Sample Paper 2 version 3.

0 (Nov 05 Manual)
Document Control Information
Document Details
Document Name:

Sample Paper 2 version 3.0 (Nov 05 Manual)

Purpose of Document:

Sample foundation paper for prospective


PRINCE2 Foundation candidates

Document Version Number:

3.0

Document Status:

Live

Document Owner:

Nicola Kelly

Prepared by:

Colin Bentley

Date of first draft:

Nov 2005

Date Approved:

01/01/2006

Approved by:

Colin Bentley

Next Scheduled review date:

TBC

Version History
Version
Number:

Date
Approved:

Change / Reasons for change / Comments:

3.0

01/01/2006

Que
s
t
i
on20a
me
nde
dt
or
e
move
dr
a
f
t

.
Que
s
t
i
on70a
me
nde
dt
or
e
a
d
s
e
ve
ndi
vi
s
i
ons
a
ndnot
s
i
x
.Al
lboxe
sr
e
move
dne
xtt
oa
ns
we
r
s
to bring format in line with live papers.
Document also brought in line with APMG
document management system.

Name
All

Title / Company
Public document

Distribution List
Version
All

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 0
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

The Foundation Examination


Sample Foundation Examination Paper 2
(4th Edition, 2nd impression (Nov 2005) of the PRINCE2 manual)

Multiple Choice
1 hour paper

Instructions

1.

All 75 questions should be attempted.

2.

There are no trick questions.

3.

All answers are to be marked on the original examination paper.

4.

Please use a pen to mark your answers with either a or X. There is only one
correct answer per question, unless more than one is specified for that
question.

5.

You have 1 hour for this paper.

6.

You must get 38 or more correct to pass.

Candidate Number:

........................................

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 1
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

1.

Which role from the following list does PRINCE2 say cannot be delegated?
a)
b)
c)
d)

2.

New versions of the Project Plan are produced at the end of each stage to reflect
updated information. Identify which option is FALSE.
a)
b)
c)
d)

3.

The Project Plan


The Project Approach
The Project Brief
The Project Quality Plan

Apa
r
tf
r
om
I
ni
t
i
a
t
i
ngaPr
oj
e
c
t
i
nwhi
c
hpr
oc
e
s
si
st
heBus
i
ne
s
sCa
s
eupda
t
e
d?
a)
b)
c)
d)

5.

Progress already made


Benefits already achieved
Any agreed changes in circumstances
Any revised forecast of cost

Thede
c
i
s
i
ononwhe
t
he
rapr
oj
e
c
t

ss
ol
ut
i
on will be contracted to third parties
is made in which product?
a)
b)
c)
d)

4.

Team Manager
Project Assurance
Project Board Member
Project Support

Managing Product Delivery


Controlling a Stage
Managing Stage Boundaries
Authorising a Stage

What does PRINCE2 suggest may assist in the ultimate acceptance of the project?
a)
b)
c)
d)

Identifying Risks associated with a plan


Agreeing the Quality Criteria for a product with the Customer
Establishing tolerance levels
Follow-on Action Recommendations

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 2
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

6.

Which individual role is ultimately accountable for the project?


a)
b)
c)
d)

7.

Project Manager
Senior Supplier
Executive
Senior User

Who is responsible for the project producing a result that is capable of achieving the
benefits defined in the Business Case?
a)
b)
c)
d)

8.

The Executive
The Project Manager
The Senior User
The entire Project Board

In which document does PRINCE2 look for the identification of the Chairman of a
Quality Review?
a)
b)
c)
d)

Project Plan
Stage Quality Plan
Project Quality Plan
Project Initiation Document

Whi
c
hoft
hef
ol
l
owi
ngqua
l
i
t
yme
a
s
ur
e
si
sc
ove
r
e
di
nt
hepr
oc
e
s
s
I
ni
t
i
a
t
i
nga
Pr
oj
e
c
t
(
I
P)
?

9.

a)
b)
c)
d)
10.

How quality will be achieved


When each product will be tested
By whom each product will be tested
Options A, B and C

In terms of configuration management what are described as the assets of a project?


a)
b)
c)
d)

The resources
The plans
The products
The business benefits

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 3
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

11.

Which of the following products is NOT created during the PRINCE2


process model?
a)
b)
c)
d)

12.

Project Brief
Project Mandate
Project Initiation Document
Project Plan

Whi
c
hs
t
a
t
e
me
nti
sNOTaf
unda
me
nt
a
lpr
i
nc
i
pl
eof
Cl
os
i
ngaPr
oj
e
c
t

?
a) A clear end to a project provides a useful opportunity to take stock of
achievements and experience
b) A clear end to a project provides an opportunity to ensure that all
unachieved goals and objectives are identified
c) A clear end to a project provides the opportunity to evaluate
achievement of all the expected benefits
d) A clear end to a project is always more successful than the natural
tendency to drift into use and subsequent modification of the product

13.

In which process are checks made for changes to the project management team?
a)
b)
c)
d)

14.

What provision in Planning can be made for implementing Requests for Change?
a)
b)
c)
d)

15.

Starting up a Project
Managing Stage Boundaries
Closing a Project
Directing a Project

Project and Stage Tolerances


A Change Budget
Contingency Plans
Adding a contingency margin to estimates

Which option is NOT part of the Project Initiation Document?


a)
b)
c)
d)

Project Mandate
Initial Business Case
Project Quality Plan
Communication Plan

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 4
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

16.

On behalf of whom do any appointed assurance jobs assure the project?


a)
b)
c)
d)

17.

Project Manager
Corporate Management
Project Executive
One or more members of the Project Board

Which statement most accurately reflects the reason for an Exception Assessment in
PRINCE2?
a) For the Project Manager to present an Exception Plan to the Project
Board
b) The Project Manager delivers a progress report to the Project Board as a
confidence boost
c) The Project Board meets to consider an Exception Report
d) The Project Manager reviews and revises the Risk Log with those with
assurance roles

18.

If a product is to be changed, what else must also pass through change control?
a)
b)
c)
d)

19.

Aspa
r
tof
As
s
e
s
s
i
ngPr
og
r
e
s
s
t
hePr
oj
e
c
tMa
na
g
e
rl
ooksa
tChe
c
kpoi
ntRe
por
t
s
,
Work Packages status and what other product?
a)
b)
c)
d)

20.

Stage Quality Plan


Product Breakdown Structure
Product Description
Quality Log

Highlight Reports
The Quality Log
The Business Case
Project Initiation Document

What document is input to the Project Board with a request to authorise the project?
a)
b)
c)
d)

The Project Brief


The Project Mandate
The Project Initiation Document
An Implementation Plan

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 5
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

21.

What is the first task in product-based planning?


a)
b)
c)
d)

22.

Which one of these is NOT a Project Issue?


a)
b)
c)
d)

23.

Project Assurance
Reviewer
Project Support
The Review Chairman

What does PRINCE2 say must drive the project?


a)
b)
c)
d)

25.

Annotation of minor errors on a Quality Review product


Request to change the specification of requirements
Suggestion to improve a project product
Record of some current or forecast failure to meet a requirement

Which role is suggested might act as Scribe to a Quality Review?


a)
b)
c)
d)

24.

Creating a Product Checklist


Creating a Product Description for the final product
Creating a Product Flow Diagram
Creating a Product Breakdown Structure

The Project Mandate


The Project Initiation Document
The Project Brief
The Business Case

Which phrase applies to the user representative in a PRINCE2 project management


team?
a) They will be impacted by the outcome
b) May need to use both in-house and external teams to construct the final
outcome
c) Representation from the business viewpoint
d) Will provide the funding

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 6
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

26.

Which process covers overall direction and decision-making of the project?


a)
b)
c)
d)

27.

Managing Product Delivery


Controlling a Stage
Directing a Project
Managing Stage Boundaries

What is the fundamental principle behind the process

Ma
na
g
i
ngPr
oduc
tDe
l
i
ve
r
y

?
a) A controlled break between Project Manager and product
creation/provision by third party suppliers
b) Before a Work Package is allocated to the team, there should be
agreement with the Project Manager on what is to be delivered
c) Whatever the type of project, the actual task of creating the required
products needs to be managed
d) Work only commences and continues with the consent of the Project
Manager

28.

The Product-based Planning technique is recommended for which plans?


a)
b)
c)
d)

29.

The use of which of these roles is OPTIONAL?


a)
b)
c)
d)

30.

Stage Plans only


Project and Stage Plans only
All levels of plan
All levels of plan except the Exception Plan

Executive
Project Manager
Senior User
Team Manager

Which of the following statements is FALSE?


a) The two standard elements to tolerance are time and cost
b) Tolerance is the permissible deviation from plan without bringing the
deviation to the attention of the next higher authority.
c) Separate tolerance figures should be given for time and cost.
d) The Project Board has absolute discretion to set new tolerances at
Project and Stage Plan levels whenever it wishes to whatever levels it
wishes.

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 7
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

31.

In which lower level process of Controlling a Stage is a Stage Plan updated with
actuals?
a)
b)
c)
d)

32.

Which process produces operational and maintenance acceptance of products?


a)
b)
c)
d)

33.

The Team Manager


Those with assurance responsibilities
The Author
The Project Board

Which report does the Project Manager receive on a regular basis?


a)
b)
c)
d)

35.

Managing Stage Boundaries


Managing Product Delivery
Closing a Project
Controlling a Stage

Who does PRINCE2 say may re-evaluate the priority of an issue after impact analysis?
a)
b)
c)
d)

34.

Assessing Progress
Reviewing Stage Status
Planning a Stage
Reporting Highlights

Highlight Report
Checkpoint Report
Issue Report
Exception Report

I
nPRI
NCE2a
l
lpot
e
nt
i
a
lc
ha
ng
e
sa
r
ede
a
l
twi
t
ha
s?
a)
b)
c)
d)

Requests For Change


Off-Specifications
Configuration Items
Project Issues

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 8
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

36.

Given that producing a Product Breakdown Structure and a Product Flow


Diagram are two of the steps of product-based planning, which is another?
a)
b)
c)
d)

37.

In preparing for a Quality Review, who should distribute a copy of the product
and Product Description to the reviewers?
a)
b)
c)
d)

38.

Highlight Reports
Plans
The control points
End Stage Assessments

Which PRINCE2 technique helps to ensure that all personnel affected by a product
ha
vet
hes
a
meunde
r
s
t
a
ndi
ngoft
hepr
oduc
t

spur
pos
e
?
a)
b)
c)
d)

40.

The Project Manager


the Scribe
the Team Manager
the Producer

Wha
ta
r
ede
s
c
r
i
be
da
s
t
heba
c
kboneoft
hema
na
g
e
me
nti
nf
or
ma
t
i
on
system requiredf
ora
nypr
oj
e
c
t

?
a)
b)
c)
d)

39.

Identifying activities and dependencies


Writing Product Descriptions
Scheduling
Defining and analysing products

Quality Review
Configuration Management
Product-based Planning
Change Control

If there were a need to know what the precise content of an old version of a
product was, what part of PRINCE2 would most help us?
a)
b)
c)
d)

The Stage Plan


The Issue Log
Configuration Management
Work Package Authorisations

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 9
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

41.

The initial Project Plan is based on the Project Brief, the Project Quality Plan
and which other product?
a)
b)
c)
d)

42.

The Project Approach


The Project Initiation Document
The project start-up notification
The Project Mandate

What is a concession?
a) A contract to a third party
b) An error found in a Quality Review which is not corrected
c) An Off-Specification accepted by the Project Board without corrective
action
d) An allowance above and beyond tolerance levels

43.

Are the majority ofPRI


NCE2c
ont
r
ol
sde
s
c
r
i
be
da
s
?
a)
b)
c)
d)

44.

Which product does PRINCE2 suggest should include the budget and
schedule impact of changes?
a)
b)
c)
d)

45.

Event-driven
Time-driven
Ad hoc
Technique-based

Checkpoint Report
Exception Report
Highlight Report
Lessons Learned Report

What time-dr
i
ve
nc
ont
r
ola
s
c
e
r
t
a
i
nst
hes
t
a
t
usoft
e
a
m me
mbe
r
s
wor
k?
a)
b)
c)
d)

Highlight Report
Checkpoint Report
Exception Report
End Stage Report

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 10
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

46.

What plan identifies quality responsibilities for the project?


a)
b)
c)
d)

47.

In which process does the Project Manager ask the Project Board where the authority
for making change lies?
a)
b)
c)
d)

48.

Lessons Learned Log


Business Case
Risk Log
Stage Plan

Closure of the project can only be authorised in which of these processes?


a)
b)
c)
d)

50.

During Starting Up A Project


During Initiating a Project
In Giving Ad Hoc Direction
When Authorising a Stage

Apart from the Issue Log, what else is updated by the lower level process

Exa
mi
ni
ngPr
oj
e
c
tI
s
s
ue
s

?
a)
b)
c)
d)

49.

The Project Plan


a Stage Quality Plan
the Project Quality Plan
a Team Plan

Initiating a Project
Closing a Project
Managing Stage Boundaries
Directing a Project

Which report assesses what management processes worked well and what went badly?
a)
b)
c)
d)

Follow-on Action Recommendations


End Stage Report
Business Case review
Lessons Learned Report

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 11
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

51.

What does PRINCE2 suggest is a direct input to the Project Quality Plan?
a)
b)
c)
d)

52.

What name is given to the review that checks that the configuration management
process is being done to a standard?
a)
b)
c)
d)

53.

The Customer
The User
Configuration Librarian
The Project Board

In the suggested filing system, where is the Risk Log kept?


a)
b)
c)
d)

55.

Product Status Account


Configuration audit
Quality Review
Quality Assurance

Who might receive completed products before the Team Manager reports
that the Work Package has been completed?
a)
b)
c)
d)

54.

ISO 9001
Stage Quality Plan
The supplier quality policy
Customer Quality Expectations

Quality File
Project File
Each Stage File
Specialist File

For a Quality Review, when are suitable reviewers selected?


a)
b)
c)
d)

When the product is passed to Configuration Management


In the Project Quality Plan
During the QR Preparation step
In planning the relevant stage

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 12
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

56.

Which of these is NOT a specific objective of an end stage assessment?


a)
b)
c)
d)

57.

Defining the stages of a project is fundamentally a process of balancing a number of


parameters. Which one of the following is NOT one of the parameters
a)
b)
c)
d)

58.

Capturing Project Issues


Assessing Progress
Examining Project Issues
Reporting Highlights

Whi
c
hs
t
e
pi
sNOTpa
r
tof
Ac
c
e
pt
i
ngaWor
kPa
c
ka
g
e

?
a)
b)
c)
d)

60.

The availability of the project board for progress meetings


How far ahead in the project it is sensible to plan
Where the key decision points need to be on the project
Too many small stages versus too few big ones

In which sub-pr
oc
e
s
sof
Cont
r
ol
l
i
ngaSt
a
g
e
i
st
heRi
s
kLogupda
t
e
d?
a)
b)
c)
d)

59.

Perform a risk analysis and management review of the project


Revise the Project Mandate
Review the tolerances set for the next Stage
Review the next Stage Plan against the Project Plan

Understand the reporting requirements


Agree tolerance margins for the Work Package
Monitor and control the risks associated with the Work Package
Produce a Team Plan which shows that the Work Package can be
completed within the constraints

The configuration of the final deliverable of the project is a)


b)
c)
d)

The single end product


The interim products
Its product description
The sum total of its products

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 13
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

61.

In the PRINCE2 document management structure, how many major types of file are
recommended?
a)
b)
c)
d)

62.

When is a Project Quality Plan created?


a)
b)
c)
d)

63.

Controls
Configuration Management
Quality in a Project Environment
Change Control

When should an initial examination of a Project Issue be performed?


a)
b)
c)
d)

65.

In 'Starting up a Project'
During Initiation
As part of 'Managing Stage Boundaries'
As part of the Project Mandate

The following appears on the cover sheet of a PID: 'Version 1. 3 Draft'. Which
Component of PRINCE2 would be responsible for this entry?
a)
b)
c)
d)

64.

Three plans, risk and quality


Three project, stage and quality
Just the Quality File
One per Project Issue

As soon as it is logged
On a weekly basis
At the next execution of the sub-process, Reviewing Stage Status
At end stage assessment

In addition to the normal steps of a Quality Review an e


xt
r
aone
,
Qua
l
i
t
yRe
vi
e
w
Pl
a
nni
ng
i
sr
e
c
omme
nde
d.I
nwhi
c
hpr
oc
e
s
sdoe
sPRI
NCE2s
ug
g
e
s
tt
ha
tt
hi
ss
t
e
p
should be done?
a)
b)
c)
d)

Planning
Starting up a Project
Initiating a Project
Controlling a Stage

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 14
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

66.

Qua
l
i
t
yma
na
g
e
me
nti
s
a)
b)
c)
d)

67.

What should be reviewed as part of preparing a Work Package?


a)
b)
c)
d)

68.

The Issue Log


The appropriate Product Descriptions
Project Board Authorisation to Proceed
Timesheets

The person operating the configuration management method is called


a)
b)
c)
d)

69.

The means of ensuring that products meet the quality criteria


The establishment of the objectives and requirements for quality
The creation and maintenance of a quality system
The process of ensuring that the quality expected by the customer is
achieved

Configuration Librarian
Configuration Auditor
Product Assurance
Version Controller

Which of the following statements is FALSE? Project Managers using


PRI
NCE2a
r
ee
nc
our
a
g
e
dt
o
a) Establish terms of reference as a prerequisite to the start of the project
b) Use a defined structure for delegation, authority and communication
c) Ensure resource commitment from management is part of any
approval to proceed
d) Provide brief reports to management at regular meetings

70.

TheQua
l
i
t
yFi
l
eha
ss
e
ve
ndi
vi
s
i
ons
.Fi
veoft
he
s
ea
r
ef
orc
us
t
ome
r

squa
l
i
t
y
expectations, Project Quality Plan, Configuration Management Plan, Configuration
Item Records and Quality inspection records. What is the sixth?
a)
b)
c)
d)

Off-Specifications
Specialist Products
Acceptance Criteria
Stage Quality Plans

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 15
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd

71.

Which process covers the work required of people who may not be using
PRINCE2?
a)
b)
c)
d)

72.

It would be chaotic to have the people who are working on the project starting
activities whenever they think fit. What product does PRINCE2 use to control this?
a)
b)
c)
d)

73.

Quality Review
Checkpoint Report
Highlight Report
End Stage Report

What environment does PRINCE2 assume?


a)
b)
c)
d)

75.

Project Issue
Work Package
Checkpoint Report
Risk Log

Wha
te
l
e
me
ntofPRI
NCE2pr
ovi
de
s
a
nobj
e
c
t
i
veme
a
s
ur
e
me
ntf
or
ma
na
g
e
me
ntpr
og
r
e
s
sc
ont
r
ol

?
a)
b)
c)
d)

74.

Managing Stage Boundaries


Starting up a Project
Directing a Project
Managing Product Delivery

A fixed-price contract
A Customer/Supplier environment
A specialist environment
A third-party environment

The Project Board has three responsibilities towards the Management of Risk. Which
of the following options is the FALSE one?
a) Notifying the Project Manager of any external risk exposure to the
project
b) Ensuring that risks are identified, recorded and regularly reviewed
c) Making decisions on recommended reactions to risk
d) Striking a balance between level of risk and potential benefits

Sample Paper 2 version 3.0 (Nov 05 Manual).doc


Version 3.0 (Status Live)
Page 16
Document Owner Nicola Kelly
The APM Group Ltd 2006. This document is not to be re-produced or re-sold without express permission from The APM Group Ltd