Professional Documents
Culture Documents
2015
Sl.No
.
Tariff
Category
Category Description
For BESCOM
Existing Tariff
Proposed by
as per
BESCOM
Tariff Order2014
Particulars
Approved as per
Tariff Order 2015
Remarks
LT-1
BJ/KJ
LT-2 (a)(i)
LT-2 (a)(ii)
LT-2(b)(i)
LT-2(b)(ii)
LT-3(i)
Domestic - Applicable
to Areas under Bruhat
Bangalore Mahangara
Palike (BBMP),
Municipal
Corporations and all
Urban Local Bodies
Domestic Applicable
to Areas under Village
Panchayats
Free
Rs 30/-
Rs 30/-
536 Ps.
Free
Rs 30 /-
616 Ps.
Change in CDT
Increased by 23 Paise
559 Ps
Sanctioned Load
Fixed Charge (FC)
FC For Ist KW
Rs.25/-
Rs.25/-
FC For 1st KW
Rs.25/-
No Increase
FC For addl. KW
Rs.35/-
Rs.35/-
FC For addl. KW
Rs.35/-
No Increase
270 Ps
350 Ps
270 Ps
No Increase
Consumption
Energy Charges
(EC)
0 to 30 KWH
31 to 100 KWH
400 Ps
480 Ps
0 to 30 KWH
31 to 100 KWH
400 Ps
No Increase
525 Ps
605 Ps
540 Ps
15 Ps Increased
625 Ps
705 Ps
640 Ps
15 Ps Increased
Rs.15/-
Rs.15/-
FC For 1st KW
Rs.15/-
No Increase
Rs.25/-
Rs.25/-
FC For addl. KW
Rs.25/-
No Increase
340 Ps.
0 to 30 KWH
260 Ps
No Increase
FC For addl. KW
Consumption
Energy Charges
(EC)
0 to 30 KWH
31 to 100 KWH
260 Ps
370 Ps
450 Ps
31 to 100 KWH
370 Ps
No Increase
495 Ps
575 Ps
510 Ps
15 Ps Increased
575 Ps
655 Ps
590 Ps
15 Ps Increased
Rs.35/-
Rs.35/-
Rs.35/-
No Increase
Rs.65/-
Rs.65/-
FC per KW
FC Minimum per
month
600 Ps
680 Ps
0 to 200 KWH
600 Ps
Rs.65/-
No Increase
No Increase
No Increase
720 Ps
800 Ps
720 Ps
Rs.25/-
Rs.25/-
Rs.25/-
Rs.50/-
Rs.50/-
FC per KW
FC Min. per
month
550 Ps
630 Ps
0 to 200 KWH
550 Ps
No Increase
670 Ps
750 Ps
670 Ps
No Increase
Rs.40/-
Rs.40/-
FC per KW
Rs.40/-
No Increase
0 to 50 KWH
675 Ps
755 Ps
0 to 50 KWH
695 Ps
20 Ps Increased
Above 50 KWH
775 Ps
855 Ps
Above 50 KWH
795 Ps
20 Ps Increased
Sanctioned Load
Fixed Charge (FC)
FC per KW
Pvt. Educational
FC Minimum per
Institutions and Pvt.
Month
Hospital & Nursing
Consumption
Homes - Applicable to
Energy Charges
Areas coming under
(EC)
Village Panchayats
0 to 200 KWH
Commercial:
Applicable to areas
coming under Bruhat
Bangalore Mahangara
Palike (BBMP) ,
Municipal
Corporations and all
Urban Local Bodies
Free
Rs.50/-
No Increase
No Increase
Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW
Fixed Charge (FC)
per KW
Rs 55/-
Rs 55/-
FC per KW
Consumption
Energy Charges
(EC)
Rs55 /-
Same as above
No Increase
LT-3(ii)
LT-4(a)
Commercial
Applicable to Areas
coming under Village
Panchayats
IP Sets
10 HP & below
Sanctioned Load
Fixed Charge
(FC)/KW
Consumption
Energy Charges
(EC)
0 to 50 KWH
Above 50 KWH
Rs.30/-
Rs.30/-
FC per KW
Rs.30/-
No Increase
625 Ps
705 Ps
0 to 50 KWH
645 Ps
20 Ps Increased
725 Ps
805Ps
Above 50 KWH
795 Ps
20 Ps Increased
Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW
Fixed Charge (FC)
Rs 45/Rs 45/FC per KW
Rs 45 /No Increase
per KW
Consumption
Energy Charges
Same as above
(EC)
FC per HP
Nil
FC per HP
Nil
CDT
Free as per GoK order.
(Commission
(In case, GOK do not
203 Ps per
283 ps per kwh
Determined Tariff)
release the subsidy,
KWH
CDT
CDT shall be collected
(Commission
203 Ps per KWH
from the Consumers)
Determined Tariff)
238 Ps
Change in CDT
35 Ps Increase
9
10
11
12
LT-4(b)
LT-4(c)(i)
LT-4(c)(ii)
LT-5 (a)
IP Sets
Above 10 HP
IP Sets
Hor. Nur., Coffee, Tea
& Rubber :
10 HP & below
IP Sets
Hor. Nur. Coffee, Tea &
Rubber:
Above 10 HP
FC per HP
Rs 30/-
Rs.30/-
FC per HP
Rs 30/-
No Increase
EC per KWH
215 Ps
295 Ps
EC per KWH
240 Ps
25 Ps Increased
FC per HP
Rs.20/-
Rs.20/-
FC per HP
Rs.20/-
No Increase
EC per KWH
215 Ps
EC per KWH
240 Ps
25 Ps Increased
FC per HP
Rs.30/-
Rs.30/-
FC per HP
Rs.30/-
No Increase
EC per KWH
215 Ps
295 Ps
EC per KWH
240 Ps
25 Ps Increased
5 HP & below
Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above
Rs30./-
No Increase
No Increase
Sanctioned Load
Fixed Charge
(FC)/HP
5 HP & below
Rs.30/Rs.30/Above 5 HP but
Rs.30/Rs.30/below 40 HP
40 HP & above but
Rs.40/Rs.40/below 67 HP
67 HP & above
Rs.110/Rs.110/Demand Based Tariff (Optional)
Above 5 HP but
Rs.50/Rs.50/below 40 HP
40 HP & above but
Rs.70/Rs.70/below 67 HP
67 HP & above
Rs.160/Rs.160/Consumption
Energy Charges
(EC)
0 to 500 KWH
475 Ps
555 Ps
Above 500 KWH
Sanctioned Load
Fixed Charge
(FC)/HP
5 HP & below
Above 5 HP but
below 40 HP
40 HP & above but
below 67 HP
67 HP & above
13
LT-5(b)
295 Ps
Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above
Rs.160/-
No Increase
Rs.50/Rs.70/-
No Increase
0 to 500 KWH
490 Ps
15 Ps Increased
600 Ps
15 Ps Increased
Rs.25/-
Rs.25/-
Rs.25/-
No Increase
Rs.30/-
Rs.30/-
Rs.35/-
Rs.35/-
Rs.100/-
Rs.100/-
5 HP & below
Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above
Rs.30/Rs.35/-
No Increase
No Increase
Rs.100/-
No Increase
Rs.45/-
No Increase
Above 5 HP but
below 40 HP
40 HP & above
but below 67 HP
67 HP & above
Rs.150/-
No Increase
Rs.60/-
No Increase
0 to 500 KWH
455 Ps
535 Ps
0 to 500 KWH
470 Ps
15 Ps Increased
535 Ps
615 Ps
550 Ps
15 Ps Increased
645 Ps
15 Ps Increased
565 Ps
22.00Hrs to 06.00Hrs
06.00Hrs to18.00Hrs
Rs110./-
No Increase
665 Ps
14
Rs.40/-
585 Ps
Time of day
Rs.30/-
18.00Hrs to 22.00Hrs
No Change
15
16
LT-6 (a)
LT-6 (b)
Water Supply
Public Lighting
FC per HP
Rs.35/-
Rs.35/-
FC per HP
Rs.35/-
EC per KWH
330 Ps
410 Ps
EC per KWH
340 Ps
FC per KW
Rs.50/-
Rs.50/-
FC per KW
EC per KWH
485 Ps
565 Ps
EC per KWH
485 Ps
565 Ps
EC per KWH to
LED Lights
400 Ps
Weekly Min.
per KW
Rs.160/-
Less than 67 HP
Weekly Min. per KW
LT-7(a)
17
Temporary Power
Supply for all
purposes
LT-7(b)
18
500 Ps
10 Ps Increased
No Increase
15 Ps Increased
85 Ps Decreased
980 Ps
EC per KWH
900 Ps
900 Ps
Less than 67 HP
Weekly Min. per KW
Power Supply on
permanent
connection basis
Rs.160/Rs.160/-
Rs.50/-
No Increase
E.C: No Increase
Rs.160/-
Rs.160/-
EC per KWH
980 Ps
EC per KWH
Rs.40/-
900 Ps
900 Ps
E.C: No Increase
Rs.180/-
DC per KVA
Rs.180/-
400 Ps
480 Ps
EC per KWH
410 Ps
Rs.180/-
Rs.180/-
DC per KVA
Rs.180/-
575 Ps
655Ps
590 Ps
15 Ps Increased
615 Ps
695 Ps
0 to 1 Lakh KWH
Above 1 Lakh
KWH
630 Ps
15 Ps Increased
DC per KVA
Rs.180/-
No Increase
535 Ps
15 Ps Increased
DC per KVA
HT-1
HT Water Supply
HT-2(a)(i)
HT Industrial:
Applicable to Areas
under Bruhat
Bangalore
Mahanagara Palike
and Municipal
Corporations.
19
20
21
22
HT-2(a)(i)
HT-2(a)(ii)
Applicable to
Bangalore
Metropolitan Railway
Corporation Ltd.
(BMRCL).
HT Industrial:
Applicable to Areas
other than those
covered under
HT-2(a)(i)
Demand Charges
(DC) per KVA
Consumption
Energy Charges (EC
0 to 1 Lakh KWH
Above 1 Lakh KWH
Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC)
Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC
0 to 1 Lakh KWH
Above 1 Lakh KWH
23
HT-2(a)(i)
and
HT-2(a)(ii)
HT-2(b)(i)
24
Railway Traction
and
Effluent Treatment
Plants
HT Commercial
Areas under
Bruhat Bangalore
Mahanagara Palike
and Municipal
Corporations.
Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC)
Per KWH
Demand Charges
(DC) per KVA
Consumption
Energy Charges
(EC)
0 to 2 Lakhs KWH
Above 2 Lakhs KWH
25
HT-2(b)(ii)
HT Commercial
Applicable to Areas
other than those
covered under
10 Ps Increased
EC per KWH
Rs.180/-
Rs.180
No Increase
520 Ps
600 Ps
Rs.170/-
Rs.170/-
DC per KVA
Rs.170/-
No Increase
570 Ps
650 Ps
585 Ps
15 Ps Increased
600 Ps
680 Ps
0 to 1 Lakh KWH
Above 1 Lakh
KWH
615 Ps
15 Ps Increased
DC per KVA
Rs.180/-
No Increase
Rs.180/-
EC per KWH
Rs.180
540 Ps
620 Ps
Rs.200/-
Rs.200/-
DC per KVA
Rs.200/-
No Increase
735 Ps
815 Ps
755 Ps
20 Ps Increased
765 Ps
845 Ps
0 to 2 Lakhs KWH
Above 2 Lakhs
KWH
785 Ps
20 Ps Increased
Rs.190/-
Rs.190/-
DC per KVA
Rs.190/-
No Increase
EC per KWH
Demand Charges
(DC) per KVA
555 Ps
15 Ps Increased
HT-2(b)(i)
26
27
28
HT-2(C)(i)
HT-2(C)(ii)
HT-3 (a)(i)
Applicable to
Government Hospitals
& Hospitals run by
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging
to Govt. , Local Bodies
& Aided Institutions
and Hostels of all
Educational
Institutions,
Applicable to Hospitals
and Educational
Institutions other than
those covered under
HT2(C) (i)
HT Lift Irrigation
Schemes under
Government
Depts./Corporations.
Consumption
0 to 2 Lakhs KWH
715 Ps
795 Ps
745 Ps
825 Ps
Demand Charges
(DC)per KVA
Rs.170/-
0 to 1 Lakh KWH
0 to 2 Lakhs KWH
Above 2 Lakhs
KWH
735 Ps
20 Ps Increased
765 Ps
20 Ps Increased
No Increase
Rs.170/-
DC per KVA
540 Ps
620 Ps
0 to 1 Lakh KWH
560 Ps
20 Ps Increased
590 Ps
670 Ps
610 Ps
20 Ps Increased
Demand Charges
(DC)per KVA
Rs.170/-
Rs.170/-
0 to 1 Lakh KWH
640 Ps
720 Ps
0 to 1 Lakh KWH
660 Ps
No Increase
20 Ps Increased
690 Ps
770 Ps
710 Ps
20 Ps Increased
EC per KWH
and
Annual Minimum
150 Ps
subject to
Min.
of Rs. 1000/per HP per
annum
Rs.30/-
DC per KVA
Rs.170/-
Rs.170/-
EC per KWH
170 Ps
230 Ps
and
subject to
subject to Min.
Annual Minimum annual Min.
of Rs. 1000 per
of Rs.1000 /HP per annum
per HP per
annum
Rs.30/-
FC per HP/PM
Rs.30/No Increase
29
HT-3 (a)(ii)
30
31
HT-3 (a)(iii)
HT-3 (b)
HT supply to
Agriculture/
Horticulture Farms
HT-4
HT Res. Apartments
Applicable to all areas
32
33
HT-5
Temporary Supply
150 Ps
EC per KWH
170 Ps
Rs.10/-
EC per KWH
and
Annual Minimum
230 Ps
Rs.10/-
FC per HP/PM
230 Ps
EC per KWH
Rs.10/-
170 Ps
350 Ps
370 Ps
430 Ps
subject to Min.
subject to
subject to Min.
of
Min. of
of
EC per KWH
Rs. 1000 per HP
Rs. 1000 per
Rs. 1000 per HP
and
per annum
HP per annum
per annum
Annual Minimum
DC per KVA
Rs 100/-
EC per KWH
530 Ps
Rs 100/-
DC per KVA
610 Ps
EC per KWH
Rs 100/-
No Increase
20 Ps Increased
No Increase
550 Ps
Rs.
Rs.
Rs.
210/HP/Month
210/HP/Month
210/HP/Month
for the entire
for the entire
Fixed Charges/
for the entire
Fixed Charges/
sanctioned
sanctioned
Demand Charges
sanctioned Demand Charges
load /
load /
load / Contract
Contract
Contract
demand
demand
demand
900 Ps
Energy Charges
980 Ps
Energy Charges
900 Ps
20 Ps Increased
20 Ps Increased
No Increase
No Increase