DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

Table of Contents
0

REVISION RECORD........................................................................................................................... 2

INTRODUCTION ................................................................................................................................. 3

ALIGNMENT AND GROUND CONDITIONS ..................................................................................... 4

2.1

Alignment ............................................................................................................................................ 4

2.2

Ground Conditions .............................................................................................................................. 4

CALCULATIONS ................................................................................................................................ 5

CONCLUSIONS & RECOMMENDATIONS ....................................................................................... 6

4.1

General ................................................................................................................................................ 6

4.2

TBM Operation .................................................................................................................................... 6

4.3

Recommendations .............................................................................................................................. 6

REFERENCES .................................................................................................................................... 8

APPENDIX:
Appendix 1

Ground Information

Appendix 2

Design Parameter and Input Data

Appendix 3

Recommended Face Pressure Values

Appendix 4

Cutter Head Intervention

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 1

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

REVISION RECORD
Revision

Description of Amendments

Date

First Issue

20/06/2011

Final Submission

13/09/2011

Final Submission Revised According to LTAs Comments

01/08/2012

File: W:\wo0_job\49\22-C918-DD Alpine\TECH-DOC\Reports\Face Pressure\TKK to BTN\Rev. B\DOC-918-TUNDCS-9101_B.doc

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 2

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

INTRODUCTION
Contract 918 consists of design and construction of station at Tan Kah Kee, the twin
bored tunnels from the cross over box northwest of Tan Kah Kee Station (TKK) to the
station at Sixth Avenue (SAV) within C917, and another twin bored tunnels between
the Tan Kah Kee station (TKK) and the station at Botanic Garden (BTN) to be
constructed under the C919.
The Tunnel works include twin bored tunnel with inner diameter of 5.8m and outer
diameter 6.35m as well as two mined cross passages. The total length of the twin
bored tunnel is about 1.483 kilometres. The length of twin bored tunnel from Cut Cover
Tunnel to Sixth Avenues Station is 0.558 kilometres and the length of twin bored tunnel
from Tan Kah Kee Station to Botanic Garden Station (BTN) is 0.925 kilometres.
This report provides estimate of required face pressures to be applied and controlled
during driving from TKK to BTN station only. The estimated TBM face pressure for
bored tunnels between CCT and SAV station is covered by a separate report.
The twin bored tunnel will be constructed by slurry tunnel boring machines (slurry
TBMs). The slurry TBM is designed to allow excavation in the varying soft ground
conditions. Pre-cast concrete segmental lining, designed to provide the final
permanent support, will be installed at the tail section of the TBM as it advances
though the ground.
The report shall be read in conjunction with drawing and geotechnical data presented
in Appendix 1 and Appendix 2.
The overall site plan of Contract C918 is presented in Figure 1-1 below.

Figure 1-1: Site Plan of Contract C918

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 3

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

ALIGNMENT AND GROUND CONDITIONS

2.1

ALIGNMENT
As stated above, contract C918 bored tunnel alignment features twin bored tunnels.
At Launching area:
Expo Bound Track tunnel (Left tunnel from TKK to BTN)
Bukit Panjang Bound Track tunnel (Right tunnel from TKK to BTN)
At Receiving area:
Expo Bound Track tunnel (Left tunnel from TKK to BTN)
Bukit Panjang Bound Track tunnel (Right tunnel from TKK to BTN)
As mentioned in Section 1 above, the alignment of DTL 2 for C918 commences from
the launching area which is located at the TKK station. After the launch, the TBMs will
run more or less at the same level throughout the drive.
The length of the bored tunnels is about 0.925 kilometers for each drive. Both tunnels
will be driven along decreasing chainages.

2.2

GROUND CONDITIONS
The ground conditions are interpreted based on GIBR attached in LTA consolidated
working document documents Ref [1]. The project site is located primarily in Fill
underlying by Kallang Formation and the bottom layers are comprised of Bukit Timah
Granite.
The subsurface layering can be classified into the following layers:

Fill

Estuarine Clay (E)

Fluvial Clay (F2)

Fluvial Sand (F1)

Residual soil of Grade VI (GVI) and Grade V (GV)

Various grades of Rock, i.e. Grade IV (GIV), Grade III (GIII), Grade II (GII)
and Grade I (GI)

For easy reference, the soil profile along the tunnel alignment is presented in Appendix
1.

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 4

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

CALCULATIONS
The calculation approach investigates the stability of tunnel face by considering limit
equilibrium of a sliding wedge at the face loaded by a prismatic body.
The imposed loads comprise of surface surcharge of 20 kPa and gravity loading of soil
above the sliding wedge. Ground water table at 1m below the ground surface is
considered in calculations. Both drained and undrained behaviours of relevant soil
materials are examined. Generally, recommended face pressures are derived from the
more conservative drained case.
A total of 38 sections for each TBM drive have been calculated. Selection of sections
for calculations is based on variations of overburden, and geology at the tunnel face.
The distance between the analysis sections is generally about 25m.
The calculation approach is based on Anagnostou and Kovari, Ref.[7]. This approach
has previously been applied successfully to the TBM tunnel drives for other projects in
Singapore including, the North East Line, the Deep Tunnel Sewerage System (DTSS),
the Circle Line Stages 2, 3, 4 & 5 and the Downtown Line 1.
The following design considerations are mentioned in particular:
1. The ground conditions at tunnel level and above are taken from the geotechnical
interpretive report and the geotechnical soil profile which is presented in Appendix 1.
2. TBM face pressures are derived by calculations based on the approach presented in
Ref.[7], considering the local ground conditions as well as groundwater seepage
forces at the face.
3. Seepage pressure and related temporary depressurisation at the excavation face
were considered in the analyses using drained soil parameters. Since the TBM will
be advancing at an average rate of about 10m per day, this is considered
conservative.
The input parameters used in calculation are summarized in Appendix 2 and the
results of calculations are summarised in Appendix 3.

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 5

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

CONCLUSIONS & RECOMMENDATIONS

4.1

GENERAL
Based on existing ground conditions at tunnel level, the required face pressures are
calculated and presented in Appendix 3.

4.2

TBM OPERATION
The twin bored tunnels will be driven using two slurry TBM for each drive.
The TBM is expected to be operated with the pressure chamber fully filled and
pressurized, such that the recommended face pressure range as provided in Appendix
3 is maintained at all times.
The tables in Appendix 3 provide the following information:
Recommended face pressure range at tunnel axis level
Recommended tail void grouting pressure range
Recommended compressed air pressure during cutterhead interventions
Hydrostatic groundwater pressure at tunnel axis level

4.3

RECOMMENDATIONS
The recommended face pressure ranges are proposed in Appendix 3.
The proposed values are based on the understanding that during TBM driving, the
following strategy will be adopted in principle:
In general, the applied face pressure shall be within the recommended face
pressure range at all times
Shop Houses:
From the findings of the CIAR, Ref. [9], the tunnel excavation needs to limit the
volume loss to 1.0% in the zone of the Shop Houses. The conclusion from that
assessment is that the volume loss of 1.0% needs to be applied for Bukit Panjang
bound tunnel only between chainage 46+020 and 45+950. According to Report Ref.
[8], Figure 4-4 the recommended minimum face pressure is 220 kPa as indicated on
the graph in Appendix 3.
DTSS:
The TBMs will be operated at target face pressures, which are typically in the range
of the local hydrostatic groundwater pressure. In this kind of operation scenario,
drastic pressure gradients between the TBMs excavation chamber and the outside
water pressure are avoided.

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 6

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

Cluny Court:
From the findings of the CIAR, Ref. [9], the tunnel excavation needs to limit the
volume loss to 0.5% in the zone of Cluny Court building. The conclusion from that
assessment is that the volume loss of 0.5% needs to be applied for both tunnel
drives of Bukit Panjang and Expo bounds between chainage 46+020 and 45+950.
According to Report Ref. [8], Figure 4-1, the recommended minimum face pressure
is 300 kPa as indicated on the graphs in Appendix 3.
CCL Tunnels:
Ref. [8] includes the volume loss assessment for the above CCL tunnels (refer to
Figure 4-2). Within this zone, TBM face pressures in the range of 300kPa is
required in order to maintain the volume loss of 0.5% or below, which is the
maximum volume loss for this area in accordance with the project specifications,
Ref. [3]. During the approach of the C918 TBMs towards the CCL crossing area, the
volume loss shall be verified in monitoring sections. The recommended minimum
face pressure at the monitoring sections are indicated on the graphs in Appendix 3.
Settlements and muck volume balance shall be continuously determined to provide
the main criteria to judge the adequacy of applied face pressures.
For cutterhead intervention (refer to Appendix 4), it is recommended to initially apply
at least the stated air pressure. However, after visual inspection and verification, the
air pressure may be reduced in stages. If no are adverse soil behavior is visible at
the face and the stability of excavation face is ensured, the intervention may be
even be carried out in atmospheric conditions (free air).
The actual face pressures applied during driving and air pressures during
cutterhead interventions shall be reviewed by the TBM operation team, QP(D),
QP(S) and LTA project team on a regular basis. If necessary, the recommended
pressure values presented in this report shall be updated.

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 7

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

REFERENCES
For the preparation of this document the following data sources were used:
[1]

LTA; Working documents; Geotechnical Interpretative Baseline Report (GIBR) for


C918

[2]

Land Transport Authority, Consolidated Working Documents for Contract C918,


General Specification.

[3]

Land Transport Authority, Consolidated Working Documents for Contract C918,


Particular Specification.

[4]

Land Transport Authority, Civil Design Criteria.

[5]

Land Transport Authority, Consolidated Working documents for Contract C918,


Factual Geotechnical Report.

[6]

SIL, Additional Soil Investigation Works for C918 Tunnel Section, Borelogs

[7]

G. Anagostou, K. Kovari: Face Stability in Slurry and EPB Shield Tunnelling;


Tunnels & Tunnelling; December 1996

[8]

Contractors Design Consultant, Volume Loss Assessment, Document No.:


DOC/918/TUN/DCS/9040

[9]

Contractors Design Consultant, Impact Assessment for Bored Tunnel, Document


No.: DOC/918/TUN/DCS/9060

[10] Contractors Design Consultant, Interfacing of C918 Bored Tunnels with existing
CCL MRT Tunnels, Document No.: DOC/918/TUN/DCS/9062

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 8

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

Appendix

Appendix 1: Ground Information

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 9

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

Appendix

Appendix 2: Design Parameter and Input Data

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 16

Geoconsult Asia Singapore

Page 1

Geotechnical Design Parameters for Bukit Panjang Bound DTL MRT Project Bukit Panjang Bound - C918
1

GW
cond

Chainage

(mDMD)
(mDMD)
Geotechnical Ground Level Top of Rail
Unit at Tunnel
Axis

10

11

12

13

14

15

Soil Layer Type


Layer 1

Layer 2

Layer 3

Layer 4

Layer 5

Layer 6

16

17

(m)
Z1

(m)
Z2

18
19
Soil Layers Depth
(m)
(m)
Z3
Z4

20

21

22

23

(m)
Z5

(m)
Z6

kN/m3
1

kN/m3
2

24
25
Bulk Weight
kN/m3
kN/m3
3
4

26

27

kN/m3
5

kN/m3
6

28

29

kN/m2
Additional Effective Lateral
surcharge Earth Pressure
Coefficient

Bukit Panjang Bound


1
2
3
4
5
6
7
8
8a
8b
9
10
11
12
13
14
15
16
16a
16b
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

46+727.180
46+700.000
46+675.000
46+650.000
46+625.000
46+600.000
46+575.000
46+550.000
46+541.000
46+535.000
46+525.000
46+500.000
46+475.000
46+450.000
46+425.000
46+400.000
46+375.000
46+350.000
46+341.200
46+329.400
46+325.000
46+300.000
46+275.000
46+250.000
46+225.000
46+200.000
46+175.000
46+150.000
46+125.000
46+100.000
46+075.000
46+050.000
46+025.000
46+000.000
45+975.000
45+950.000
45+925.000
45+900.000
45+875.000
45+850.000
45+825.000
45+809.880

GIII
GIII
GVI
N-3
N-3
N-3
N-3
GVI
GVI
GVI
GVI
GVI
GVI
GV50
GV50
GV50
GV70
GV90
GV120
GV120
GV120
GV120
GV120
GIII
GIII
GIII
GV150
GV150
GV120
GIV
GIII
GIII
GV70
GV120
GV120
N-1
GV150
GV150
GV70
GV70
GV70
GII

104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
101.400
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
101.000
104.000
104.000
104.000
104.000
104.500
105.000
104.500
104.000
104.000
104.000
103.750
103.500
103.650
101.300
103.500
103.200
105.100
106.000
106.300
105.600
106.250
106.500

84.700
83.900
83.100
82.400
81.600
80.900
80.100
79.500
79.500
79.500
79.500
77.900
77.100
76.400
75.700
74.800
74.100
73.400
72.600
72.600
72.600
71.900
71.100
70.400
70.300
68.800
68.300
68.100
68.100
68.140
69.950
69.800
69.750
70.000
70.500
71.000
71.500
72.200
72.650
73.300
73.800
74.000

FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL

E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
F1
F1
F1
E
E
E
E
GVI
E
E
E
E
E
E
E
E
E
E
E

F2
F2
F1
F1
F1
F1
F2
F1
F1
F1
F1
F1
F1
F2
F2
F2
F1
F2
F2
F2
F2
F2
F2
GVI
GVI
GVI
F1
F2
F2
F2
GV70
GVI
F2
F2
F2
F1
F1
F1
F2
F2
F1
F2

GVI
GVI
GVI
GVI
F1
F1
F1
GVI
GVI
GVI
GVI
GVI
E
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV70
GV70
GV70
GVI
GVI
GVI
GVI
GIV
GV120
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI

GIII
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV50
GV50
GV50
GV50
GV90
GV120
GV120
GV120
GV120
GV120
GVI
GVI
GIII
GV150
GV150
GV70
GV120
GIII
GIII
GV70
GV120
GV120
GV150
GV70
GV70
GV70
GV70
GV
GII

GIII
GIII
GVI
N-3
N-3
N-3
N-3
GVI
GVI
GVI
GVI
GVI
GVI
GV50
GV50
GV50
GV70
GV90
GV120
GV120
GV120
GV120
GV120
GIII
GIII
GIII
GV150
GV150
GV120
GIV
GIII
GIII
GV70
GV120
GV120
N-1
GV150
GV150
GV70
GV70
GV70
GII

2.40
2.00
3.31
3.70
2.30
3.00
2.80
2.51
3.10
0.50
3.10
3.80
3.80
3.00
2.70
3.11
4.00
4.00
4.30
1.30
4.30
3.50
2.70
6.30
6.20
5.41
3.00
2.00
2.51
2.21
7.40
3.00
4.00
1.70
3.90
4.00
5.30
6.90
7.00
6.50
5.55
5.40

3.80
4.00
4.20
3.80
4.11
4.10
3.30
4.50
3.60
3.60
3.60
3.10
3.00
4.10
4.90
4.20
5.00
6.00
3.40
3.40
3.40
2.70
1.21
3.00
3.00
6.00
3.00
4.00
4.00
6.50
7.40
6.51
4.50
4.10
4.90
5.00
4.60
3.30
5.60
5.20
5.80
5.70

1.80
1.40
3.30
3.70
3.35
4.00
2.11
7.00
6.50
6.50
6.50
7.00
6.81
6.00
4.70
6.20
4.80
2.20
4.40
4.40
4.40
3.40
4.00
6.00
6.10
7.40
6.20
4.81
4.00
13.00
9.00
6.30
3.40
6.50
6.00
6.00
6.50
9.80
7.35
6.40
4.80
4.30

3.90
4.00
2.70
3.70
3.35
4.00
8.00
2.90
3.30
3.30
3.30
3.80
1.70
7.00
7.70
8.00
9.00
9.50
7.61
7.61
7.61
9.10
9.80
9.20
9.10
8.50
11.60
5.00
7.40
4.95
3.00
9.70
10.51
4.80
4.00
3.00
3.90
2.90
6.30
7.10
6.40
6.00

2.70
4.00
2.70
2.00
4.60
3.30
3.00
2.90
3.30
3.31
3.30
3.70
6.90
2.80
3.60
3.00
2.41
4.20
7.00
7.00
7.00
8.70
10.50
4.40
5.11
4.20
7.71
15.40
13.30
4.51
2.30
3.50
6.80
9.50
9.50
9.51
8.60
6.20
2.70
2.40
5.20
6.40

3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17

18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7

15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
19
19
19
15
15
15
15
18.5
15
15
15
15
15
15
15
15
15
15
15

18.5
18.5
19
19
19
19
18.5
19
19
19
19
19
19
18.5
18.5
18.5
19
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19
18.5
18.5
18.5
19.5
18.5
18.5
18.5
18.5
19
19
19
18.5
18.5
19
18.5

18.5
18.5
18.5
18.5
19
19
19
18.5
18.5
18.5
18.5
18.5
15
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
18.5
18.5
18.5
18.5
23
19.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5

23
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
18.5
18.5
23
19.5
19.5
19.5
19.5
23
23
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
24

23
23
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
23
23
23
19.5
19.5
19.5
23
23
23
19.5
19.5
19.5
21.3
19.5
19.5
19.5
19.5
19.5
24

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30

Cutterhead Intervention
CHI1
46+636.000 GV50
CHI2
46+430.000 GV70
CHI3
46+341.200 GV90
CHI4
46+280.000 GV90
CHI5
46+131.000 GV120
CHI6
46+020.000 GV120
CHI7
45+870.000 GV90

103.720
103.900
104.000
104.400
103.500
103.750
105.500

81.600
75.700
73.400
71.300
67.900
69.700
72.600

FILL
FILL
FILL
FILL
FILL
FILL
FILL

E
E
E
E
E
E
E

F1
F1
F2
F1
F2
F1
F2

F1
GVI
GVI
GVI
GVI
GVI
GVI

GVI
GV70
GV90
GV70
GV70
GV120
GV90

GV50
GV70
GV90
GV90
GV120
GV120
GV90

2.50
2.71
4.00
3.00
1.80
3.70
6.90

3.80
4.70
6.00
1.61
4.00
4.45
4.80

4.50
5.00
2.20
3.80
4.50
5.60
7.61

4.50
7.60
9.50
10.00
5.30
7.00
5.30

2.13
3.50
4.20
10.00
15.30
8.60
3.60

3.17
3.17
3.17
3.17
3.17
3.17
3.17

18.7
18.7
18.7
18.7
18.7
18.7
18.7

15
15
15
15
15
15
15

19
19
18.5
19
18.5
19
18.5

19
18.5
18.5
18.5
18.5
18.5
18.5

18.5
19.5
19.5
19.5
19.5
19.5
19.5

19.5
19.5
19.5
19.5
19.5
19.5
19.5

0
0
0
0
0
0
0

0.50
0.50
0.50
0.50
0.50
0.50
0.50

MasterGTInfo-C918_Bukit Panjang

MasterGTInfo-C918_Bukit Panjang
Page 17

Geoconsult Asia Singapore

Page 1

Project - Contract C918 Bukit Panjang Bound(TKK To BTN)


INPUT PARAMETERS - TUNNEL GEOMETRY AND GROUND PROPERTIES
Tunnel Geometry
D
cor
D rel

[m]
[%]

6.60
60%

[m]

4.17

P
Lscrew

[m]

0.89

[m]

na

[kPa]

20.00

Overall factor of safety

q
FS tot

[-]

1.20

(applied to driving forces in force equilibrium)

Air pressure FOS

FS air

[-]

1.00

(normally use 1.0 - especially in shallow ground order to avoid air blow-out)

cu

[-]

1.00

(applied to strength parameter, cu)

[-]

1.00

(applied to strength parameter, phi)

Minimim tail void grout pressure

ptv

[kPa]

350

Minimum nominal face pressure

Flagfpmin

[-]

fpmin

[%]

30%

pair-0

[kPa]

80

10

Fill
F1
F2
E
GVI
GV L
GV
GIV
GIII
GII
GV50
GV70
GV90
GV120
GV150
GVI50

c'
[kPa]
0.00
0.00
0.00
0.00
3.00
4.00
4.00
50.00
300.00
500.00
4.00
4.00
4.00
4.00
4.00
3.00

f
[deg]
30.00
29.00
24.00
22.00
30.00
31.00
31.00
40.00
45.00
50.00
31.00
31.00
31.00
31.00
31.00
30.00

g
[kN/m3]
18.70
19.00
18.50
15.00
18.50
19.50
19.50
23.00
23.00
24.00
19.50
19.50
19.50
19.50
19.50
18.50

cu
[kPa]
20.00
0.00
21.00
10.00
90.00
200.00
200.00
250.00
0.00
0.00
200.00
200.00
200.00
200.00
200.00
90.00

K0
[-]
0.50
0.50
0.75
0.75
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50

E
[MPa]
7.00
13.00
5.50
1.70
37.00
60.00
90.00
300.00
3000.00
6000.00
50.00
70.00
90.00
120.00
150.00
50.00

N-1
N-2
N-3
N-4
N-5

4.00
50.00
3.00
3.00
3.00

31.00
40.00
30.00
30.00
30.00

21.30
23.50
18.50
18.50
18.50

0.00
0.00
0.00
0.00
0.00

0.50
0.50
0.50
0.50
0.50

588.50
3369.20
43.40
37.00
37.00

S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8

4.00
4.00
300.00
4.00
3.00
3.00
3.00
3.00

31.00
31.00
45.00
31.00
30.00
30.00
30.00
30.00

21.30
23.50
21.30
19.00
18.50
18.50
18.50
18.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.50
0.50
0.30
0.50
0.50
0.50
0.50
0.50

1433.10
1024.60
1476.90
62.40
43.00
3923.10
47.60
37.00

TBM diameter
Cutterhead opening ratio
Relevant face diameter
Length of TBM cutter head
Length of screw conveyor
Surcharge

Soil material, partial strength factor

Nominal intial compressed air pressure

Design Parameters
x

Soil / Rock Type

C918-TBM-Face Press_B.Panjang Bound_RevC

(percent of area covered by cutting wheel)

(Yes or any other input is No)


(percentage of full porewater pressure at tunnel level)
(compressed air pressure to be applied initially for cutterhead intervention, applies only if free air intervention is possible)

Input

Page 18

Geoconsult Asia Singapore

Page 1

Geotechnical Design Parameters for Expo Bound DTL MRT Project Expo Bound - C918
1

GW
cond
1
2
3
4
5
6
7
8
9
9a
9b
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Chainage

46+735.651
46+700.000
46+675.000
46+650.000
46+625.000
46+600.000
46+575.000
46+550.000
46+525.000
46+523.500
46+510.970
46+500.000
46+475.000
46+450.000
46+425.000
46+400.000
46+375.000
46+350.000
46+325.000
46+300.000
46+275.000
46+250.000
46+225.000
46+200.000
46+175.000
46+150.000
46+125.000
46+100.000
46+075.000
46+050.000
46+025.000
46+000.000
45+975.000
45+950.000
45+925.000
45+900.000
45+875.000
45+850.000
45+825.000
45+809.881

(mDMD)
(mDMD)
Geotechnical Ground Level Top of Rail
Unit at Tunnel
Axis

10

11

12

13

14

15

Soil Layer Type


Layer 1

Layer 2

Layer 3

Layer 4

Layer 5

Layer 6

16

17

(m)
Z1

(m)
Z2

18
19
Soil Layers Depth
(m)
(m)
Z3
Z4

20

21

22

23

(m)
Z5

(m)
Z6

kN/m3
1

kN/m3
2

24
25
Bulk Weight
kN/m3
kN/m3
3
4

26

27

kN/m3
5

kN/m3
6

28

29

kN/m2
Additional Effective Lateral
surcharge Earth Pressure
Coefficient

GIII
S-6
GIII
S-5
GVI
S-5
S-4
S-4
GVI
GVI
GVI
GV70
GV70
GV90
GV90
GV90
GV90
GV90
GV50
GV50
GV90
GV120
GV150
S-3
GV120
S-2
GV120
GV120
GV120
GV120
GV120
GV120
S-1
S-1
GV90
GV90
GV90
GV50
GII
GII

103.800
103.000
104.000
104.000
103.700
104.000
104.000
104.000
104.000
104.000
101.400
104.000
104.200
104.500
99.100
99.000
99.000
99.200
99.000
99.700
100.400
100.300
99.800
99.500
99.200
99.000
99.300
99.100
99.000
98.000
97.900
98.300
98.300
98.300
104.000
104.200
104.500
105.500
105.000
105.200

85.000
84.200
83.500
83.000
82.000
81.000
80.500
80.000
79.000
79.000
78.629
78.000
77.700
77.000
76.100
75.000
74.600
74.000
73.500
73.000
72.200
71.500
71.100
71.000
69.900
69.000
68.700
68.200
67.900
67.800
68.100
68.600
69.200
70.000
69.300
71.500
72.200
73.000
74.000
73.900

FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL

E
E
E
E
E
E
E
E
F2
F2
F2
E
E
E
E
E
E
E
E
E
E
E
GVI
GVI
GVI
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E

F2
E
F1
F1
F1
F2
F1
F1
E
E
E
F1
F2
F1
F2
F2
F2
F2
F2
F2
GVI
F2
GVI
GVI
GVI
GVI
GVI
GVI
GVI
F1
F2
F2
F1
F1
F1
F2
F2
F2
F2
F1

F1
F1
F1
GVI
F2
F1
F1
GVI
F1
F1
F1
GVI
F1
GVI
GVI
GVI
GVI
GVI
F1
F1
GVI
GVI
GV
GVI
GV70
GV120
GV70
GVI
GV50
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI

GVI
S-6
GIII
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV70
GV50
GV50
GV90
GV90
GVI
GVI
GV90
GV120
GV50
GV120
GV120
GV120
GV120
GV120
GV90
GV120
GV90
GV90
GV90
GV90
GV90
GV90
GV90
GV50
GII
GII

GIII
S-6
GIII
S-5
GVI
S-5
S-4
S-4
GVI
GVI
GVI
GV70
GV70
GV90
GV90
GV90
GV90
GV90
GV50
GV50
GV90
GV120
GV150
S-3
GV120
S-2
GV120
GV120
GV120
GV120
GV120
GV120
S-1
S-1
GV90
GV90
GV90
GV50
GII
GII

2.30
2.70
3.60
4.00
2.80
3.00
2.90
3.00
2.90
2.90
0.67
3.00
2.80
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.81
3.70
4.20
5.00
4.11
3.50

4.70
2.20
4.00
4.00
1.31
3.00
3.00
4.00
1.91
1.91
1.91
6.00
7.50
6.80
2.10
1.71
3.31
4.30
1.00
0.00
1.21
0.00
4.40
0.00
3.70
0.00
0.00
0.30
1.80
1.31
0.91
2.01
2.50
3.10
5.40
4.30
3.60
4.01
4.30
5.10

4.00
2.20
2.40
6.00
3.70
2.00
4.40
6.00
2.90
2.90
2.90
4.00
1.40
4.80
7.50
6.00
2.90
2.01
2.00
1.71
10.00
4.90
5.90
6.00
5.70
7.00
9.00
5.00
9.60
2.80
6.50
5.50
3.00
2.20
3.00
3.21
3.90
3.40
3.00
2.50

1.40
3.30
2.40
1.00
6.00
7.00
4.40
3.00
3.50
3.50
3.50
4.00
2.40
5.60
4.00
4.00
5.30
10.60
1.50
2.00
10.00
14.60
5.90
7.00
7.60
15.00
8.45
5.00
7.50
8.30
5.00
5.80
8.20
9.00
8.00
6.90
6.10
6.80
8.90
9.50

1.70
3.70
3.40
1.30
3.20
3.30
4.10
3.30
9.10
9.10
9.10
4.30
7.70
2.60
4.70
7.60
8.20
3.60
16.30
18.30
2.30
4.60
7.80
10.80
7.60
3.30
8.45
15.90
7.50
13.10
12.70
11.70
10.70
9.30
9.80
9.90
9.80
8.60
6.00
6.00

3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17

18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7

15
15
15
15
15
15
15
15
18.5
18.5
18.5
15
15
15
15
15
15
15
15
15
15
15
18.5
18.5
18.5
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15

18.5
15
19
19
19
18.5
19
19
15
15
15
19
18.5
19
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19
18.5
18.5
19
19
19
18.5
18.5
18.5
18.5
19

19
19
19
18.5
18.5
19
19
18.5
19
19
19
18.5
19
18.5
18.5
18.5
18.5
18.5
19
19
18.5
18.5
19.5
18.5
19.5
19.5
19.5
18.5
19.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5

18.5
18.5
23
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
24
24

23
18.5
23
18.5
18.5
18.5
19
19
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
21.3
19.5
23.5
19.5
19.5
19.5
19.5
19.5
19.5
21.3
21.3
19.5
19.5
19.5
19.5
24
24

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.30
0.50
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.30

Cutterhead Intervention
CHI1
46+635.000 GVI
CHI2
46+380.000 GV90
CHI3
46+276.000 GV120
CHI4
46+132.000 GV120
CHI5
46+035.000 GV120
CHI6
46+005.000 GV120
CHI7
45+980.000 S-1
CHI8
45+870.000 GV90

104.000
104.000
105.400
104.300
102.900
103.300
103.300
104.500

82.300
74.600
72.200
68.700
68.100
68.600
69.200
72.200

FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL

E
E
E
E
E
E
E
E

F1
F2
GVI
GVI
F2
F2
F1
F2

F2
GVI
GVI
GV70
GVI
GVI
GVI
GVI

GVI
GV90
GV120
GV120
GV90
GV90
GV90
GV90

GVI
GV90
GV120
GV120
GV120
GV120
S-1
GV90

3.20
3.21
3.00
3.00
2.00
2.51
2.50
4.20

1.90
5.10
3.21
1.70
3.91
4.50
5.00
3.60

3.11
2.90
10.00
9.30
6.50
5.50
3.00
3.90

5.60
5.30
10.00
8.45
5.00
5.80
8.20
6.10

3.20
8.20
2.30
8.45
12.70
11.70
10.70
9.80

3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17

18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7

15
15
15
15
15
15
15
15

19
18.5
18.5
18.5
18.5
18.5
19
18.5

18.5
18.5
18.5
19.5
18.5
18.5
18.5
18.5

18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5

18.5
19.5
19.5
19.5
19.5
19.5
21.3
19.5

0
0
0
0
0
0
0
0

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

MasterGTInfo-C918_Expo

MasterGTInfo-C918_Expo
Page 19

Geoconsult Asia Singapore

Page 1

Project - Contract C918 Expo Bound (TKK To BTN)


INPUT PARAMETERS - TUNNEL GEOMETRY AND GROUND PROPERTIES
Tunnel Geometry
D
cor
D rel

[m]
[%]

6.60
60%

[m]

4.17

P
Lscrew

[m]

0.89

[m]

na

[kPa]

20.00

Overall factor of safety

q
FS tot

[-]

1.20

(applied to driving forces in force equilibrium)

Air pressure FOS

FS air

[-]

1.00

(normally use 1.0 - especially in shallow ground order to avoid air blow-out)

cu

[-]

1.00

(applied to strength parameter, cu)

[-]

1.00

(applied to strength parameter, phi)

Minimim tail void grout pressure

ptv

[kPa]

350

Minimum nominal face pressure

Flagfpmin

[-]

fpmin

[%]

30%

pair-0

[kPa]

80

10

Fill
F1
F2
E
GVI
GV L
GV
GIV
GIII
GII
GV50
GV70
GV90
GV120
GV150
GVI50

c'
[kPa]
0.00
0.00
0.00
0.00
3.00
4.00
4.00
50.00
300.00
500.00
4.00
4.00
4.00
4.00
4.00
3.00

f
[deg]
30.00
29.00
24.00
22.00
30.00
31.00
31.00
40.00
45.00
50.00
31.00
31.00
31.00
31.00
31.00
30.00

g
[kN/m3]
18.70
19.00
18.50
15.00
18.50
19.50
19.50
23.00
23.00
24.00
19.50
19.50
19.50
19.50
19.50
18.50

cu
[kPa]
20.00
0.00
21.00
10.00
90.00
200.00
200.00
250.00
0.00
0.00
200.00
200.00
200.00
200.00
200.00
90.00

K0
[-]
0.50
0.50
0.75
0.75
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50

E
[MPa]
7.00
13.00
5.50
1.70
37.00
60.00
90.00
300.00
3000.00
6000.00
50.00
70.00
90.00
120.00
150.00
50.00

N-1
N-2
N-3
N-4
N-5

4.00
50.00
3.00
3.00
3.00

31.00
40.00
30.00
30.00
30.00

21.30
23.50
18.50
18.50
18.50

0.00
0.00
0.00
0.00
0.00

0.50
0.50
0.50
0.50
0.50

588.50
3369.20
43.40
37.00
37.00

S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8

4.00
4.00
300.00
4.00
3.00
3.00
3.00
3.00

31.00
31.00
45.00
31.00
30.00
30.00
30.00
30.00

21.30
23.50
21.30
19.00
18.50
18.50
18.50
18.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.50
0.50
0.30
0.50
0.50
0.50
0.50
0.50

1433.10
1024.60
1476.90
62.40
43.00
3923.10
47.60
37.00

TBM diameter
Cutterhead opening ratio
Relevant face diameter
Length of TBM cutter head
Length of screw conveyor
Surcharge

Soil material, partial strength factor

Nominal intial compressed air pressure

Design Parameters
x

Soil / Rock Type

C918-TBM-Face Press_Expo Bound

(percent of area covered by cutting wheel)

(Yes or any other input is No)


(percentage of full porewater pressure at tunnel level)
(compressed air pressure to be applied initially for cutterhead intervention, applies only if free aire intervention is possible)

Input

Page 20

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

Appendix

Appendix 3: Recommended Face Pressure Values

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 21

Geoconsult Asia Singapore

Page 1

Summary of Recommended Values


Project - Contract C918 Bukit Panjang Bound(TKK To BTN)
45+809.88
1

1.4
5

1.2
8

Geotechnical Unit
No.

Applicable Chainage

Segment Rings

11

12

13

TARGET
Face Pressure
at AXIS
[kPa]

Total
Octaeder stress
at AXIS
[kPa]

Tail Void Grout


Grouting
Pressure
[kPa]

CALCULATED

just above
CROWN

just below
CROWN

at
AXIS

Face
Pressure
at AXIS
[kPa]

14

80%
15

110
16

Compressed

RECOMMENDED

MINIMUM

Hydrostatic

MAXIMUM

air
Intervention
Scenario
[kPa]

INITIAL Compr.
Air Pressure
for Intervention
[kPa]

INITIAL Compr.
Air Pressure
for Intervention
[kPa]

Groundwater
Pressure
at AXIS
[kPa]

Face Pressure
at AXIS
[kPa]
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
330
330
330
330
330
330
330
330
330
330
330
300
300
300
300
250
250
250

17

from

to

from

to

38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16b
16a
16
15
14
13
12
11
10
9
8b
8a
8
7
6
5
4
3
2
1

45+810
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46+300
46+325
46+329
46+341
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+525
46+535
46+541
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+727

45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46+300
46+325
46+329
46+341
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+525
46+535
46+541
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+727
x

0
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
371
380
386
404
422
439
457
475
493
511
518
522
529
547
564
582
600
618
636
655

11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
386
404
422
404
422
439
457
475
493
511
529
547
564
547
564
582
600
618
636
655
x

GII
GV
GV70
GV70
GV70
GV70
GV150
GV120
GV120
GV70
GIII
GIII
GV120
GV70
GV150
GV150
GIII
GVI
GVI
GV120
GV120
GV120
GV120
GV120
GV90
GV50
GV50
GV50
GV50
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GIII

GII
GV70
GV70
GV70
GV150
GV150
N-1
GV120
GV120
GV70
GIII
GIII
GIV
GV120
GV150
GV150
GIII
GIII
GIII
GV120
GV120
GV120
GV120
GV120
GV90
GV70
GV50
GV50
GV50
GVI
GVI
GVI
GVI
GVI
GVI
N-3
N-3
N-3
N-3
GVI
GIII
GIII

GII
GV70
GV70
GV70
GV150
GV150
N-1
GV150
GV150
GV150
GIII
GIII
GIV
GV120
GV150
GV150
GIII
GIII
GIII
GV120
GV120
GV120
GV120
GV120
GV90
GV70
GV70
GV50
GV50
GVI
GVI
GVI
GVI
GVI
GV70
GV70
N-3
N-3
GV70
GVI
GIII
GIII

94
93
250
259
268
97
93
259
263
98
97
97
104
283
284
105
105
99
97
265
256
249
246
249
237
234
229
222
218
218
213
200
197
200
197
195
189
184
176
172
56
54

330
330
330
330
330
330
320
320
350
350
350
350
350
350
350
350
350
350
350
320
320
300
300
300
300
300
280
280
280
260
260
240
240
240
240
240
220
220
220
200
200
200

495
509
504
525
538
532
514
520
504
534
504
522
522
570
572
576
555
513
504
528
511
497
460
497
477
469
458
443
433
418
410
383
351
383
382
376
361
349
337
324
294
292

350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
366 - 500
367 - 500
367 - 500
370 - 500
370 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500

Pressure -->
Pressure -->
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Pressure -->
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
Pressure -->
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
Free air possible
Pressure -->
Pressure -->
Pressure -->

110
110
248
259
260
110
110
254
260
110
110
110
110
277
277
110
110
110
110
253
246
241
241
241
234
229
223
216
210
205
198
186
186
186
186
181
174
169
162
157
110
110

110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
67
65

312
311
310
323
325
323
309
317
325
326
324
325
345
346
346
349
349
329
323
316
308
301
301
301
293
286
279
270
263
256
248
232
232
232
232
226
218
211
203
196
188
180

11

12

13

14

15

16

17

NOTE 4)

NOTE 5)

NOTE 6)

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\[C918-TBM-Face Press_B.Panjang Bound_RevB.xls]Table
NOTES:
NOTE 1)
NOTE 2)
NOTE 3)
1) These pressure values are orientated on the calculated pressures and represent the recommended range.
2) Beyond this pressure level, there is a risk of heaving the ground surface; (1+2+3)/3
3) Recommended tail void pressure range. Actual minimum pressure is defined by method statement. Actual maximum pressure is defined by segmental lining design.
4) Recommended compressed air pressure required at the beginning of cutterhead intervention. If the ground is found stable after visual inspection at each step, the pressure can be dropped in steps to atmospheric.
5) Calculated minimum compressed air pressure for intial entry. During the air pressure reduction procesdure, face stability should be verified insitu at this pressure level.

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Table

07/08/2012

Page 22

Geoconsult Asia Singapore

Page 2

Project - Contract C918 Bukit Panjang Bound(TKK To BTN)


Recommended Slurry Pressure Range
400

DTSS

350
Cluny
Court

CCL

300

Vl= 1.0% at
Shop Houses

PRESSURE [kPa]

250

200

150

100

50
Verification Monitoring for CCL
46+010 and 45+935

0
46+800

46+700

46+600

46+500

46+400

46+300

CALCULATED Face Pressure at AXIS


MINIMUM Face Pressure at AXIS
RECOMMENDED TARGET Face Pressure at AXIS
Hydrostatic Groundwater Pressure at AXIS
CALCULATED Face Pressure at AXIS
RECOMMENDED INITIAL Compr. Air Pressure for Intervention
TARGET Face Pressure at AXIS
MINIMUM INITIAL Compr. Air Pressure forRECOMMENDED
Intervention

MINIMUM INITIAL Compr. Air Pressure for Intervention

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Table

46+200

46+100

46+000

45+900

45+800

45+700

CHAINAGE
Hydrostatic Groundwater Pressure at AXIS
RECOMMENDED INITIAL Compr. Air Pressure for Intervention
MAXIMUM Face Pressure at AXIS

07/08/2012

Page 23

Geoconsult Asia Singapore

Page 1

Summary of Recommended Values


Project - Contract C918 Expo Bound (TKK To BTN)
45+809.88
1

1.4
5

Geotechnical Unit

38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9b
9a
9
8
7
6
5
4
3
2
1

from
45+810
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46 300
46+300
46+325
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+511
46+524
46+525
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+736

to
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46+300
46 325
46+325
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+511
46+524
46+525
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+736
x

from
0
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
386
404
422
439
457
475
493
501
510
511
529
547
564
582
600
618
636
661

to
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
386
404
422
439
457
475
493
501
510
511
529
547
564
582
600
618
636
661
x

GII
GII
GV50
GV90
GV90
GV90
GV90
GV90
GV90
GV90
GV120
GV90
GV120
GV120
GV120
GV120
GV120
GV50
GV120
GV90
GVI
GVI
GV90
GV90
GV50
GV50
GV70
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GIII
S-6
GVI

GII
GII
GV50
GV90
GV90
GV90
S-1
S-1
GV120
GV120
GV120
GV120
GV120
GV120
S-2
GV120
S-3
GV150
GV120
GV90
GV50
GV50
GV90
GV90
GV90
GV90
GV90
GV70
GV70
GVI
GVI
GVI
S-4
S-4
S-5
GVI
S-5
GIII
S-6
GIII

GII
GII
GV50
GV90
GV120
GV120
S-1
S-1
GV120
GV120
GV120
GV120
GV120
GV150
S-2
GV150
S-3
GV150
GV120
GV90
GV50
GV50
GV90
GV90
GV90
GV90
GV90
GV70
GV70
GV50
GV50
GV50
GV70
GV70
S-5
GV50
GV50
GIII
GII
GIII

Applicable Chainage

Segment Rings

12

13

TARGET
Face Pressure
at AXIS
[kPa]
330
330
330
330
330
340
340
340
340
340
350
350
350
350
340
340
340
340
340
320
320
300
300
280
280
280
270
270
270
270
270
270
240
240
240
240
210
210
210
210

Total
Octaeder stress
at AXIS
[kPa]
478
475
514
513
517
547
472
487
493
498
504
518
519
515
516
494
450
483
479
465
443
422
412
405
402
383
427
406
402
366
392
392
376
371
361
344
328
312
271
274

Tail Void Grout


Grouting
Pressure
[kPa]
350 - 500
350 - 500
350 - 500
350 - 500
355 - 500
350 - 500
350 - 500
355 - 500
356 - 500
360 - 500
369 - 500
367 - 500
364 - 500
358 - 500
351 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500

11

12

13

CALCULATED
Face
Pressure
at AXIS
[kPa]
90
89
256
256
258
271
96
98
275
279
282
287
289
103
101
99
97
273
269
261
251
241
234
233
233
223
214
203
202
202
202
202
191
190
190
181
172
58
52
52

No.

11

just above
CROWN

just below
CROWN

at
AXIS

14

Compressed

RECOMMENDED

MINIMUM

Hydrostatic

MAXIMUM

air
Intervention
Scenario
[kPa]
As recommended
As recommended
Free air possible
Free air possible
Free air possible
Free air possible
As recommended
As recommended
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
As recommended
Free air possible
As recommended
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
As recommended
Free air possible
Free air possible
As recommended
As recommended
As recommended

INITIAL Compr.
Air Pressure
for Intervention
[kPa]
110
110
250
248
251
267
110
110
267
268
271
278
277
110
110
110
110
259
260
255
243
234
231
225
222
214
210
202
198
192
190
190
182
178
174
163
158
110
110
110

INITIAL Compr.
Air Pressure
for Intervention
[kPa]
108
107
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
70
62
62

Groundwater
Pressure
at AXIS
[kPa]
300
297
312
310
314
334
320
328
334
335
339
348
346
343
337
330
322
324
325
319
304
292
289
281
277
267
262
252
247
241
237
237
227
222
217
204
197
192
175
175

Face Pressure
at AXIS
[kPa]
370
370
370
370
380
380
380
380
380
380
380
380
380
380
380
380
380
380
370
370
370
370
370
370
330
330
330
330
330
330
330
330
330
300
300
300
240
240
240
240

14

15

16

17

NOTE 5)

NOTE 6)

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\[C918-TBM-Face Press_Expo Bound RevB.xls]Table
NOTES:
NOTE 2)
NOTE 3)
NOTE 4)
1) These pressure values are orientated on the calculated pressures and represent the recommended range.
2) Beyond this pressure level, there is a risk of heaving the ground surface; (1+2+3)/3
3) Recommended tail void pressure range. Actual minimum pressure is defined by method statement. Actual maximum pressure is defined by segmental lining design.
4) Recommended compressed air pressure required at the beginning of cutterhead intervention. If the ground is found stable after visual inspection at each step, the pressure can be dropped in steps to atmospheric.
5) Calculated minimum compressed air pressure for intial entry. During the air pressure reduction procesdure, face stability should be verified insitu at this pressure level.
6) This column is provided for information. Recommended face pressure values for TBM operation are provided in Column with Note 1).

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Table

1.2
110
16

80%
15

17

07/08/2012
Page 24

Geoconsult Asia Singapore

Page 2

Project - Contract C918 Expo Bound (TKK To BTN)


Recommended Slurry Pressure Range
400

DTSS

350

Cluny

CCL

300

PRESSURE [kPa]

250

Shop Houses

200

150

100

50
Verification Monitoring for CCL
46+010 and 49+935

0
46+800

46+700

46+600

46+500

46+400

46+300

46+200

46+100

46+000

45+900

45+800

45+700

CHAINAGE
CALCULATED Face Pressure at AXIS
RECOMMENDED TARGET Face Pressure at AXIS
MINIMUM INITIAL Compr. Air Pressure for Intervention

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Table

Hydrostatic Groundwater Pressure at AXIS


RECOMMENDED INITIAL Compr. Air Pressure for Intervention
MAXIMUM Face Pressure at AXIS

07/08/2012
Page 25

DOWNTOWN LINE 2 CONTRACT C918

Revision B

Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation

Appendix

Appendix 4: Cutter Head Intervention


- Planned stoppage location
- Selected analysis results

Job No. S4922

Geoconsult Asia Singapore

01/08/2012

Page 26

Geoconsult Asia Singapore

Page 1

Summary of Recommended Values - Cutterhead Interventions


Project - Contract C918 Bukit Panjang Bound(TKK To BTN)
45+809.88
1

1.4
3

Geotechnical Unit

Cutter Head Intervention

Segment
No.

Applicable Chainage

Ring

80%
9

1.2
110
10

just above
CROWN

just below
CROWN

at
AXIS

at
INVERT

CHI-1
CHI-2
CHI-3
CHI-4
CHI-5
CHI-6
CHI-7

from
46+636
46+430
46+341
46+280
46+131
46+020
45+870

approx.
590
443
380
336
229
150
43

GVI
GV70
GV120
GV70
GV70
GV120
GV90

GV50
GV70
GV120
GV90
GV120
GV120
GV90

GV50
GV70
GV90
GV150
GIII
GV150
GV90

GV70
GV70
GV120
GV150
GIII
GV150
GV90

Intervention
Scenario
[kPa]
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
Free air possible

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\[C918-TBM-Face Press_Expo Bound RevB.xls]Table
NOTE 1)
NOTES:
1) Indicates whether as per design free air intervention is principally considered possible
2) If free air intervention is principlally possible, this is the minimum air pressure to be applied intially at the beginning of a cutterhead intervention
3) If flowing conditions occur, the air pressure shall be increased to the recommended face slurry pressure

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Interv-Table

11

Hydrostatic

RECOMMENDED

MINIMUM

Groundwater

INITIAL Compr.
Air Pressure
[kPa]
166
215
241
254
110
262
253

INITIAL Compr.
Air Pressure
[kPa]
110
110
110
110
0
110
110

Pressure
at AXIS
[kPa]
208
269
301
318
343
327
316

10

11

NOTE 2)

NOTE 3)

07/08/2012
Page 27

Geoconsult Asia Singapore

Page 2

Project - Contract C918 Bukit Panjang Bound(TKK To BTN)


Recommended Compressed Air Pressure Range for Interventions
400
350
300

PRESSURE [kPa]

250
200
150
100
50
0
46+721

46+615

46+508

46+401

46+295

46+188

46+081

45+975

45+868

45+761

CHAINAGE
RECOMMENDED INITIAL RECOMMENDED
Compr. Air Pressure
INITIAL Compr. Air Pressure
MINIMUM INITIAL Compr. Air Pressure
Hydrostatic Hydrostatic Pressure at AXIS

MINIMUM INITIAL Compr. Air Pressure

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Interv-Table

Hydrostatic Hydrostatic Pressure at AXIS

07/08/2012
Page 28

Geoconsult Asia Singapore

Page 1

Summary of Recommended Values - Cutterhead Interventions


Project - Contract C918 Expo Bound (TKK To BTN)
45+809.88
1

1.4
3

Geotechnical Unit
Applicable

Segment

No.

Chainage

Ring

CHI-1
CHI-2
CHI-3
CHI-4
CHI-5
CHI-6
CHI-7
CHI-8

approximately
46+635
46+380
46+276
46+132
46+035
46+005
45+980
45+870

80%
9

1.2
110
10

Cutter Head Intervention

just above
CROWN

just below
CROWN

at
AXIS

at
INVERT

approx.
589
407
333
230
161
139
122
43

GVI
GV90
GV120
GV120
GV90
GV90
GV90
GV90

GVI
GV90
GV120
GV120
GV120
GV120
S-1
GV90

GVI
GV70
GV120
GV120
GV120
GV120
GV120
GV120

GV50
GV90
GV120
GV120
GIII
GIII
GIII
GIII

Intervention
Scenario
[kPa]
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\[C918-TBM-Face Press_Expo Bound RevB.xls]Table
NOTE 1)
NOTES:
1) Indicates whether as per design free air intervention is principally considered possible
2) If free air intervention is principlally possible, this is the minimum air pressure to be applied intially at the beginning of a cutterhead intervention
3) If flowing conditions occur, the air pressure shall be increased to the recommended face slurry pressure

C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Interv-Table

11

Hydrostatic

RECOMMENDED

MINIMUM

Groundwater

INITIAL Compr.
Air Pressure
[kPa]
163
225
255
274
110
110
110
110

INITIAL Compr.
Air Pressure
[kPa]
110
110
110
110
0
0
0
0

Pressure
at AXIS
[kPa]
204
281
319
343
335
334
328
310

10

11

NOTE 2)

NOTE 3)

07/08/2012
Page 29

Geoconsult Asia Singapore

Page 2

Project - Contract C918 Expo Bound (TKK To BTN)


Recommended Compressed Air Pressure Range for Interventions
400
350
300

PRESSURE [kPa]

250
200
150
100
50
0
46+721

46+615

46+508

46+401

46+295

46+188

46+081

45+975

45+868

45+761

CHAINAGE
RECOMMENDED
INITIAL Compr.
Air Compr.
Pressure
RECOMMENDED
INITIAL
Air Pressure
MINIMUM INITIAL Compr. Air Pressure
Hydrostatic Hydrostatic Pressure at AXIS

MINIMUM INITIAL Compr. Air Pressure