I. INTRODUCTION
978-7-900714-13-8/08/ 2008DRPT
1067
A. Load Survey
Load survey is conducted regionally. The purpose of load
Load survey
Load curves
analysis
Load model
aggregation
Getting
typical
load
model
Fieldmeasured
data
Faultrecorded
data
Transent
data
recorded by
PMU
Creating primary
load model
Load model
verification
220kV
Load model
stroage
110kV
Pagg = j Pj
(1)
j =1
Rnet + jX net
C
Z
Fig. 2. The structure of synthesis load model considering line impedance and
reactive compensation
1068
(2)
i =1
Pi (t ) = i (t ) Pi ,max
(3)
(9)
i ,max
, i = 1, 2,..., m
(10)
# #
P
m (t ) m,max
C. Analysis Example
An example is given to explain this approach. Load curves
of the feeder in specific substation from April 1, 2006 to April
7, 2006 are used as Fig. 3.
The main load types of this feeder are residential load,
commercial load and some light industrial load through
investigations. The load curve on 4 April is taken as example.
In the analysis, the typical residential daily load curve is
shown as Fig. 4, the typical commercial daily load curve is
shown as Fig. 5, and the typical industrial daily load curve is
shown as Fig. 6.
(4)
3.50
Ps (t )
3.00
2.50
MW
"
"
#
"
(t ) P
P (t )
i
peri =
Set
(1) (1)
2
1
(2) (2)
1
2
A=
#
#
1 (t ) 2 (t )
, i = 1, 2,..., m
Power (MW)
"
"
#
"
Ps (t )
(1) (1)
2
1
(2) (2)
1
2
#
#
1 (t ) 2 (t )
i Pi ,max
peri (t ) =
m (1)
m (2)
#
m (t )
2.00
1.50
1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time
(Hour)
42
43
44
45
46
47
April 2
April 3
April 4
April 5
April 6
April 7
41
April 1
P1,max
Ps (1)
P
P (2)
2,max
s
x =
b
=
#
#
Pm ,max
Ps (t )
Therefore
40
30
Ax = b
(5)
When the order of [A]and the order of [A,b] equal m, this
equation group has unique solution x.
1
(6)
x=A b
However, the above condition does not always be satisfied
in practical applications, thus, the least square solution could
be deduced. Set
n
f ( x) = ( i ( j ) Pi ,max Ps ( j ))2
20
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
(7)
j =1 i =1
x = ( AT A) 1 AT b
(8)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1069
B. Fault-recorded Data
Fault-recording equipment can record data automatically
when power system encounters a fault or oscillation, and it has
become a significant foundation of analyzing faults in power
system. At present, important 110kV and almost all 220kV
substations have been equipped with fault-recording
equipments in China. Considering the requirement of faultrecorded data for load modeling, the data recorded by Faultrecording equipment presently can satisfy with the parameters
identification of load model in sampling rate, sample precision
and data recording duration.
[6]
[7]
[8]
1070
VII. BIOGRAPHIES
Jingchao Zhang was born in China, in 1973. He
received the Ph.D. degree in school of electrical
engineering, Wuhan University in 2007. Then he
joined the Henan Electric Power Research
Institute. His research interests include power
system analysis and control, load modeling,
electric energy measurement, etc.