Project Deliverable 6 Final Project Plan

This assignment consists of three (4) sections: a written project plan, revised business
requirements document, project plan PowerPoint presentation, and a finalized project
plan. You must submit the four (4) sections as separate files for the completion of this
assignment. Label each file name according to the section of the assignment it is written
for. Additionally, you may create and / or assume all necessary assumptions needed for
the completion of this assignment.
While taking all business and project parameters into consideration, make quality
assumptions to support the following requirements.
Section 1: Written Project Plan
You are now in the final stage of the project plan development. All previous
documentation should be combined into one document that will serve as the statement
of work for the project. Your goal is to have the project approved by the executive team.
The project plan should be very detailed, which is designed to accomplish the
monumental task of implementation; however, the executive team is only interested in a
30-minute summation. Therefore, you also must create a compelling executive summary
that is supported by your detail that convinces the executive team that they should move
forward with your solution.
Develop a thirty to forty (30-40) page project plan in which you:
Write a five to ten (5-10) page executive summary that provides a high-level technical
overview of your project in which you:
Describe the scope of the project and control measures.
Describe the goals and objectives of the project.
Include a high-level overview of all project deliverables.
Give a detailed, realistically estimated cost analysis of the entire project, including
human capital.
Relate the value of the project plan solution to the competitive advantage that
information technology will afford your organization.
Recommend solution providers who can assist with development and implementation.
Combine all previous documentation for Project Deliverables 1-5 in which you:
Provide all aspects of the information technology implementation into the project plan.
Revise the documentation based on feedback from the earlier evaluation of your
deliverable.
Use at least five (5) quality resources in this assignment. Note: Wikipedia and similar
Websites do not qualify as quality resources.
Section 1 of this assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins
on all sides; citations and references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the students name, the
professors name, the course title, and the date. The cover page and the reference page
are not included in the required assignment page length.
Include charts or diagrams created in MS Visio or Dia as an appendix of the project plan.
All references to these diagrams must be included in the body of the project plan.

Section 2: Revised Business Requirements Document


Document all revisions made to the written project plan in the Document Control section
of the business requirements document from Project Deliverable 2: Business
Requirement. Note: This documentation must outline the revisions made to the previous
deliverables required in Section 1: Written Project Plan.
Section 3: Project Plan PowerPoint Presentation
Additional to your detailed executive summary you must present your findings to the
executive team and the venture capital group that along with the executive summary will
convince the group that your solution is optimal.
Create a ten to fifteen (10-15) slide PowerPoint presentation in which you:
Illustrate the concepts from your executive summary in Section 1 of this assignment.
Create bulleted speaking notes for your presentation to the executive board in the Notes
section of the PowerPoint. Note: You may create or assume any fictitious names, data,
or scenarios that have not been established in this assignment for a realistic flow of
communication.
Use a professional technically written style to graphically convey the information.
Section 4: Finalized Project Plan
Use Microsoft project to:
Finalize your project plan from Project Deliverable 5: Infrastructure and Security to
include all necessary changes in assumptions, tasks, and / or subtasks.
The specific course learning outcomes associated with this assignment are:
Develop information systems-related activities to maximize the business value within
and outside the organization.
Demonstrate an understanding of existing and emerging information technologies, the
functions of IS, and its impact on the organizational operations.
Evaluate the issues and challenges associated with information systems integration.
Use technology and information resources to research issues in information systems.
Write clearly and concisely about strategic issues and practices in the information
systems domain using proper writing mechanics and technical style conventions.

Table of Contents
1. Project Plan Overview
1.1 Background
1.2 Project Description
1.3 Goals and Objectives
1.4 Scope
1.5 Roles and Responsibilities
1.6 Constraints and Assumptions
1.7 Risks
1.8 Project Deliverables
2. Project Work Plan
2.1 Work Breakdown Structure
2.2 Staffing Plan
2.3 Project Schedule

2.4 Project Budget


3. Solution Provider
4. Database and Data warehousing
5. Infrastructure and Security
6. Appenidx

The Project Plan defines the following:

Background
Project Description
Business and project goals and objectives
Scope

Roles and responsibilities


Assumptions and constraints
Project budget
Project timeline
The conceptual design of new technology
1. Project Plan Overview
1.1 Background
Information is a significant component of any trusted business activity. Information is
useful across the entire organization for number of purposes and is stored in an
assortment of information systems. Modification to any of these information systems
must be firmly controlled and managed to evade those loss of important information that
cannot be recovered. System owners must lay strong emphasis on impacts and risks that
are mitigated due to implementation of change. Their emphasis must comprise of the
following areas:
Hardware and Technical configuration
Software and Application configuration
Security, Governance, policies, and procedures
Business benefits
Costs
End Users
Health, safety, and equality

The policies and procedures generally define the technique for managing all (software
and hardware) modifications made to the information systems and technical infrastructure
of an organization.
In a globalized market of today, companies are faced with challenges in each and every
step of their business. Our analytics and research services are geared towards giving those
companies that extra edge over the competition. We process and analyze terabytes of data
and break down all the fuzz and chatter around it to give our customers meaningful
insights about their competition and the market they are engaged in.

By leveraging our data collection, processing, and research and analytics expertise and by
focusing on operational excellence and an industry standard delivery model, we help the
leading companies making insightful business decisions.

A comprehensive portfolio of our services include, Market, Business and financial


research, Domain based analytics and Data processing services. Our industry wide focus
is into Banking, Finance, FMCG, Insurance, Retail and Manufacturing industries.

The project will make use of methodology which is designed to build, test and assess a
practical approach, constructing on existing tools.

1.2 Project Description


The Company has online database for processing data, messages, batch and manual data
input processing. It has two integrations: Vertical integration where processing of data is

done for office area (ERP) and Horizontal integration where archival of data of various
archival system takes place.
Databases include the open SQL database where process values, batch data and messages
are stored.

It provides client-server architecture for displaying data. Along with

displaying of data, user can also evaluate data, analysis data and generate reports

1.3 Goals and Objectives


The main goal of the Project Plan is to represent the complete detail needed to
successfully deploy and manage the project, make possible communication among
project stakeholders, and document describing approved schedule baselines. The project
plan is a living document and is likely to vary over time as more information regarding
project becomes available.
The project goal The project aims at upgrading the companys information system
infrastructure which provides data collection and analysis services.
Following are the goals and objectives of project:

The goal of this project is to support the vision, mission, and goals of organization,
helping people realize their visions through the use of information technology.

The project should help firm to achieve its goal of outstanding customer service.

The framework deliverable of project should avoid excess of detail to ensure mutual
understanding, adoption and flexibility.

The deliverables of the project should be implemented organization wide, providing


support to most of the assorted functional groups, customers and projects.

1.4 Scope
Applications - In order to achieve its goals, company uses following tools:
a) Data collection tools
b) Web Analytics tool
c) Resource tracking application
Information System specialist will be responsible for carrying out these tasks.
Sites - At offshore, data collection is being carried. Data processing and analysis is done
at onsite. Project managers at both sites will prepare the project plan for their respective
sites.
Process Re-engineering - IT Re-engineering implementation can be divided into three
phases: before the process is defined, during process designing and after the process is
designed. Re-engineering will include defining new business opportunities by re-defining
the processes, proficient database utilization and data mining. Information System
Specialist will be responsible for it.
Customization - Customizations will be limited to improvement of old hardware with
new infrastructure. Network engineer along with Information System Specialist will be
responsible for this task.
Interfaces - The companys IS has interfaces for evaluating data i.e. reports defined by
users with MS Office (Excel and Microsoft word), standard components of software like
Crystal reports and Business Objects. Licensed software will deal by the human resource
team.

Architecture Application and technical architecture will be designed once the


requirements are approved by the senior management.
Application architecture:

Technical architecture:

Conversion - Since company is not very old, so all of the online data will need to be
converted in new format as per the upgraded infrastructure.
Testing - It will include integration testing, load testing, tuning and network testing

Funding - It is limited to $1million


Training - It will be include sessions on using new hardwares, softwares, and
technologies. Functional lead will lay down the training plan.
Education - It will include Bachelors of Engineering and certification in information
systems.
1.5 Roles and Responsibilities
On studying the companys profile, it seems that company has following resources which
form the personnel of its information systems:
a. Chief Information Officer - It provides assistance to senior management on IT
related tasks.
b. Develop and maintain IT infrastructure.
c. Develop efficient design to implement operations of the company.
d. Information System specialist - It designs and administers infrastructure
development and support.
e. Database administration - Storing data and mining it for future goals of the
company.
f. Project Manager - He/ She will be responsible for managing the project issues.
g. System Analyst - He/ She analyzes the whole system and conduct technical
research. Also prepares documentation for future goals.
h. System Administrator - He or she will be responsible for resolving internal
network issues of the company.

Data collection
a) SP-based data - It is the data collected over network traffic. It provides data to
tool vendor. It does not collect secure data.
b) Panel based data - It collects internet user data.
c) Tool-monitoring data - It is installed at user end. Alexa is one of the examples in
this category.
d) Online monitoring data - Here user takes survey and provides data to company.

1.6. Constraints and Assumptions


The following assumptions have been identified:

Finance & Marketing activities for the training organization are out of scope of
this engagement.

100% funding has been from sponsors

Organization will allocate key project roles and sufficient budget for the
development and implementation of this project.

Efficient, ample, and proper levels of communication exist between the sponsor,
management, and the project team during all project phases.

The timeline is feasible and reasonable. The phased rollout provides support to
early achievement and sustained improvement. The project involves a detailed
implementation as modules are developed and implemented, followed by
continued competency and enhancements in the component areas.

Economic conditions like land & infrastructure prices are relatively stable

Availability of minimum skilled labor is there to start the project

Government Rules and Regulations would be stable.

Functional lead, technical lead, database administrator are already been recruited.

Signoff for the various project artifacts happen within 4 working days to ensure
the project is complete on time. And if there are any recommended changes in the
artifacts then those are been notified

The following constraints have been identified:

The upper limit for the expected budget should not be exceeded by 10%. In case
of overshooting of budget within 10% range, the additional capital will be raised
through loans or VC funding.

The upper limit for the expected time should not be exceeded by 60 days. The
assumptions of stable government policies, economic conditions may not hold
true after 60 days.

1.7 Risks
The following risks have been identified as possibly affecting the project during its progression:

#
1
2
3
4

#
1

Project Impact-Mitigation Plan


Risk Area
Economic Unmet budgetary constraints
Downturns Identify locations within companys location area which are cheap and
have less fluctuations
Technology Obsolete IT Infrastructure
Changes
Take correct sizing decisions by studying the market
Technology Increased Opportunity Cost
Changes
Need to purchase the right configuration at the right time, only
possible by a proper market study
Project
Milestones not achieved & Budget may be exceeded
Schedule Use another vendor and have constant follow-ups to decrease delay

Risk Area
Economic
Downturns

2 Technology

Risk

Probability**

Impact**

Probability*Impact

Fluctuating
real estate
prices
Hardware

Low

High

High

High

High

Critical

Changes

& Software
Upgrades
3 Technology Decreasing
Changes
IT Infra
Cost
4 Governme
Delay in
nt
Company
Processes
Registratio
n
5
Project
Vendors not
Schedule
meeting
deadlines

Med

High

High

High

Med

Medium

Low

High

High

These are some risks that can occur during all phases of development
SOFTWARE REQUIREMENT RISKS
Lack of analysis for change of requirements
Change extension of requirements
Lack of report for requirements Poor definition of requirements
Ambiguity of requirements Change of requirements
Inadequate of requirements Impossible requirements
Invalid requirements
SOFTWARE COST RISKS
Lack of good estimation in projects Unrealistic schedule
The hardware does not work well Human errors
Lack of testing and monitoring
Lack of monitoring
Complexity of architecture Large size of architecture
Extension of requirements change The tools does not work well
Personnel change Management change

Technology change Environment change


Lack of reassessment of management cycle
SOFTWARE SCHEDULING RISKS
Inadequate budget
Change of requirements
Extension of requirements change Human errors
Inadequate knowledge about tools
Inadequate knowledge about techniques
Long-term training for personnel
Lack of employment of manager experience
Lack of enough skill Lack of good estimation in projects
Lack of accurate system domain definition Lack of goals specification
Difficulty of implementation Disagreement between members
Lack of tools Shortage of personnel
Tools failure Technology change
Lack of agreement between
customer and developer
Slow management cycle
Supply budget in inappropriate time
Environment change
Lack of a good guideline

SOFTWARE QUALITY RISKS


Inadequate documentation Lack of project standard
Lack of design documentation Inadequate budget
Human errors Unrealistic schedule
Extension of requirements change
Poor definition of requirements
Lack of enough skill Lack of testing
Lack of good estimation in projects
Inadequate knowledge about techniques
Lack of employment of manager experience
Lack of accurate system
domain definition
The simulator is to be destroyed Lack of reassessment
Inadequate knowledge about programming language
Inadequate knowledge about tools
The hardware does not work well Lack of analysis for change of requirements
The tools do not work well Loss technical equipment
Lack of stability between personnel
Personnel change
Weakness of management Lack of commitment
Disagreement between members Ambiguity of requirements

Complexity of architecture Incomplete requirements


Lack of roles and responsibilities
Inadequate training of personnel
Management change Technology change
Lack of collaboration between developer
Environment change
Lack of a good guideline

SOFTWARE BUSINESS RISKS

The products that no one want them


The products that are not suitable with total strategy
The products that sellers do not know how to sell them
Failure in total budget
Failure in commitment
Failure in management because of change in different people

1.8 Project Deliverables


Following is a list of all deliverables:
Corporate Data Model
The corporate data model will describe the entire flow of information throughout the
system, i.e. how system works. This model will give us overall framework for how data
is collected, organized, managed and maintained within the system.

Software/Hardware
It is a predictable suite of hardware and software that will be required to successfully run
the information system.
Web-based Mapping
One of the major predictable component of IS will be a web based application, or some
sort of connectivity that makes this information system available over the web.
Connectivity with the server is required.
Standards/Procedures
Promoting standards will ensure reliability, consistency and quality of the information
system. Promoting procedures will also ensure a consistent approach.
Information Systems data maintenance and application development will reduce overall
costs in the long run.
Types of standards and procedures generally comprise of software standards, metadata
standards,

application

development

environment

standards

and

data

development/maintenance standards.
Application Development Capability
It will not be possible to fulfill all IS needs through commercial off-the-shelf(COTS)
applications; hence, it will be required to develop an application development
environment to tackle additional needs as new systems are developed and requirements
are updated.

2. Project Work Plans


2.1 Work Breakdown Structure
The work breakdown structure identifies the projects tasks to provide a framework for organizing and managing the work of the project.
Project
Management
Initiative

Initiate Project

Develop Project
Charter

Define Scope

Define
Requirements

Develop Work
Plan

Develop
Work
Breakdow
n

Define HighLevel Roles

Develop
Project
Staffing
Plan

Define HighLevel Budget

Develop
Project
Schedule

Identify HighLevel Control


Strategies

Develop
Project
Budget

Finalize Charter

Execute and
Control Project

Plan Project

Develop Project
Control Plan

Develop
Communicatio
n Plan

Develop
Quality
Management
Plan

Finalize Project
Plan and Gain
Approvals

Design the
Framework

Build the
Framework

Close the
Project

Test the
Framework

Define
stages
and
activities

Write the
content

Test
web tool
usability

Design
Content
formats

Review
content for
quality

Test
content
usability

Design
web
Delivery
Tool

Build web
tool
prototype

Adjust tool
and
content
based on
feedback

Implement the
Framework

Conduct
post
project
review

Move web
tool to
production
Celebrate
environment

Announce
Tool
availability

2.2 Staffing Plan


The principle of the staffing plan is to ensure that the project has adequate staff with the
proper skills and experience to make certain a successful project completion.

Role Requirements
The following table is a comprehensive breakdown of the roles needed to deploy the
project. It includes: the project role, skills required, the project responsibility of the role,
the estimated start date, number of staff needed to fulfill the role, and the anticipated
duration the staff resource will be required on the project.

Role

Project Responsibility

Skills Required

Number of
Staff Required

Project Team

System Analyst

To analyze requirements,
interaction with client and team

Good Communication
and Analytical Skills

Project Manager

Lead team, report status

Project Management

Core Team

Review deliverables, assure


quality

Project Management

Content Developer

Create framework content

Research and web writing


skills

Web Designer

Design web-based performance Web design, web writing


mgmt tool
skills

Web Developer

Build the web-based


Web development
performance management tool

DBA

Manage the Database,


Periodically Backups and
recovery

Database Design and


Handling

System Administrator

User and system administration


and managing security of system

Administration and
Management

Review Team

Evaluate deliverables, promote


use

Project Management
experience

20

Staff Assigned to Roles


The table given below is a comprehensive breakdown of the genuine staff assigned to the
project role, the quantity of Full Time Equivalent (FTE) desired for the role, the real FTE
acquired, labor rate and unit of labor rate for the resource and the source from which the
resource can be recruited.
Role

Name

Requested
FTE
FY12-13

Acquired
FTE
FY12-13

Rate

Rate
Unit

Source

Project Team

System
Analyst

Name1

Project
Manager

Name2 Project
Manager

Core Team

1.00

$85 hour System Analysing


Operations

1.00
1.00

1.00

Name3

.10

.10

$70 hour Network Services

Name4

.10

.10

$70 hour Enterprise Internet


Services

Name5

.10

.10

$70 hour Data Resource


Management
Technologies

Name6

.10

.10

$70 hour Data Resource


Management
Technologies

Name7

.90

.90

$70 hour Data Resource


Management
Technologies and Web

Web Designer Name8

.05

.05

$75 hour Academic Technology


Solutions

Web
Developer

Name9

.05

.00

$65 hour Academic Technology


Solutions

DBA

Name 10

1.00

1.00

Content
Developer

$85 hour Systems Engineering


Operations

$80 hour Data Management

Role

Name

System
Name 11
Administrator
Review Team

Total

Various
Project
Managers

Requested
FTE
FY12-13

1.00

Acquired
FTE
FY12-13

1.00

Rate

Rate
Unit

Source

$80 hour Network Management

.10

.10

5.5

5.45

$70 hour Manage and Review


Project

PROJECT ORGANIZATION CHART


The project organization chart is a graphical picture of the organization and reporting
relationships of the project.

Management
Organization
Office

Stakeholder
Round Table

Stakeholder
Operations
Directors

Project Sponsor
Name1 - Project
Sponsor/Analyst

Stakeholder
Tech
Directors

Project Manager
Name 2 - Project
Manager

Stakeholder
MTeam

Project Team

Core Team
Name 3: Network
Services

Name 4:

Enterprise
Internet
Services
Name5/Name6:
Resource
Management
Technologies

Content
Developer
Name7
Data Resource
Management
Technologies
and Web

Academic
Technology
Solutions
Web
Designer
Name8

Academic
Technology
Solutions
Web
Developer
Name9

Data
Management
DBA
Name 10

Network and
Security
Management
System
Administrator
Name 11

Manage
and
Review
Project
Reviewers

2.3 Project Schedule


The project schedule includes milestones, task dependencies, task duration, delivery dates, and
staff resources assigned to complete the tasks.

Project Management
Improvement Project Phase 1
1
1.1
1.1.1

Define Requirements

1.1.3

Identify High-Level Roles

1.1.4

Develop High-Level Budget

1.1.5

Identify High-Level Control


Strategies
Finalize Charter and Gain Approvals
Consolidate and Publish Project
Charter
Hold Review Meeting
Revise Project charter
Gain approvals

1.1.6.2
1.1.6.3
1.1.6.4

2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.2
2.2.1
2.2.2
2.3
3
3.1
3.1.1
3.1.2
3.1.3
3.2
3.2.1
3.2.2

Planned
Start
Date

Planned
End
Date

4.00

7/12/12

11/12/12

3.00

12/12/12

14/12/12

0.25

14/12/12

14/12/12

1.00

14/12/12

15/12/12

0.50
2.00

1512/12
16/12/12

15/12/12
17/12/12

Name1,2 - Project Manager,


System Analyst
Name1,2 - Project Manager,
System Analyst
Name1,2 - Project Manager,
System Analyst
Name1,2 - Project Manager,
System Analyst
Name1,2 - Project Manager,
System Analyst
Name1 - Project Manager

1.00
0.50
0.50
0.50

18/12/12
19/12/12
19/12/12
20/12/12

18/12/12
19/12/12
19/12/12
20/12/12

Name1 - Project Manager


Name1 - Project Manager
Name1 - Project Manager
Name1 - Project Manager

2.00
2.00
3.00
3.00

21/12/12
23/12/12
25/12/12
28/12/12/

22/12/12
24/12/12
27/12/12
31/12/12

Name1 - Project Manager


Name1 - Project Manager
Name1 - Project Manager
Name1 - Project Manager

1.50
1.50

1/1/13
2/1/13

2/1/13
3/1/13

Name1 - Project Manager


Name1 - Project Manager

5.00

4/1/13

6/1/13

Name1 - Project Manager

5.00
1.00
2.00

7/1/13
12/1/13
13/1/13

11/1/13
12/1/13
14/1/13

Name1 - Project Manager, core


team
Name7, Name6
Name8

5
3

15/1/13
20/1/13

19/1/13
22/1/13

Name7
Name1 - Project Manager, core

Initiate Project
Develop Project Charter
Define Scope

1.1.2

1.1.6
1.1.6.1

Effort
Estimate in
Days

Plan Project
Develop Work Plan
Develop Work Breakdown Structure
Develop Project Staffing Plan
Develop Project Schedule
Develop Project Budget
Develop Project Control Plan
Develop Communication Plan
Develop Quality Management Plan
Finalize Project Plan and Gain
Approvals
Execute and Control Project
Design Framework
Define framework stages and
activities
Design framework content formats
Design web framework delivery tool
Build the Framework
Write the framework content
Review framework content for

Resource

Project Management
Improvement Project Phase 1

3.2.3
3.3
3.3.1
3.3.2
3.3.3

3.4
3.4.1
3.4.2
4
4.1
4.2

quality
Build web tool prototype
Test the Framework
Test usability of web tool
Test usability of content
Adjust framework based on user
feedback
Implement Framework
Move framework to production
environment
Announce availability of framework
Close the Project
Conduct Post-Project Review

Effort
Estimate in
Days

Planned
Start
Date

Planned
End
Date

5.00

23/1/13

27/1/13

team, review team


Name9, web developer

2.00
1.00

28/1/13
30/1/13

29/1/13
30/1/13

core team, review team


core team, review team

1.00

31/1/13

31/1/13

Name7, Name8

1.00
0.50

1/2/13/
2/12/13

1/12/13
2/12/13

Name1 - Project Manager


Name1 - Project Manager

1.00

2/12/13

2/12/13

0.50

3/12/13/

3/12/13

Celebrate

Resource

Name1 - Project Manager, core


team, review team
Name1 - Project Manager, core
team, review team

2.4 Project Budget


The project budget describes cost and budget needed to complete the project tasks. It
may include cost and budget for ongoing support after project completion.

Budget during the life of the Project


The budget below describes the detailed estimates for material, labor and other items for
the entire project duration.

Line Item

FY12-13
Labor

Phase I
1. Initiate Project
1.1 Develop Project Charter
2. Plan the Project
2.1 Develop Work Plan
2.2 Develop Project Control Plan
2.3 Finalize Project Plan
3. Execute and Control Project
3.1 Design Framework
3.2 Build Framework
3.3 Test the Framework
3.4 Implement the Framework
4. Close the Project

Total Project Budget

Total
$172,100

FY12-13
Material

Other

FY Total

Labor

Material

Other

FY Total

$8,600

$0

$8,600

$0

$0

$0

$0

$15,000
$5,000

$0
0

$15,000
$5,000

2,000
$0

$0
$0

$0
$0

$2,000
$0

$5,000
$65,000
$30,000
$0
$0

$0
$0
$0
$0
$0

$2000
$0
$0
$0

$5,000
$67,000
$30,000
$0
$0

20,000
10,000
$4,500
$5,000

$0
$0
$0
$0

$0
$0
$0
$0

$20,000
$10,000
$4,500
$5,000

$128,600

$0

$2,000

$130,600

$41,500

$0

$0

$41,500

Comments: Other is the budget estimate for a training class: Effective Writing for the Web

3. Solution Provider
IBM - Smarter Analytics is one of the most renowned analytical tools available in the
market today. It is developed and maintained by IBM and also has proven track record in
the market. It is suitable for various types of industries and can integrate in nearly all
business operations.
Tools based on CMOS technology should be used, so that the data can be analyzed at a
faster rate. These tools are very compact in size.
The system can be integrated with cloud computing techniques. In this technique the data
is stored at a remote server which is managed by the third party service providers. So
there is no need to manage the data. It is the responsibility of the service providers. So it
helps in saving the cost. The charges are Pay per use. So there is no need to pay for the
complete service.

4. Database and Data Warehousing


In order to have a successful data warehouse design the IT management must closely
follow the development and implementation of every step along the way. The need for a
good data warehousing design is critical in the supporting the storage of enormous
amounts of data. The records of a database are specific data and references of every
individual transaction of any passing of data in the database system as a whole. This data
needs to be readably accessible at any time to be analyzed or used. In order to meet the
needs of the organization they data warehouse must be organized in a way that allows
rapid access to data for analysis and reporting.
Entity-Relationship (E-R): See Appendix A
Data Flow Diagram (DFD): See Appendix B

5. Infrastructure and Security

Classification of Data
Any companys user having authoritative access to data of the company may, modify
datas classification. The user may be in a position to change classification of data if there
are sufficient and justifiable reasons of doing so. Resources doing so will be held strictly
responsible for their changes. When a new data is created, it should be classified as
Company Only data till it user reclassifies it as per ones modifications. Users are held
strictly for any change in classification they do.
Classifications for existing company data are given below:

Companys business information (memos, financial documents, planning


documents etc) should be classified as "Company Only";

Companys customer data (contact details, contracts, billing information etc)


should be classified as "Company Only";

Network management data (IP addresses, passwords, configuration files, etc.)


should be classified as "Confidential";

Human resources information (employment contracts, salary information, etc.)


should be classified "Confidential";

Published information (pamphlets, performance reports, marketing material, etc.)


should be classified "Shared";

E-mail between Companys employees should be classified "Company Only";


and,

E-mail between Companys employees and non-Company employees should be


regarded as "Unclassified".

Classifications: Roles and Responsibilities

1. Responsibility of the user to:


o

Know ones own clearance level and to understand what are the rights
and limitations associated with that clearance

Ensure all the data ones going to work on is correctly classified;

Ensure one is familiar with the restrictions associated with the data
ones working on and

Ensure all the data one works with is protected properly.

2. Responsibility of all system owners and system administrators to:


o

Determine the security level for all users.

Proper verification of the equipment user is going to work with.

Installation of the equipment.

3. Responsibility of each divisional manager is:


o

Getting approval on clearance for employees.

Clarifying the classification of data on systems.

Clarifying the classification of equipment.

Understanding and implementing the policy.

4. Responsibility of the Security Officer to:

Compliance

approving all classifications

Maintaining a list of all classifications

Approving the final layout of the companys network.

controlling and managing all trusted points

1. Any unauthorized user accessing data, device, equipment or a location with


insufficient privileges can face disciplinary action.
2. Any user who is allowed to access a system that he/she controls on behalf of
someone else with insufficient clearance can face disciplinary action.
3. Any person who is trying to connect to an equipment for which one is not
classified to access the network with an inappropriate part of the network can
face disciplinary action,
4. Any person who is transmitting data over the network without specific
privileges can face disciplinary action.
IDAM can be implemented in the organization. IDAM stands for Identity and Access
Management. This is implemented mainly for increasing the security of the organization
and for the administration purpose. The routine work admin jobs can be easily managed
with this technology. Its main benefits are as discussed below:
1. Unique user-ids are provided to the employees of the company. It becomes easy to
manage the user identities across the organization.
2. The employees get the access to the resources based on their role in the
organization. This is an automated process, so there are no chances of any kind of
biasing or interference.
3. Common password is set for all the resources. So there is no need to remember
multiple passwords for different resources.
4. All the activities of the employees are logged into the log files. So the security is
increased. Things can be tracked when required.

Appendix

References:
1. Ferris, B. (n.d.). Why Do We Need a Project Schedule. Retrieved from
http://cobaltpm.com.
2. Haughey, D. (n.d.). Project Planning a Step by Step Guide. Retrieved from
http://www.projectsmart.co.uk/.
3. John Baker, A. E. (n.d.). Cost - Benefit analysis essential to IT projects . Retrieved
from http://www.gisdevelopment.net/.
4. rff.com. (n.d.). Gantt Charts and Project Schedules. Retrieved from
http://www.rff.com/ganttcharts.htm.
5. sei.cmu.edu. (n.d.). Cost Benefit Analysis Method. Retrieved from
http://www.sei.cmu.edu.

6. troym.hubpages.com. (n.d.). Need for Project Planning. Retrieved from


http://troym.hubpages.com.