Calculation for
CPF Main Control Facility (PB-05)
IDBC-TS-NCCAL-C05001
1-May-12
ARD
ARD
ARD
AW
LQ
INM
Prepared
by
Checked
by
Approved
by
REV
6-Aug-12
DATE
DESCRIPTION
LQ
LQ
LQ
INM
INM
INM
BANYU URIP
PROJECT
Page 3+1 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
REVISION
0
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
X
X
X
X
X
X
X
ATT - A
ATT - B
ATT - C
ATT - D
ATT - E
ATT - F
ATT - G
ATT - H
ATT - I
X
X
X
X
X
X
X
X
ATT - J
264522103.xls
DESCRIPTION
BANYU URIP
PROJECT
Page 4+2 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
E.
F.
G.
H.
I.
J.
CONCRETE DESIGN
REACTION TO PILECAP
FOUNDATION PLAN AND PILING LAYOUT DRAWING
PLATE TABLE
STAAD INPUT
MATERIAL TAKE-OFF CALCULATION
264522103.xls
Page 5+2 of 18
BANYU URIP
PROJECT
Page 6+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
1.0
GENERAL
1.1
Scope
This document presents calculation design of CPF Main Control Facility PB-05 for Banyu Urip
Project EPC1 Production Processing Facilities.
1.2
1.3
Unit
All Units are in SI Unit, unless noted otherwise.
1.4
Quality of Material
Table 1.4 Quality Material
Material
Structural Concrete
Levelling Concrete
Reinforcing Bar :
ASTM A 615 Grade 60 or JIS G3112 SD390 (BJTD 40)
ASTM A 307 Grade C
264522103.xls
fc' =
fc' =
fy =
fy =
ft all =
fv all =
fy =
fu =
fy =
fu =
Strength
Unit
35 MPa
10.3 MPa
390
240
137.3
68.6
235
400
400
600
MPa
MPa
MPa
MPa
MPa
MPa
MPa
MPa
BANYU URIP
PROJECT
Page 7+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
24.53 kNm
53.96 kNm
BANYU URIP
PROJECT
Page 8+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
1.5
1.6
(Ref. 8 Att. B)
Abbreviation
A
:
Ab
:
Ac
:
Af
:
Ar
:
As
:
BCD
:
BCDi
:
B raft
:
B.O.PL
:
b
:
Ca
:
Cd
:
Cf
:
Cv
:
c.o.w
:
d
:
d'
:
db
:
264522103.xls
Qcomp
( kN )
295.53
393.05
Qtens
( kN )
196.31
261.09
Qlat
( kN )
61.00
75.00
BANYU URIP
PROJECT
D
DF
DP
E
264522103.xls
:
:
:
:
dead load
footing diameter
pile diameter
earthquake load
Page 9+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 10+3 of 18
IDBC-TS-NCCAL-C05001
Es
F
fc'
Fh
fs
ft
fv
Fv
fy
G
h
HF
HG
Hn
I
ID
Ip
Iw
Kd
Kz
Kzt
Le
LP
Ls
Lw
M
ME(E)
ME(O)
Mu
MW
n
nb
PCDi
n PCDi
P
264522103.xls
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 11+3 of 18
IDBC-TS-NCCAL-C05001
Pa
Pso
Pr
Ps
Q
Q(E)
Q(O)
Q(T)
Qcomp
Qlat
Qtens
q
qz
qo
R
Rm
s
S
S
Tc
Td
Te
Tn
Tall
Tb
U
V
Vc
Vs
Vs(E)
Vs(O)
Vu
w
W
Wt
yE
yO
i
c
b
max
264522103.xls
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 12+3 of 18
IDBC-TS-NCCAL-C05001
264522103.xls
:
:
:
:
:
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 13+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
2.0
DESIGN CRITERIA
Unfactored loading combination is used for checking the axial and horizontal capacity of pile
foundation.
Stability due to overturning moment is checked based on the axial and horizontal capacity of pile.
Factored loading combination is subsequently used for reinforced concrete design.
3.0
DESIGN LOADING
The following loads and forces are considered in the design of control room building:
3.1 Dead Load (D)
3.1.1 Self Weight (SW)
Selfweight of structure including, but not limited to, footing and pedestal.
3.1.2 Super Imposed Dead Load (SIDL)
Including but not limited to partition and floor finishing.
3.2
3.3
3.4
3.5
264522103.xls
BANYU URIP
PROJECT
Page 14+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
0.84 kN/m2
(Att. C)
BANYU URIP
PROJECT
Page 15+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
3.6
=
=
=
=
=
=
=
=
56.8
=
=
=
0.0731 (Hn)3/4
0.28 s
5.90 m
8.30 m
(Att. C)
5.90 m
(Att. C)
335
18.5
109
5.9
335.12
x
0.84
282.12
x
5.9
109.15
x
0.84
91.89
m2
kN
m2
kN
264522103.xls
BANYU URIP
PROJECT
Page 16+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
4.0
LOAD COMBINATION
4.1
4.2
264522103.xls
BANYU URIP
PROJECT
Page 17+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
5.0
CALCULATION DESIGN
5.1
Plan
Attachment B show architectural & structural drawing for CPF Main Control Facility (PB-05).
5.2
Pile Arrangement
Pilecap arrangement is shown on attachment F as support of each column, number of pile for each
pile cap will be calculated from total axial and horizontal load from column reaction. Attachment F
show pile arrangement.
5.3
Loading Data
5.3.1 Dead Load (D)
5.3.1.1 Self Weight (SW)
All dead load caused by selfweight will be calculated directly in member or pile
design calculation.
5.3.1.2 Super Imposed Dead Load (SIDL)
On Roof
- Roof Levelling Concrete
=
0.50 kN/m2
- M/E Ducting
=
0.20 kN/m2
- Ceiling
=
0.15 kN/m2
- Insulation Board
=
0.15 kN/m2
On Floor
- Ground Finishing
=
0.60 kN/m2
- Rised Floor
=
0.30 kN/m2
(Vendor specification)
Partition include all architechtural wall supported by slab except wall directly
supported by beam.
5.3.2 Live Load (L)
Electrical Room
Control Rack & Central Control Room
Others Room
=
=
=
7.00 kN/m2
7.00 kN/m2
3.00 kN/m2
1.00 kN/m2
264522103.xls
BANYU URIP
PROJECT
Page 18+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
6.0
PILING DESIGN
6.1 Axial Capacity Check
Axial capacity checking for all load combination refer to Attachment F Section F.2. The number of
pile and ratio of maximum axial force to allowable compression capacity has been summarized in
table below.
Table 6.1 Axial Capacity Check
Axis
A-1
A-2
A-3
A-4
B-1
B-2
B-3
B-4
C-1
C-2
C-3
C-3A
C-4
C1-3
C1-3A
C1-4
C1-5
D-1
D-2
D1-3
D1-3A
D1-4
D1-5
E-1
E-2
F-1
F-2
F1-3
F1-3A
F1-4
F1-5
G-1
G-2
G1-3
G1-3A
G1-4
264522103.xls
n pile
used
2
2
2
1
2
2
3
2
3
2
2
2
2
2
2
3
3
2
3
2
2
2
2
1
1
1
2
2
2
2
2
2
2
2
2
3
Load to Capacity
Ratio for Single Pile
0.55
0.86
0.81
0.79
0.99
0.71
0.99
0.61
0.76
0.80
0.98
0.67
0.89
0.66
0.77
0.79
0.85
0.86
0.98
0.75
0.88
0.89
0.89
0.98
0.63
0.87
0.86
0.57
0.84
0.86
0.92
0.57
0.93
0.54
0.82
0.89
137 nos
BANYU URIP
PROJECT
G1-5
H-1
H-2
H1-3
H1-3A
264522103.xls
3
2
2
2
2
0.96
0.63
0.93
0.53
0.70
Page 19+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 20+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Axis
H1-4
I-1
I-2
I1-3
I1-3A
I1-4
J-1
J-2
J-3
J-4
K-1
K-2
K-3
K-4
L-1
L-2
L-3
L-4
M-1
M-2
M-3
M-4
N-1
N-2
N-3
N-4
6.2
n pile
used
2
2
3
2
2
2
2
2
2
1
2
3
2
2
2
2
2
2
2
2
3
2
1
2
2
1
Load to Capacity
Ratio for Single Pile
0.60
0.61
0.74
0.47
0.68
0.99
0.57
0.47
0.87
0.97
0.57
0.74
0.86
0.60
0.59
0.45
0.99
0.57
0.74
0.57
0.81
0.65
0.68
0.68
0.60
0.80
264522103.xls
1659.01
91.89
1241.33
137.00
137.00
17.00
12.11
2.06
74.76
Qlat
(kN)
75.00
75.00
75.00
Fh
Remark
Qlat
0.16 Seismic X dir
0.03 Wind X dir
1.00 Blast X dir
12.11
0.67
73.02
75.00
75.00
75.00
Fh (kN)
BANYU URIP
PROJECT
Page 21+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
6.3
264522103.xls
Mu /
Mcap.
0.41
0.43
0.43
0.43
0.44
0.41
0.43
0.41
0.42
0.42
0.45
0.43
0.45
0.41
0.43
0.44
0.44
0.43
0.43
0.43
0.44
0.45
0.45
0.44
0.41
0.43
0.42
0.41
0.44
0.44
0.45
0.40
0.43
0.41
0.44
0.45
BANYU URIP
PROJECT
G1-5
H-1
264522103.xls
38.39
18.45
5.24
5.24
11.56
12.89
0.45
0.41
Page 22+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 23+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Pilecap
H-2
H1-3
H1-3A
H1-4
I-1
I-2
I1-3
I1-3A
I1-4
J-1
J-2
J-3
J-4
K-1
K-2
K-3
K-4
L-1
L-2
L-3
L-4
M-1
M-2
M-3
M-4
N-1
N-2
N-3
P max
(ton)
31.89
18.75
26.97
22.85
17.20
21.66
14.98
27.39
39.84
16.20
12.94
26.49
30.74
16.68
21.27
26.00
17.96
17.09
13.06
30.46
17.26
23.19
16.62
23.82
19.51
23.77
21.36
17.48
Mu
(ton.m)
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
5.24
Mcap.
(ton.m)
11.99
12.87
12.32
12.60
12.97
12.68
13.12
12.29
11.46
13.04
13.26
12.35
12.07
13.01
12.70
12.39
12.92
12.98
13.25
12.09
12.97
12.57
13.01
12.53
12.82
12.53
12.70
12.95
Mu /
Mcap.
0.44
0.41
0.43
0.42
0.40
0.41
0.40
0.43
0.46
0.40
0.40
0.42
0.43
0.40
0.41
0.42
0.41
0.40
0.40
0.43
0.40
0.42
0.40
0.42
0.41
0.42
0.41
0.40
If Strength Ratio < 1, pile is capable to resist combination forces between axial load and moment
due to lateral forces.
264522103.xls
BANYU URIP
PROJECT
Page 24+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
7.0
8.0
SETTLEMENT CALCULATION
The settlement of pile group with average depth of 12 m was analyzed using elastic half-space theory
proposed by Timoshenko and Goodier (1951) and Poulos and Davis (1980) as shown below.
Imaginary raft at the depth of 2/3 the length of pile was assumed with load spreading of 4v : 1h. The
settlement were estimated below.
2/3
D
1
2
B Raft
P max
B raft
Area of Imaginary raft (Ar)
Load per unit area, p = V/Ar
Poisson ratio,
Young Modulus, E
Influence Factor, Ip
Elastic Settlement,
Check Settlement
264522103.xls
=
=
=
=
=
=
=
1 2
i p.B.
Ip
E
292.07
4.40
15.21
19.21
0.33
9045
0.88
kN
m
m2
kPa
(Ref 4 Plate 14.3)
(Ref 4 Plate 14.3)
(Ref. 13)
kPa
=
=
0.007 m
7.33 mm < 25 mm
OK
BANYU URIP
PROJECT
Page 25+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
9.0
CONCLUSION
9.1 Summary of Pile Calculation
The following table summarizes the calculation result of piling foundation in governing cases
Table 9.1 Summary of Pile Calculation
Maximum
Description
Load
Forces
Capacity
Combined for pile:
Fv Max
( KN )
390.81
393.05 LC2-5 b
Lateral
( KN )
74.76
75.00 Wbx
Moment
( KN.m )
51.41
115.06
Remarks
Temporary Load
Temporary Load
Temporary Load
Based on the given condition in the structural analysis, the piling and concrete design of Main
Control Facility (PB-05) Foundation considered adequate in meeting the design criteria.
9.2
264522103.xls
BANYU URIP
PROJECT
Dimension
300 x 800
300 x 800
Top
6D19
3D19
5D19
3D19
Middle
6D10
6D10
6D10
6D10
Bottom
3D19
6D19
3D19
5D19
Stirup
D10 - 150 D10 - 200 D10 - 150 D10 - 200
264522103.xls
Page 26+3 of 18
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Page 27+3 of 18
IDBC-TS-NCCAL-C05001
Table 9.2.3.1 Tie Beam Dimension, Number of Reinforcements and Reinforcement Size
TB1
TB2
TB3
End
Mid
End
Mid
End
Mid
Dimension
300 x 500
300 x 500
300 x 500
Top
4D22
2D22
4D22
2D22
6D22
3D22
Middle
2D13
2D13
Bottom
2D22
2D22
2D22
4D22
3D22
5D22
Stirup
D13 - 150 D13 - 200 D13 - 150 D13 - 200 D13 - 150 D13 - 200
Table 9.2.3.2 Tie Beam Dimension, Number of Reinforcements and Reinforcement Size
TB4
TB5
TB6
End
Mid
End
Mid
End
Mid
Dimension
300 x 550
300 x 500
250 x 400
Top
5D22
2D22
3D19
2D19
3D16
2D16
Middle
2D10
2D10
2D13
2D13
Bottom
2D22
3D22
2D19
3D19
2D16
3D16
Stirup
D13 - 150 D13 - 200 D13 - 150 D13 - 200 D13 - 150 D13 - 200
Table 9.2.3.3 Tie Beam Dimension, Number of Reinforcements and Reinforcement Size
TB7
TB8
TB9
End
Mid
End
Mid
End
Mid
Dimension
250 x 400
400 x 600
400 x 600
Top
3D22
2D22
6D22
3D22
4D22
4D22
Middle
2D13
2D13
2D13
2D13
Bottom
2D22
3D22
6D22
3D22
4D22
4D22
Stirup
D13 - 150 D13 - 200 D13 - 150 D13 - 200 D13 - 150 D13 - 200
Table 9.2.4 Column Dimension, Number of Reinforcements and Reinforcement Size
C1
C2
C3
C4
Dimension
500 x 500
500 x 500
400 x 400
300 x 300
Rebar
20D22
16D22
12D22
8D19
Ties (End)
D13 - 100
D13 - 100
D13 - 150
D10 - 100
Ties (Mid)
D13 - 200
D13 - 200
D13 - 200
D10 - 150
9.3
264522103.xls
6-Aug-12
Rev. 1
ATTACHMENT A
SOIL PROPERTIES
BANYU URIP
PROJECT
Attachment
A - Page 29 of 2
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Fig. A.1 Borehole location (BH-CPF 01) enclosed to CPF Main Contol Facility
A.2
264522103.xls
Pile
Length
m
12
12
18
Diameter
(mm)
300
400
300
Plant
Elevation
(m)
+37.00
+37.00
+37.00
Comp.
Pile
Capacity
(kN)
192.93
295.53
250.14
Tension
Pile
Capacity
(kN)
129.57
196.31
178.69
Comp.
Pile
Capacity
(kN)
256.59
393.05
332.69
Tension
Pile
Capacity
(kN)
172.33
261.09
237.66
BANYU URIP
PROJECT
18
24
24
264522103.xls
400
300
400
383.04
362.36
559.55
Attachment
A - Page 30 of 2
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
274.13
231.00
386.00
509.44
481.93
744.21
364.59
307.23
513.38
BANYU URIP
PROJECT
Attachment
A - Page 31 of 2
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
ATTACHMENT B
CPF MAIN CONTROL FACILITY
LAYOUT, PLAN & SECTION
BANYU URIP
PROJECT
Attachment
B - Page 33 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
BANYU URIP
PROJECT
B
Fig B.1 CPF Main Control Facility (PB-05) Layout
264522103.xls
Attachment
B - Page 34 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
B - Page 35 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
B - Page 36 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
B - Page 37 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
B - Page 38 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
B.2
264522103.xls
Attachment
B - Page 39 of 4
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
B - Page 40 of 4
IDBC-TS-NCCAL-C05001
Fig B.4 CPF Main Control Facility (PB-05) Column and Wall Position
264522103.xls
6-Aug-12
Rev. 1
ATTACHMENT C
UNIFORM LOAD
BANYU URIP
PROJECT
Attachment
C - Page 42 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Wind Load
Fig C.3 Building surface for transerve direction wind load in GCpf application
264522103.xls
BANYU URIP
PROJECT
264522103.xls
Attachment
C - Page 43 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
C - Page 44 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Fig C.4 Building surface for longitudinal direction wind load in GCpf application
WZ
8300
5900
18500
54300
WX
Rear Wall
Roof
Side Wall
Front Wall
Wind Direction
264522103.xls
BANYU URIP
PROJECT
264522103.xls
Attachment
C - Page 45 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
C - Page 46 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
BANYU URIP
PROJECT
Attachment
C - Page 47 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Blast Load
For both condition, TNT equivalent and Vapor Cloud Explosion (VCE) blast load, ASCE 97 "Design of
Blast-Resistant Building in Petrochemical Facilities" give following empirical formula to relate between
peak pressure (Pa or Pr) and effective duration (Td or Te) with equivalentstatic load of blast load (Rm).
Rm
Po
2 d 1
( 2 d 1)
2 d ( 0.7)
ACI349-01 gives the permissible ductility ratio for concrete structure that induced by impulsive and
impactive effects with fc' at 28 days shall not be less then 20.7 Mpa shall be:
a.
For beam, wall and slab subjected to out-of-plane impulsive loads but carrying no axial
compressive load:
- Flexural capacity controlling
3.00
- Shear capacity controlling with shear carried by concrete and stirrup
3.00
b.
For beam, wall and slab subjected to out-of-plane impulsive loads and carrying axial compressive
load:
- Compression controlling (axial load exceed 0.1 fc' Ag)
1.30
- Flexural capacity controlling (axial load does not exceed 0.1 fc' Ag)
3.00
- Shear capacity controlling
1.30
c. For axial compressive load
1.30
In determining number of pile needed for control room building, the most conservative load shall be
applied but in designing or checking structure member capacity, the most fit condition and load shall be
applied.
TNT equivalent Blast Load
Table C.2.1 Design Blast Loading for Explosion Equivalent to 1 ton of TNT
Structural Component
Pa (psi)
Wall
25.00
Roof
Slab
10.00
Beam
10.00
Structure Frame
Lateral Load
25.00
Vertical Load depends on span
< 10 ft span
10.00
20 ft
5.50
40 ft
4.00
> 60 ft
3.00
264522103.xls
(Ref. 15)
Td (milisecond)
20.00
20.00
20.00
20.00
20.00
35.00
50.00
70.00
BANYU URIP
PROJECT
Attachment
C - Page 48 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
Td/Tn
=
20/276.73
=
0.07
=
2d - 1
=
2 x 1.3 - 1
=
1.60
Rm
=
Pa
+
.
.
2d ( + 0.7)
=
25
1.6
+
1.6 x 0.07
3.14 x 0.07
2 x 1.3(0.07 + 0.70)
=
4.44 psi
=
30.65 kPa
Table C.2.2 Summary of Static Load due to Blast Loading for Explosion Equivalent to 1 ton of TNT
Structural Component
Pa (psi)
Td (milisecond)
Rm (kPa)
Wall
md =
3.00
25
20
17.38
md =
1.30
25
20
30.65
Roof
Slab
md =
3.00
10
20
6.95
md =
1.30
10
20
12.26
Beam
md =
3.00
10
20
6.95
md =
1.30
10
20
12.26
Structure Frame
Lateral Load
md =
3.00
25
20
17.38
md =
1.30
25
20
30.65
Vertical Load for 27.1 m (88.89 ft) span
md =
3.00
4
50
6.71
md =
1.30
4
50
11.72
264522103.xls
BANYU URIP
PROJECT
Attachment
C - Page 49 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Iw
Te
=
=
=
=
=
=
=
=
=
264522103.xls
10.00 psi
20.00 ms
1130 (1 + 0.058 Pso)0.5
1130 (1 + 0.058 x 10)^0.5
1420.39 ft/s
U x Td
1420 x 20/1000
28.41 ft
0.022 x Pso2
0.022 x 10^2
2.20 psi
(2 + 0.05 Pso) Pso
(2 + 0.05 x 10) x 10
25.00 psi
min of H or B/2
14.76 ft
3S/U < Td
20.00 ms
1.00
Pso + Cd qo
10 + 1 x 2.2
12.20 psi
0.5 (Pr - Ps) Tc + 0.5 Ps Td
0.5 x (25 - 12.2) x 20/1000 + 0.5 x 12.2 x 20/1000
0.25 psi.s
2 Iw / Pr
2 x 0.25/25 x 1000
20.00 ms
BANYU URIP
PROJECT
Attachment
C - Page 50 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
3.00 psi
100.00 ms
1130 (1 + 0.058 Pso)0.5
(Ref. 16 eq. 3.5)
1130 x (1 + 0.058 x 3)^0.5
1224.37 ft/s
U x Td
(Ref. 16 eq. 3.6)
1224 x 100/1000
122.44 ft
0.022 x Pso2
(Ref. 16 eq. 3.4)
0.022 x 3^2
0.20 psi
(2 + 0.05 Pso) Pso
(Ref. 16 eq. 3.2 & 3.3)
(2 + 0.05 x 3) x 3
6.45 psi
min of H or B/2
14.76 ft
3S/U < Td
(Ref. 16 eq. 3.8)
36.17 ms
1.00 (compression wind load due to blast load)
Pso + Cd qo
(Ref. 16 eq. 3.7)
3 + 1 x 0.198
3.20 psi
0.5 (Pr - Ps) Tc + 0.5 Ps Td
(Ref. 16 eq. 3.9)
0.5 x (6.45 - 3.198) x 36.17/1000 '+' 0.5 x 3.198 x 100/1000
0.22 psi.s
2 Iw / Pr
(Ref. 16 eq. 3.10)
2 x 0.219/6.45 x 1000
67.82 ms
264522103.xls
BANYU URIP
PROJECT
Attachment
C - Page 51 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
10.00 psi
20.00 ms
1130 (1 + 0.058 Pso)0.5
1130 x (1 + 0.058 x 10)^0.5
1420.39 ft/s
U x Td
1420 x 20/1000
28.41 ft
0.022 x Pso2
0.022 x 10^2
2.20 psi
(2 + 0.05 Pso) Pso
(2 + 0.05 x 10) x 10
25.00 psi
0.32
0.33
-0.40 (suction wind due to blast load)
Ce Pso + Cd qo
0.33 x 10 + -0.4 x 2.2
2.42 psi
20.00 ms
- Low Pressure
Pso
=
Td
=
U
=
=
=
Lw
=
=
=
qo
=
=
=
3.00 psi
100.00 ms
1130 (1 + 0.058 Pso)0.5
1130 x (1 + 0.058 x 3)^0.5
1224.37 ft/s
U x Td
1224 x 100/1000
122.44 ft
0.022 x Pso2
0.022 x 3^2
0.20 psi
Pr
Lw/L
Ce
Cd
Pa
Te
264522103.xls
=
=
=
=
=
=
=
=
=
=
BANYU URIP
PROJECT
Attachment
C - Page 52 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
10.00 psi
20.00 ms
1130 (1 + 0.058 Pso)0.5
1130 x (1 + 0.058 x 10)^0.5
1420.39 ft/s
U x Td
1420 x 20/1000
28.41 ft
0.022 x Pso2
0.022 x 10^2
2.20 psi
(2 + 0.05 Pso) Pso
(2 + 0.05 x 10) x 10
25.00 psi
1.92
0.70
-0.40 (suction wind due to blast load)
Ce Pso + Cd qo
0.7 x 10 + -0.4 x 2.2
6.12 psi
20.00 ms
- Low Pressure
Pso
=
Td
=
U
=
=
=
Lw
=
=
=
qo
=
=
=
3.00 psi
100.00 ms
1130 (1 + 0.058 Pso)0.5
1130 x (1 + 0.058 x 3)^0.5
1224.37 ft/s
U x Td
1224 x 100/1000
122.44 ft
0.022 x Pso2
0.022 x 3^2
0.20 psi
Pr
Lw/L
Ce
Cd
Pa
264522103.xls
=
=
=
=
=
=
=
=
=
BANYU URIP
PROJECT
Te
264522103.xls
Attachment
C - Page 53 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
C - Page 54 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Pa (psi)
Td (milisecond)
25.0
25.0
6.45
6.45
20.00
20.00
67.82
67.82
17.38
30.65
14.26
24.69
2.42
2.42
2.32
2.32
20.00
20.00
67.82
67.82
1.68
2.97
5.13
8.88
Rm (kPa)
17.38
30.65
6.95
12.26
Roof Blast
Load
Front Wall Blast Load
264522103.xls
Rm (kPa)
BANYU URIP
PROJECT
Attachment
C - Page 55 of 11
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Earthquake Load
Earthquake load is estimated by calculating participating weight with STAAD.Pro 2007. Participating
weight is consist of dead load and live load of roof plan.
EQX
X
Z
Load 8
136.56
8.39
786.52
191.30
19.37
1.06
90.66
124.78
5.81
0.32
27.20
37.43
142.37
8.71
813.72
228.73
Wi =
F1(1) =
F1(2) =
264522103.xls
29.58 Ton
1.81 Ton
/
/
10 column
3 column
Height
(m)
(6)
8.30
8.30
5.90
2.50
1193.53 Wi x hi=
=
=
2.96 Ton
0.60 Ton
WxH
(Tonm)
(7)=(5)x(6)
1181.68
72.28
4800.94
571.84
6626.73
BANYU URIP
PROJECT
F2
F3
=
=
264522103.xls
120.19 Ton
14.32 Ton
/
/
Attachment
C - Page 56 of 11
IDBC-TS-NCCAL-C05001
1.97 Ton
1.19 Ton
6-Aug-12
Rev. 1
ATTACHMENT D
CPF MAIN CONTROL FACILITY MODELLING
STAAD.PRO 2007
BANYU URIP
PROJECT
Attachment
D - Page 58 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
North
X
Z
Fig D.1 STAAD.Pro 2007 3D roof plan of structure modelling
X
Z
Load 8
North
X
Y
X
Z
264522103.xls
Load 8
BANYU URIP
PROJECT
Y
Attachment
D - Page 59 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
X
Z
264522103.xls
Load 8
BANYU URIP
PROJECT
Attachment
D - Page 60 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
North
X
X
Z
Load 8
D.2
Plate member in STAAD.Pro 2007 is not able to distribute load assigned to beam supporting the plate,
but load distributed directly to each corner point of plate. To avoid complex meshing in finite element
model by software, load shall be assigned directly to beam supporting plate, including plate self weight
by tributary area.
Lx
Ly
264522103.xls
BANYU URIP
PROJECT
Note : Ly > Lx
Fig D.4 Slab tributary area
264522103.xls
Attachment
D - Page 61 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
D - Page 62 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
300 kg/m2
Load 2
Z
Fig D.5 Assigning of Live load
Y
60 kg/m2 of ground finishing
Z
Fig D.6 Assigning of super imposed dead load
Y
X Z
264522103.xls
Load 1
BANYU URIP
PROJECT
Attachment
D - Page 63 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
X+
X
X
Z
Load 4
Z
Fig D.7 Wind load X direction (South North)
Z+
X
Y
X
Z
264522103.xls
Load 5
BANYU URIP
PROJECT
Y
Attachment
D - Page 64 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Load 5
264522103.xls
BANYU URIP
PROJECT
Attachment
D - Page 65 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
X
Y
X
Z
Load 8
X
Y
X
Z264522103.xls
Load 9
BANYU URIP
PROJECT
Y
Attachment
D - Page 66 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Load 9
264522103.xls
BANYU URIP
PROJECT
Attachment
D - Page 67 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Y
Z
Load 6
Y
Z
Load 7
BANYU URIP
PROJECT
264522103.xls
Attachment
D - Page 68 of 6
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
ATTACHMENT E
CONCRETE DESIGN
Attachment
E - Page 70 of 44
IDBC-TS-NCCAL-C05001
BANYU URIP
PROJECT
6-Aug-12
Rev. 1
3250
3250
2500
2500
5000
A1
A1
A2
A2
4500
A3
A3
A4
A4
6000
A5
A5
A6
A6
4000
A7
A7
LL
kN/m2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SIDL
Partition
kN/m2
kN/m2
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
Rise fl.
kN/m2
0
0
0
0
0
0
0
ts
mm
150
150
150
150
150
150
150
LC1-1
kN/m2
6.34
6.34
6.34
6.34
6.34
6.34
6.34
Ly
Lx
(m) (m)
3.25 5.00
2.50 5.00
Lx/Ly
0.65
0.50
mlx
36.00
40.50
mly
6.10
2.40
mtx
76.70
83.30
LC1-2
kN/m2
7.04
7.04
7.04
7.04
7.04
7.04
7.04
(see Att H)
mty
24.20
14.30
ws
26.10
29.60
BANYU URIP
PROJECT
A3
A4
A5
A6
A7
264522103.xls
3.25
2.50
3.25
2.50
3.25
4.50
4.50
6.00
6.00
4.00
0.72
0.56
0.54
0.42
0.81
72.05
81.70
81.70
66.80
Attachment
E - Page 71 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
30.00
17.20
17.20
36.00
23.85
28.60
28.60
21.40
BANYU URIP
PROJECT
Attachment
E - Page 72 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Mu lx
kN.m/m
2.68
1.78
2.43
1.73
2.93
2.18
Mu ly
kN.m/m
1.07
0.42
1.26
0.47
0.84
1.16
(kN.m/m)
(kN.m/m)
Mu tx
kN.m/m
5.70
3.66
5.35
3.59
6.07
4.96
Mu ty
kN.m/m
4.26
2.52
4.27
2.45
4.36
4.05
mlx
Ly
mtx
mly
mty
Lx
Lx < Ly
Example : Roof slab type A1
Fig. E.2 Moment coefficient
Bottom Reinforcement X Direction
Mu max
=
2.68 kN.m
d'
=
30 mm
d
=
0.12 m
=
120 mm
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
0.21 MPa
m
=
fy / ( 0.85 * fc' )
=
13.11 MPa
r
=
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
=
0.05%
1 * 0.85 fc' *
600
b
=
=
fy
600 + fy
=
3.68%
max
=
0.75 balanced
=
2.76%
min
=
0.18%
( min = 1.4/fy if 1.33 x required > 1.4/fy)
( min = 0.18% if 1.33 x required < 1.4/fy)
need
=
0.07%
( need = r if r > 1.4/fy)
used
As
=
0.18% < 2.77%OK
=
*b*d
=
216.00 mm2
db
=
10 mm
s
=
363.61 mm =>
150 mm
Use D10 - 150 for top & bottom flexural reinforcement
Bottom Reinforcement Y Direction
Mu max
=
1.07 kN.m
264522103.xls
BANYU URIP
PROJECT
d'
d
1
264522103.xls
=
=
=
=
Attachment
E - Page 73 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 74 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
min
=
=
=
=
=
=
=
=
=
=
=
=
need
m
r
b
max
Mu / ( x b x d2)
0.08 MPa
fy / ( 0.85 * fc' )
13.11 MPa
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
0.02%
1 * 0.85 fc' *
600
fy
600 + fy
3.68%
0.75 balanced
2.76%
0.18%
( min = 1.4/fy if 1.33 x required > 1.4/fy)
( min = 0.18% if 1.33 x required < 1.4/fy)
0.03%
( need = r if r > 1.4/fy)
( need = r x 1.33 but not need to exceed
1.4/fy if r < 1.4/fy)
( used = largest of min and need)
used
As
=
0.18% < 2.77%OK
*b*d
=
=
216.00 mm2
db
=
10 mm
s
=
363.61 mm =>
150 mm
Use D10 - 150 for top & bottom flexural reinforcement
used
264522103.xls
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
E - Page 75 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 76 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
used
As
db
s
=
=
=
=
=
0.18%
*b*d
216.00
10
363.61
< 2.77%OK
mm2
mm
mm =>
150 mm
r
0.04%
0.05%
0.03%
0.06%
0.04%
r
0.07%
0.11%
0.07%
0.12%
-
max
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
-
min
0.18%
0.18%
0.18%
0.18%
0.18%
min
0.18%
0.18%
0.18%
0.18%
-
used
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.18%
0.18%
0.18%
0.18%
-
db
mm
10
10
10
10
10
s
mm
363.61
363.61
363.61
363.61
363.61
s used
mm
150.00
150.00
150.00
150.00
150.00
db
mm
10
10
10
10
-
s
mm
363.61
363.61
363.61
363.61
-
s used
mm
150.00
150.00
150.00
150.00
-
BANYU URIP
PROJECT
A7
4.96
264522103.xls
30 120 0.80
Attachment
E - Page 77 of 44
IDBC-TS-NCCAL-C05001
0.18%
6-Aug-12
Rev. 1
10
363.61
150.00
BANYU URIP
PROJECT
Attachment
E - Page 78 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
ws q a4/(E ts3)
q
Slab
ws
kPa
A1
26.10
5.53
A2
29.60
5.53
A3
23.85
5.53
A4
28.60
5.53
A5
28.60
5.53
A6
A7
21.40
5.53
r
0.01%
0.02%
0.01%
0.02%
0.02%
0.80
0.80
0.80
0.80
0.80
0.05%
0.09%
0.05%
0.09%
0.08%
mm
a
m
3.25
2.50
3.25
2.50
3.25
3.25
max
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
E
kPa
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
min
used
0.18%
0.18%
0.18%
0.18%
0.18%
min
used
0.18%
0.18%
0.18%
0.18%
0.18%
ts
m
0.15
0.15
0.15
0.15
0.15
0.15
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
mm
0.17
0.07
0.16
0.07
0.19
0.14
db
mm
10
10
10
10
10
s
mm
363.61
363.61
363.61
363.61
363.61
s used
mm
150.00
150.00
150.00
150.00
150.00
db
mm
10
10
10
10
10
s
mm
363.61
363.61
363.61
363.61
363.61
s used
mm
150.00
150.00
150.00
150.00
150.00
all
mm
9.03
6.94
9.03
6.94
9.03
9.03
Remark
OK
OK
OK
OK
OK
OK
Crack
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as follow :
w
=
1.11 x 10-6 x x fs x 3(d' x A)
where
w
=
crack width (mm)
=
height factor (1.2 for beam, 1.35 for slab)
=
1.35
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
=
30 mm
s
=
maximum s in one slab
=
150 mm
A
=
effective tension area divided by number of bar
264522103.xls
BANYU URIP
PROJECT
so:
264522103.xls
=
=
=
=
=
Attachment
E - Page 79 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 80 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
A9
A9
A10
A11
A13
A14
A15
A13
A14
A15
4000
A7
A7
A12
A13
A14
A15
A20
A21
A20
A21
A7
A12
A23
A23
4000
A7
A7
A12
A24
A24
A7
A7
A12
A24
A24
A7
A7
A12
A24
A24
A1
A1
A14
A8
A8
A22
4000
4000
4000
A7
A3
3200
4500
A3
4000
A19
4000
A18
5000
A18
5000
A17
5000
3000
A16
264522103.xls
5000
A8
4500
A8
4000
4100
3500
A12
A16
4800
3500
5000
4000
5000
BANYU URIP
PROJECT
A1
A1
3250
3250
5000
3500
3500
264522103.xls
Attachment
E - Page 81 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 82 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
LL
kN/m2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SIDL
Partition
kN/m2
kN/m2
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
1.00
0
Rise fl.
kN/m2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
ts
mm
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
LC1-1
kN/m2
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
6.34
264522103.xls
Lx
(m)
3.50
3.50
2.00
4.10
4.00
2.00
5.00
4.00
3.00
3.00
3.25
4.80
2.00
4.00
4.50
3.20
3.50
Ly
(m)
5.00
4.50
4.10
5.00
5.00
5.00
5.00
5.00
3.25
5.00
4.80
5.00
4.00
5.00
5.00
3.50
4.00
Lx/Ly
0.70
0.78
0.49
0.82
0.80
0.40
1.00
0.80
0.92
0.60
0.68
0.96
0.50
0.80
0.90
0.91
0.88
mlx
33.90
30.40
28.10
29.30
20.20
29.30
23.55
37.80
34.95
22.40
40.50
29.30
24.70
24.70
25.80
mly
7.90
10.05
12.10
10.30
20.20
10.30
17.05
4.60
7.00
18.10
2.40
10.30
16.00
16.00
14.95
mtx
73.70
68.60
64.95
66.80
51.50
66.80
57.35
79.40
75.20
55.40
83.30
66.80
59.30
59.30
61.20
LC1-2
kN/m2
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
7.04
(see Att H)
mty
28.00
34.00
38.00
36.00
51.50
36.00
46.00
20.60
26.10
48.00
14.30
36.00
44.00
44.00
42.00
ws
24.60
22.25
20.50
21.40
14.90
21.40
17.20
27.50
25.35
16.40
29.60
21.40
18.00
18.00
18.80
BANYU URIP
PROJECT
Attachment
E - Page 83 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Mu lx
kN.m/m
2.92
2.62
3.32
3.30
3.55
3.30
1.49
2.39
2.60
3.63
1.14
3.30
3.52
1.78
2.22
Mu ly
kN.m/m
1.39
1.43
2.13
1.81
3.55
1.81
1.27
0.81
1.13
3.18
0.27
1.81
2.81
1.38
1.68
Mu tx
kN.m/m
6.35
5.91
7.68
7.52
9.06
7.52
3.63
5.03
5.59
8.98
2.34
7.52
8.45
4.27
5.28
Mu ty
kN.m/m
4.93
4.84
6.68
6.33
9.06
6.33
3.42
3.62
4.23
8.44
1.61
6.33
7.74
3.79
4.73
r
0.06%
0.05%
0.07%
0.07%
0.07%
0.07%
0.03%
0.05%
0.05%
0.07%
0.02%
0.07%
0.07%
0.04%
0.04%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
min
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
used
db
mm
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
s
mm
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
db
mm
s
mm
s used
mm
BANYU URIP
PROJECT
A8
A9
A10
A11
A12
6.35
5.91
7.68
7.52
264522103.xls
30
30
30
30
120
120
120
120
0.80
0.80
0.80
0.80
0.18%
0.18%
0.18%
0.18%
Attachment
E - Page 84 of 44
IDBC-TS-NCCAL-C05001
0.18%
0.18%
0.20%
0.20%
6-Aug-12
Rev. 1
10
10
10
10
363.61
363.61
320.50
327.47
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
Attachment
E - Page 85 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Mu
kN.m
9.06
7.52
3.63
5.03
5.59
8.98
2.34
7.52
8.45
4.27
5.28
d'
mm
30
30
30
30
30
30
30
30
30
30
30
d
mm
120
120
120
120
120
120
120
120
120
120
120
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.18%
0.15%
0.07%
0.10%
0.11%
0.18%
0.05%
0.15%
0.17%
0.09%
0.11%
r
0.03%
0.03%
0.04%
0.04%
0.07%
0.04%
0.03%
0.02%
0.02%
0.06%
0.01%
0.04%
0.06%
0.03%
0.03%
0.80
0.80
0.80
0.80
0.80
0.10%
0.10%
0.13%
0.13%
0.18%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
min
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.24%
0.20%
0.18%
0.18%
0.18%
0.24%
0.18%
0.20%
0.22%
0.18%
0.18%
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.18%
0.18%
0.18%
0.18%
0.24%
db
mm
10
10
10
10
10
10
10
10
10
10
10
s
mm
s used
mm
271.29
327.47
363.61
363.61
363.61
273.67
363.61
327.47
291.11
363.61
363.61
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
db
mm
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
s
mm
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
363.61
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
db
mm
10
10
10
10
10
s
mm
363.61
363.61
363.61
363.61
271.29
s used
mm
150.00
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
A15
A16
A17
A18
A19
6.33
3.42
3.62
4.23
8.44
264522103.xls
30
30
30
30
30
120
120
120
120
120
0.80
0.80
0.80
0.80
0.80
0.18%
0.18%
0.18%
0.18%
0.18%
Attachment
E - Page 86 of 44
IDBC-TS-NCCAL-C05001
0.18%
0.18%
0.18%
0.18%
0.22%
6-Aug-12
Rev. 1
10
10
10
10
10
363.61
363.61
363.61
363.61
291.31
150.00
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
Attachment
E - Page 87 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Slab
A20
A21
A22
A23
A24
d
mm
120
120
120
120
120
0.80
0.80
0.80
0.80
0.80
0.03%
0.13%
0.15%
0.08%
0.09%
max
2.76%
2.76%
2.76%
2.76%
2.76%
min
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.21%
0.18%
0.18%
db
mm
10
10
10
10
10
s
mm
363.61
363.61
318.09
363.61
363.61
s used
mm
150.00
150.00
150.00
150.00
150.00
Deflection of Slab
ws q a4/(E ts3)
where:
Slab
A8
A9
A10
A11
A12
A13
A14
A15
A16
A17
A18
A19
A20
A21
A22
A23
A24
ws
24.60
22.25
20.50
21.40
14.90
21.40
17.20
27.50
25.35
16.40
29.60
21.40
18.00
18.00
18.80
=
=
=
mm
4700fc'
4700 35
27806 MPa
q
kPa
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
5.53
a
m
5.00
4.50
5.00
5.00
5.00
5.00
3.25
5.00
4.80
5.00
4.00
5.00
5.00
3.50
4.00
E
kPa
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
ts
m
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
mm
0.91
0.54
0.76
0.79
0.55
0.79
0.11
1.01
0.79
0.60
0.45
0.79
0.66
0.16
0.28
all
mm
9.72
9.72
11.39
11.11
13.89
11.11
8.33
8.33
9.03
13.33
5.56
11.11
12.50
8.89
9.72
Remark
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Crack
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as follow :
w
=
1.11 x 10-6 x x fs x 3(d' x A)
where
w
=
crack width (mm)
=
height factor (1.2 for beam, 1.35 for slab)
=
1.35
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
264522103.xls
BANYU URIP
PROJECT
s
264522103.xls
=
=
=
Attachment
E - Page 88 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
so:
w
=
=
=
=
=
=
(clear span)
q
kN/m2
6.34
7.04
q max
7.04 kN/m2
Ly
Lx
Ly/Lx
=
=
=
6.00 m
2.50 m
2.40
Flexural reinforcement
Mu (-) max
=
1/9 x q x L x Lx2
=
1/9 x 7.04 x 2.5 x 2.5^2
=
12.22 kN.m
d'
=
30 mm
d
=
0.12 m
=
120 mm
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
0.94 MPa
m
=
fy / ( 0.85 * fc' )
=
13.11
r
=
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
=
0.25%
b
1 * 0.85 fc' *
600
=
=
fy
600 + fy
=
3.68%
264522103.xls
Attachment
E - Page 89 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
max
min
264522103.xls
=
=
=
Attachment
E - Page 90 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 91 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
0.33%
used
As
=
0.33% < 2.77%...OK
=
*b*d
=
392.05 mm2
db
=
10 mm
s
=
200.33 mm =>
Use D10 - 150 for top flexural reinforcement
Mu (+) max
min
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
need
d'
d
1
Ru
m
r
b
max
used
As
max
264522103.xls
=
=
=
=
=
150 mm
1/14 x q x L x Lx2
1/14 x 7.04 x 2.5 x 2.5^2
7.85 kN.m
30 mm
0.12 m
120 mm
0.80
Mu / ( x b x d2)
0.61 MPa
fy / ( 0.85 * fc' )
13.11
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
0.16%
1 * 0.85 fc' *
600
fy
600 + fy
3.68%
0.75 balanced
2.76%
0.18%
( min = 1.4/fy if 1.33 x required > 1.4/fy)
( min = 0.18% if 1.33 x required < 1.4/fy)
0.21%
( need = r if r > 1.4/fy)
=
0.21% < 2.77%OK
=
*b*d
=
250.55 mm2
db
=
10 mm
s
=
313.46 mm =>
Use D10 - 200 for bottom flexural reinforcement
Deflection
I per m'
200 mm
1/12 b ts3
1/12 x 1000 x 150^3
2.8E+008 mm4
q Lx4/(185 E I)
(7.04 x 1000/1000) x (2.5 x 1000)^4/(185 x 27806 x 281250000)
Rev. 1
BANYU URIP
PROJECT
all
264522103.xls
=
=
=
=
Attachment
E - Page 92 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 93 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
height factor (1.2 for beam, 1.35 for slab)
=
1.35
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
=
30 mm
s
=
maximum s in one slab
=
200 mm
A
=
effective tension area divided by number of bar
=
2 d' x b / (1000 / s)
=
2 x 30 x 1000/(1000/200)
=
12,000 mm2
so:
w
=
1.11e-6 x 1.35 x 234 x (30 x 12000)^(1/3)
=
0.02 mm < 0.33 mm OK
264522103.xls
BANYU URIP
PROJECT
Attachment
E - Page 94 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
2500
5000
B1
B1
B2
B2
4500
3500
B3
B3
B4
B4
3500
B7
B7
B8
B8
4000
5000
3250
4500
3250
B11
B11
B12
B16
B16
B17
4100
B10
B13
B14
B15
B13
B14
B15
B13
B14
B15
B20
B12
B20
B12
B23
B22
B22
B23
B26
B26
B27
B22
B23
B22
B23
4000
4000
EL +0.200
B22
B22
B21
3200
4000
B22
B3
B24
B24
B25
B25
B25
B25
B25
B25
B7
B7
4000
4500
4000
B22
4000
B19
4000
B18
5000
B12
5000
B18
B11
4000
4800
B11
4000
4000
EL +0.800
B3
264522103.xls
B9
5000
B6
5000
B6
4000
B5
3000
B5
5000
6000
EL +2.500
BANYU URIP
PROJECT
Attachment
E - Page 95 of 44
IDBC-TS-NCCAL-C05001
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 96 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
LL
kN/m2
7.00
7.00
7.00
7.00
7.00
7.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
7.00
7.00
7.00
3.00
3.00
7.00
7.00
SIDL
Partition
kN/m2
kN/m2
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
0.60
0
Rise fl.
kN/m2
0.00
0.00
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.30
0.30
0.30
0.00
0.00
0.30
0.30
ts
mm
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
LC1-1
kN/m2
5.78
5.78
6.20
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
5.78
6.20
6.20
6.20
5.78
5.78
6.20
6.20
LC1-2
kN/m2
16.16
16.16
16.52
16.16
16.16
16.16
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
9.76
16.52
16.52
16.52
9.76
9.76
16.52
16.52
(Ref. 12 or see Att. H)
Slab
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12
B13
264522103.xls
Lx
(m)
3.25
2.50
3.25
2.50
3.25
2.50
3.50
3.50
2.00
4.10
3.25
4.00
2.00
Ly
(m)
5.00
5.00
4.50
4.50
6.00
6.00
5.00
4.50
4.10
5.00
4.00
5.00
5.00
Lx/Ly
0.65
0.50
0.72
0.56
0.54
0.42
0.70
0.78
0.49
0.82
0.81
0.80
0.40
mlx
36.00
40.50
32.70
39.40
39.95
33.90
30.40
28.10
29.30
29.30
-
mly
6.10
2.40
8.85
3.30
2.85
7.90
10.05
12.10
10.30
10.30
-
mtx
76.70
83.30
72.05
81.70
82.50
73.70
68.60
64.95
66.80
66.80
-
mty
24.20
14.30
30.00
17.20
15.75
28.00
34.00
38.00
36.00
36.00
-
ws
26.10
29.60
23.85
28.60
29.10
24.60
22.25
20.50
21.40
21.40
-
BANYU URIP
PROJECT
B14
B15
B16
B17
B18
264522103.xls
5.00
4.00
3.00
3.00
3.25
5.00
5.00
3.25
5.00
4.80
1.00
0.80
0.92
0.60
0.68
51.50
66.80
57.35
79.40
75.20
Attachment
E - Page 97 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
51.50
36.00
46.00
20.60
26.10
14.90
21.40
17.20
27.50
25.35
BANYU URIP
PROJECT
Attachment
E - Page 98 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Lx
(m)
4.80
2.00
4.50
3.25
4.00
3.20
3.50
3.25
5.00
Ly
(m)
5.00
4.00
5.00
4.00
5.00
3.50
4.00
5.00
5.00
Lx/Ly
0.96
0.50
0.90
0.81
0.80
0.91
0.88
0.65
1.00
Flexural reinforcement
Mux
=
0.001 m q Lx2
Muy
=
0.001 m q Ly2
Slab
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12
B13
B14
B15
B16
B17
B18
B19
B20
B21
B22
B23
B24
B25
B26
B27
264522103.xls
Mu lx
kN.m/m
6.14
4.09
5.70
3.98
6.82
4.05
3.63
4.61
3.02
4.57
4.93
4.57
2.07
3.32
3.60
5.04
1.58
8.26
5.11
7.74
2.47
3.08
6.28
8.34
Mu ly
kN.m/m
2.46
0.97
2.96
1.08
1.66
1.93
1.99
2.95
1.61
2.51
4.93
2.51
1.76
1.12
1.57
4.41
0.37
6.61
2.72
4.25
1.91
2.33
2.52
8.34
mlx
mly
22.40
40.50
24.70
29.30
29.30
24.70
25.80
36.00
20.20
18.10
2.40
16.00
10.30
10.30
16.00
14.95
6.10
20.20
(kN.m/m)
(kN.m/m)
Mu tx
kN.m/m
13.09
8.41
12.57
8.25
14.08
8.81
8.20
10.65
6.88
10.43
12.56
10.43
5.04
6.97
7.75
12.45
3.25
19.83
11.65
17.65
5.92
7.31
13.38
21.26
Mu ty
kN.m/m
9.77
5.78
10.03
5.63
9.16
6.83
6.72
9.27
5.62
8.78
12.56
8.78
4.74
5.02
5.87
11.71
2.23
18.17
9.51
14.86
5.26
6.56
9.99
21.26
mtx
55.40
83.30
59.30
66.80
66.80
59.30
61.20
76.70
51.50
mty
48.00
14.30
44.00
36.00
36.00
44.00
42.00
24.20
51.50
ws
16.40
29.60
18.00
21.40
21.40
18.00
18.80
26.10
14.90
BANYU URIP
PROJECT
Attachment
E - Page 99 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
used
As
=
0.18% < 2.77%OK
=
*b*d
=
216.00 mm2
db
=
13 mm
s
=
614.50 mm =>
150 mm
Use D13 - 150 for top & bottom flexural reinforcement
Bottom Reinforcement Y Direction
Mu max
=
2.46 kN.m
d'
=
30 mm
d
=
0.12 m
=
120 mm
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
0.19 MPa
m
=
fy / ( 0.85 * fc' )
=
13.11
r
=
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
=
0.05%
1
*
0.85 fc' *
600
b
=
=
fy
600 + fy
=
3.68%
max
=
0.75 balanced
264522103.xls
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 100 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
=
=
2.76%
0.18%
need
0.07%
264522103.xls
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 101 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
used
As
=
0.18% < 2.77%OK
=
*b*d
=
216.00 mm2
db
=
13 mm
s
=
614.50 =>
150 mm
Use D13 - 150 for top & bottom flexural reinforcement
used
As
=
0.35% < 2.77%OK
*b*d
=
=
420.57 mm2
db
=
13 mm
s
=
320 =>
150 mm
Use D13 - 150 for top & bottom flexural reinforcement
Top Reinforcement Y Direction
Mu max
=
9.77 kN.m
d'
=
30 mm
d
=
0.12 m
=
120 mm
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
0.75 MPa
264522103.xls
BANYU URIP
PROJECT
m
r
264522103.xls
=
=
=
=
Attachment
E - Page 102 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 103 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
min
=
=
=
=
=
=
need
max
1 * 0.85 fc' *
600
fy
600 + fy
3.68%
0.75 balanced
2.76%
0.18%
0.26%
used
As
=
0.26% < 2.77%OK
*b*d
=
=
312.66 mm2
db
=
13 mm
s
=
424.52 =>
150 mm
Use D13 - 150 for top & bottom flexural reinforcement
Bottom reinforcement X direction
Mu
d'
d
Slab
1
kN.m
mm mm
B1
6.14 30 120 0.80
B2
4.09 30 120 0.80
B3
5.70 30 120 0.80
B4
3.98 30 120 0.80
B5
6.82 30 120 0.80
B6
B7
4.05 30 120 0.80
B8
3.63 30 120 0.80
B9
B10
4.61 30 120 0.80
B11
3.02 30 120 0.80
B12
4.57 30 120 0.80
B13
B14
4.93 30 120 0.80
B15
4.57 30 120 0.80
B16
2.07 30 120 0.80
B17
3.32 30 120 0.80
B18
3.60 30 120 0.80
B19
5.04 30 120 0.80
B20
1.58 30 120 0.80
B21
8.26 30 120 0.80
B22
5.11 30 120 0.80
B23
7.74 30 120 0.80
B24
2.47 30 120 0.80
B25
3.08 30 120 0.80
B26
6.28 30 120 0.80
264522103.xls
r
0.12%
0.08%
0.11%
0.08%
0.14%
0.08%
0.07%
0.09%
0.06%
0.09%
0.10%
0.09%
0.04%
0.07%
0.07%
0.10%
0.03%
0.17%
0.10%
0.15%
0.05%
0.06%
0.13%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.22%
0.18%
0.21%
0.18%
0.18%
0.18%
db
mm
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
s
mm
614.50
614.50
614.50
614.50
611.07
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
503.32
614.50
537.38
614.50
614.50
614.50
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
B27
8.34
264522103.xls
30 120 0.80
Attachment
E - Page 104 of 44
IDBC-TS-NCCAL-C05001
0.22%
6-Aug-12
Rev. 1
13
498.46
150.00
BANYU URIP
PROJECT
Attachment
E - Page 105 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
r
0.26%
0.17%
0.25%
0.17%
0.28%
0.18%
0.16%
0.21%
0.14%
0.21%
0.25%
0.21%
0.10%
0.14%
0.15%
0.25%
0.06%
0.40%
0.23%
0.36%
0.12%
0.15%
0.27%
0.43%
r
0.05%
0.02%
0.06%
0.02%
0.03%
0.04%
0.04%
0.06%
0.03%
0.05%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
min
0.18%
0.18%
0.18%
0.18%
0.36%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.36%
0.18%
0.36%
0.18%
0.18%
0.18%
0.36%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.35%
0.22%
0.34%
0.22%
0.36%
0.23%
0.22%
0.28%
0.18%
0.28%
0.34%
0.28%
0.18%
0.19%
0.21%
0.33%
0.18%
0.40%
0.31%
0.36%
0.18%
0.19%
0.36%
0.43%
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
db
mm
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
s
mm
320.00
494.23
328.88
504.01
308.13
471.70
507.19
389.09
605.13
397.58
329.09
397.58
614.50
597.42
536.91
332.00
614.50
274.44
355.17
308.13
614.50
569.18
308.60
255.44
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
db
mm
13
13
13
13
13
13
13
13
13
13
s
mm
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
B13
B14
B15
B16
B17
4.93
2.51
1.76
1.12
264522103.xls
30
30
30
30
120
120
120
120
0.80
0.80
0.80
0.80
0.18%
0.18%
0.18%
0.18%
Attachment
E - Page 106 of 44
IDBC-TS-NCCAL-C05001
0.18%
0.18%
0.18%
0.18%
6-Aug-12
Rev. 1
13
13
13
13
614.50
614.50
614.50
614.50
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
Attachment
E - Page 107 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Mu
d'
kN.m
mm
1.57 30
4.41 30
0.37 30
6.61 30
2.72 30
4.25 30
1.91 30
2.33 30
2.52 30
8.34 30
d
mm
120
120
120
120
120
120
120
120
120
120
264522103.xls
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.03%
0.09%
0.01%
0.13%
0.05%
0.08%
0.04%
0.05%
0.05%
0.17%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.20%
0.12%
0.20%
0.11%
0.18%
0.14%
0.13%
0.19%
0.11%
0.18%
0.25%
0.18%
0.09%
0.10%
0.12%
0.24%
0.04%
0.37%
0.19%
0.30%
0.10%
0.13%
0.20%
0.43%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.36%
0.18%
0.36%
0.18%
0.18%
0.18%
0.36%
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.22%
used
0.26%
0.18%
0.27%
0.18%
0.24%
0.18%
0.18%
0.25%
0.18%
0.23%
0.34%
0.23%
0.18%
0.18%
0.18%
0.31%
0.18%
0.37%
0.25%
0.36%
0.18%
0.18%
0.27%
0.43%
db
mm
13
13
13
13
13
13
13
13
13
13
s
mm
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
614.50
498.46
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
db
mm
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
s
mm
424.52
614.50
413.41
614.50
453.35
609.99
614.50
448.00
614.50
473.20
329.09
473.20
614.50
614.50
614.50
353.50
614.50
300.29
436.33
308.13
614.50
614.50
415.15
255.44
s used
mm
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
BANYU URIP
PROJECT
Attachment
E - Page 108 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
ws q a4/(E ts3)
q
Slab
ws
kPa
B1
26.10
11.13
B2
29.60
11.13
B3
23.85
11.43
B4
28.60
11.13
B5
29.10
11.13
B6
B7
24.60
7.13
B8
22.25
7.13
B9
B10
20.50
7.13
B11
21.40
7.13
B12
21.40
7.13
B13
B14
14.90
7.13
B15
21.40
7.13
B16
17.20
7.13
B17
27.50
7.13
B18
25.35
7.13
B19
16.40
7.13
B20
29.60
7.13
B21
18.00
11.43
B22
21.40
11.43
B23
21.40
11.43
B24
18.00
7.13
B25
18.80
7.13
B26
26.10
11.43
B27
14.90
11.43
mm
a
m
5.00
5.00
4.50
4.50
6.00
5.00
4.50
5.00
4.00
5.00
5.00
5.00
3.25
5.00
4.80
5.00
4.00
5.00
4.00
5.00
3.50
4.00
5.00
5.00
E
kPa
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
2.78E+07
ts
m
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
mm
1.93
2.19
1.19
1.39
4.47
1.17
0.69
0.97
0.42
1.02
0.71
1.02
0.15
1.31
1.02
0.78
0.58
1.37
0.67
1.63
0.21
0.37
1.99
1.13
all
mm
9.03
6.94
9.03
6.94
9.03
9.72
9.72
11.39
9.03
11.11
13.89
11.11
8.33
8.33
9.03
13.33
5.56
12.50
9.03
11.11
8.89
9.72
9.03
13.89
Remark
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Crack
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as follow:
w
=
1.11 x 10-6 x x fs x 3(d' x A)
where:
w
=
crack width (mm)
=
height factor (1.2 for beam, 1.35 for slab)
=
1.35
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
=
30 mm
s
=
maximum s in one slab
=
150 mm
A
=
effective tension area divided by number of bar
264522103.xls
BANYU URIP
PROJECT
so:
264522103.xls
=
=
=
=
=
Attachment
E - Page 109 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 110 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Beam Design
This section provide calculation for beam design to estimate beam dimension. All beam shall be redesign by 3D structure model by STAAD.Pro 2007.
E.2.1 Roof Beam Design
B8
Max: 366.709 kNm
660
662
661
341
113
112
841
871
111
840
Max: 172.75 kN
660
Y
Z
Max: 38.15 kN
662
661
341
Max: -203.35 kN
113
112
871
111
839
Y
Z X
264522103.xls
841
840
BANYU URIP
PROJECT
Attachment
E - Page 111 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
used
As
=
0.62%
*b*d
=
=
1,395 mm2
db
=
19 mm
s
=
4.92 =>
5
Use 5D19 for bottom flexural reinforcement at mid span
Top Reinforcement at End Span
Mu max
=
366.71 kN.m
d'
=
50 mm
d
=
0.75
=
750
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
2.41 MPa
m
=
fy / ( 0.85 * fc' )
=
13.11
r
=
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
=
0.65%
1 * 0.85 fc' *
600
b
=
=
fy
600 + fy
=
3.68%
264522103.xls
Rev. 1
BANYU URIP
PROJECT
max
min
=
=
=
need
264522103.xls
Attachment
E - Page 112 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 113 of 44
IDBC-TS-NCCAL-C05001
used
As
=
0.65%
*b*d
=
=
1,455 mm2
db
=
19 mm
s
=
5.1 =>
5
Use 5D19 for top reinforcement at end span
1
61. 3 - 25MM
0.
5000.
YES YES
|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 352.38 KN-MET AT 0.MM, LOAD 14|
| REQD STEEL= 1417.MM2, ROW=0.0064, ROWMX=0.0276 ROWMN=0.0035 |
| MAX/MIN/ACTUAL BAR SPACING= 284./ 50./ 89. MMS
|
| REQD. DEVELOPMENT LENGTH = 833. MMS
|
|----------------------------------------------------------------|
Cracked Moment of Inertia Iz at above location = 385801.9 cm^4
2
739. 3 - 25MM
0.
5000.
YES YES
|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 366.71 KN-MET AT 5000.MM, LOAD 13|
| REQD STEEL= 1472.MM2, ROW=0.0066, ROWMX=0.0276 ROWMN=0.0035 |
| MAX/MIN/ACTUAL BAR SPACING= 284./ 50./ 89. MMS
|
| REQD. DEVELOPMENT LENGTH = 833. MMS
|
|----------------------------------------------------------------|
Cracked Moment of Inertia Iz at above location = 388668.2 cm^4
B E A M N O. 661 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 74.80 KNS Vc= 213.40 KNS Vs= 0.00 KNS
Tu= 13.04 KN-MET Tc= 10.0 KN-MET Ts= 17.4 KN-MET LOAD 25
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 114 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
BANYU URIP
PROJECT
Attachment
E - Page 115 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
=
264522103.xls
Attachment
E - Page 116 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 117 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
Vu - Vc
=
203.35 - 166.39
=
36.96 kN
Vs
=
49.28 kN
db
=
10 mm
Av
=
2 x 1/4 x x db2
=
2 x 1/4 x x 10^2
=
157.08 mm2
minimum shear reinfocement :
s1
=
3 Av fy / bw
=
3 x 157.08 x 390/300
=
612.61 mm
s2
=
1200 Av fy / (75 fc' bw)
=
1200 x 157.08 x 390/(75 x 35^0.5 x 300)
=
552.27 mm
s max
=
min of s1 and s2
=
552.27 mm
150 mm
Use D10 - 150 for stirrup at end span
(2 legs)
Mid span
Vu
Vc
=
113.84 kN
0.75 x 2 fc' b d / 12
=
(Ref.9 Sect. 11.3 Eq. 11-3)
=
0.75 x 35^0.5 x 2/12 x 300 x 750
=
166.39 kN
Vs
=
Vu - Vc
=
113.84 - 166.39
=
-52.55 kN
(Have to use minimum reinforcement)
Use D10 - 200 for stirrup at mid span
E.2.1.2 Crack
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as follow :
w
=
1.11 x 10-6 x x fs x 3(d' x A)
where:
w
=
crack width (mm)
=
height factor (1.2 for beam, 1.35 for slab)
=
1.2
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
=
75 mm
n
=
minimum number of longitudinal bar
=
5
A
=
effective tension area divided by number of bar
=
2 d' x b / n
=
2 x 75 x 300/5
=
9,000 mm2
264522103.xls
BANYU URIP
PROJECT
so:
264522103.xls
=
=
Attachment
E - Page 118 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 119 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
660
662
661
341
113
112
Fig. E.7 Grid M, TB4 beam maximum bending moment force (LC1-6a)
111
839
841
660
871
840
662
661
341
Z X
113
112
Max: 110.40 kN
871
Y
Z
264522103.xls
841
840
111
Max: -153.210 k
BANYU URIP
PROJECT
Attachment
E - Page 120 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
=
0.69%
*b*d
used
=
As
=
1,031 mm2
db
=
22 mm
s
=
2.71 =>
3
Use 3D22 for bottom flexural reinforcement at mid span
Top Reinforcement at End Span
Mu max
=
264.37 kN.m
d'
=
50 mm
d
=
0.50
=
500
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
3.92 MPa
m
=
fy / ( 0.85 * fc' )
=
13.11
r
=
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
=
1.08%
1 * 0.85 fc' *
600
b
=
=
fy
600 + fy
=
3.68%
264522103.xls
Rev. 1
BANYU URIP
PROJECT
max
min
=
=
=
need
264522103.xls
Attachment
E - Page 121 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 122 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
used
As
=
1.08%
*b*d
=
=
1,621 mm2
db
=
22 mm
n
=
4.26 =>
5
Use 5D22 for top reinforcement at end span
Vs
Vs
264522103.xls
=
=
=
=
=
=
=
=
(2 legs)
68.80 kN
0.75 x 2 fc' b d / 12
(Ref.9 Sect. 11.3 Eq. 11-3)
0.75 x 35^0.5 x 2/12 x 300 x 500
110.93 kN
Vu - Vc
68.8 - 110.93
-42.13 kN
-56.17 kN
(Have to use minimum reinforcement)
BANYU URIP
PROJECT
264522103.xls
Attachment
E - Page 123 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 124 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
height factor (1.2 for beam, 1.35 for slab)
=
1.2
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
=
50 mm
n
=
minimum number of longitudinal bar
=
3
A
=
effective tension area divided by number of bar
=
2 d' x b / n
=
2 x 50 x 300/3
=
5,546 mm2
so: w
=
1.11e-6 x 1.2 x 234 x (50 x 5546.33)^(1/3)
=
0.02 mm < 0.33 mm .. OK
264522103.xls
BANYU URIP
PROJECT
Attachment
E - Page 125 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Wall Design
E.3.1 Front Wall
Wall is designed to resist blast load. Since wind load and earthquake load is smaller than blast load,
it is considered adequate.
(See sect. 6.2)
Wb
=
30.65 kN/m2
(shear capacity controlling)
tw
=
200 mm
CL
5
3A
Axis
C1-D1
D1-F1
F1-G1
C-C1
G1-H1
H1-I1
C-C1
C1-D1
D1-F1
F1-G1
G1-H1
H1-I1
Panel Dimension
Lx (m)
Ly (m)
4.60
5.00
4.60
5.00
4.60
5.00
4.10
4.60
4.00
4.60
4.00
4.60
4.10
4.60
4.60
5.00
4.60
5.00
4.60
5.00
4.00
4.60
4.00
4.60
Tab.
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
Lx/Ly
mlx
0.92
0.92
0.92
0.89
0.87
0.87
0.89
0.92
0.92
0.92
0.87
0.87
mly
23.55
23.55
23.55
24.70
25.80
25.80
24.70
23.55
23.55
23.55
25.80
25.80
17.05
17.05
17.05
16.00
14.95
14.95
16.00
17.05
17.05
17.05
14.95
14.95
mtx
57.35
57.35
57.35
59.30
61.20
61.20
59.30
57.35
57.35
57.35
61.20
61.20
mty
46.00
46.00
46.00
44.00
42.00
42.00
44.00
46.00
46.00
46.00
42.00
42.00
In this calculation, top surface is surface that facing the blast load while bottom surface mean surface in
opposite direction with blast load.
Flexural reinforcement
Mux
=
0.001 m q Lx2
Muy
=
0.001 m q Ly2
CL
5
3A
Axis
C1-D1
D1-F1
F1-G1
C-C1
G1-H1
H1-I1
C-C1
C1-D1
D1-F1
F1-G1
G1-H1
H1-I1
Type
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
1.12
Mu lx
kN.m/m
15.27
15.27
15.27
12.73
12.65
12.65
12.73
15.27
15.27
15.27
12.65
12.65
(kN.m/m)
(kN.m/m)
Mu ly
kN.m/m
13.06
13.06
13.06
10.38
9.70
9.70
10.38
13.06
13.06
13.06
9.70
9.70
Mu tx
kN.m/m
37.19
37.19
37.19
30.55
30.01
30.01
30.55
37.19
37.19
37.19
30.01
30.01
Mu ty
kN.m/m
35.25
35.25
35.25
28.54
27.24
27.24
28.54
35.25
35.25
35.25
27.24
27.24
BANYU URIP
PROJECT
Mu max
d'
d
1
264522103.xls
=
=
=
=
=
15.27
30
0.17
170
0.80
Attachment
E - Page 126 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 127 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
min
=
=
=
=
=
=
=
=
=
=
=
=
need
m
r
b
max
Mu / ( x b x d2)
0.59 MPa
fy / ( 0.85 * fc' )
13.11 MPa
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
0.15%
1 * 0.85 fc' *
600
fy
600 + fy
3.68%
0.75 balanced
2.76%
0.18%
( min = 1.4/fy if 1.33 x required > 1.4/fy)
( min = 0.18% if 1.33 x required < 1.4/fy)
0.20%
( need = r if r > 1.4/fy)
used
As
=
0.20% < 2.77%... OK
*b*d
=
=
343.86 mm2
db
=
13 mm
s
=
386.01 mm =>
Use D13 - 200 for bottom flexural reinforcement
200 mm
used
264522103.xls
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 128 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
200 mm
used
As
=
0.38% < 2.77% OK
*b*d
=
=
639.09 mm2
db
=
13 mm
s
=
207.69 mm =>
Use D13 - 200 for top reinforcement
Top Reinforcement Y Direction
Mu max
=
35.25 kN.m
d'
=
30 mm
d
=
0.17 m
=
170 mm
1
=
0.80
Mu / ( x b x d2)
Ru
=
=
1.36 MPa
m
=
fy / ( 0.85 * fc' )
=
13.11 MPa
r
=
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
264522103.xls
200 mm
Rev. 1
BANYU URIP
PROJECT
b
264522103.xls
=
=
=
=
Attachment
E - Page 129 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 130 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
min
=
=
=
0.75 balanced
2.76%
0.36%
need
0.36%
max
used
As
=
0.36% < 2.77% OK
*b*d
=
=
610.26 mm2
db
=
13 mm
s
=
217.50 mm =>
Use D13 - 200 for top reinforcement
Bottom reinforcement X direction
Mu
d'
d
Axis
1
kN.m
mm mm
15.27 30 170 0.80
C1-D1
15.27 30 170 0.80
D1-F1
15.27 30 170 0.80
F1-G1
12.73 30 170 0.80
C-C1
12.65 30 170 0.80
G1-H1
12.65 30 170 0.80
H1-I1
12.73 30 170 0.80
C-C1
15.27 30 170 0.80
C1-D1
15.27 30 170 0.80
D1-F1
15.27 30 170 0.80
F1-G1
12.65 30 170 0.80
G1-H1
12.65 30 170 0.80
H1-I1
264522103.xls
r
0.15%
0.15%
0.15%
0.13%
0.13%
0.13%
0.13%
0.15%
0.15%
0.15%
0.13%
0.13%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
200 mm
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.20%
0.20%
0.20%
0.18%
0.18%
0.18%
0.18%
0.20%
0.20%
0.20%
0.18%
0.18%
db
mm
13
13
13
13
13
13
13
13
13
13
13
13
s
mm
386.01
386.01
386.01
433.77
433.77
433.77
433.77
386.01
386.01
386.01
433.77
433.77
s used
mm
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
BANYU URIP
PROJECT
Attachment
E - Page 131 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
r
0.13%
0.13%
0.13%
0.10%
0.10%
0.10%
0.10%
0.13%
0.13%
0.13%
0.10%
0.10%
r
0.38%
0.38%
0.38%
0.31%
0.30%
0.30%
0.31%
0.38%
0.38%
0.38%
0.30%
0.30%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.36%
0.36%
0.36%
0.29%
0.27%
0.27%
0.29%
0.36%
0.36%
0.36%
0.27%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
max
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
2.76%
min
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
min
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
min
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
used
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
0.18%
used
0.38%
0.38%
0.38%
0.36%
0.36%
0.36%
0.36%
0.38%
0.38%
0.38%
0.36%
0.36%
used
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
0.36%
db
mm
13
13
13
13
13
13
13
13
13
13
13
13
s
mm
433.77
433.77
433.77
433.77
433.77
433.77
433.77
433.77
433.77
433.77
433.77
433.77
s used
mm
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
db
mm
13
13
13
13
13
13
13
13
13
13
13
13
s
mm
207.69
207.69
207.69
217.50
217.50
217.50
217.50
207.69
207.69
207.69
217.50
217.50
s used
mm
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
db
mm
13
13
13
13
13
13
13
13
13
13
13
s
mm
217.50
217.50
217.50
217.50
217.50
217.50
217.50
217.50
217.50
217.50
217.50
s used
mm
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
BANYU URIP
PROJECT
H1-I1
27.24
264522103.xls
30 170 0.80
Attachment
E - Page 132 of 44
IDBC-TS-NCCAL-C05001
0.36%
6-Aug-12
Rev. 1
13
217.50
200.00
BANYU URIP
PROJECT
Attachment
E - Page 133 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
=
CL
Axis
B1
C1
G1
I1
3A-4
4-5
4-5
3A-4
12.26 kN/m2
200 mm
Panel Dimension
Lx (m)
Ly (m)
4.60
5.00
4.00
4.60
4.00
4.60
4.60
5.00
Tab.
1.12
1.12
1.12
1.12
Flexural Resistance
Mux
= 0.001 m q Lx2
Muy
= 0.001 m q Ly2
CL
B1
C1
G1
I1
Axis
Type
3A-4
4-5
4-5
3A-4
Mu max
d'
d
1
Ru
m
r flexural
Shear Resistance
Wb
tw
Lw
hw / Lw
c
Max Vu
264522103.xls
1.12
1.12
1.12
1.12
Mu lx
kN.m/m
6.11
5.06
5.06
6.11
Lx/Ly
mlx
0.92
0.87
0.87
0.92
mly
23.55
25.80
25.80
23.55
17.05
14.95
14.95
17.05
mtx
mty
57.35
61.20
61.20
57.35
(kN.m/m)
(kN.m/m)
Mu ly
kN.m/m
5.23
3.88
3.88
5.23
=
=
=
=
=
=
=
=
=
=
=
14.88 kN.m
30 mm
0.17 m
170 mm
0.80
Mu / ( x b x d2)
0.57 MPa
fy / ( 0.85 * fc' )
13.11 MPa
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
0.15%
=
=
=
=
=
=
=
=
3065.00 kN
200 mm
27100 mm
4600 / 27100
0.17
1/4
1/2 Wb
1/2 x 3065
Mu tx
kN.m/m
14.88
12.00
12.00
14.88
Mu ty
kN.m/m
14.10
10.89
10.89
14.10
46.00
42.00
42.00
46.00
BANYU URIP
PROJECT
Vn
264522103.xls
=
=
Attachment
E - Page 134 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 135 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
= 0.9 x tw x Lw
= 0.9 x 200 x 27100
=
4878000 mm2
r shear
= 1/fy (Vn/Acv - cfc')
= 1/390 x (2786.36 x 1000/4878000 - 0.25 x 35^0.5)
=
-0.23%
r shear smaller than 0 so no shear reinforcement needed.
Reinforcement
r minimum per side of wall
=
0.13%
r per side of wall
= r shear + r flexural
= 0 + 0.0015
=
0.15%
264522103.xls
BANYU URIP
PROJECT
Attachment
E - Page 136 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Column Design
C3
662
661
33.739 kNm
341
113
112
871
Max: -80.325 kNm
111
Y
Z
841
840
264522103.xls
BANYU URIP
PROJECT
Attachment
E - Page 137 of 44
IDBC-TS-NCCAL-C05001
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 138 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
mm
mm
mm
mm2
kN
kN
kN.m
kN.m
c = 0.003
50
0.85 x fc'
s'1
84
s'2
fs'1
Cb
fs'2
fs3
d = 326
84
s3
fs2
s2
84
fs1
s1
50
=>
=>
=>
=>
=>
Reinforcement force,
(+) Compression, (-) Tension
As1
=
1520.53 mm2
=> Ts1
= fs1 x As1 for tens.
=
-593.01 kN
As2
=
760.27 mm2
=> Ts2
= fs2 x As2 for tens.
=
-150.61 kN
As3
=
760.27 mm2
=> Ts3
= fs3 x As3 for tens.
=
-4.72 kN
As'1
=
1520.53 mm2
=> Cs'1
= As'1(fs'1 - 0.85fc') for comp.
264522103.xls
fs1
fs2
fs'3
fs'1
fs'2
=
=
=
=
=
-390.00
-198.10
-6.20
377.59
185.70
MPa
MPa
MPa
MPa
MPa
BANYU URIP
PROJECT
As'2
=> Cs'2
264522103.xls
=
=
=
=
Attachment
E - Page 139 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 140 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
(2 legs)
BANYU URIP
PROJECT
Attachment
E - Page 141 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Pilecap Design
Pmax
745.38 kN
700
q
1200
Mu
Vu
Mu max
b
d'
d
1
Ru
m
r
b
max
min
=
=
=
need
used
As
db
s
264522103.xls
=
=
=
=
=
=
=
=
b x t x selfweight
1 x 0.7 x 23.54
16.5 kN/m
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
227.77 kN.m
1000 mm
100 mm
0.60 m
600 mm
0.80
Mu / ( x b x d2)
0.70 MPa
fy / ( 0.85 * fc' )
13.11 MPa
(1/m) x (1 - (1 - 2m Ru/fy)0.5)
0.18%
1 * 0.85 fc' *
600
fy
600 + fy
3.68%
0.75 balanced
2.76%
0.18%
( min = 1.4/fy if 1.33 x required > 1.4/fy)
( min = 0.18% if 1.33 x required < 1.4/fy)
0.24%
( need = r if r > 1.4/fy)
0.24%
*b*d
1,456
19
200.00
< 2.77% OK
mm2
mm
mm =>
200 mm
BANYU URIP
PROJECT
264522103.xls
Attachment
E - Page 142 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
E - Page 143 of 44
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
386.53 kN
0.75 x 2 fc' b d / 12
=
=
0.75 x 35^0.5 x 2/12 x 1000 x 600
=
443.71 kN
Vs
=
Vu - Vc
=
386.53 - 0
=
386.53 kN
Vs
=
515.37 kN
db
=
13 mm
Av
=
2 x 1/4 x x db2
=
2 x 1/4 x x 13^2
=
265.46 mm2
minimum shear reinfocement :
s1
=
3 Av fy / bw
=
3 x 265.46 x 390/1000
=
310.59 mm
s2
=
1200 Av fy / (75 fc' bw)
=
1200 x 265.46 x 390/(75 x 35^0.5 x 1000)
=
280.00 mm
s max
=
min of s1 and s2
=
280.00 mm =>
200 mm
Use D13 - 200 as stirrup
(2 legs)
Crack
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as follow:
w
=
1.11 x 10-6 x x fs x 3(d' x A)
where
w
=
crack width (mm)
=
height factor (1.2 for beam, 1.35 for slab)
=
1.2
fs
=
reinforcement calculated stress at service load (MPa), shall be 0.6fy for max. crack
=
234 MPa
d'
=
thickness of concrete cover (mm)
=
100 mm
s
=
200 mm
A
=
effective tension area divided by number of bar
=
2 d' x b / (1000 / s)
=
2 x 100 x 1000/(1000/200)
=
40000 mm2
w
=
1.11e-6 x 1.2 x 234 x (100 x 40000)^(1/3)
=
0.05 mm < 0.33 mm ... OK
264522103.xls
ATTACHMENT F
REACTION TO PILE CAP
BANYU URIP
PROJECT
264522103.xls
Attachment
F - Page 145 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
F - Page 146 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
F - Page 147 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
Pilecap
1 Pile
2 Pile
3 Pile
4 Pile
Pilecap
n pile
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
BANYU URIP
PROJECT
H1-3
H1-3A
264522103.xls
276.92
375.87
36.25
36.25
2
2
Attachment
F - Page 148 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
0.53
0.70
###
###
BANYU URIP
PROJECT
Attachment
F - Page 149 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
LC2-1
(kN)
319.75
324.46
586.92
240.71
333.16
312.22
299.05
242.64
476.50
276.09
301.01
585.61
470.02
320.59
310.06
229.99
546.63
303.20
403.87
299.48
649.21
345.49
189.68
366.50
319.69
224.76
Q comp
(kN)
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
295.53
n used
(ea)
2
2
3
2
2
2
2
2
2
1
2
3
2
2
2
2
2
2
2
2
3
2
1
2
2
1
131
Fv ratio
0.60
0.61
0.74
0.47
0.62
0.59
0.57
0.47
0.87
0.97
0.57
0.74
0.86
0.60
0.59
0.45
0.99
0.57
0.74
0.57
0.81
0.65
0.68
0.68
0.60
0.80
n pile
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
BANYU URIP
PROJECT
Attachment
F - Page 150 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
Fv ratio
2
2
2
1
2
2
3
1
2
2
2
2
2
2
2
3
3
2
3
2
2
2
2
1
1
1
2
2
2
2
2
1
2
1
2
3
3
1
2
1
2
2
0.54
0.70
0.70
0.69
0.79
0.55
0.76
0.93
0.89
0.61
0.89
0.67
0.89
0.54
0.75
0.79
0.85
0.70
0.76
0.67
0.86
0.89
0.89
0.82
0.48
0.69
0.66
0.53
0.84
0.86
0.92
0.82
0.71
0.92
0.82
0.89
0.96
0.92
0.80
0.94
0.67
0.57
n pile
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
BANYU URIP
PROJECT
I-1
I-2
I1-3
I1-3A
264522103.xls
326.98
601.20
283.28
501.11
Attachment
F - Page 151 of 8
IDBC-TS-NCCAL-C05001
393.05
393.05
393.05
393.05
6-Aug-12
Rev. 1
1
2
1
2
0.86
0.81
0.75
0.68
###
###
###
###
BANYU URIP
PROJECT
Attachment
F - Page 152 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
Vertical Load
(kN)
745.38
307.32
243.37
483.50
291.03
316.75
589.65
473.82
341.89
324.73
245.67
561.39
328.18
418.81
315.53
664.82
372.16
222.65
382.85
332.32
253.49
Condition
LC2-5 b
LC2-3 d
LC2-4 d
LC2-3 c
LC2-3 a
LC2-3 d
LC2-4 d
LC2-3 d
LC2-3 a
LC2-3 c
LC2-4 a
LC2-3 c
LC2-3 a
LC2-3 d
LC2-4 c
LC2-3 d
LC2-3 a
LC2-4 b
LC2-4 b
LC2-4 b
LC2-3 a
Q comp
(kN)
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
393.05
n used
(ea)
2
1
1
2
1
1
2
2
1
1
1
2
1
2
1
2
1
1
2
1
1
116
Fv ratio
0.99
0.81
0.65
0.66
0.77
0.83
0.80
0.65
0.90
0.85
0.65
0.76
0.86
0.58
0.83
0.89
0.97
0.59
0.53
0.87
0.67
n pile
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
BANYU URIP
PROJECT
Attachment
F - Page 153 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
=
=
4.5
121.95
x
x
27.10
30.65
=
=
121.95 m2
3737.77 kN
=
=
4.5
40.5
x
x
9.00
30.65
=
=
40.5 m2
1241.325 kN
Slab and tie beam are assumed rigid enough to distribute lateral load uniformly to all pile cap. Figure F.2
and figure F.3 show pilecap resisting lateral load. Pilecap considered resisting lateral load is in line with
lateral load.
264522103.xls
BANYU URIP
PROJECT
Attachment
F - Page 154 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
WbX
264522103.xls
BANYU URIP
PROJECT
264522103.xls
50
Attachment
F - Page 155 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
WbZ
264522103.xls
Attachment
F - Page 156 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
17
Attachment
F - Page 157 of 8
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
ATTACHMENT G
FOUNDATION PLAN AND PILING LAYOUT DRAWING
BANYU URIP
PROJECT
264522103.xls
Attachment
G - Page 159 of 1
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
264522103.xls
ATTACHMENT H
PLATE TABLE
BANYU URIP
PROJECT
Attachment
H - Page 162 of 1
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
lx
ly
Fig H.1 Support Type of Plate
where:
Fixed
Free
Table H.1A Moment Coefficient of Plate for "c" Value Between 0.50 - 0.63 and Poisson's Ratio = 0.15
Various value of "c"
= lx/ly
0.50
0.53
0.55
0.58
0.60
0.63
2
Mu
lx
=
0.001*q*lx
*c
40.50
39.95
39.40
38.60
37.80
36.90
All Fixed
Support Mu ly = 0.001*q*lx2*c
2.40
2.85
3.30
3.95
4.60
5.35
Type
Mu tx = 0.001*q*lx2*c
83.30
82.50
81.70
80.55
79.40
78.05
Mu ty = 0.001*q*lx2*c
14.30
15.75
17.20
18.90
20.60
22.40
ws
29.60
29.10
28.60
28.05
27.50
26.80
Table H.1B Moment Coefficient of Plate for "c" Value Between 0.65 - 0.78 and Poisson's Ratio = 0.15
Various value of "c"
= lx/ly
0.65
0.68
0.70
0.73
0.75
0.78
2
36.00
34.95
33.90
32.70
31.50
30.40
All Fixed Mu lx = 0.001*q*lx *c
Support Mu ly = 0.001*q*lx2*c
6.10
7.00
7.90
8.85
9.80
10.05
2
Type
Mu tx = 0.001*q*lx *c
76.70
75.20
73.70
72.05
70.40
68.60
Mu ty = 0.001*q*lx2*c
24.20
26.10
28.00
30.00
32.00
34.00
ws
26.10
25.35
24.60
23.85
23.10
22.25
Table H.1C Moment Coefficient of Plate for "c" Value Between 0.80 - 0.93 and Poisson's Ratio = 0.15
Various value of "c"
= lx/ly
0.80
0.83
0.85
0.88
0.90
0.93
2
29.30
28.10
26.90
25.80
24.70
23.55
Mu
lx
=
0.001*q*lx
*c
All Fixed
Support Mu ly = 0.001*q*lx2*c
10.30
12.10
13.90
14.95
16.00
17.05
2
Type
66.80
64.95
63.10
61.20
59.30
57.35
Mu tx = 0.001*q*lx *c
36.00
38.00
40.00
42.00
44.00
46.00
Mu ty = 0.001*q*lx2*c
ws
21.40
20.50
19.60
18.80
18.00
17.20
Table H.1D Moment Coefficient of Plate for "c" Value Between 0.95 - 1.15 and Poisson's Ratio = 0.15
Various value of "c"
= lx/ly
0.95
0.98
1.00
1.50
1.10
1.15
2
Mu
lx
=
0.001*q*lx
*c
22.40
21.30
20.20
1.20
16.40
14.75
All Fixed
Support Mu ly = 0.001*q*lx2*c
18.10
19.15
20.20
40.20
24.20
26.45
Type
264522103.xls
BANYU URIP
PROJECT
All Fixed
Support
Type
Mu tx = 0.001*q*lx *c
Mu ty = 0.001*q*lx2*c
ws
264522103.xls
Attachment
H - Page 163 of 1
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
18.50
86.50
0.90
44.90
58.50
12.10
41.85
61.40
10.95
ATTACHMENT I
STAAD INPUT
BANYU URIP
PROJECT
Attachment
I - Page 165 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 166 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 167 of 17
IDBC-TS-NCCAL-C05001
203 14.5 4.88 9.5; 204 15.5 4.88 9.5; 205 16.5 4.88 9.5; 206 17.5 4.88 9.5;
207 18.5 4.88 10.525; 208 13.5 4.88 10.525; 209 18.5 4.88 11.55;
210 13.5 4.88 11.55; 211 18.5 4.88 12.575; 212 13.5 4.88 12.575;
213 22.5 4.88 13.6; 214 18.5 4.88 13.6; 215 19.5 4.88 13.6; 216 20.5 4.88 13.6;
217 21.5 4.88 13.6; 218 13.5 4.88 13.6; 219 22.5 4.88 14.6; 220 13.5 4.88 14.6;
221 22.5 4.88 15.6; 222 13.5 4.88 15.6; 223 22.5 4.88 16.6; 224 13.5 4.88 16.6;
225 22.5 4.88 17.6; 226 13.5 4.88 17.6; 227 22.5 4.88 18.6; 228 13.5 4.88 18.6;
229 22.5 4.88 19.6; 230 13.5 4.88 19.6; 231 22.5 4.88 20.6; 232 13.5 4.88 20.6;
233 22.5 4.88 21.6; 234 13.5 4.88 21.6; 235 22.5 4.88 22.6; 236 13.5 4.88 22.6;
237 22.5 4.88 23.6; 238 13.5 4.88 23.6; 239 22.5 4.88 24.6; 240 13.5 4.88 24.6;
241 22.5 4.88 25.6; 242 13.5 4.88 25.6; 243 22.5 4.88 26.6; 244 13.5 4.88 26.6;
245 22.5 4.88 27.6; 246 13.5 4.88 27.6; 247 22.5 4.88 28.6; 248 13.5 4.88 28.6;
249 18.5 4.88 28.6; 250 21.5 4.88 28.6; 251 20.5 4.88 28.6; 252 19.5 4.88 28.6;
253 18.5 4.88 29.6; 254 13.5 4.88 29.6; 255 18.5 4.88 30.6; 256 13.5 4.88 30.6;
257 18.5 4.88 31.6; 258 13.5 4.88 31.6; 259 18.5 4.88 32.6; 260 13.5 4.88 32.6;
261 18.5 4.88 33.6; 262 13.5 4.88 33.6; 263 18.5 4.88 34.6; 264 13.5 4.88 34.6;
265 18.5 4.88 35.6; 266 13.5 4.88 35.6; 267 18.5 4.88 36.6; 268 13.5 4.88 36.6;
269 17.5 4.88 36.6; 270 16.5 4.88 36.6; 271 15.5 4.88 36.6; 272 14.5 4.88 36.6;
301 18.5 3.86 9.5; 302 13.5 3.86 9.5; 303 14.5 3.86 9.5; 304 15.5 3.86 9.5;
305 16.5 3.86 9.5; 306 17.5 3.86 9.5; 307 18.5 3.86 10.525;
308 13.5 3.86 10.525; 309 18.5 3.86 11.55; 310 13.5 3.86 11.55;
311 18.5 3.86 12.575; 312 13.5 3.86 12.575; 313 22.5 3.86 13.6;
314 18.5 3.86 13.6; 315 19.5 3.86 13.6; 316 20.5 3.86 13.6; 317 21.5 3.86 13.6;
318 13.5 3.86 13.6; 319 22.5 3.86 14.6; 320 13.5 3.86 14.6; 321 22.5 3.86 15.6;
322 13.5 3.86 15.6; 323 22.5 3.86 16.6; 324 13.5 3.86 16.6; 325 22.5 3.86 17.6;
326 13.5 3.86 17.6; 327 22.5 3.86 18.6; 328 13.5 3.86 18.6; 329 22.5 3.86 19.6;
330 13.5 3.86 19.6; 331 22.5 3.86 20.6; 332 13.5 3.86 20.6; 333 22.5 3.86 21.6;
334 13.5 3.86 21.6; 335 22.5 3.86 22.6; 336 13.5 3.86 22.6; 337 22.5 3.86 23.6;
338 13.5 3.86 23.6; 339 22.5 3.86 24.6; 340 13.5 3.86 24.6; 341 22.5 3.86 25.6;
342 13.5 3.86 25.6; 343 22.5 3.86 26.6; 344 13.5 3.86 26.6; 345 22.5 3.86 27.6;
346 13.5 3.86 27.6; 347 22.5 3.86 28.6; 348 13.5 3.86 28.6; 349 18.5 3.86 28.6;
350 21.5 3.86 28.6; 351 20.5 3.86 28.6; 352 19.5 3.86 28.6; 353 18.5 3.86 29.6;
354 13.5 3.86 29.6; 355 18.5 3.86 30.6; 356 13.5 3.86 30.6; 357 18.5 3.86 31.6;
358 13.5 3.86 31.6; 359 18.5 3.86 32.6; 360 13.5 3.86 32.6; 361 18.5 3.86 33.6;
362 13.5 3.86 33.6; 363 18.5 3.86 34.6; 364 13.5 3.86 34.6; 365 18.5 3.86 35.6;
366 13.5 3.86 35.6; 367 18.5 3.86 36.6; 368 13.5 3.86 36.6; 369 17.5 3.86 36.6;
370 16.5 3.86 36.6; 371 15.5 3.86 36.6; 372 14.5 3.86 36.6; 401 18.5 2.84 9.5;
402 13.5 2.84 9.5; 403 14.5 2.84 9.5; 404 15.5 2.84 9.5; 405 16.5 2.84 9.5;
406 17.5 2.84 9.5; 407 18.5 2.84 10.525; 408 13.5 2.84 10.525;
409 18.5 2.84 11.55; 410 13.5 2.84 11.55; 411 18.5 2.84 12.575;
412 13.5 2.84 12.575; 413 22.5 2.84 13.6; 414 18.5 2.84 13.6;
415 19.5 2.84 13.6; 416 20.5 2.84 13.6; 417 21.5 2.84 13.6; 418 13.5 2.84 13.6;
419 22.5 2.84 14.6; 420 13.5 2.84 14.6; 421 22.5 2.84 15.6; 422 13.5 2.84 15.6;
423 22.5 2.84 16.6; 424 13.5 2.84 16.6; 425 22.5 2.84 17.6; 426 13.5 2.84 17.6;
427 22.5 2.84 18.6; 428 13.5 2.84 18.6; 429 22.5 2.84 19.6; 430 13.5 2.84 19.6;
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 168 of 17
IDBC-TS-NCCAL-C05001
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 169 of 17
IDBC-TS-NCCAL-C05001
451 20.5 2.84 28.6; 452 19.5 2.84 28.6; 453 18.5 2.84 29.6; 454 13.5 2.84 29.6;
455 18.5 2.84 30.6; 456 13.5 2.84 30.6; 457 18.5 2.84 31.6; 458 13.5 2.84 31.6;
459 18.5 2.84 32.6; 460 13.5 2.84 32.6; 461 18.5 2.84 33.6; 462 13.5 2.84 33.6;
463 18.5 2.84 34.6; 464 13.5 2.84 34.6; 465 18.5 2.84 35.6; 466 13.5 2.84 35.6;
467 18.5 2.84 36.6; 468 13.5 2.84 36.6; 469 17.5 2.84 36.6; 470 16.5 2.84 36.6;
471 15.5 2.84 36.6; 472 14.5 2.84 36.6; 501 0 2.5 0; 502 6.5 2.5 0;
503 11.5 2.5 0; 504 3.25 2.5 0; 505 9 2.5 0; 506 0 2.5 5; 507 6.5 2.5 5;
508 11.5 2.5 5; 509 3.25 2.5 5; 510 9 2.5 5; 511 0 2.5 9.5; 512 6.5 2.5 9.5;
513 11.5 2.5 9.5; 514 3.25 2.5 9.5; 515 9 2.5 9.5; 516 0 2.5 15.5;
517 6.5 2.5 15.5; 518 11.5 2.5 15.5; 519 3.25 2.5 15.5; 520 9 2.5 15.5;
601 18.5 1.82 9.5; 602 13.5 1.82 9.5; 603 14.5 1.82 9.5; 604 15.5 1.82 9.5;
605 16.5 1.82 9.5; 606 17.5 1.82 9.5; 607 18.5 1.82 10.525;
608 13.5 1.82 10.525; 609 18.5 1.82 11.55; 610 13.5 1.82 11.55;
611 18.5 1.82 12.575; 612 13.5 1.82 12.575; 613 22.5 1.82 13.6;
614 18.5 1.82 13.6; 615 19.5 1.82 13.6; 616 20.5 1.82 13.6; 617 21.5 1.82 13.6;
618 13.5 1.82 13.6; 619 22.5 1.82 14.6; 620 13.5 1.82 14.6; 621 22.5 1.82 15.6;
622 13.5 1.82 15.6; 623 22.5 1.82 16.6; 624 13.5 1.82 16.6; 625 22.5 1.82 17.6;
626 13.5 1.82 17.6; 627 22.5 1.82 18.6; 628 13.5 1.82 18.6; 629 22.5 1.82 19.6;
630 13.5 1.82 19.6; 631 22.5 1.82 20.6; 632 13.5 1.82 20.6; 633 22.5 1.82 21.6;
634 13.5 1.82 21.6; 635 22.5 1.82 22.6; 636 13.5 1.82 22.6; 637 22.5 1.82 23.6;
638 13.5 1.82 23.6; 639 22.5 1.82 24.6; 640 13.5 1.82 24.6; 641 22.5 1.82 25.6;
642 13.5 1.82 25.6; 643 22.5 1.82 26.6; 644 13.5 1.82 26.6; 645 22.5 1.82 27.6;
646 13.5 1.82 27.6; 647 22.5 1.82 28.6; 648 13.5 1.82 28.6; 649 18.5 1.82 28.6;
650 21.5 1.82 28.6; 651 20.5 1.82 28.6; 652 19.5 1.82 28.6; 653 18.5 1.82 29.6;
654 13.5 1.82 29.6; 655 18.5 1.82 30.6; 656 13.5 1.82 30.6; 657 18.5 1.82 31.6;
658 13.5 1.82 31.6; 659 18.5 1.82 32.6; 660 13.5 1.82 32.6; 661 18.5 1.82 33.6;
662 13.5 1.82 33.6; 663 18.5 1.82 34.6; 664 13.5 1.82 34.6; 665 18.5 1.82 35.6;
666 13.5 1.82 35.6; 667 18.5 1.82 36.6; 668 13.5 1.82 36.6; 669 17.5 1.82 36.6;
670 16.5 1.82 36.6; 671 15.5 1.82 36.6; 672 14.5 1.82 36.6; 701 18.5 0.8 0;
702 11.5 0.8 0; 703 15 0.8 0; 704 18.5 0.8 5; 705 11.5 0.8 5; 706 15 0.8 5;
707 18.5 0.8 9.5; 708 11.5 0.8 9.5; 709 13.5 0.8 9.5; 710 14.5 0.8 9.5;
711 15.5 0.8 9.5; 712 16.5 0.8 9.5; 713 17.5 0.8 9.5; 714 15 0.8 9.5;
715 18.5 0.8 10.525; 716 13.5 0.8 10.525; 717 18.5 0.8 11.55;
718 13.5 0.8 11.55; 719 18.5 0.8 12.575; 720 13.5 0.8 12.575;
721 18.5 0.8 13.6; 722 22.5 0.8 13.6; 723 13.5 0.8 13.6; 724 11.5 0.8 13.6;
725 19.5 0.8 13.6; 726 20.5 0.8 13.6; 727 21.5 0.8 13.6; 728 22.5 0.8 14.6;
729 13.5 0.8 14.6; 730 0 0.8 15.5; 731 6.5 0.8 15.5; 732 11.5 0.8 15.5;
733 3.25 0.8 15.5; 734 22.5 0.8 15.6; 735 13.5 0.8 15.6; 736 22.5 0.8 16.6;
737 13.5 0.8 16.6; 738 22.5 0.8 17.6; 739 13.5 0.8 17.6; 740 18.5 0.8 18.6;
741 22.5 0.8 18.6; 742 13.5 0.8 18.6; 743 11.5 0.8 18.6; 744 0 0.8 19.5;
745 6.5 0.8 19.5; 746 11.5 0.8 19.5; 747 3.25 0.8 19.5; 748 22.5 0.8 19.6;
749 13.5 0.8 19.6; 750 22.5 0.8 20.6; 751 13.5 0.8 20.6; 752 22.5 0.8 21.6;
753 13.5 0.8 21.6; 754 0 0.8 22.5; 755 6.5 0.8 22.5; 756 11.5 0.8 22.5;
757 3.25 0.8 22.5; 758 22.5 0.8 22.6; 759 13.5 0.8 22.6; 760 18.5 0.8 23.6;
761 22.5 0.8 23.6; 762 13.5 0.8 23.6; 763 11.5 0.8 23.6; 764 22.5 0.8 24.6;
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 170 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 171 of 17
IDBC-TS-NCCAL-C05001
785 18.5 0.8 30.6; 786 13.5 0.8 30.6; 787 0 0.8 31.3; 788 6.5 0.8 31.3;
789 11.5 0.8 31.3; 790 3.25 0.8 31.3; 791 18.5 0.8 31.6; 792 13.5 0.8 31.6;
793 18.5 0.8 32.6; 794 13.5 0.8 32.6; 795 11.5 0.8 32.6; 796 18.5 0.8 33.6;
797 13.5 0.8 33.6; 798 18.5 0.8 34.6; 799 13.5 0.8 34.6; 800 18.5 0.8 35.6;
801 13.5 0.8 35.6; 802 11.5 0.8 35.8; 803 18.5 0.8 36.6; 804 13.5 0.8 36.6;
805 11.5 0.8 36.6; 806 17.5 0.8 36.6; 807 16.5 0.8 36.6; 808 15.5 0.8 36.6;
809 14.5 0.8 36.6; 810 15 0.8 36.6; 811 11.5 0.8 39.8; 812 18.5 0.8 39.8;
813 15 0.8 39.8; 814 11.5 0.8 43.8; 815 18.5 0.8 43.8; 816 15 0.8 43.8;
817 11.5 0.8 47.8; 818 18.5 0.8 47.8; 819 15 0.8 47.8; 820 11.5 0.8 51.8;
821 18.5 0.8 51.8; 822 15 0.8 51.8; 823 11.5 0.8 56.8; 824 18.5 0.8 56.8;
825 15 0.8 56.8; 901 0 0 0; 902 6.5 0 0; 903 11.5 0 0; 904 18.5 0 0; 905 0 0 5;
906 6.5 0 5; 907 11.5 0 5; 908 18.5 0 5; 909 0 0 9.5; 910 6.5 0 9.5;
911 11.5 0 9.5; 912 13.5 0 9.5; 913 18.5 0 9.5; 914 11.5 0 13.6;
915 13.5 0 13.6; 916 18.5 0 13.6; 917 22.5 0 13.6; 918 11.5 0 15.5;
919 0 0 15.5; 920 6.5 0 15.5; 921 11.5 0 18.6; 922 13.5 0 18.6;
923 18.5 0 18.6; 924 22.5 0 18.6; 925 11.5 0 19.5; 926 0 0 19.5;
927 6.5 0 19.5; 928 11.5 0 22.5; 929 0 0 22.5; 930 6.5 0 22.5; 931 11.5 0 23.6;
932 13.5 0 23.6; 933 18.5 0 23.6; 934 22.5 0 23.6; 935 11.5 0 26.5;
936 0 0 26.5; 937 6.5 0 26.5; 938 11.5 0 28.6; 939 13.5 0 28.6;
940 18.5 0 28.6; 941 22.5 0 28.6; 942 11.5 0 31.3; 943 0 0 31.3;
944 6.5 0 31.3; 945 3.25 0 31.3; 946 11.5 0 32.6; 947 13.5 0 32.6;
948 18.5 0 32.6; 949 11.5 0 35.8; 950 0 0 35.8; 951 6.5 0 35.8;
952 3.25 0 35.8; 953 11.5 0 36.6; 954 13.5 0 36.6; 955 18.5 0 36.6;
956 0 0 39.8; 957 6.5 0 39.8; 958 11.5 0 39.8; 959 18.5 0 39.8;
960 3.25 0 39.8; 961 0 0 43.8; 962 6.5 0 43.8; 963 11.5 0 43.8;
964 18.5 0 43.8; 965 3.25 0 43.8; 966 0 0 47.8; 967 6.5 0 47.8;
968 11.5 0 47.8; 969 18.5 0 47.8; 970 3.25 0 47.8; 971 0 0 51.8;
972 6.5 0 51.8; 973 11.5 0 51.8; 974 18.5 0 51.8; 975 3.25 0 51.8;
976 0 0 56.8; 977 6.5 0 56.8; 978 11.5 0 56.8; 979 18.5 0 56.8;
980 3.25 0 56.8;
MEMBER INCIDENCES
1 926 744; 2 744 98; 3 98 21; 4 927 745; 5 99 22; 6 925 746; 7 746 100;
8 101 24; 9 929 754; 10 754 108; 11 930 755; 12 755 109; 13 928 756;
14 756 110; 15 936 768; 16 768 122; 17 937 769; 18 769 123; 19 935 770;
20 770 124; 51 903 702; 52 904 701; 53 901 501; 54 902 502; 55 702 503;
56 701 51; 57 501 53; 58 502 54; 59 503 52; 60 52 3; 61 53 1; 62 54 2;
63 906 507; 64 908 704; 65 704 57; 66 910 512; 67 914 724; 68 919 730;
69 920 731; 70 918 732; 71 730 516; 72 731 517; 73 732 518; 74 516 84;
75 518 86; 76 517 85; 77 84 16; 78 85 17; 79 86 18; 80 938 779; 81 943 787;
82 942 789; 83 944 788; 84 787 141; 85 788 142; 86 789 143; 87 795 946;
88 949 802; 89 950 156; 90 951 157; 91 802 158; 92 953 805; 93 959 812;
94 812 171; 95 958 811; 96 956 168; 97 811 170; 98 964 815; 99 815 177;
100 963 814; 101 961 174; 102 962 175; 103 814 176; 104 969 818; 105 818 183;
106 968 817; 107 966 180; 108 817 182; 109 974 821; 110 821 189; 111 973 820;
112 971 186; 113 820 188; 114 979 824; 115 824 195; 116 978 823; 117 976 192;
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 172 of 17
IDBC-TS-NCCAL-C05001
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 173 of 17
IDBC-TS-NCCAL-C05001
178 916 721; 179 721 614; 180 917 722; 181 722 613; 182 613 413; 183 413 313;
184 313 213; 185 213 75; 186 614 414; 187 414 314; 188 314 214; 189 214 76;
190 618 418; 191 418 318; 192 318 218; 193 218 77; 194 922 742; 195 742 628;
196 923 740; 197 740 95; 198 924 741; 199 741 627; 200 627 427; 201 427 327;
202 327 227; 203 227 94; 204 628 428; 205 428 328; 206 328 228; 207 228 97;
208 932 762; 209 762 638; 210 933 760; 211 760 115; 212 934 761; 213 761 637;
214 637 437; 215 437 337; 216 337 237; 217 237 114; 218 638 438; 219 438 338;
220 338 238; 221 238 116; 222 940 776; 223 939 778; 224 776 649; 225 778 648;
226 941 777; 227 777 647; 228 647 447; 229 447 347; 230 347 247; 231 247 130;
232 648 448; 233 448 348; 234 348 248; 235 248 132; 236 649 449; 237 449 349;
238 349 249; 239 249 131; 240 947 794; 241 794 660; 242 948 793; 243 793 659;
244 659 459; 245 459 359; 246 359 259; 247 259 147; 248 660 460; 249 460 360;
250 360 260; 251 260 149; 252 955 803; 253 954 804; 254 803 667; 255 804 668;
256 667 467; 257 467 367; 258 367 267; 259 267 160; 260 668 468; 261 468 368;
262 368 268; 263 268 162; 301 1 4; 302 2 5; 303 53 54; 304 54 52; 305 4 2;
306 5 3; 307 16 19; 308 17 20; 309 84 85; 310 85 86; 311 19 17; 312 20 18;
313 108 111; 314 109 110; 315 111 109; 316 122 125; 317 123 124; 318 125 123;
319 141 144; 320 142 143; 321 144 142; 322 156 159; 323 157 158; 324 159 157;
325 174 178; 326 175 176; 327 178 175; 328 192 196; 329 193 194; 330 196 193;
331 52 55; 332 55 51; 333 56 59; 334 59 57; 335 170 173; 336 173 171;
337 176 179; 338 179 177; 339 182 185; 340 185 183; 341 188 191; 342 191 189;
343 194 197; 344 197 195; 351 60 62; 352 62 64; 353 64 68; 354 65 66;
355 66 67; 356 67 61; 357 68 65; 358 76 79; 359 78 77; 360 77 76; 361 79 80;
362 80 81; 363 81 75; 364 95 94; 365 96 97; 366 97 95; 367 117 116;
368 115 114; 369 116 115; 370 133 132; 371 131 136; 372 132 131; 373 134 130;
374 135 134; 375 136 135; 376 148 149; 377 149 147; 378 161 162; 379 162 166;
380 163 160; 381 164 163; 382 165 164; 383 166 167; 384 167 165; 401 61 69;
402 62 70; 403 69 71; 404 70 72; 405 71 73; 406 72 74; 407 73 76; 408 74 77;
409 75 82; 410 77 83; 411 82 88; 412 83 89; 413 76 95; 414 88 90; 415 89 91;
416 90 92; 417 91 93; 418 92 94; 419 93 97; 420 94 102; 421 97 103;
422 102 104; 423 103 105; 424 95 115; 425 104 106; 426 105 107; 427 106 112;
428 107 113; 429 112 114; 430 113 116; 431 114 118; 432 116 119; 433 118 120;
434 119 121; 435 115 131; 436 120 126; 437 121 127; 438 126 128; 439 127 129;
440 128 130; 441 129 132; 442 131 137; 443 132 138; 444 137 139; 445 138 140;
446 139 145; 447 140 146; 448 145 147; 449 146 149; 450 147 150; 451 149 151;
452 150 152; 453 151 153; 454 152 154; 455 153 155; 456 154 160; 457 155 162;
501 2 8; 502 53 58; 503 1 6; 504 3 7; 505 52 56; 506 51 57; 507 8 13;
508 56 60; 509 57 61; 510 58 63; 511 6 11; 512 7 12; 513 60 78; 514 13 17;
515 63 84; 516 11 16; 517 12 18; 518 78 86; 519 86 96; 520 84 98; 521 85 99;
522 16 21; 523 17 22; 524 96 100; 525 98 108; 526 100 110; 527 99 109;
528 110 117; 529 108 122; 530 109 123; 531 117 124; 532 124 133; 533 122 141;
534 123 142; 535 133 143; 536 143 148; 537 141 156; 538 142 157; 539 148 158;
540 158 161; 541 156 168; 542 157 169; 543 160 171; 544 161 170; 545 168 174;
546 170 176; 547 171 177; 548 169 175; 549 174 180; 550 176 182; 551 177 183;
552 175 181; 553 180 186; 554 182 188; 555 183 189; 556 181 187; 557 186 192;
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 174 of 17
IDBC-TS-NCCAL-C05001
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 175 of 17
IDBC-TS-NCCAL-C05001
606 13 15; 607 14 13; 608 15 12; 651 98 101; 652 99 100; 653 101 99;
654 168 172; 655 169 170; 656 172 169; 657 180 184; 658 181 182; 659 184 181;
660 186 190; 661 187 188; 662 190 187; 701 901 905; 702 902 906; 703 705 702;
704 501 506; 705 502 507; 706 503 508; 707 701 704; 708 708 705; 709 704 707;
710 905 909; 711 906 910; 712 506 511; 713 507 512; 714 508 513; 715 708 709;
716 724 708; 717 909 919; 718 910 920; 719 511 516; 720 512 517; 721 513 518;
722 723 724; 723 732 724; 724 732 743; 725 730 744; 726 731 745; 727 743 742;
728 743 746; 729 744 754; 730 745 755; 731 746 756; 732 756 763; 733 763 762;
734 754 768; 735 755 769; 736 763 770; 737 770 779; 738 779 778; 739 768 787;
740 769 788; 741 779 789; 742 789 795; 743 795 794; 744 943 950; 745 944 951;
746 795 802; 747 802 805; 748 805 804; 749 950 956; 750 951 957; 751 803 812;
752 805 811; 753 953 958; 754 812 815; 755 956 961; 756 957 962; 757 958 963;
758 811 814; 759 815 818; 760 961 966; 761 962 967; 762 963 968; 763 814 817;
764 818 821; 765 966 971; 766 967 972; 767 968 973; 768 817 820; 769 821 824;
770 971 976; 771 972 977; 772 973 978; 773 820 823; 801 901 902; 802 902 903;
803 905 906; 804 906 907; 805 909 910; 806 910 911; 807 919 920; 808 920 918;
809 730 733; 810 731 732; 811 733 731; 812 744 747; 813 745 746; 814 747 745;
815 754 757; 816 755 756; 817 757 755; 818 768 771; 819 769 770; 820 771 769;
821 943 945; 822 944 942; 823 787 790; 824 788 789; 825 790 788; 826 945 944;
827 950 952; 828 951 949; 829 952 951; 830 956 960; 831 957 958; 832 960 957;
833 961 965; 834 962 963; 835 965 962; 836 966 970; 837 967 968; 838 970 967;
839 971 975; 840 972 973; 841 975 972; 842 976 980; 843 977 978; 844 980 977;
845 501 504; 846 502 505; 847 504 502; 848 505 503; 849 506 509; 850 507 510;
851 509 507; 852 510 508; 853 511 514; 854 512 515; 855 514 512; 856 515 513;
857 516 519; 858 517 520; 859 519 517; 860 520 518; 861 702 703; 862 703 701;
863 705 706; 864 706 704; 865 811 813; 866 813 812; 867 814 816; 868 816 815;
869 817 819; 870 819 818; 871 820 822; 872 822 821; 873 823 825; 874 825 824;
901 709 716; 902 707 715; 903 715 717; 904 716 718; 905 717 719; 906 718 720;
907 719 721; 908 720 723; 909 723 729; 910 728 722; 911 734 728; 912 729 735;
913 721 740; 914 736 734; 915 735 737; 916 738 736; 917 737 739; 918 741 738;
919 739 742; 920 742 749; 921 748 741; 922 750 748; 923 749 751; 924 740 760;
925 752 750; 926 751 753; 927 758 752; 928 753 759; 929 761 758; 930 759 762;
931 762 765; 932 764 761; 933 766 764; 934 765 767; 935 760 776; 936 772 766;
937 767 773; 938 774 772; 939 773 775; 940 777 774; 941 775 778; 942 778 784;
943 776 783; 944 783 785; 945 784 786; 946 785 791; 947 786 792; 948 791 793;
949 792 794; 950 794 797; 951 793 796; 952 796 798; 953 797 799; 954 798 800;
955 799 801; 956 800 803; 957 801 804; 1001 703 706; 1002 706 714;
1003 733 747; 1004 747 757; 1005 757 771; 1006 771 790; 1007 945 952;
1008 952 960; 1009 810 813; 1010 813 816; 1011 960 965; 1012 816 819;
1013 965 970; 1014 819 822; 1015 970 975; 1016 822 825; 1017 975 980;
1018 504 509; 1019 505 510; 1020 509 514; 1021 510 515; 1022 514 519;
1023 515 520; 2001 709 710; 2002 710 714; 2003 711 712; 2004 712 713;
2005 713 707; 2006 714 711; 2007 723 721; 2008 721 725; 2009 725 726;
2010 726 727; 2011 727 722; 2012 742 740; 2013 740 741; 2014 762 760;
2015 760 761; 2016 778 776; 2017 776 782; 2018 780 777; 2019 781 780;
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 176 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 177 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 178 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
1257 412 312 310 410; 1258 312 212 210 310; 1260 212 74 72 210;
1262 718 610 608 716; 1263 610 410 408 608; 1264 410 310 308 408;
1265 310 210 208 308; 1267 210 72 70 208; 1268 716 608 602 709;
1269 608 408 402 602; 1270 408 308 302 402; 1271 308 208 202 302;
1272 208 70 62 202; 1275 778 648 646 775; 1277 648 448 446 646;
1279 448 348 346 446; 1281 348 248 246 346; 1283 248 132 129 246;
1285 775 646 644 773; 1286 646 446 444 644; 1287 446 346 344 444;
1288 346 246 244 344; 1290 246 129 127 244; 1292 773 644 642 767;
1293 644 444 442 642; 1294 444 344 342 442; 1295 344 244 242 342;
1297 244 127 121 242; 1299 767 642 640 765; 1300 642 442 440 640;
1301 442 342 340 440; 1302 342 242 240 340; 1304 242 121 119 240;
1306 765 640 638 762; 1308 640 440 438 638; 1310 440 340 338 438;
1312 340 240 238 338; 1313 240 119 116 238; 1315 762 638 636 759;
1316 638 438 436 636; 1317 438 338 336 436; 1318 338 238 236 336;
1320 238 116 113 236; 1322 759 636 634 753; 1323 636 436 434 634;
1324 436 336 334 434; 1325 336 236 234 334; 1327 236 113 107 234;
1329 753 634 632 751; 1330 634 434 432 632; 1331 434 334 332 432;
1332 334 234 232 332; 1334 234 107 105 232; 1336 751 632 630 749;
1337 632 432 430 630; 1338 432 332 330 430; 1339 332 232 230 330;
1341 232 105 103 230; 1343 749 630 628 742; 1345 630 430 428 628;
1347 430 330 328 428; 1349 330 230 228 328; 1350 230 103 97 228;
1352 742 628 626 739; 1353 628 428 426 626; 1354 428 328 326 426;
1355 328 228 226 326; 1357 228 97 93 226; 1359 739 626 624 737;
1360 626 426 424 624; 1361 426 326 324 424; 1362 326 226 224 324;
1364 226 93 91 224; 1366 737 624 622 735; 1367 624 424 422 622;
1368 424 324 322 422; 1369 324 224 222 322; 1371 224 91 89 222;
1373 735 622 620 729; 1374 622 422 420 620; 1375 422 322 320 420;
1376 322 222 220 320; 1378 222 89 83 220; 1379 729 620 618 723;
1380 620 420 418 618; 1381 420 320 318 418; 1382 320 220 218 318;
1383 220 83 77 218; 1386 776 649 653 783; 1388 649 449 453 653;
1390 449 349 353 453; 1392 349 249 253 353; 1394 249 131 137 253;
1396 783 653 655 785; 1397 653 453 455 655; 1398 453 353 355 455;
1399 353 253 255 355; 1401 253 137 139 255; 1403 785 655 657 791;
1404 655 455 457 657; 1405 455 355 357 457; 1406 355 255 257 357;
1408 255 139 145 257; 1410 791 657 659 793; 1412 657 457 459 659;
1414 457 357 359 459; 1416 357 257 259 359; 1417 257 145 147 259;
1419 793 659 661 796; 1420 659 459 461 661; 1421 459 359 361 461;
1422 359 259 261 361; 1424 259 147 150 261; 1426 796 661 663 798;
1427 661 461 463 663; 1428 461 361 363 463; 1429 361 261 263 363;
1431 261 150 152 263; 1433 798 663 665 800; 1434 663 463 465 665;
1435 463 363 365 465; 1436 363 263 265 365; 1438 263 152 154 265;
1440 800 665 667 803; 1442 665 465 467 667; 1444 465 365 367 467;
1446 365 265 267 367; 1447 265 154 160 267; 1450 804 668 666 801;
1452 668 468 466 666; 1454 468 368 366 466; 1456 368 268 266 366;
1458 268 162 155 266; 1460 801 666 664 799; 1461 666 466 464 664;
264522103.xls
Attachment
I - Page 179 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 180 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 181 of 17
IDBC-TS-NCCAL-C05001
1485 460 360 358 458; 1486 360 260 258 358; 1488 260 149 146 258;
1490 792 658 656 786; 1491 658 458 456 656; 1492 458 358 356 456;
1493 358 258 256 356; 1495 258 146 140 256; 1497 786 656 654 784;
1498 656 456 454 654; 1499 456 356 354 454; 1500 356 256 254 354;
1502 256 140 138 254; 1503 784 654 648 778; 1504 654 454 448 648;
1505 454 354 348 448; 1506 354 254 248 348; 1507 254 138 132 248;
1509 803 667 669 806; 1510 667 467 469 669; 1511 467 367 369 469;
1512 367 267 269 369; 1514 267 160 163 269; 1516 806 669 670 807;
1517 669 469 470 670; 1518 469 369 370 470; 1519 369 269 270 370;
1521 269 163 164 270; 1523 807 670 671 808; 1524 670 470 471 671;
1525 470 370 371 471; 1526 370 270 271 371; 1528 270 164 165 271;
1530 808 671 672 809; 1531 671 471 472 672; 1532 471 371 372 472;
1533 371 271 272 372; 1535 271 165 166 272; 1536 809 672 668 804;
1537 672 472 468 668; 1538 472 372 368 468; 1539 372 272 268 368;
1540 272 166 162 268; 1542 777 647 650 780; 1543 647 447 450 650;
1544 447 347 350 450; 1545 347 247 250 350; 1547 247 130 134 250;
1549 780 650 651 781; 1550 650 450 451 651; 1551 450 350 351 451;
1552 350 250 251 351; 1554 250 134 135 251; 1556 781 651 652 782;
1557 651 451 452 652; 1558 451 351 352 452; 1559 351 251 252 352;
1561 251 135 136 252; 1562 782 652 649 776; 1563 652 452 449 649;
1564 452 352 349 449; 1565 352 252 249 349; 1566 252 136 131 249;
UNIT CM KG
ELEMENT PROPERTY
1033 1035 1037 1039 1041 1043 TO 1046 1048 1050 TO 1053 1055 1057 TO 1060 1062 1064 1066 1068 1070 1071 1073 TO 1076 1078 1080 TO 1083 1085 1087 TO 1090 1092 1094 TO 1097 1099 1101 1103 1105 1107 1108 1110 TO 1113 1115 1117 TO 1120 1122 1124 TO 1127 1129 1131 TO 1134 1136 1138 1140 1142 1144 1145 1148 1150 1152 1154 1156 1158 TO 1161 1163 1165 TO 1168 1170 TO 1175 1178 1180 1182 1184 1186 1188 TO 1191 1193 1195 TO 1198 1200 1201 TO 1205 1208 1210 1212 1214 1216 1218 TO 1221 1223 1225 TO 1228 1230 1232 TO 1235 1237 TO 1242 1245 1247 1249 1251 1253 1255 TO 1258 1260 1262 1263 TO 1265 1267 TO 1272 1275 1277 1279 1281 1283 1285 TO 1288 1290 1292 1293 TO 1295 1297 1299 TO 1302 1304 1306 1308 1310 1312 1313 1315 TO 1318 1320 1322 TO 1325 1327 1329 TO 1332 1334 1336 TO 1339 1341 1343 1345 1347 1349 1350 1352 TO 1355 1357 1359 TO 1362 1364 1366 TO 1369 1371 1373 TO 1376 1378 TO 1383 1386 1388 1390 1392 1394 1396 TO 1399 1401 1403 TO 1406 1408 1410 1412 1414 1416 1417 1419 TO 1422 1424 1426 TO 1429 1431 1433 TO 1436 1438 1440 1442 1444 1446 1447 1450 1452 1454 1456 1458 1460 TO 1463 1465 1467 TO 1470 1472 1474 1476 1478 1480 1481 1483 TO 1486 1488 1490 TO 1493 1495 1497 TO 1500 1502 TO 1507 1509 TO 1512 1514 1516 TO 1519 1521 1523 TO 1526 1528 1530 TO 1533 1535 TO 1540 1542 TO 1545 1547 1549 THICKNESS 20
1550 TO 1552 1554 1556 TO 1559 1561 TO 1566 THICKNESS 20
UNIT METER KG
DEFINE MATERIAL START
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
ISOTROPIC CONCRETE
E 2.21467e+009
POISSON 0.17
DENSITY 2400
ALPHA 1e-005
264522103.xls
Attachment
I - Page 182 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 183 of 17
IDBC-TS-NCCAL-C05001
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
1 TO 20 PRIS YD 0.3 ZD 0.3
51 TO 119 PRIS YD 0.4 ZD 0.4
150 TO 263 PRIS YD 0.5 ZD 0.5
301 TO 330 PRIS YD 0.5 ZD 0.3
331 TO 344 PRIS YD 0.55 ZD 0.3
351 TO 384 PRIS YD 0.5 ZD 0.3
401 TO 457 PRIS YD 0.5 ZD 0.3
501 TO 560 PRIS YD 0.4 ZD 0.25
561 TO 585 PRIS YD 0.4 ZD 0.25
601 TO 608 PRIS YD 0.8 ZD 0.3
651 TO 662 PRIS YD 0.8 ZD 0.3
701 TO 773 PRIS YD 0.5 ZD 0.3
801 TO 844 PRIS YD 0.5 ZD 0.3
845 TO 860 PRIS YD 0.5 ZD 0.3
861 TO 874 PRIS YD 0.55 ZD 0.3
901 TO 957 PRIS YD 0.5 ZD 0.3
1001 TO 1017 PRIS YD 0.4 ZD 0.25
1018 TO 1023 PRIS YD 0.4 ZD 0.25
2001 TO 2027 PRIS YD 0.6 ZD 0.4
3001 TO 3014 PRIS YD 0.6 ZD 0.4
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
901 TO 917 919 TO 924 926 927 929 TO 934 936 TO 941 943 944 946 TO 948 950 951 953 TO 959 961 TO 964 966 TO 969 971 TO 974 976 TO 979 PINNED
UNIT CM KG
MEMBER OFFSET
701 702 710 711 717 718 744 745 749 750 753 755 TO 757 760 TO 762 765 TO 767 770 TO 772 3001 TO 3004 3006 3009 3011 3013 START 0 0 40
701 702 710 711 717 718 744 745 749 750 753 755 TO 757 760 TO 762 765 TO 767 770 TO 772 3001 TO 3003 3005 3008 3010 3012 3014 END 0 0 -40
801 TO 808 821 822 827 828 830 831 833 834 836 837 839 840 842 843 START 40 0 0
801 TO 807 822 826 828 829 831 832 834 835 837 838 840 841 843 844 END -40 0 0
821 END 0 0 0
826 START 0 0 0
827 END 0 0 0
829 START 0 0 0
830 END 0 0 0
832 START 0 0 0
833 END 0 0 0
835 START 0 0 0
836 END 0 0 0
838 START 0 0 0
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
839 END 0 0 0
841 START 0 0 0
842 END 0 0 0
844 START 0 0 0
UNIT METER KG
264522103.xls
Attachment
I - Page 184 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 185 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 186 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 187 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 188 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 189 of 17
IDBC-TS-NCCAL-C05001
ELEMENT LOAD
1148 1150 1152 1154 1156 1158 TO 1161 1163 1165 TO 1168 1170 TO 1175 PR GZ 28
1542 TO 1545 1547 1549 TO 1552 1554 1556 TO 1559 1561 TO 1566 PR GZ 35
1386 1388 1390 1392 1394 1396 TO 1399 1401 1403 TO 1406 1408 1410 1412 1414 1416 1417 1419 TO 1422 1424 1426 TO 1429 1431 1433 TO 1436 1438 1440 1442 1444 1446 1447 PR GX 38
1033 1035 1037 1039 1041 1043 TO 1046 1048 1050 TO 1053 1055 1057 TO 1060 1062 1064 1066 1068 1070 1071 1073 TO 1076 1078 1080 TO 1083 1085 1087 TO 1090 1092 1094 TO 1097 1099 1101 1103 1105 1107 1108 1110 TO 1113 1115 1117 TO 1120 1122 1124 TO 1127 1129 1131 TO 1134 1136 1138 1140 1142 1144 1145 PR GX 38
1178 1180 1182 1184 1186 1188 TO 1191 1193 1195 TO 1198 1200 TO 1205 PR GX 38
**
LOAD 6 BLAST LOAD X-DIR (WBX)
ELEMENT LOAD
** ON FRONT WALL **
1178 1180 1182 1184 1186 1188 TO 1191 1193 1195 TO 1198 1200 TO 1204 1205 PR GX -3065
1033 1035 1037 1039 1041 1043 TO 1046 1048 1050 TO 1053 1055 1057 TO 1060 1062 1064 1066 1068 1070 1071 1073 TO 1076 1078 1080 TO 1083 1085 1087 TO 1090 1092 1094 TO 1097 1099 1101 1103 1105 1107 1108 1110 TO 1113 1115 1117 TO 1120 1122 1124 TO 1127 1129 1131 TO 1134 1136 1138 1140 1142 1144 1145 PR GX -3065
1386 1388 1390 1392 1394 1396 TO 1399 1401 1403 TO 1406 1408 1410 1412 1414 1416 1417 1419 TO 1422 1424 1426 TO 1429 1431 1433 TO 1436 1438 1440 1442 1444 1446 1447 PR GX -3065
** ON SIDE WALL **
1148 1150 1152 1154 1156 1158 TO 1161 1163 1165 TO 1168 1170 TO 1175 PR GZ 3065
1542 TO 1545 1547 1549 TO 1552 1554 1556 TO 1559 1561 TO 1566 PR GZ -3065
FLOOR LOAD
** ON ROOF **
YRANGE 5.9 5.9 FLOAD 1226 XRANGE 13.5 18.5 ZRANGE 9.5 36.6
YRANGE 5.9 5.9 FLOAD 1226 XRANGE 18.5 22.5 ZRANGE 13.6 28.6
**
LOAD 7 BLAST LOAD Z-DIR (WBZ)
ELEMENT LOAD
** ON FRONT WALL **
1148 1150 1152 1154 1156 1158 TO 1161 1163 1165 TO 1168 1170 TO 1175 PR GZ 3065
** ON SIDE WALL **
1033 1035 1037 1039 1041 1043 TO 1046 1048 1050 TO 1053 1055 1057 TO 1060 1062 1064 1066 1068 1070 1071 1073 TO 1076 1078 1080 TO 1083 1085 1087 TO 1090 1092 1094 TO 1097 1099 1101 1103 1105 1107 1108 1110 TO 1113 1115 1117 TO 1120 1122 1124 TO 1127 1129 1131 TO 1134 1136 1138 1140 1142 1144 1145 PR GX -1226
FLOOR LOAD
** ON ROOF **
YRANGE 5.9 5.9 FLOAD 1226 XRANGE 13.5 18.5 ZRANGE 9.5 36.6
YRANGE 5.9 5.9 FLOAD 1226 XRANGE 18.5 22.5 ZRANGE 13.6 28.6
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 190 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 191 of 17
IDBC-TS-NCCAL-C05001
JOINT LOAD
1 TO 3 6 7 11 12 16 TO 18 FX 2.96
21 22 24 FX 0.6
501 TO 503 506 TO 508 511 TO 513 516 TO 518 FX 1.19
51 TO 54 56 TO 58 60 TO 63 75 TO 77 84 TO 86 94 95 97 98 100 108 TO 110 114 115 TO 116 122 TO 124 130 TO 132 141 TO 143 147 149 156 TO 158 160 162 168 170 171 174 TO 177 180 182 183 186 188 189 192 TO 195 FX 1.97
**
LOAD 9 EARTHQUAKE LOAD Z-DIR (EZ)
JOINT LOAD
1 TO 3 6 7 11 12 16 TO 18 FZ 2.96
21 22 24 FZ 0.6
501 TO 503 506 TO 508 511 TO 513 516 TO 518 FZ 1.19
51 TO 54 56 TO 58 60 TO 63 75 TO 77 84 TO 86 94 95 97 98 100 108 TO 110 114 115 TO 116 122 TO 124 130 TO 132 141 TO 143 147 149 156 TO 158 160 162 168 170 171 174 TO 177 180 182 183 186 188 189 192 TO 195 FZ 1.97
*****************************
*** $$$ PILING DESIGN $$$ ***
*****************************
*** PERMANENT LOAD ***
**********************
*LOAD COMB 10 (D + L + LR)
*1 1.0 2 1.0 3 1.0
**********************
*** TEMPORARY LOAD ***
**********************
*LOAD COMB 11 (D + L + LR + WX)
*1 1.0 2 1.0 3 1.0 4 1.0
*LOAD COMB 12 (D + L + LR + WZ)
*1 1.0 2 1.0 3 1.0 5 1.0
*LOAD COMB 13 (D + L + LR - WX)
*1 1.0 2 1.0 3 1.0 4 -1.0
*LOAD COMB 14 (D + L + LR - WZ)
*1 1.0 2 1.0 3 1.0 5 -1.0
*LOAD COMB 15 (D + L + LR + EX + 0.3 EZ)
*1 1.0 2 1.0 3 1.0 8 1.0 9 0.3
*LOAD COMB 16 (D + L + LR + EX - 0.3 EZ)
*1 1.0 2 1.0 3 1.0 8 1.0 9 -0.3
*LOAD COMB 17 (D + L + LR - EX + 0.3 EZ)
*1 1.0 2 1.0 3 1.0 8 -1.0 9 0.3
*LOAD COMB 18 (D + L + LR - EX - 0.3 EZ)
*1 1.0 2 1.0 3 1.0 8 -1.0 9 -0.3
*LOAD COMB 19 (D + L + LR + EZ + 0.3 EX)
*1 1.0 2 1.0 3 1.0 9 1.0 8 0.3
*LOAD COMB 20 (D + L + LR + EZ - 0.3 EX)
*1 1.0 2 1.0 3 1.0 9 1.0 8 -0.3
*LOAD COMB 21 (D + L + LR - EZ + 0.3 EX)
*1 1.0 2 1.0 3 1.0 9 -1.0 8 0.3
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 192 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 193 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 194 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 195 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
Attachment
I - Page 196 of 17
IDBC-TS-NCCAL-C05001
264522103.xls
6-Aug-12
Rev. 1
BANYU URIP
PROJECT
264522103.xls
Attachment
I - Page 197 of 17
IDBC-TS-NCCAL-C05001
6-Aug-12
Rev. 1
ATTACHMENT J
MATERIAL TAKE-OFF CALCULATION
BANYU URIP
PROJECT
Attachment
J - Page 199 of 1
IDBC-TS-NCCAL-C05001
:
:
1110.80
m2
:
:
:
:
400.00
12.00
137.00
1644.00
mm
m
points
m
Reinforcement Concrete
Lean Concrete :
Concrete
:
Rebar
:
D-10
:
D-13
:
D-16
:
D-19
:
D-22
:
:
Ratio
Rebar/Concrete
55.54
814.44
77416.46
6532.15
16011.20
2155.44
19353.59
33364.09
95.05
PC Pile
Diameter
Pile length
Point
Total pile length
264522103.xls
m3 fc'
m3 fc'
kg
kg
kg
kg
kg
kg
kg/m3
=
=
10.5 MPa
35 MPa
6-Aug-12
Rev. 1
Description
IDBC-TS-NCCAL-C05001
TOTAL
REINF
steel
COLUMN
C500x500 (1)
Longitudinal Bar, D22
Transversal Bar, D13 - 100
C500x500 (2)
Longitudinal Bar, D22
Transversal Bar, D13 - 100
C400x400
Longitudinal Bar, D22
Transversal Bar, D13 - 150
C300x300
Longitudinal Bar, D19
Transversal Bar, D10 - 150
BEAM
B300x500 (1)
Top Bar, D19
Bottom Bar, D19
Middle Bar, D10
Transversal Bar, D10 - 200
B300x550
Top Bar, D19
Bottom Bar, D19
Middle Bar, D13
Transversal Bar, D10 - 200
B300x500 (2)
Top Bar, D19
Bottom Bar, D19
Middle Bar, D13
Transversal Bar, D10 - 200
B300x500 (3)
Top Bar, D19
Bottom Bar, D19
Middle Bar, D10
TB400x600 (1)
Top Bar, D22
Bottom Bar, D22
Middle Bar, D13
Transversal Bar, D13 - 200
TB400x600 (2)
Top Bar, D22
Bottom Bar, D22
Middle Bar, D13
Transversal Bar, D13 - 200
SLAB & WALL
Slab Roof, D10
Slab Ground, D13
Wall (Front), D13
Wall (Rear), D13
Side Wall, D13
PILECAP
1 Pile
Longitudinal Bar, D19 - 200
Transversal Bar, D19 - 200
Stirrups, D13
2 Pile
Longitudinal Bar, D19 - 200
Transversal Bar, D19 - 200
Stirrups, D13
3 Pile
Longitudinal Bar, D19 - 200
Transversal Bar, D19 - 200
Stirrups, D13
4 Pile
Longitudinal Bar, D19 - 200
Transversal Bar, D19 - 150
Stirrups, D13
TOTAL WEIGHT OF REINFORCEMENT BAR (KG)
CONC
beton
SLAB & WALL
Slab Roof
Slab Ground
Wall (Front)
Wall (Rear)
Side Wall
PILECAP
1 Pile
2 Pile
3 Pile
4 Pile
COLUMN & BEAM
Output STAAD.Pro
TOTAL VOLUME OF CONCRETE (M3)
EARTH
NG C.L. CONSORTIUM
rocessing Facilities
DIME
Drawing Reference
IDBC-TS-CDAED-C05001
Revision
ORGINATOR
ARD
LENGTH
WIDTH
( m)
( m)
56.80
15.00
REINFORCEMENT BARS
76.99 kN/m3
Weight/Unit Length
Unit Length Member
(kg/m)
Quantity (ea)
Length (m)
Weight (kg)
18.50
4.00
Total Length
(m)
2.99
1.05
20.00
8.00
1.00
1.60
59.80
13.44
64.90
64.90
2.99
1.05
16.00
8.00
1.00
1.60
47.84
13.44
74.50
74.50
2.99
1.05
12.00
6.00
1.00
1.20
35.88
7.56
205.50
205.50
2.23
0.62
Weight/Unit Length
(kg/m)
8.00
8.00
1.00
0.80
17.84
3.97
55.20
55.20
Total Length
(m)
Weight (kg)
2.23
2.23
0.62
0.62
4.00
2.00
2.00
6.00
2.00
4.00
-
1.00
1.00
1.00
1.20
1.24
4.46
115.00
115.00
115.00
115.00
2.23
2.23
1.05
0.62
6.00
3.00
2.00
6.00
3.00
3.00
-
1.00
1.00
1.00
1.30
2.10
4.84
49.00
49.00
49.00
49.00
2.23
2.23
1.05
0.62
5.00
3.00
2.00
6.00
3.00
3.00
-
1.00
1.00
1.00
1.20
2.10
4.46
65.00
65.00
65.00
65.00
2.23
2.23
0.62
3.00
2.00
2.00
2.00
2.00
-
1.00
1.00
1.00
1.24
69.20
69.20
69.20
0.62
6.00
1.20
4.46
69.20
2.23
2.23
0.62
0.62
4.00
2.00
0.00
6.00
2.00
3.00
-
1.00
1.00
1.00
0.90
0.00
3.35
239.10
239.10
239.10
239.10
1.58
1.58
0.62
0.62
4.00
2.00
2.00
8.00
2.00
2.00
-
1.00
1.00
1.00
0.90
1.24
4.46
108.50
108.50
108.50
108.50
2.23
2.23
0.62
0.62
6.00
3.00
6.00
6.00
3.00
6.00
-
1.00
1.00
1.00
1.80
3.72
6.70
23.00
23.00
23.00
23.00
2.23
2.23
0.62
0.62
5.00
3.00
6.00
6.00
3.00
5.00
-
1.00
1.00
1.00
1.80
3.72
6.70
46.00
46.00
46.00
46.00
2.99
2.99
1.05
1.05
4.00
2.00
0.00
6.00
2.00
2.00
-
1.00
1.00
1.00
1.20
0.00
7.56
280.80
280.80
280.80
280.80
2.99
2.99
1.05
1.05
4.00
2.00
0.00
6.00
2.00
4.00
-
1.00
1.00
1.00
1.20
0.00
7.56
184.00
184.00
184.00
184.00
2.99
2.99
1.05
1.05
6.00
3.00
2.00
6.00
3.00
5.00
-
1.00
1.00
1.00
1.20
2.10
7.56
46.00
46.00
46.00
46.00
2.99
2.99
0.62
1.05
5.00
2.00
2.00
6.00
2.00
3.00
-
1.00
1.00
1.00
1.30
1.24
8.19
49.00
49.00
49.00
49.00
2.23
2.23
1.05
1.05
3.00
2.00
2.00
6.00
2.00
3.00
-
1.00
1.00
1.00
1.20
2.10
7.56
69.20
69.20
69.20
69.20
1.58
1.58
0.62
1.05
3.00
2.00
2.00
6.00
2.00
3.00
-
1.00
1.00
1.00
0.90
1.24
5.67
71.00
71.00
71.00
71.00
2.99
2.99
0.62
1.05
3.00
2.00
2.00
6.00
2.00
3.00
-
1.00
1.00
1.00
0.90
1.24
5.67
31.00
31.00
31.00
31.00
2.99
2.99
1.05
1.05
6.00
6.00
2.00
6.00
3.00
3.00
-
1.00
1.00
1.00
1.60
2.10
10.08
51.00
51.00
51.00
51.00
2.99
2.99
1.05
1.05
4.00
4.00
2.00
6.00
4.00
4.00
-
1.00
1.00
1.00
1.60
2.10
10.08
36.60
36.60
36.60
36.60
Weight/m2
(kN)
0.19
0.33
0.33
0.33
0.33
Slab Area
(m2)
1110.80
1110.80
124.66
124.66
82.80
Total Quantity
(ea)
Diameter
(mm)
10.00
13.00
13.00
13.00
13.00
Weight/Unit Length
(kg/m)
Quantity (ea)
Quantity/m2
32.00
32.00
32.00
32.00
32.00
Unit Member
Weight (kg)
Layer
2.23
2.23
1.05
4.00
4.00
-
2.00
2.00
1.00
17.84
17.84
2.52
7.00
7.00
7.00
2.23
2.23
1.05
11.00
5.00
-
2.00
2.00
1.00
49.06
22.30
5.88
36.00
36.00
36.00
2.23
2.23
1.05
11.00
11.00
-
2.00
2.00
1.00
49.06
49.06
8.09
10.00
10.00
10.00
2.23
2.23
1.05
20.00
11.00
-
2.00
2.00
1.00
89.20
49.06
10.08
7.00
7.00
7.00
CONCRETE
23.54 kN/m3
Thickness (mm)
Thickness (mm)
Area
(m2)
0.00008
0.00013
0.00013
0.00013
0.00013
150
150
200
200
200
700
700
800
800
Quantity (ea)
7.00
36.00
10.00
7.00
Area(m2)
Volume (m3)
1110.8
166.62
1110.8
166.62
124.66
24.93
124.66
24.93
82.8
16.56
Area(m2)
Volume (m3)
0.64
3.14
2.20
55.44
3.79
30.32
6.60
36.96
Volume (cu.ft) Volume (m3)
10202.94
288.92
814.44
EARTH WORK
DIMENSION
HEIGHT
AREA
VOLUME
Number or
Story
AREA
CLEARING AREA
( m)
( m2 )
( m3 )
ea
( m2 )
( m2 )
5.90
5.90
Total Weight
(kg)
3881.02
872.26
3564.08
1001.28
7373.34
1553.58
984.77
219.03
Total Weight
(kg)
1128.38
1128.38
142.60
513.36
721.18
524.50
102.90
236.96
869.70
695.76
136.50
290.16
586.40
493.81
85.81
1050.80
60.00
6199.72
354.00
1.00
1,050.80
60.00
1,110.80
6,553.72
1.00
1,110.80
308.91
2346.05
2026.13
0.00
800.51
754.29
548.58
134.54
484.34
338.51
338.51
85.56
154.01
615.48
615.48
171.12
308.02
3694.20
2686.69
0.00
2122.85
2420.70
2420.70
0.00
1391.04
907.76
825.24
96.60
347.76
732.55
556.74
60.76
401.31
586.40
586.40
145.32
523.15
426.28
426.28
88.04
402.57
352.22
352.22
38.44
175.77
1006.43
1189.42
107.10
514.08
700.38
700.38
76.86
368.93
Weight
(kg)
2409.98
4072.86
457.08
457.08
303.59
Total Weight
(kg)
124.88
124.88
17.64
1766.16
802.80
211.68
490.60
490.60
80.85
624.40
343.42
70.56
77416.46
EARTH WORK
GRUBBING
t=150mm
Excavation
BACK FILLING
SOIL DISPOSAL
( m3 )
( m3 )
( m3 )
( m3 )
( m3 )
FINISH GRADING
( m2 )
Sand Bedding
t=100mm
( m3 )
Gravel
DIA. 300
Bottom
middle
12 m
12 m
( m3 )
111.08
111.08
PILING WORK
DIA. 300
DIA. 400
top
top
6m
12 m
total
( m' )
Bottom
middle
12 m
12 m
point
point
130.00
130.00
DIA. 400
Concrete
top
top
6m
12 m
point
point
total
K-125 (L/C)
K-250
K-300
( m' )
( m3 )
( m3 )
( m3 )
1,560.00
55.54
1,560.00
55.54
CIVIL WORK
Concrete
Reinforcement
K-450
( m3 )
K-600
(Fireproof)
( m3 )
814.44
814.44
D-10
D-13
D-16
D-19
D-22
0.62
1.05
1.58
2.23
2.99
(kg)
(kg)
(kg)
(kg)
(kg)
6,532.15
16011.20
2,155.44
19,353.59
33364.09
6,532.15
16,011.20
2,155.44
19,353.59
33,364.09
878
1271
114
Ratio Rebar/Concrete
724
930
CIVIL WORK
Anchor bolt dia.
D-25
Dia-0.5
Dia-0.625
Dia-0.75
Dia-0.875
Dia-1
Dia-1.25
3.86
Dia. 1/2"
Dia. 5/8"
Dia. 3/4"
Dia. 7/8"
Dia. 1"
Dia. 11/4"
(kg)
(ea)
(ea)
(ea)
(ea)
(ea)
(ea)
95.06
0 batang
Misscelanous
Dia-1.5
Dia-2
Dia. 11/2"
Dia. 2"
(ea)
(ea)
Formwork
Embedded
Plate
GROUTING
J.Sealant
J.Filler
(m2)
(kg)
(m3)
(m')
(m')
Steel Structure
Main Structure
Cladding
Bituminous sand
Type of
Equipment
A4
WH400x400
172.0 kg/m
( ton )
(m2)