You are on page 1of 5

Retail Supply Tariff approved by K.E.R.C. in Tariff Order 2015-16 dated: 02.03.

2015
Sl.No
.

Tariff
Category

Category Description

For BESCOM
Existing Tariff
Proposed by
as per
BESCOM
Tariff Order2014

Particulars

Approved as per
Tariff Order 2015

Remarks

Low Tension Supply


Fully subsidized by
GOK

LT-1

BJ/KJ

Monthly Min. per


Installation per
Month.
CDT(Commission
Determined Tariff)
EC per KWH

LT-2 (a)(i)

LT-2 (a)(ii)

LT-2(b)(i)

LT-2(b)(ii)

LT-3(i)

Domestic - Applicable
to Areas under Bruhat
Bangalore Mahangara
Palike (BBMP),
Municipal
Corporations and all
Urban Local Bodies

Domestic Applicable
to Areas under Village
Panchayats

Free

Rs 30/-

Rs 30/-

536 Ps.

Fully subsidized by GOK

Free

Cost of Supply: 559 Ps. / unit

Rs 30 /-

616 Ps.

Change in CDT
Increased by 23 Paise

559 Ps

Sanctioned Load
Fixed Charge (FC)
FC For Ist KW

Rs.25/-

Rs.25/-

FC For 1st KW

Rs.25/-

No Increase

FC For addl. KW

Rs.35/-

Rs.35/-

FC For addl. KW

Rs.35/-

No Increase

270 Ps

350 Ps

270 Ps

No Increase

Consumption
Energy Charges
(EC)
0 to 30 KWH
31 to 100 KWH

400 Ps

480 Ps

0 to 30 KWH
31 to 100 KWH

400 Ps

No Increase

101 to 200 KWH

525 Ps

605 Ps

101 to 200 KWH

540 Ps

15 Ps Increased

Above 200 KWH


Sanctioned Load
Fixed Charge (FC)
FC For Ist KW

625 Ps

705 Ps

Above 200 KWH

640 Ps

15 Ps Increased

Rs.15/-

Rs.15/-

FC For 1st KW

Rs.15/-

No Increase

Rs.25/-

Rs.25/-

FC For addl. KW

Rs.25/-

No Increase

340 Ps.

0 to 30 KWH

260 Ps

No Increase

FC For addl. KW
Consumption
Energy Charges
(EC)
0 to 30 KWH
31 to 100 KWH

260 Ps
370 Ps

450 Ps

31 to 100 KWH

370 Ps

No Increase

101 to 200 KWH

495 Ps

575 Ps

101 to 200 KWH

510 Ps

15 Ps Increased

575 Ps

655 Ps

Above 200 KWH

590 Ps

15 Ps Increased

Rs.35/-

Rs.35/-

Rs.35/-

No Increase

Rs.65/-

Rs.65/-

FC per KW
FC Minimum per
month

600 Ps

680 Ps

0 to 200 KWH

600 Ps

Above 200 KWH


Pvt. Educational
Sanctioned Load
Institutions & Pvt.
Fixed Charge (FC)
Hospitals and Nursing
FC per KW
Homes:
FC Minimum per
Applicable to Areas
Month
under Bruhat
Consumption
Bangalore Mahangara
Energy Charges
Palike (BBMP) ,
(EC)
Municipal
Corporations and all
0 to 200 KWH
areas coming under
Urban Local Bodies.
above 200 KWH

Rs.65/-

No Increase

No Increase
No Increase

720 Ps

800 Ps

above 200 KWH

720 Ps

Rs.25/-

Rs.25/-

Rs.25/-

Rs.50/-

Rs.50/-

FC per KW
FC Min. per
month

550 Ps

630 Ps

0 to 200 KWH

550 Ps

No Increase

670 Ps

750 Ps

above 200 KWH

670 Ps

No Increase

Rs.40/-

Rs.40/-

FC per KW

Rs.40/-

No Increase

0 to 50 KWH

675 Ps

755 Ps

0 to 50 KWH

695 Ps

20 Ps Increased

Above 50 KWH

775 Ps

855 Ps

Above 50 KWH

795 Ps

20 Ps Increased

Sanctioned Load
Fixed Charge (FC)
FC per KW
Pvt. Educational
FC Minimum per
Institutions and Pvt.
Month
Hospital & Nursing
Consumption
Homes - Applicable to
Energy Charges
Areas coming under
(EC)
Village Panchayats
0 to 200 KWH

Commercial:
Applicable to areas
coming under Bruhat
Bangalore Mahangara
Palike (BBMP) ,
Municipal
Corporations and all
Urban Local Bodies

Free

above 200 KWH


Sanctioned Load
Fixed Charge (FC)
per KW
Consumption
Energy Charges
(EC)

Rs.50/-

No Increase
No Increase

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW
Fixed Charge (FC)
per KW

Rs 55/-

Rs 55/-

FC per KW

Consumption
Energy Charges
(EC)

Retail Supply Tariff of BESCOM for FY 16 Existing, Proposed & Approved

Rs55 /-

Same as above

No Increase

LT-3(ii)

LT-4(a)

Commercial
Applicable to Areas
coming under Village
Panchayats

IP Sets
10 HP & below

Sanctioned Load
Fixed Charge
(FC)/KW
Consumption
Energy Charges
(EC)
0 to 50 KWH
Above 50 KWH

Rs.30/-

Rs.30/-

FC per KW

Rs.30/-

No Increase

625 Ps

705 Ps

0 to 50 KWH

645 Ps

20 Ps Increased

725 Ps

805Ps

Above 50 KWH

795 Ps

20 Ps Increased

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW
Fixed Charge (FC)
Rs 45/Rs 45/FC per KW
Rs 45 /No Increase
per KW
Consumption
Energy Charges
Same as above
(EC)
FC per HP
Nil
FC per HP
Nil
CDT
Free as per GoK order.
(Commission
(In case, GOK do not
203 Ps per
283 ps per kwh
Determined Tariff)
release the subsidy,
KWH
CDT
CDT shall be collected
(Commission
203 Ps per KWH
from the Consumers)
Determined Tariff)
238 Ps
Change in CDT
35 Ps Increase

9
10

11

12

LT-4(b)

LT-4(c)(i)

LT-4(c)(ii)

LT-5 (a)

IP Sets
Above 10 HP
IP Sets
Hor. Nur., Coffee, Tea
& Rubber :
10 HP & below
IP Sets
Hor. Nur. Coffee, Tea &
Rubber:
Above 10 HP

Heating and Motive


Power:
Applicable to Areas
under Bruhat
Bangalore
Mahanagara Palike
and Municipal
Corporations.

FC per HP

Rs 30/-

Rs.30/-

FC per HP

Rs 30/-

No Increase

EC per KWH

215 Ps

295 Ps

EC per KWH

240 Ps

25 Ps Increased

FC per HP

Rs.20/-

Rs.20/-

FC per HP

Rs.20/-

No Increase

EC per KWH

215 Ps

EC per KWH

240 Ps

25 Ps Increased

FC per HP

Rs.30/-

Rs.30/-

FC per HP

Rs.30/-

No Increase

EC per KWH

215 Ps

295 Ps

EC per KWH

240 Ps

25 Ps Increased

5 HP & below
Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above

Rs30./-

No Increase
No Increase

Sanctioned Load
Fixed Charge
(FC)/HP
5 HP & below
Rs.30/Rs.30/Above 5 HP but
Rs.30/Rs.30/below 40 HP
40 HP & above but
Rs.40/Rs.40/below 67 HP
67 HP & above
Rs.110/Rs.110/Demand Based Tariff (Optional)
Above 5 HP but
Rs.50/Rs.50/below 40 HP
40 HP & above but
Rs.70/Rs.70/below 67 HP
67 HP & above
Rs.160/Rs.160/Consumption
Energy Charges
(EC)
0 to 500 KWH
475 Ps
555 Ps
Above 500 KWH
Sanctioned Load
Fixed Charge
(FC)/HP
5 HP & below
Above 5 HP but
below 40 HP
40 HP & above but
below 67 HP
67 HP & above

13

LT-5(b)

295 Ps

Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above

Rs.160/-

No Increase

Rs.50/Rs.70/-

No Increase

0 to 500 KWH

490 Ps

15 Ps Increased

Above 500 KWH

600 Ps

15 Ps Increased

Rs.25/-

Rs.25/-

Rs.25/-

No Increase

Rs.30/-

Rs.30/-

Rs.35/-

Rs.35/-

Rs.100/-

Rs.100/-

5 HP & below
Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above

Rs.30/Rs.35/-

No Increase
No Increase

Rs.100/-

No Increase

Rs.45/-

No Increase

Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above

Rs.150/-

No Increase

Rs.60/-

No Increase

0 to 500 KWH

455 Ps

535 Ps

0 to 500 KWH

470 Ps

15 Ps Increased

501 to 1000 KWH

535 Ps

615 Ps

501 to 1000 KWH

550 Ps

15 Ps Increased

645 Ps

Above 1000 KWH


580 Ps

15 Ps Increased

565 Ps

22.00Hrs to 06.00Hrs
06.00Hrs to18.00Hrs

Rs110./-

No Increase

665 Ps

Above 1000 KWH

14

Rs.40/-

585 Ps

Demand Based Tariff (Optional


Above 5 HP but
Rs.45/Rs.45/below 40 HP
Heating and Motive
Power Applicable all 40 HP & above but
Rs.60/Rs.60/Areas other than those
below 67 HP
covered under
67 HP & above
Rs.150/Rs.150/LT-5(a).
Consumption
Energy Charges
(EC)

Time of day

Rs.30/-

Increase(+)/reduction(-) in energy charges


over the normal tariff applicable
(-)125 paise per Unit

18.00Hrs to 22.00Hrs

Retail Supply Tariff of BESCOM for FY 16 Existing, Proposed & Approved

No Change

(+)100 paise per unit

15

16

LT-6 (a)

LT-6 (b)

Water Supply

Public Lighting

FC per HP

Rs.35/-

Rs.35/-

FC per HP

Rs.35/-

EC per KWH

330 Ps

410 Ps

EC per KWH

340 Ps

FC per KW

Rs.50/-

Rs.50/-

FC per KW

EC per KWH

485 Ps

565 Ps

EC per KWH

EC per KWH to LED


Lights

485 Ps

565 Ps

EC per KWH to
LED Lights

400 Ps

Weekly Min.
per KW

Rs.160/-

Less than 67 HP
Weekly Min. per KW

LT-7(a)
17

Temporary Power
Supply for all
purposes

LT-7(b)
18

500 Ps

10 Ps Increased
No Increase
15 Ps Increased
85 Ps Decreased

Weekly Min: No Increase


EC per KWH

980 Ps

EC per KWH

900 Ps

900 Ps

Less than 67 HP
Weekly Min. per KW

Power Supply on
permanent
connection basis

Rs.160/Rs.160/-

Rs.50/-

No Increase

E.C: No Increase

Rs.160/-

Fixed charge per


month per KW.

Rs.160/-

EC per KWH

980 Ps

EC per KWH

Rs.40/-

Newly introduced category


FC: Introduce FC concept

900 Ps

900 Ps

E.C: No Increase

High Tension Supply


No Increase
Rs.180/-

Rs.180/-

DC per KVA

Rs.180/-

400 Ps

480 Ps

EC per KWH

410 Ps

Rs.180/-

Rs.180/-

DC per KVA

Rs.180/-

575 Ps

655Ps

590 Ps

15 Ps Increased

615 Ps

695 Ps

0 to 1 Lakh KWH
Above 1 Lakh
KWH

630 Ps

15 Ps Increased

DC per KVA

Rs.180/-

No Increase

535 Ps

15 Ps Increased

DC per KVA
HT-1

HT Water Supply

HT-2(a)(i)

HT Industrial:
Applicable to Areas
under Bruhat
Bangalore
Mahanagara Palike
and Municipal
Corporations.

19

20

21

22

HT-2(a)(i)

HT-2(a)(ii)

Applicable to
Bangalore
Metropolitan Railway
Corporation Ltd.
(BMRCL).

HT Industrial:
Applicable to Areas
other than those
covered under
HT-2(a)(i)

Demand Charges
(DC) per KVA
Consumption
Energy Charges (EC
0 to 1 Lakh KWH
Above 1 Lakh KWH
Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC)

Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC
0 to 1 Lakh KWH
Above 1 Lakh KWH

23

HT-2(a)(i)
and
HT-2(a)(ii)

HT-2(b)(i)
24

Railway Traction
and
Effluent Treatment
Plants

HT Commercial
Areas under
Bruhat Bangalore
Mahanagara Palike
and Municipal
Corporations.

Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC)
Per KWH

Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC)
0 to 2 Lakhs KWH
Above 2 Lakhs KWH

25

HT-2(b)(ii)

HT Commercial
Applicable to Areas
other than those
covered under

10 Ps Increased

EC per KWH

Rs.180/-

Rs.180

No Increase

520 Ps

600 Ps

Rs.170/-

Rs.170/-

DC per KVA

Rs.170/-

No Increase

570 Ps

650 Ps

585 Ps

15 Ps Increased

600 Ps

680 Ps

0 to 1 Lakh KWH
Above 1 Lakh
KWH

615 Ps

15 Ps Increased

DC per KVA

Rs.180/-

No Increase

Rs.180/-

EC per KWH

Rs.180

540 Ps

620 Ps

Rs.200/-

Rs.200/-

DC per KVA

Rs.200/-

No Increase

735 Ps

815 Ps

755 Ps

20 Ps Increased

765 Ps

845 Ps

0 to 2 Lakhs KWH
Above 2 Lakhs
KWH

785 Ps

20 Ps Increased

Rs.190/-

Rs.190/-

DC per KVA

Rs.190/-

No Increase

EC per KWH

Demand Charges
(DC) per KVA

Retail Supply Tariff of BESCOM for FY 16 Existing, Proposed & Approved

555 Ps

15 Ps Increased

HT-2(b)(i)

26

27

28

HT-2(C)(i)

HT-2(C)(ii)

HT-3 (a)(i)

Applicable to
Government Hospitals
& Hospitals run by
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging
to Govt. , Local Bodies
& Aided Institutions
and Hostels of all
Educational
Institutions,
Applicable to Hospitals
and Educational
Institutions other than
those covered under
HT2(C) (i)
HT Lift Irrigation
Schemes under
Government
Depts./Corporations.

Consumption
0 to 2 Lakhs KWH

715 Ps

795 Ps

Above 2 Lakhs KWH

745 Ps

825 Ps

Demand Charges
(DC)per KVA

Rs.170/-

0 to 1 Lakh KWH

0 to 2 Lakhs KWH
Above 2 Lakhs
KWH

735 Ps

20 Ps Increased

765 Ps

20 Ps Increased
No Increase

Rs.170/-

DC per KVA

540 Ps

620 Ps

0 to 1 Lakh KWH

560 Ps

20 Ps Increased

Above 1 Lakh KWH

590 Ps

670 Ps

Above 1 Lakh KWH

610 Ps

20 Ps Increased

Demand Charges
(DC)per KVA

Rs.170/-

Rs.170/-

0 to 1 Lakh KWH

640 Ps

720 Ps

0 to 1 Lakh KWH

660 Ps

No Increase
20 Ps Increased

Above 1 Lakh KWH

690 Ps

770 Ps

Above 1 Lakh KWH

710 Ps

20 Ps Increased

EC per KWH
and
Annual Minimum

150 Ps
subject to
Min.
of Rs. 1000/per HP per
annum

Rs.30/-

DC per KVA

Rs.170/-

Rs.170/-

EC per KWH
170 Ps
230 Ps
and
subject to
subject to Min.
Annual Minimum annual Min.
of Rs. 1000 per
of Rs.1000 /HP per annum
per HP per
annum

Rs.30/-

FC per HP/PM

No Increase in Annual Minimum


Charges
EC ; 20 Ps Increased

Rs.30/No Increase

F.C. per HP /PM

29

HT-3 (a)(ii)

HT Private Lift Irrigation


Schemes
/Societies : Connected
to
Urban / Express
feeders

E.C. per KWH

F.C. per HP/PM

30

31

HT-3 (a)(iii)

HT-3 (b)

HT Private Lift Irrigation


Schemes /Societies
other than those
covered under HT-3
(a)(ii)
(Not Connected to
Urban / Express
feeders)

HT supply to
Agriculture/
Horticulture Farms

HT-4
HT Res. Apartments
Applicable to all areas

32

33

HT-5

Temporary Supply

150 Ps

EC per KWH
170 Ps

Rs.10/-

E.C. per KWH


150 Ps

EC per KWH
and
Annual Minimum

230 Ps

Rs.10/-

FC per HP/PM

230 Ps

EC per KWH

Rs.10/-

170 Ps

350 Ps
370 Ps
430 Ps
subject to Min.
subject to
subject to Min.
of
Min. of
of
EC per KWH
Rs. 1000 per HP
Rs. 1000 per
Rs. 1000 per HP
and
per annum
HP per annum
per annum
Annual Minimum

DC per KVA

Rs 100/-

EC per KWH

530 Ps

Rs 100/-

DC per KVA

610 Ps

EC per KWH

Rs 100/-

No Increase

20 Ps Increased

No Change in Annual Minimum


Charges
E.C: 20 Ps Increased

No Increase

550 Ps

Rs.
Rs.
Rs.
210/HP/Month
210/HP/Month
210/HP/Month
for the entire
for the entire
Fixed Charges/
for the entire
Fixed Charges/
sanctioned
sanctioned
Demand Charges
sanctioned Demand Charges
load /
load /
load / Contract
Contract
Contract
demand
demand
demand
900 Ps
Energy Charges
980 Ps
Energy Charges
900 Ps

Retail Supply Tariff of BESCOM for FY 16 Existing, Proposed & Approved

20 Ps Increased

20 Ps Increased

No Increase

No Increase

Retail Supply Tariff of BESCOM for FY 16 Existing, Proposed & Approved

You might also like