5m

P = 12 T 2.1

TINGGI = 4.8

P = 12 T 2.1

5m

P = 16 M T 2.5

P = 16 M T 2.5

NO

HARGA SATUAN BAHAN UPAH DAN ALAT


URAIAN
SATUAN
HARGA
BAHAN

1 Batu Kali

m3

Rp

75,000

2 Pasir

m3

Rp

150,000

3 Kerikil 2/3

m3

Rp

160,000

4 Semen Gresik ( 50 kg )

Zak

Rp

64,000

5 Besi O 16

ljr

Rp

160,000

6 Besi O 12

ljr

Rp

68,000

7 Besi O 10

ljr

Rp

48,000

8 Besi O 8

ljr

Rp

42,000

ljr

Rp

27,000

10 Bendrat

9 Besi O 6

kg

Rp

15,000

11 Pipa Hand Ril O 2,5 "

btg

Rp

375,000

12 Pipa PVC D 3/4 "

btg

Rp

20,000

13 Pipa PVC D 2,5 "

btg

Rp

60,000

14
15
16
17
18
19
20
21
22
23
24
25

Karet Landasan
Ijuk
Cat Besi
Triplek 5 mm
Papan begesting 2/20 x 200
Kayu 4/6 - 3 m
Bambu
Plat L 45.45.5
Paku usuk
Paku Reng
Kawat bendrat
Tanah Urug

bj
ikat
kg
lbr
lbr
btg
btg
ljr
kg
kg
kg
m3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,000
8,000
25,000
90,000
7,000
25,000
10,000
90,000
14,000
14,000
15,000
45,000

ALAT
Prasasti
Papan nama proyek
Sekop
Selang timbangan
Tali Senar
Ember
Sewa Molen

bh
bh
bh
m
rol
bh
hari

Rp
Rp
Rp
Rp
Rp
Rp
Rp

300,000
150,000
30,000
3,000
3,000
10,000
150,000

HOK
HOK

Rp
Rp

30,000
40,000

1
2
3
4
5
6
7
8

Upah
1 Pekerja
2 Tukang

DATA PENDUKUNG LAINNYA


KABUPATEN
KAB. MAGETAN
KECAMATAN
KEC. PANEKAN
DESA
REJOMULYO
DUSUN
DUSUN SEKANCIL
FK
NUR SOFRUDIN, SE
FT
RIPTO PRIHARTONO, ST
PJOK
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
NIP
TPK
SUYATNO
TANGGAL
21 Maret 2012
KADER TEKNIS
Muhajirin
JENIS KEGIATAN 1
Jembatan Beton
UKURAN
P= 6 X L= 3
JENIS KEGIATAN 2
Talud Bagian Jembatan
UKURAN
31 m
GAMBAR

GAMBAR RENCANA

95
58
27

PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET


0.5

0.7

0.7

6.0

II
0.4
IV
1.5

III

2.1

0.2

0.2
1.0

Volume Pasangan Pondasi


Pias
Luas
Lebar Volume
Luas Tot
I
3.15 3.5
11.03
II
3.9 3.5
13.65
III
3.15 3.5
11.03
IV
2.00 3.5
7.00
Volume pondasi
42.70
Vol. Pondasi Ka/Ki
85.40

Volume Pasangan
Kegiatan

Sayap

d
b

Oprit/TPT

a
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

t
2.00
2.00
2.00
2.00
5.20
1.50
5.20
1.50
5.20
1.50
5.20
1.50

b
0.80
0.80
0.80
0.80
1.50
0.60
1.50
0.60
1.50
0.60
1.50
0.60

0.80
0.80
0.80
0.80
1.20
0.60
1.20
0.60
1.20
0.60
1.20
0.60

Luas
Panjang
1.74
10.00
1.74
10.00
1.74
10.00
1.74
10.00
5.70
18.00
1.04
5.70
18.00
1.04
5.70
13.00
1.04
5.70
13.00
1.04
0.00
0.00
0.00
0.00
0.00
0.00

Volume
17.40
17.40
17.40
17.40
60.62
60.62
43.78
43.78
0.00
0.00
0.00
0.00
0.00
0.00

Total pasangan

278.39

Volume Galian
Pondasi

(1.5 x 2.1 x 3.5) x 2 sisi

22.05 m3

Oprit

((1.5 x 1.2)+(0.6 x 0.6))/2 x 18


((1.5 x 1.2)+(0.6 x 0.6))/2 x 18
((1.5 x 1.2)+(0.6 x 0.6))/2 x 13
((1.5 x 1.2)+(0.6 x 0.6))/2 x 13

=
=
=
=

19.44
19.44
14.04
14.04

Sayap

(0.8 x 0.8 x 10) x 4 sisi

25.60 m3

Talud

x
x
x
x
x
x

=
=
=
=
=
=

x
x
x
x
x
x
Volume Galian Total

0.00
0.00
0.00
0.00
0.00
0.00

m3
m3
m3
m3

m3
m3
m3
m3
m3
m3

114.61 m3

Volume Beton = ((0.2 x 0.7)+((0.7 - 0.2) x 0.2) x 3.5x2


=
1.68 m3

0.2

O 12-- 20

Besi 12 = (((0.7+0.2+0.7+0.2+0.2)+(0.7+0.2+0.7+0.2+0.2)x((3.5/0,2)+1))+(12x3.5))x2)/12

=
O 12 - 20

0.7

Btg

Balok Tumpu camp. 1 : 2 : 3

0.2

20

Papan begesting = (0.5 + 0.2) x 3.5


=
2.45 m2

0.7

URUGAN OPRIT

Sebelah Kiri panjang oprit 18 m', lebar 3.5, tinggi 5.2 m


Sebelah Kiri panjang oprit 13 m', lebar 3.5, tinggi 5.2 m
total

163.8 m3
118.3 m3
282.1 m3

PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET


No
1

Uraian

Panjang

Lebar

Tinggi

3.00

0.20

Luas

Volume

18.00

3.60 m3

Perhitungan Plat Beton

3.00

6.00

6.00
0.20
2

Pembesian Plat Jembatan


3.00

= ((3/0,15)+1)x6x2

12 mm - 15 cm

23.00 ljr

246.00

23.00 ljr

= ((6/0,15)+1)x3x2

6.00

12 mm - 15 cm
3

252.00

Pembesian Tiang Hand Rail


0,15 m'

1.20

0.15

###

0.02

0.22 m3

1 m'

4 - 12 mm

= 4 x 1,2 x 6

Begel 10 - 15

28.80

3.00 ljr

46.80

5.00 ljr

=(1,2/0,1)+1)x0,6x6

No
4

Uraian

Panjang

Pembesian Balok Jembatan

Lebar

Tinggi

0.20

0.50

Luas

Volume

Begel 10 - 15
2 16

6.00

1.20

1.20 m3

2 12
2 12

4 12

4 16
25
Tul Pokok 8 12

Tul Utama 6 16

Begel 10 - 15

96.00
72.00

9.00 ljr
7.00 ljr

123.00

12.00 ljr

=((6/0,15)+1)x1.5 x2

Perhitungan Begesting

Papan 2/20 x 200 m


=(6x3)+0,2x8x6

63.00 lbr

Kayu 4/6 x 3 m
=((6/0,3)+1)x3
93.00

31.00 btg

Vol Beton

3.60 m3
0.22 m3
1.20
12

58.00

10

17.00

300/15

ANALISA PERHITUNGAN JEMBATAN PLAT BETON


No
A/1
SNI

SNI

SNI

Uraian
Galian Tanah
Pekerja
Pasangan Batu Kali 1 : 4
Pondasi
Batu Gebal
Semen (50 Kg)
Pasir
Kepala Tukang

Analisa

0.7500

1.1000
3.2600
0.5200
0.0500

Volume

Kebutuhan

114.61 m3

85.96 HOK

Harga sat

Bahan

Upah

30,000

3,438,300

85.4
85.4
85.4
85.4
85.4
85.4

m3
m3
m3
m3
m3
m3

93.94
278.40
44.41
4.27
42.70
106.75

m3
zak
m3
HOK
HOK
HOK

75,000
64,000
150,000
40,000
40,000
30,000

7,045,500
17,817,900
6,661,200

69.60
69.60
69.60
69.6
69.60
69.60

m3
m3
m3
m3
m3
m3

76.56
226.90
36.19
3.48
34.80
87.00

m3
zak
m3
HOK
HOK
HOK

75,000
64,000
150,000
40,000
40,000
30,000

5,742,000
14,521,300
5,428,800

282.10
282.10
282.10
282.10
282.10
282.10

m3
m3
m3
m3
m3
m3

310.31
919.65
146.69
14.11
141.05
352.63

m3
zak
m3
HOK
HOK
HOK

75,000
64,000
150,000
40,000
40,000
30,000

23,273,300
58,857,300
22,003,800

m3
m3
m3
m3
m3
m3

m3
zak
m3
HOK
HOK
HOK

75,000
64,000
150,000
40,000
40,000
30,000

m3
m3
m3
m3
m3
m3

zak
m3
m3
HOK
HOK
HOK

64,000
150,000
160,000
40,000
40,000
30,000

2,914,100
542,400
878,500

48,000
68,000
160,000

897,600
5,834,400
1,232,000

Tukang

0.5000

Pekerja

1.2500

Sayap Jembatan 1 : 4
Batu Gebal
Semen (50 Kg)
Pasir
Kepala Tukang

1.1000
3.2600
0.5200
0.0500

Tukang

0.5000

Pekerja

1.2500

Oprit 1 : 4
Batu Gebal
Semen (50 Kg)
Pasir
Kepala Tukang

1.1000
3.2600
0.5200
0.0500

Tukang

0.5000

Pekerja

1.2500

Talud 1 : 5
Batu Gebal
Semen (50 Kg)
Pasir
Kepala Tukang

1.1000
2.7200
0.5440
0.0500

Tukang

0.5000

Pekerja

1.2500

0.00
0.00
0.00
0.00
0.00
0.00

Pekerjaan Beton
Beton Bertulang 1 : 2 : 3
Semen (50 Kg)
Pasir
Kerikil
Kep Tukang
Tukang
Pekerja

6.8000
0.5400
0.8200
0.0833
0.8333
5.0000

6.696
6.696
6.696
6.696
6.696
6.696

Pembesian
Besi 10
Besi 12
Besi 16

1.1000
1.1000
1.1000

17.00 btg
78.00 btg
7.00 btg

45.53
3.62
5.49
0.56
5.58
33.48

18.70 btg
85.80 btg
7.70 btg

227,700
2,277,300
4,270,000

185,600
1,856,000
3,480,000

752,300
7,522,700
14,105,000

29,800
297,600
1,339,200

ANALISA PERHITUNGAN JEMBATAN PLAT BETON


No

Uraian
Kawat Bendrat
Tukang Besi
Kepala Tukang
Pekerja
Dihitung Perancah/Begesting
Papan begesting 2 /20
K. Begesting 5/7 x 300
Paku
Tk Kayu
Kep Tukang
Pekerja
F. I / 6

Analisa
2.0000
7.5000
2.5000
7.5000

Volume
6.696 m3
6.696 m3
6.696 m3
6.696 m3

1.5000
2.0000
0.2500
0.2917
0.0292
0.1167

0
0
12
12
12

m2
m2
m2
m2
m2
m2

0.1667

24 m'

Kebutuhan
13.39 kg
50.22 HOK
16.74 HOK
50.22 HOK
63.00
31.00
5.00
3.50
0.35
1.40

lbr
btg
kg
HOK
HOK
HOK

Harga sat
15,000
40,000
40,000
30,000

Bahan
200,900

7,000
25,000
14,000
40,000
40,000
30,000
-

441,000
775,000
70,000

375,000

1,500,000

Upah
2,678,400
892,800
2,008,800

186,700
18,700
56,000
-

Pek. Sandaran
Hand raill dia 2,5"

4.00 btg

176,637,000

45,622,900

Pekerja

Tukang

Kep tukang

3,438,300

227,700
2,277,300
4,270,000
38,299,600

185,600
1,856,000
31,213,700

3,480,000

752,300
7,522,700
14,105,000

29,800
297,600
1,339,200

2,678,400
892,800
2,008,800

186,700
18,700
56,000

28,697,300

14,818,700

2,106,900

Mandor

Form.7e

PNPM-Mandiri Perdesaan

RENCANA ANGGARAN BIAYA


Propinsi
:
Kabupaten :
Kecamatan :
Desa
:
U RAIAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

1
2
3
4
5
6
7

BAHAN
Batu Kali
Pasir
Kerikil 2/3
Semen ( 50 kg )
Besi O 16
Besi O 12
Besi O 10
Bendrat
Pipa Hand Ril O 2,5 "
Cat Besi
Papan begesting 2/20 x 400
Kayu 4/6 - 4 m
Bambu
Paku
Tanah Urug

JAWA TIMUR
MAGETAN
KEC. PANEKAN
REJOMULYO
VO LU M E
Dari
Dari
Satuan
Total
Swadaya PNPM-MP
b
c=a-b
a
d
481.00
120
361.00
m3
231.00
20
211.00
m3
5.00
5.00
m3
1,470.00
1,470.00
Zak
8.00
8.00
ljr
86.00
86.00
ljr
19.00
19.00
ljr
13.00
13.00
kg
4.00
2
2.00
btg
2.00
2.00
kg
63.00
63.00
lbr
31.00
31.00
btg
15.00
10
5.00
btg
5.00
5.00
kg
282.00
282.00
m3

ALAT
Prasasti
Papan nama proyek
Sekop
Selang timbangan
Tali Senar
Ember
Sewa Molen

1
1
1
10
6
10
15

10
15

1
1
1
10
6
0
-

No. RAB
Pogram
Jenis Kegiatan
Ukuran/Dimensi
Harga
Kategori
Satuan
Biaya
( Rp. )
f
e
75,000
150,000
160,000
64,000
160,000
68,000
48,000
15,000
375,000
25,000
7,000
25,000
10,000
14,000
45,000
Sub Total 1

bh
bh
bh
m
rol
bh
hari

: 01
: PNPM MP
Jembatan Beton
P= 6 X L= 3
Jumlah
Swadaya
( Rp. )
g=bxf
9,000,000
3,000,000
750,000
100,000
12,850,000

300,000
150,000
30,000
3,000
3,000
10,000
150,000

Sub Total 2

Jumlah
PNPM MP
( Rp. )
h=cxf
27,075,000
31,650,000
800,000
94,080,000
1,280,000
5,848,000
912,000
195,000
750,000
50,000
441,000
775,000
50,000
70,000
12,690,000
176,666,000

100,000
2,250,000

300,000
150,000
30,000
30,000
18,000
-

2,350,000

528,000

UPAH
1 Pekerja
2 Tukang
Kepala Tukang

717.00
317.00
40.00

0.00
0.00

717
317
40

HOK
HOK

30,000
40,000
40,000
Sub Total 3

Total Biaya (PNPM MP + Swadaya)

Sumber Dana

Total Biaya PNPM MP


Total Biaya Swadaya

Rp
Rp
Rp

REJOMULYO 21 Maret 2012

Catatan :
Sumbangan lahan tidak dimasukkan RAB tetapi dilaporkan dengan form .6a, 6b dan 6c
Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya
Operasional TPK dilaporkan pada form Rekapitulasi

Diketahui
PjOK

Diperiksa
Fasilitator Teknik Kecamatan

Dbuat oleh
Ketua TPK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

RIPTO PRIHARTONO, ST

SUYATNO

21,510,000
12,680,000
1,600,000
35,790,000
228,184,000
212,984,000
15,200,000

95,000
68,000

8,170,000
1,292,000
9,462,000

5,848,000
912,000
6,760,000

2,702,000

PNPM-Mandiri Perdesaan Kab Magetan 2012

RENCANA ANGGARAN BIAYA SUMBER DANA DARI SWADAYA MASYARAKAT


Propinsi
Kabupaten
Kecamatan
Desa

:
:
:
:

Jawa Timur
Ngawi
KEC. PANEKAN
REJOMULYO

No. RAB :
Pogram :
Jenis Kegiatan :
Ukuran/Dimensi :
VO LU M E

U RAIAN

Total
Volume
a

Volume
PNPM
b=a-c

Volume
Swadaya
c=d+e

Swadaya
Selain Uang
d

Swadaya
Uang
e

Harga
Satuan Satuan
( Rp. )
f
g

Nilai Swadaya
Selain Uang
( Rp. )
h=dxg

Nilai Swadaya
Uang
( Rp. )
i=exg

02
PNPM-MP
Jembatan Beton
P= 6 X L= 3
Jumlah
Total
j(=Rp.
h +)i

BAHAN
Batu Kali
Pasir
Kerikil 2/3
Semen ( 50 kg )
Besi O 16
Besi O 12
Besi O 10
Bendrat
Pipa Hand Ril O 2,5 "
Cat Besi
Papan begesting 2/20 x 400
Kayu 4/6 - 4 m
Bambu
Paku
Tanah Urug
ALAT
Prasasti
Papan nama proyek
Sekop
Selang timbangan
Tali Senar
Ember
Sewa Molen
UPAH
Pekerja
Tukang

481.00
231.00
5.00
1,470.00
8.00
86.00
19.00
13.00
4.00
2.00
63.00
31.00
15.00
5.00
282.00

361
211
5
1,470
8
86
19
13
2
2
63
31
5
5
282

120
20
2
10
-

120 m3
75,000
20 m3
150,000
m3
160,000
Zak
64,000
ljr
160,000
ljr
68,000
ljr
48,000
kg
15,000
2 btg
375,000
kg
25,000
lbr
7,000
btg
25,000
10 btg
10,000
kg
14,000
m3
45,000
Sub Total 1 )

9,000,000
3,000,000
750,000
100,000
12,850,000

9,000,000
3,000,000
750,000
100,000
12,850,000

1
1
1
10
6
10
15

1
1
1
10
6
-

10
15

20
795

20
645

bh
300,000
bh
150,000
bh
30,000
m
3,000
rol
3,000
10 bh
10,000
15 hari
150,000
Sub Total 2 )
HOK
30,000
HOK
40,000
Sub Total 3 )
TOTAL BIAYA SWADAYA
Swadaya Selain Uang
Swadaya Uang

100,000
2,250,000
2,350,000
15,200,000

100,000
2,250,000
2,350,000
15,200,000
15,200,000

Sumber Dana
Disetujui Oleh,
PjOK

Diperiksa
Fasilitator Teknik Kecamatan

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

RIPTO PRIHARTONO, ST

15,200,000
Dibuat Oleh,
Ketua TPK

SUYATNO
REJOMULYO

PNPM-Mandiri Perdesaan Magetan 2012

Form 8.b

REKAPITULASI RENCANA ANGGARAN BIAYA ( R-RAB )


Propinsi
: Jawa Timur
Kabupaten : Magetan

No

Jenis Prasarana : Jembatan Beton

Kegiatan
Ukuran
Jumlah
No. RAB

Uraian

:
:
:
:

PNPM
I

BAHAN

II

PERALATAN

III

UPAH

Jembatan Beton
P= 6 X L= 3
Bobot
1
%
01

SWADAYA

:
:
:
:

PNPM

Bobot
%

1
02

SWADAYA

Kegiatan
Ukuran
Jumlah
No. RAB

PNPM

:
:
:

Bobot
%

KEC. PANEKAN
REJOMULYO

Bobot
%

JUMLAH TOTAL

SWADAYA

PNPM

SWADAYA

176,666,000

12,850,000

83.1

176,666,000

12,850,000

83.1

528,000

2,350,000

1.3

528,000

2,350,000

1.3

15.7

35,790,000

35,790,000
Jumlah

Kegiatan
Ukuran
Jumlah
No. RAB

Kecamatan
Desa

212,984,000

15,200,000

100

212,984,000

15.7

15,200,000

95.0

IV Operasional UPK 2 %

4,484,000

2.00

6,726,000

3.00

Operasional TPK 3 %

JUMLAH (PNPM MP + Swadaya)


Jumlah Biaya Upah Konstruksi

228,184,000
35,790,000

100

224,194,000

15,200,000

100.00

100.0

35,790,000

100.0

100

35,790,000

100

40.00

Jumlah Biaya Upah Pengumpulan Bahan


Jumlah Biaya Upah

35,790,000

Jumlah Upah

40.00

0.00

HOK

HOK

HOK

REJOMULYO 21 Maret 2012


PjOK

Fasilitator Kecamatan

Ketua TPK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

RIPTO PRIHARTONO, ST

SUYATNO

HOK

KE JABUNG
GAMBAR RENCANA
PROPINSI JAWA TIMUR
KAB. MAGETAN
KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA

TPT 1
SYP 1

Jembatan Beton

TPT 2

LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

10,00
1,50

Denah Jembatan

Dibuat Oleh :
10,00

10,00

TPK / KPMD

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

SYP 3

TPT 3

SYP 2

10,00

B
SYP 4
TPT 4

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

PARAPET

Ir. HARI BUDI S


Diketahui Oleh
PjOK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

6.0
1,50

0.2

1.2

1.2

1.2

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KAB. MAGETAN
KEC. PANEKAN
DESA
REJOMULYO
JENIS PRASARANA

1,50

0.2

Jembatan Beton
PARAPET

2012

Pipa GI 2 "

0,90

LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

0.7
Balok Gelagar Beton Bertulang

MAB

5.20

Potongan B - B

Dibuat Oleh :
TPK / KPMD

4.50
5M
40 CM

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
1.5

1.5
0,10
0,2

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

0,2

2.1

0.2

-0.4

POTONGAN B - B

0.2

2.1

Pas. Batu Kali 1 : 4

Ir. HARI BUDI S


Diketahui Oleh
PjOK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

0,60
0,75

1.5

0,60

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KABUPATEN Magetan
KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA

0,75
PARAPET

Plat Beton Bertulang, camp. 1:2:3


0,90
Plesteran, camp. 1:4

Jembatan Beton
LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

0,50

Pas. Batu Kali 1 : 4

3,20

Potongan A - A

Dibuat Oleh :
2,00

TPK / KPMD

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
0,20
0,80
1,60
0,10

POTONGAN A - A

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

Ir. HARI BUDI S


Diketahui Oleh
PjOK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

0,20
12-20

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KAB. MAGETAN
KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA

12 - 20

0,50
12 - 15

12 - 15

0,20

Jembatan Beton
LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

0,70

PENULANGAN BALOK LANDAS

Detail Penulangan

Dibuat Oleh :
TPK / KPMD

6 - 10

6-8
0,20
0

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik
0,15

PENULANGAN BALOK DIAFRAGMA


0.75

1.50

DETAIL PENULANGAN BALOK


GELAGAR

0.75

Ir. HARI BUDI S


Diketahui Oleh
PjOK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

0,1
5

0,15

3
0,10

0,10

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KABUPATEN MAGETAN
KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA

0.10
8 - 15

0.40

Pipa GI 2 "
12 - 15

8 - 10

12 - 15

0.40

Jembatan Beton
LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

0.20
0.30
*
0.75

0.75

1.5

Detail Penulangan

Dibuat Oleh :

2 16

TPK / KPMD

DETAIL PENULANGAN LANTAI PLAT

Sengkang 10 - 15

2 12

4 12
4 16

2 12

2 16

10-15

POTONGAN 1 - 1

2 12

0.50

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

2 16

8 12

4 16

Begel 10 - 15

2 12

4 12

DETAIL PENULANGAN BALOK GELAGAR

2 12

Ir. HARI BUDI S


Diketahui Oleh
PjOK

4 16

POTONGAN 2 - 2
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

0,30

Pas. Batu Kali 1 : 4

Tanah Urug

Tanah Urug

0,30

Sulingan + Ijuk

Plesteran camp. 1 : 3

2,00

2,00

Pas. Batu Kali camp. 1 : 4

0,80

0,80

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA
Jembatan Beton

0,80

0,80

POT. MELINTANG SAYAP 2


panjang = 10 m

POT. MELINTANG SAYAP 1


panjang = 10 m

Tanah Urug

Sulingan + Ijuk

0,30

Plesteran camp. 1 : 3

0,30

Pas. Batu Kali 1 : 4

Tanah Urug

* Potongan Melintang
Sayap
Dibuat Oleh :
TPK / KPMD

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

2,00
2,00

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

0.8

Pas. Batu Kali camp. 1 : 4

LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

0,80

0.80

0,80

POT. MELINTANG SAYAP 3


panjang = 10 m

POT. MELINTANG SAYAP 4


panjang = 10 m

Ir. HARI BUDI S


Diketahui Oleh
PjOK

Kebutuhan Sayap Jembatan :

Panjang
Volume Talud
Vol. Galian Tanah
Luas Plester

:
:
:
:

Volume Tanah Urug

40.00
65.32
32.60
16.00

m'
m
m
m

425.50 m

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

TPT 1 & 2 :

26,00

Panjang
Volume Talud
Vol. Galian Tanah
Luas Plester
Volume Tanah Urug

:
:
:
:
:

52.00
122.20
44.20
20.80
58.00

m'
m
m
m
m

T1

T0

KODE

Jembatan Beton

Titik
0

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA

4.00 1.00

1.50 0.50

1.00 0.40

LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR
POTONGAN MELINTANG
TALUD
3,50

Pas. Batu Kali 1 : 5

0.30

0.30

Dibuat Oleh :
TPK / KPMD

POT. TPT 1 & 2


panjang = 26 m

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

Ir. HARI BUDI S


Diketahui Oleh
PjOK

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

0.00 m
2 12

2 12

10-15
2 12

0.40

1
2 12

0,75
2 12

8 12

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
DESA
REJOMULYO
JENIS PRASARANA
JEMBATAN BETON

DETAIL PENULANGAN BALOK


GELAGAR

4.00

LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR
Detail Penulangan Balok

2 12

Sengkang 10 - 15

2 12

Dibuat Oleh :
TPK / KPMD

4 12
4 12

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

POTONGAN 1 - 1
KUNTADI SUWANDONO,S.Sos
Disetujui Oleh
Faskab Teknik

2 12

Begel 10 - 15

2 12

4 12

2 12

Ir. HARI BUDI S


Diketahui Oleh
PjOK

4 12

POTONGAN 2 - 2

KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001

0.10
0.20
0.12
0.40

GAMBAR RENCANA
PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
DESA
REJOMULYO
JENIS PRASARANA

0.10
0.10

Pipa GI 2 "

0.40
0.40

JEMBATAN BETON
LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

PERSPEKTIF BALOK SANDARAN

GAMBAR DETAIL

0.50

ABUTMENT
SANDARAN
PENULANGAN PLAT
m

Dibuat Oleh :
TPK / KPMD

DETAIL ABUTMENT
0.10
6 - 15

6 - 20

Pipa GI 2 "

0.40
12 - 15

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

12 - 15

0.40
0.20

KUNTADI SUWANDONO,S.Sos
Disetujui Oleh
Faskab Teknik

0.20
Ir. HARI BUDI S
Diketahui Oleh
PjOK

DETAIL PENULANGAN LANTAI PLAT


KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001