Base Year
Current Total Population
Adopted Growth rate
Domestic Water Demand
Other Uses of Water:
Commerce and Industry
Institutions
Fire Services
Horticulture
Total Other Uses

vi

Allowance for:

2008
106469
4
50
20
20
5
5
50

Backwashing of Treatment Facilities

Flushing of Sludge in Sedimentation


Tank

c Laboratory Works (Chemical Mixing etc)

vii

d
Total Allowance =

Staff Quarters Use etc.


10

Adopted Operation Hour

20

Population Estimation
Population Figure at 4% annual
growth rate

Year
a
b
c
d
e
f

2008
2010
2015
2020
2025
2030

106469
115157
140106
170460
207391
252323

viii
a
b
Total =

Total Water Demand:


4.16
0.42
4.58

mgd
mgd
mgd

ix
a

Scheme Design:
Intake Works
Raw Water Draft

1040.83
0.289

Detention Time in well =

103.67
0.15

Storage in Well

156.12

Adopted Height of Water in Well

4.5

Are of Well

34.69

No of Chambers

Area of each Chamber

8.67

Width of Chamber
Length of Chamber

2
4.34

Chamber Dimensions
Length

4.5

Breath
Assumed Freeboard
Adopted Height

2
0.5
5

Raw Water Mains:


Capacity
Diameter of Mains

V
C wh

Area of Mains

0.20

Length of Mains
Velocity of Flow
Hazen Williams Constant
Head Loss (Hi)

1840
0.53
140
0.4970

Total Head Loss in mains line

0.91

Raw Water Pumps


No of Pumps

Potential Head at Treatment Works

96.55

Potential Head at Intake Works


Static Head Difference (SHD)
Fittings Losses

50.96
45.59
10
4.559
51.06

1.852

6.819

0.104
500
0.5

.D 1.167

Total D Head (TDH)


Pump Min. Specification
No of Duty
No of Standby

3
1

Capacity of Each

346.94
0.096

Min. Allowable Head


Assumed Pump Efficiency

96.37
51.06
0.70

Acc. Due to Gravity (g)

9.81

Density of liquid ()

1.00

Pump Power Consumption

68.97

Pump Power Consumption


Generator Power Rating

92.49
0.80
344.8326875851

Conversion Factor to Horse Power (Divide by)

Genset Power Rating


ii Aerators
Type of Aerator
No. of Aerator

Spray Aerators
2

Capacity of each

0.14

Assumed Diameter of Riser Pipe

350
0.35

V
6.819
C wh

1.852

.D 1.167

Area of Mains

0.10

Length of Mains
Velocity of Flow
Hazen Williams Constant
Head Loss (Hi)

5
1.50
140
5.2278

Total Head Loss in mains line

0.03

Header Pipe
No of Header Pipe

2.00

Flow Through each

0.07

Assumed Diameter of Riser Pipe

250
0.25
Area of Mains

0.05

Length of Mains
Velocity of Flow
Hazen Williams Constant
Head Loss (Hi)

5
1.47
140
7.4576

V
6.819
C wh

Total Head Loss in mains line

0.04

Laterals
No of Laterals

5.00

Flow Through each

0.01

1.852

.D 1.167

Assumed Diameter of Riser Pipe

V
6.819
C wh

100
0.1
Area of Mains

0.01

Length of Mains
Velocity of Flow
Hazen Williams Constant
Head Loss (Hi)

4
1.84
140
32.8451

Total Head Loss in mains line

0.13

Nozzles
Lateral Length
Spacing of Laterals
No of Nozzles

4.00
0.25
32.00

Flow / Nozzle

0.00

1.852

.D 1.167

1.63
Flash Mixer Design
No of Flash Mixer

Capacity of each Chamber

520.4159478638

Assumed Detention Time

Volume

8.67

Assumed Depth

1.5

Area

5.7823994207

Length
Width

4.7
4.3

Area

20.21

Flocculators
Number of Flocculators
Assumed Detention Time

2
15

Capacity of each Chamber

520.4159478638

Volume

130.10

Assumed Tank Height

4.5

Area

28.9119971035

Length
Width

4.7
4.7

Area

22.09

Sedimentation Tank Design


No of Sedimat

Capacity of Each Chamber

260.2079739319

Assumed Detention Time

Volume

780.62

Assumed Depth of Tank

3.3

Surface Area

236.5527035744

Length
Breath

18.3
6.5

Area

118.95

Surface Loading (overflow Rate)

2.1875407645

Rapid Sand Filter


No of Beds

Assumed filtration rate

Area of Filter
Area of Each Bed
Adopted Length
Adopted Width

115.6479884142
57.8239942071
9.1
7

Area of Bed

63.7

Assumed Depth of Sand

80

Underdrainage System:
Total Area of Holes =
Assumption
Area of Lateral =
Area of Manifold
So, area of Manifold =

0.2 to 0.5% of Bed Area


0.25
2 (Area of Holes of Lateral)
2 (Area of Laterals)
4 (Area of Holes)

Area of Holes =

0.15925

Area of Manifold =

0.637

Diameter of Manifold =

0.90
90.0
30
30.3333333333

Assume c/c of Lateral (Btw 15 and 30) =


Total Number (Length/c/c of Lateral) =
Length of lateral ((Width of Bed/no of beds) - (Diameter of Manifold/no of
Beds) =
CS area of Lateral (2 x area of perforation per Lateral)
Take dia of holes

4.0997980251

12
0.012
1.2

Total Area of Holes =

0.15925

Number of Holes
Adopt

1407.5126262626
1410

Number of Holes/ Lateral

17.625

Area of Perforations/lateral

1994.1428571429

Spacing of Holes = (Length of Lateral/Number of Laterals)

0.2326126539
23.2612653908

CS area of Lateral

39.8828571429

Diamter of Lateral =
Check: Length of Lateral < 60 d =

7.1246052522
427.4763151334
4.2747631513
50
0.5

Rising Washwater Velocity in Bed =


Washwater discharge/bed=

0.5308333333

Velocity of Flow through Lateral


Manifold Velocity =

1.6637265086
1.3309812069

WashWater Gutter
Discharge of Washwater/ bed

0.5308333333

Size of Bed:
Length
Width
Assume 3 troughs running lengthwise at =

9.1
7
2.3333333333

Discharge of each trough = (Q/3)

0.1769444444

Q=
Assume b =
h=
Free Board =
Adopted h =

1.71.b.h^(3/2)
0.3
0.6408330623
0.05
0.69

Clear Water Reservoir for Backwashing


For 4 Hour Filter Capacity,

Capacity of Tank =

4586.4

Assume Depth =

Surface Area =

1146.6

B=
L=
Diameter of Inlet Pipe coming from two filter
Velocity =
Diameter of washwater pipe to overhead tank

23.9436839271
47.8873678542
150
< 0.6m/s
67.5

Air Compressor unit

For

Air required =

10.6166666667

Rapid Pressure Filter Design:


Scheme Capacity =

2
9092

Total Scheme Capacity =


At 22hrs operation,
Scheme Capacity =

9092

Flow Rate =
At 24hrs operation,
Scheme Capacity =

413.27
413.27
114.80
378.83

Flow Rate =

378.83
105.23

Allow for 10% for other Uses =

909.2

Total Scheme Capacity =


At 22hrs operation,
Scheme Capacity =

10001.2

Flow Rate =

454.60
126.28

At 24hrs operation,
Scheme Capacity =

454.6

416.72

Flow Rate =

416.72
115.75

Filter Loading Rate =

10

With Combined sand & anthracite media


No of Filters =
2 Sets in Parallel/ Sed Tank
Area of each Filter =
Diameter of each filter =
Adopted Diameter =

45.46
2

Transfer Pumps
No of Duty pumps =
No of Standby =
Pump Rate =
Assumed Head =
Backwashing:
Backwashing Water rate =
Filter Surface Area =
Number of Filter(s) to be washed
Quantity of Water needed for Backwashing

22.73
5.38
5.00

2
1
227.3
63.14
10

37

Allowable Head

19.64
2
1453.57
403.77
10.00

Pump Efficiency

0.70

Motor Efficiency
Acc. Due to Gravity (g)

0.80
9.81

Density of liquid ()
Pump Power Consumption
Conversion Factor to Horse Power (Divide by)
Pump Power Consumption
Motor Power Rating

1.00
56.59
75.88
70.73

Backwash Tank:
Backwash Duration
Volume of Wastewater
Assumed Height
Area of Backwash Tank

10
242
2.5
97

Contractor's Specification
Tank Dimension:
Length
Breath
Height

5.7
5.7
2.5

Volume

81.2

Clear Water Tank:


Detention Time =

Genset Power Rating

Volume =

3122.4956871827

No of Tanks =

Capacity of each =

1561.2478435913

for efficient treatment works, the clear water tank should have a minimum storage of 3 hrs. this will allow for a timely warning to the communit
emergency situation at the plant.
Circular Ground Tank:
Heigth of Tank =

Surface Area of Tank =

173.4719826213

Diameter of Tank =
Adopted Diameter =
Free Board =
Total Height =

14.8587524152
15
0.6
9.6

Chemical Dosing:

%
Lpd
%
%
%
%
%

%
hrs

Domestic Demand

Per Capita Water Demand (Lpd)


50
50
50
50
50
50

m3/h
m3/s
L/s
h
m3
m
m2
m2
m
m

Other Uses Demand

Total Water Demand

m3/day

mgd

m3/day

mgd

m3/day

mgd

5323
5758
7005
8523
10370
12616

1.17
1.27
1.54
1.87
2.28
2.78

2662
2879
3503
4262
5185
6308

0.59
0.63
0.77
0.94
1.14
1.39

7985
8637
10508
12785
15554
18924

1.76
1.90
2.31
2.81
3.42
4.16

m
m
m

m3/s
mm
m
m2
m
m/s
Note: Decrease in the Constant will increase the Head Loss in mains
m/Km

Note: This is Determined From Spot heigths from Survey Report

m
m
% of SHD
m
m

m3/h
m3/s
L/s
m
(Adopt between 0.7 and 0.9)
m/s2
ton/m3
KW
745.7
HP
use 0.75 or 0.8 or 0.85
KW

Nos
m3/s
mm
m
m2
m
m/s
Note: Decrease in the Constant will increase the Head Loss in mains
m/Km

m3/s
mm
m
m2
m
m/s
Note: Decrease in the Constant will increase the Head Loss in mains
m/Km

m3/s
mm
m
m2
m
m/s
Note: Decrease in the Constant will increase the Head Loss in mains
m/Km

m
m
m3/s
m3/h

m3/h
mins

30 - 60
secs

m3
m
m2
m
m
m2

mins
m3/h
m3
m

Ok

m2
m
m
m2

Error!!!:
Redesign

m3/h
Hrs

3 - 4 hrs

m3

Note: Depth of Sedimat is 0.6 to 1.2m much than the depth of


flocculator

m2
m
m
m2

Error!!!:
Redsign

m/hr

Ok

m3/m2/h

Ok

m
m

Ok

m2

Ok

cm

m2
m2
m
cm
cm
on either side

Ok

mm
m
cm
m2
Numbers
Numbers
(Number of Holes /Depth of Sand Bed
mm2

Ok

m
cm
cm2
cm
cm
m
cm/min
m/min

Ok

m3/s
m/s
m/s

m3/s
m
m
m c/c
m3/s
m
m
m
m

m3
m
m2
m
m
mm
cm
air/min/m2
mins
m3/ of air

mgd
m3/day
m3/day
m3/hr
m3/h
L/s
m3/hr
m3/h
L/s
m3/day

Ok
Ok

m3/day
m3/hr
m3/h
L/s
m3/hr
m3/h
L/s
m3/m2/h

Ok

m2
m
m

m3/h
L/s
m

m3/m2/h
m2
m3/h
L/s
m
(Adopt between 0.7 and 0.9)
m/s2
Kg/m3
KW
745.7
HP
KW

mins
m3
m
m2

m
m
m

Ok

m3

Error!!!

Hrs
m3
m3

for a timely warning to the communities being served during any

m
m2
m
m
m
m

Chlorine
Dosing =
Normal
Water =

4.5 - 5 mg/L

Heavily
Polluted
Water =

10 mg/L

Alum
Dosing =

40 - 60 mg/L

Lime
Dosing =

45 mg/L