Professional Documents
Culture Documents
ISSN-2347-4890
Volume 3 Issue 4 April, 2015
Abhijit Mandal
Asst. Prof., EEE department
DIMAT
Raipur, India
abhijitmandal1986@gmail.com
Abstract
I.
INTRODUCTION
Page 47
III.
PROPOSED METHOD
www.ijournals.in
Page 48
SIMULINK MODEL:
135
130
Voltage ( Volt )
125
120
115
110
105
100
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Time (Sec)
Current ( Amp )
3.5
3
2.5
2
1.5
1
0.5
0
0
VI.
500
1000
1500
2000
2500
Time (Sec)
3000
3500
4000
4500
5000
SIMULATION RESULT
500
1
0.9
0.8
400
Power ( Watt )
300
200
100
Efficiency
0.7
0.6
0.5
-100
0
0.4
0.3
500
1000
1500
2000
2500
Time (Sec)
3000
3500
4000
4500
5000
0.2
0.1
0
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Time (Sec)
PROPOSED METHOD
0.5
0.48
0.46
Duty cycle
0.44
Efficiency
MPPT WITH
BOOST
CONVERTER
(P&O Method)
0.9644
0.42
0.4
0.38
Current Output
2.46
Power Output
492.6
3.936
0.36
0.34
0.32
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Time (Sec)
Fig. 1.7 Duty cycle for P&O MPPT for Boost converter
www.ijournals.in
Page 49
www.ijournals.in
Page 50