FACULTAD: INGENIERIA
CARRERA: INGENIERIA INDUSTRIAL
INGENIERIA DE METODOS I
INFORME FINAL
Junio - 2013
Company brick ceramic Cajamarca, remains leader in the market of the branch
brikes in virtue of his long experience you have earned recognition at the regional
level. Our company has been working hard to develop growth strategies both
production capacity and the market expansion and diversification of new product
lines for the production sector. Being the only company brick industrial
Cajamarquina in the brick making King Kong, pastry chef, tambourine and ceiling.
The factory has 12 workers for full-time and 5 part-time. Also has machines like
backhoe, kneading, extruder, cutter mill, wagons, and 3 oven semi - industrial to
optimize the time in the manufacture of bricks.
Extruder machine responsible for the action of pressing, molding and forming a
raw material, which by continuous flow, pressure or thrust, pretends it to be a
mold charge give the desired form
Caoln Arcilla blanca muy pura usada principalmente para la fabricacin de objetos de porcelana, en
la industria del papel.
Kaolin very pure white clay, mainly used for the manufacture of porcelain, in the
paper industry
Viruta Tira delgada y enrollada que sale de la madera o de otro material al pulirlo o rebajarlo con
algn instrumento cortante
Chip thin and rolled strip coming out of wood or other material to polishing it or
lower it with some sharp instrument
Calderas Recipiente metlico de grandes dimensiones que, completado con algunos accesorios
(quemador, condensador, precalentador, etc.), sirve para la produccin de vapor.
I.
Introduccin.
1.1
1.2
Se decidi trabajar con la empresa CECAJ, ya que esta se encuentra ubicada en una
zona rural de Cajamarca, asumiendo que carecen de informacin, adems de no contar
con las mejores condiciones de trabajo y medias de seguridad para su personal.
(LOCKYER, 2001)Para reducir los accidentes es necesario eliminar los riesgos con un
buen diseo y una distribucin apropiada, capacitar al personal para que trabaje sin
correr riesgos. La seguridad en el trabajo; al igual que la calidad del producto; es ante
todo un estado de nimo; si se considera al accidente como una anormalidad y se
analizan y eliminan sus causas, as como analizan y eliminan las causas de la mala
calidad, entonces mejorara la calidad en general: la seguridad, como la calidad, es
asunto de todos.
Nuestro aporte concurrir con mtodos que ayuden a mejorar su produccin, reducir
sus costos y tiempos, evitar prdidas de produccin y contribuir a la mejora de calidad
y seguridad industrial (prevencin de riegos).
(Criollo, 2003)Como no pueden mejorarse al mismo tiempo todos los aspectos de
trabajo de una empresa, la primera cuestin que debe resolverse es con qu criterio
debe seleccionarse el trabajo que se quiere mejorar.
Desde el punto de vista econmico: se debe dar preferencia a los trabajos cuyo valor
represente un alto porcentaje del costo del producto terminado
Desde el punto de vista funcional del trabajo: se deben seleccionar los trabajos que
constituyen cuellos de botella y retrasan el resto de la produccin, y los trabajos clave de
cuya ejecucin dependen otros.
Se opt aplicar los conocimientos adquiridos para contribuir con esta mejora que
refiere al incremento de su produccin con la obtencin de mayores utilidades y
reduccin de costos.
Objetivos.
Generales:
Incorporar mtodos de mejora continua que permita a la empresa contribuir al
incremento de su produccin mediante reduccin de tiempos y costos.
Especficos:
II.
Material y mtodos
2.1 LNEA DE PRODUCCIN
M.P
P.T
E 1: MEZCLADO
MOLDEADO
E 5: ESTRUJADO Y
E 6: CORTADO
E 3: MOLINO
E 4: AMASADO
E 7: SECADO
E 8: QUEMADO
1333.20
40.00
1500.00
Agua (Cisterna)
Trabajadores
120.00
7 sin planilla x 700.00sol/mes
3 en planilla x
1200.00 sol /mes
Total
1lote= 70 TN
4900.00
3600
11,493.2 Soles
1 LADRILLO = 3KG
Produccin
min
h
lad
P h=
=139
min
1 lote
1 TN
3 KG
hora
10080
/
Pdia =
139 lad 8 h
lad
=1112
1 hora dia
dia
Psem=
1112lad 5 dias
lad
=5560
dia
sem
sem
Pmes=
=22240
sem
mes
mes
Pao =
22240lad 12meses
lad
=266880
mes
ao
ao
2.2.2 Productividad
22240 lad
mes
1.93lad
Pk=
=
11493.2 sol
sol
mes
m. o=
22240 lad
lad
=2224
10 operarios
operario
P
TN
lad
mes =278 TN
P
80
f =
50 millares
=0.63 63
80 TN
E
Interpretacin:
En el proceso de producir ladrillos tipo King Kong popular, hay un
aprovechamiento de un 63% de materia prima y un desperdicio o
merma de 37%
650 soles
x 1 millar /1000 lad
1millar
=1.25
11493.2 soles
E
Interpretacin:
Por cada sol invertido hay una ganancia de 0.25 cntimos
10
11
2.5 ACTIVID
ADES
PRODUCTIVAS E IMPRODUCTIVAS:
|
Operacin
Inspeccin
Operacin-Inspeccin
Transporte
Almacn
Demora
Cantida
d
6
2
2
4
1
2
Tiempo
9830
4
10380
8
0
8
20230min/lo
te
12
9830+4 +10380
20214
AP=
=0.999
20230
20230
99.9%
AI =
8+0+ 8
16
AI =
=0.0008
20230
20230
0.1%
Del 100% de las actividades el 1 % son improductivas, lo cual es
desperdicio o merma.
2.6 MQUINAS - HOMBRES:
2.6.1
Mquinas
Retroexcavadora
Molino Amasador
Extrusor
Cortador
Carretas
Alimentadora
Triturador Molido
3Hornos semi-industriales
2.6.2 Hombres
La empresa cuentas con 10 Obreros tiempo completo.
13
14
8+5
8+0.5
N=1.53 2
c N 1=
k 1 ( L+m ) +k 2 ( N 1 ) ( L+m)
N1
c N 1=
c N 1=910
cN =
k 1 ( L+m ) +k 2 ( N ) (L+m)
N
cN =
c N =650
c N +1= [ k 1+ k 2 ( N +1 ) ] (L+w)
c N +1= [ 40+30 ( 2+1 ) ] (8+0.5)
c N +1=1105
k1: 40
k2: 30
15
Espalda
Brazos
Piernas
Carga
Espalda
Brazos
Piernas
Carga
16
correctiva:
Se
requieren
AMASADO
Espalda
Brazos
Piernas
Carga
Categora de riego: 2
Espalda
Brazos
Piernas
Carga
17
Espalda
Brazos
Piernas
Carga
18
Espalda
Brazos
Piernas
Carga
Categora de riego: 2
Efectos sobre el sistema musculo esqueltico: Postura con
posibilidades de causar dao en el sistema musculo esqueltico.
Accin correctiva: Se requieren acciones correctivas en un futuro
cercano
DESCARGA DE LADRILLOS
Espalda
Brazos
Piernas
Carga
19
20
21
General
E1
0.35
E2
0.17
E3
7
E4
8
E5
8
E6
8
E7
150
E8
169
SEGN TABLA
E1
84
E2
150
E3
10
E4
10
E5
10
E6
10
E7
3
E8
3
Red Productiva
P.T
M.P
4200
Cuello de
botella
22
TIEMPO MUERTO:
K (ESTACIONES) : 6 t = (420-30) + (420- 20) + (420 - 360) + (420 - 420) + (420 - 360) + (420 300)
C: 420 min/Lot
t = 1030 min
EFICIENCIA EN LNEAL:
E=((30*1)+(20*1)+(360*1)+(420*1)+(360*1)+(300*1))/
(6*420)
E = 59 %
BALANCE DE LNEA:
Preal =
La produccin actual ser de 2 lotes por mes
C=
480 min/da
2 Lot /da = 240 min/Lot
480 min/da
420 min/ Lot
= 1.14 Lot/da
23
E3
E1
E5
E6
E5
E6
E2
E3
30'
E4
20'
180
E4
210
180
150
min/Lot
Cuello de
botella
TIEMPO MUERTO:
K (ESTACIONES) : 6
C: 210min/Lot
EFICIENCIA EN LNEA:
E=((30*1)+(20*1)+(180*2)+(210*2)+(180*2)+(150*2))/(10*210)
E
= 71%
24
Iluminacin adecuada
nivel de ruido muy agudo
trabajo muy tedioso
lo realiza encorvado
el peso es menos de20 libras
0.01
0.05
0.05
0.02
0.02
0.15
25
REA DE AMASADO
Por medio de la faja n 2 llega a esta rea el material triturado y listo para ser amasado,
tenemos:
Amasadora (se mezcla todo el material con agua, con distintas velocidades, esto
depender
del
tipo
fabricar.).
Faja n 3
De
aqu pasa:
REA
DE
de
ladrillo
EXTRUSADO
producto
REA DE SECADO
Este proceso tambin llamado
canteado, el cual
dura
secadores.
semanas,
existen
26
REA DE QUEMADO
En esta rea se realiza el quemado del ladrillo, donde se ubican 3 hornos semiindustriales, en cada horno se puede quemar de 60-61 paquetes de ladrillo.
27
III. Resultado.
Produccion
Ladrillos
Hora
139
Dia
1112
Semana
5560
Mes
22240
Ao
266880
Productividad
Capital
1.93 lad/sol
2224
Mano Obra lad/operario
Materia
Prima
278 lad/tn
Eficiencia
Fisica
63%
Economica
1.25
Actividadades
Productivas e
Improductivas
Tecnicas Cuantitativas
99.902
N
Productivas
%
Cn-1
910
Improductivas
0.10%
Cn
650
Cn+1
1105
Estudio de Tiempos
Tiempo
Promedio
42.01
Tiempo
204.23
Normal
8
Numero de
Observaciones
E1
E2
84
150
28
E3
E4
E5
E6
E7
E8
10
10
10
10
3
3
Tiempo Estndar
Ts
240.28
IV. Discusin.
Cecaj debera tener en cuenta el orden (CRIOLLO, 2007, pg. 24) El orden favorece la
productividad y ayuda a reducir el nmero de accidentes. si en los pasadizos hay pilas
de materiales y otros estorbos se pierde tiempo apartndolos para trasladar cargas de
un lado a otro de las maquinas o locales. En las fbricas que producen operaciones en
serie estas pueden ser interrumpidas varias horas si los materiales estn esparcidos o
en desorden.
Tener material desparramado, productos semiacavados amontonados en los pisos y
bancos de muchas empresas representan dinero parado que bien podra utilizarse para
reducir costos y aumentar la productividad.
Desde un punto de vista sistmico se sabe que para que una empresa trabaje bien,
todas sus reas y su persona, sin importar sus jerarquas, deben funcionar
adecuadamente, pues la productividad es el punto final del esfuerzo y combinacin de
todos los recursos humanos, materiales y financieros que integran una empresa.
Tal como dice (CRIOLLO, 2007, pg. 19) La eficacia implica la obtencin de los
resultados deseados y puede ser un reflejo de cantidades, calidad percibida o ambos.
La eficiencia se logra cuando se obtienen resultados deseados con el mnimo de
insumos, es decir, se genera cantidad y calidad y se incrementa la productividad. De
ello se desprende que la eficacia es hacer lo correcto y la eficiencia es hacer las cosas
correctamente con el mnimo de recursos.
Los diagramas de flujo serian una fuente de apoyo para poder detectar el cuello de
botella (Boero, 2009, pg. 71) Estos diagramas aportan un medio para asegurar que se
entiendan todas las etapas del proceso y sus relaciones con la etapa siguiente.
Constituye un dibujo que describe el proceso como una serie de actividades, cada una
de las cuales est vinculada con la siguiente. La causa del problema puede radicar en
cualquier o en varias actividades asociadas al proceso. Es fundamental conocer las
interacciones de las actividades antes de buscar causa posible del problema.
29
30
31
VI. Agradecimiento
Agradecemos a Dios, por brindarnos la dicha de la salud.
A nuestros padres, como agradecimiento a su esfuerzo, amor y apoyo incondicional,
durante nuestra formacin tanto personal como profesional.
A nuestra docente Katty Vigo Alva, por brindarnos su gua y sabidura en el desarrollo de
este trabajo.