544
Bay Ref:
Substation:
1 PURPOSE OF TESTS
The purpose of the tests is to check the full functionality of the protection relay.
This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or
SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning
procedures.
This procedure does not intend to check all tripping matrix and PSL logic tests, This, when applicable, is
described into a separate document, dedicated to the specific substation and feeder type.
2 REFERENCE DOCUMENTS
DOCUMENT
REFERENCE
DOCUMENT
VERSION/
DATE
REMARKS
3 SCOPE
Substation Name :Diameter:
Bay :
Panel Number :
Relay Denomination in Scheme
87LB/21BU/50BU
Scheme to be Checked
4 TERMINOLOGY
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 2 of 21
P544
Code ( ANSI)
87LB
21BU
50BU
Bay Ref:
Substation:
Terminology
Line Differential Protection
Back Up Distance Protection
Back Up Over Current Protection
Description
Make
Equipment
Sl No.
Calibration
date
2.
Secondary
Injection Kit
Multimeter
3.
Laptop
NA
Setting software
Type
: MICOM S1 Studio
Version : 2.14
Calibration due
date
6. PRE - REQUISITES
PRE-REQUISITES
REMARKS
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 3 of 21
P544
Bay Ref:
Substation:
7. TEST PROCEDURES
The following procedures are written for demonstrating the main protection functions of the P544
relay using an Omicron test set or similar. The tests do not test the boundaries of all available function
characteristics. They do test that the function is operating at a point on one chosen characteristic. This
document is to be referred to when performing commissioning tests in association with the
commissioning section of the service manual.
NOTE :
All the Test are performed in the Test Switch.
Omicron CMC156 Test Equipment or Any Equivalent To Be Used .
.
7.1. Differential Function Tests :( Ref Record Test Sheet 8.5)
To perform this test the relay should be set on Test loop back mode - Enabled in Commission Tests
Setting.
7.1.1 Pick Up and Time measurement Test : ( Ref 8.5.1)
Inject current on Phase A starting from 0.001 A to until the relays trip on Phase A Differential.
Record the values in the test sheet. The same Steps will be repeated for other Phases.
Inject 2 X I Pickup in Phase A and Measure the Operating time of the Relay. Note down
readings. The same Steps will be repeated for other Phases.
Inject current of 1A is injected into the A phase which is used as the bias current. The relay will
trip and any contacts associated with the A-phase will operate, but ignore them for the moment.
Inject another small current into the B phase which is used as differential current. Ia is always
greater than Ib. Slowly increase the current in the B phase until Phase B trips. Record the phase
B current magnitude. Switch OFF the ac supply, read and clear all alarms.
Pass Criteria:
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 4 of 21
P544
Bay Ref:
Substation:
The current magnitude at which B phase element operates should be 0.25 amp +/- 10%. (Assumption:
Is1 = 0.2pu, k1 = 30%, Is2 = 2.0pu. It is noted that B phase operate current is 0.5 x (Is1 + 1.5k1) pu +/10% )
7.1.2
Objective:
To check operation on the upper bias slope of the current differential characteristic.
Relay Settings:
Initial Settings plus enable phase differential protection in the configuration section of the menu.
Method:
Repeat the test in 7.1.1 with the bias current set in the A-phase to be 3pu.
Slowly increase the current in the B phase until phase B trips (bit 2 of [0F04: Test Port Status] is
set to 1). Record the phase B current magnitude and check that it corresponds to the information
below.
Note that the duration of current injections should be short to avoid overheating of the injection
test set and Relay
Pass Criteria:
The current magnitude at which B phase element operates should be 1.15 amp +/- 20%. Assumption:
Is1 = 0.2pu, k2 = 150%, Is2 = 2.0pu. It is noted that B phase Operate current is 0.5 x [(3 x k2) {(k2
k1) x Is2 } + Is1] pu +/- 20%
7.1.3
Objective:
To check operation of the relay in case of Fiber Com error. Noting that tow communication channels are
used with the P544.
Method
Inject 1 A current, then record the operation of the relay. Relay should operate as follows:
When Both channels are health IN, => the relay operates with diff trip only.
When one channel is OUT => the relay operates with diff trip only.
When both the two channels are OUT => the relay operates with dist trip, and give Comm. Fail
Alarm.
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 5 of 21
P544
Bay Ref:
Substation:
Apply AN,BN,CN, AB, BC, CA,ABC faults at the relay line angle to find the Z1, Z2, Z3 reach
pick up.
Use the reach test facility in Omicron Test Universe Advance Distance module or Equal test
module in other Test Kits
Pass Criteria:
Reach should be within +/- 5% on line angle fault and +/- 10 % on off line angle fault.
7.2.2
Objective:
To check the resistive reach along the resistive axis for all zones for phase to ground fault types.
Relay Settings:
Final Settings plus enable distance protection in the configuration section of the menu.
Method:
Apply AN,BN,CN, AB, BC, CA,ABC faults at the relay line angle to find the Z1, Z2, Z3 reach
pick up.
Use the reach test facility in Omicron Test Universe Advance Distance module or Equal test
module in other Test Kits
Pass Criteria:
The reach should be within 10% of the setting.
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 6 of 21
P544
7.2.3
Bay Ref:
Substation:
Objective:
To check the operation times for each zone on selected fault types.
Method:
For zone 1 timing apply AN fault at 50% of the Zone 1 reach, for zone 2 apply a CN fault at zone
1 plus 50% Zone 2 minus zone 1 reach, for zone 3 apply a AB fault at zone 2 plus 50% Zone 3
minus zone 2 reach, for zone 4 apply a BC fault at 50% zone 4 reach.
Use the reach test facility in Omicron Test Universe Advance Distance module or Equal test
module in other Test Kits
Pass Criteria:
The operation times should be within 1 to 2 cycles for zone 1 and 5% of the set time for the other zones.
7.2.4
Fault Locator :
Objective:
To verify the correct operation of Fault Locator..
Method:
Apply fault at 100 %,75%,50% and 25 % of AN,BN,CN,AB,BC,CA,ABC and record the values.
Use the reach test facility in Omicron Test Universe Advance Distance module or Equal test
module in other Test Kits
Pass Criteria:
Fault Location + or 2 % of line Length(Solid fault applied on line)
7.3 DIRECTIONAL EF PROTECTION ( DEF ) ( Ref 8.7)
7.3.1 Forward DEF element test: ( Ref 8.7.1)
Apply 3phase volts healthy voltage ( 2 sec ) , inject only one phase current for this test to
the phase under test and reduce voltage of phase under test. Until Vo=Vn/3=(Va+Vb+Vc) is
greater than setting.
With angle of 0 degree between voltage and current , Increase the current in 0.001In
steps, pausing for 1s between each step, until the relay operates on Forward. The current must
then be reduced in the same manner until the protection resets.
7.3.2 Reverse DEF element test: ( Ref 8.7.2)
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 7 of 21
P544
Bay Ref:
Substation:
Apply 3phase volts healthy voltage ( 2 sec ) , inject only one phase current for this test to
the phase under test and reduce voltage of phase under test. Until Vo=Vn/3=(Va+Vb+Vc) is
greater than setting.
With angle of 180 degree between voltage and current, Increase the current in 0.001In
steps, pausing for 1s between each step, until the relay operates on Reverse. The current must
then be reduced in the same manner until the protection resets.
Apply 3phase volts healthy voltage ( 2 sec ) , inject only one phase current with value
higher than setting ( 1 A).
With angle of 0 degree between voltage and current, 0.01Vn steps, pausing for 1s
between each step, . The calculate Vo=Vn/3=(Va+Vb+Vc) The Voltage must then be Increased in
the same manner until the protection resets.
7.3.4 Directional Angle Test: ( Ref 8.7.4)
Apply 3phase volts healthy voltage ( 2 sec ) ,then inject only one phase current with
value higher than setting ( 1 A)and Decrease voltage until the relay operates, with angle 180
between voltage & current.
Change the angle in step of 1 degree pausing for 1s between each step ,between voltage
and current until relay operates on Forward ,The angle must then be decreased in the same
manner until the Forward protection resets.
For reverse direction test , do the same noting Reverse operation.
Apply 3phase volts healthy voltage ( 2 sec ) ,then apply fault ( inject only one phase
current with value higher than setting ( 1 A)and and decrease one voltage to make VN below
the setting).
Check for DEF signal send when Forward DEF operates.
Check for DEF signal NOT send when Forward DEF operates.
Activate the receive signal and check the time with DEF receive and without receive.
7.4 VT supervision
Method:
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 8 of 21
P544
Bay Ref:
Substation:
Enable the Voltage Transformer Supervision. Apply three phase nominal voltages (63.5V per phase)
and currents (1A per phase) to the relay. After 5s simulate a fuse failure condition on Phase A by
reducing the voltage of 0.01 V step by step till VT failure Appears. Record the Values on test sheet.
(VT fail Pick up).The same Step by Step increase the Voltage till VT fail Disappears. Record the
Values on test sheet.(VT fail Reset).the same steps will be repeated for AN,BN,CN and ABC.
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 9 of 21
P544
Bay Ref:
Substation:
PASS CRITERIA
For the relay to pass it shall operate as detailed below.
DT operating time 1.0s +/-2%, IDMT operating time 10.029s +/-5% at 2In and 2.971s +/-5% at 10In.
7.6 Testing of Binary Inputs :
Apply nominal Voltage on respective Relay terminal and Check the Healthiness of Binary Inputs in the
System Manu Relay input status. ( 0 or 1 )
Note : if the BI is used in the scheme the BI will be tested along with scheme.
Caution : please make sure of Nominal voltage and Polarity of Terminal before apply the voltage to
relay.
7.7 Testing of Binary Outputs :
This test checks that all the output relays are functioning correctly.
Ensure that the relay is made in test mode by viewing cell [0F0D: COMMISSION TESTS, Test Mode]
to ensure that it is set to Blocked.The output relays should be energized one at a time. To select output
relay 1 for testing, set cell [0F0E: COMMISSION TESTS, Test Pattern] as appropriate.Connect a
continuity tester across the terminals corresponding to output relay 1 as given in external connection
diagram (P54x/EN IN).To operate the output relay set cell [0F0F: COMMISSION TESTS, Contact Test]
to Apply Test. Operation will be confirmed by the continuity tester operating for a normally open
Contact and ceasing to operate for a normally closed contact. Measure the resistance of the
contacts in the closed state.Reset the output relay by setting cell [0F0F: COMMISSION TESTS, Contact
Test] toRemove Test.Repeat the test for the remaining relays.Return the relay to service by setting cell
[0F0D: COMMISSION TESTS, Test Mode] toDisabled.
Note : If the Outputs are assigned for function this will be tested along with Functional test of
relays.
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 10 of 21
P544
Bay Ref:
Substation:
P544
Designation :
Nominal Current :
Model No :
Serial Number
Firmware Version :
Nominal Voltage` :
Aux. Volts :
Current
injected
(Amps)
V dc
V dc
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 11 of 21
P544
PH-N
IR
L1-E
1.0
L2-E
1.0
L3-E
1.0
L1-L2-L3
1.0
IY
IB
Bay Ref:
Substation:
IN
IR
IY
IB
IN
0
0
8.4.2Voltage Measurement
Phase
injected
Voltage
applied
(Volts)
PH-N
L1-E
63.5
L2-E
63.5
L3-E
63.5
L1-L2-L3
63.5
VY
VB
V_RY
V_YB
V_BR
VN
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 12 of 21
P544
Bay Ref:
Substation:
Description
IS1
Is2
K1
K2
Setting
R-E
Expected Trip
Time
in m-sec
<40 ms
Y-E
<40 ms
B-E
<40 ms
R-Y
<40 ms
Y-B
<40 ms
B-R
<40 ms
R-Y-B
<40 ms
Fault Type
Expected Pickup
In Amp
Actual Pickup
In Amp
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 13 of 21
P544
Bay Ref:
Substation:
, K1= % , K2= % )
, K1= % , K2= % )
3.0
3.0
B
x
C
x
CH 1 IN
CH 2 OUT
CH 1 OUT
CH 2 IN
1.0 A
Diff .Trip
1.0 A
Diff .Trip
1.0 A
CH 1 OUT
4
CH 2 OUT
Result
No Diff Trip
Comm. Fail alarm
Dist. Z1 Trip
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 14 of 21
P544
Bay Ref:
Substation:
Description
Setting
1
2
3
4
5
8
Line Length
Line Impedance
Line Angle
KZN Res Comp
Zone 1 phase
Zone 1 Earth
km
degree
Description
Checked
Description
Checked
Expected
Distance
Measured Distance
A-N
B-N
C-N
A-B
B-C
C-A
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 15 of 21
P544
Item
1
Description
67N Polarizing
67N VN polarizing
67N Threshold
Bay Ref:
Substation:
Setting
degrees
V
mA
67N Pickup
67N Pickup
V Pickup
V Drop Off
From Angle
To Angle
V
8.7.4 Directional Angle Test:
Direction
Forward
Reverse
8.7.5
Time multiplier
Timing test
Injected
current
Expected Op.
Time
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 16 of 21
P544
Bay Ref:
Substation:
Vb
Pick
Up
Vb
Drop
Off
Vc Pick
Up
Vc
Drop
Off
I2 Pick Up
mA
Vabc
Pick
Up
Vabc
Drop
Off
V2 Pick
Up
V2
Drop
Off
I Pick Up
A
Setting
Characteristic test
Measured op.
current
Char
Time
multiplier
Injected
current
Measured
op. time
R
Y
B
8.10
Input No.
Terminal No.
Active
Function Assigned
sheet
D1-D2
High
SPARE*
211
D3-D4
High
SPARE
211
D5-D6
High
NOT USED**
D7-D8
High
A/R LOCKOUT
211
D9-D10
High
211
D11-D12
High
NOT USED
D13-D14
High
SPARE
AREVA T&D
Result
211
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 17 of 21
P544
Bay Ref:
Substation:
D15-D16
High
SPARE
211
F1-F2
High
SPARE
212
10
F3-F4
High
SPARE
212
11
F5-F6
High
NOT USED
12
F7-F8
High
NOT USED
13
F9-F10
High
NOT USED
14
F11-F12
High
NOT USED
15
F13-F14
High
NOT USED
16
F15-F16
High
NOT USED
H1 H2
NO
Function Assigned
(Aux relay operated)
QA31 3PH TRIP (94B)
H3 H4
NO
H5 H6
NO
NOT USED**
H8 H9
NO
AR INITIATION Y-PH
243
H7 H9
NC
H11 H12
NO
AR INITIATION B-PH
243
H10 H12
NC
H14 H15
NO
H13 H15
NC
H17 H18
NO
H16 H18
NC
Output No.
4
5
6
7
Terminal No.
Type
sheet
Result
213
214
NOT USED
SPARE*
AREVA T&D
216
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 18 of 21
P544
Bay Ref:
Substation:
G1 G2
NO
G3 G4
NO
10
G5 G6
NO
AR INITIATION R-PH
243
G8 G9
NO
SPARE
216
G7 G9
NC
G11 G12
NO
222
G10 G12
NC
G14 G15
NO
214
G13 G15
NC
G17 G18
NO
QA31 AR INITIATION
252
11
12
13
14
G16 G18
NC
* SPARE: wired up to terminal blocks.
** NOT USED: Not wired.
8.12
FIXED LED INDICATIONS TEST:
LED No.
LED Label
1
Trip
8.13
214
214
Color
Red
Alarm
Yellow
Out of Service
Yellow
Relay healthy
Green
Result
LED No.
1
LED Label
Color
Result
2
3
4
5
6
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 19 of 21
P544
Bay Ref:
Substation:
7
8
8.14
LED No.
1
LED Label
Color
Result
2
3
4
5
6
7
8
9
10
8.15
8.16
Result
FINAL CHECKS
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name
Date
Doc. No.
Name
Date
REV-3
Page 20 of 21
P544
Bay Ref:
Substation:
Item
Description
Result
All test equipment, leads, shorts and test block removed safely?
Alarms reset?
10
LEDs reset?
11
REMARKS
Confirming that the differential settings could be adjusted depending on the effective charging
current of the line, once the feeder is energized. Steady state differential current, with no load,
should be measured and recorded.
Confirming that the stability and full communication loop should be measured once the
telecommunication between both ends is in operation.
END OF REPORT