You are on page 1of 225

A&C

PARTIDA

ESTRUCTURAS
ESTRUCTURAS EXTERIORES
ARQUITECTURA
ARQUITECTURA EXTERIORES
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS EXTERIORES
SISTEMA CONTRAINCENDIO
OBRAS EXTERIORES SCI
INSTALACIONES ELECTRICAS
OBRAS EXTERIORES IIEE
SISTEMA DE DRENAJE
EQUIPOS AIRE ACONDICIONADO
EQUIPOS DE VENTILACION
INSTALACION EQUIPOS AA Y VENTILACION
COSTO DIRECTO
GG
UTIL
VALOR VENTA S/
AMORTIZACION ADELANTO
SUB TOTAL N 01
RETENCIN POR GARANTIA TECNICA
SUB TOTAL N 02
I.G.V.
TOTAL A FACTURAR

FINAL
30,877,535.44
536,586.57
5,646,742.79
448,946.15
512,579.60
2,326,882.73
687,888.62
3,307,772.25
1,553,920.66
789,964.52

12.85%
5.61%
-20.00%
-10.00%
18.00%

46,688,819.32
5,999,513.28
2,617,913.91
55,306,246.51
(11,061,249.30)
44,244,997.21
(5,530,624.65)
38,714,372.56
6,968,587.06
45,682,959.62

RESUMEN DE VAL / P-133-13 AC REV FINAL


RESUMEN Val - A&C
VAL - ACUMULADA ANTERIOR
Monto

VAL - N 04

% de Acance

3,155,321.16
134,759.86

10.22%
0.00%
0.00%
0.00%
0.00%
5.79%

2,446.38
3,274.52
54,170.82

0.36%
0.00%
0.21%
6.86%

3,349,972.74
430,471.50
187,838.12
3,968,282.36
(793,656.47)
3,174,625.89
(396,828.24)
2,777,797.65
500,003.58
3,277,801.23

7.18%

Monto

% de Acance

2,328,989.34

7.54%

92,202.64

3.96%

4,534.75
12,226.37

2,437,953.10
313,276.97
136,699.78
2,887,929.85
(577,585.97)
2,310,343.88
(288,792.99)
2,021,550.89
363,879.16
2,385,430.05

0.00%
0.29%
1.55%

5.22%

N Val - A&C
VAL - ACUMULADA
Monto

SALDO POR VALORIZAR

% de Acance

Monto

% de Acance

5,484,310.50
226,962.50

17.76%
0.00%
0.00%
0.00%
0.00%
3.96%

25,393,224.94
536,586.57
5,646,742.79
448,946.15
512,579.60
2,099,920.23

82%
100%
100%
100%
100%
90%

2,446.38
7,809.27
66,397.19

0.00%
0.00%
0.29%
1.55%

685,442.24
3,307,772.25
1,546,111.39
723,567.33

100%
100%
99%
92%

5,787,925.84
743,748.47
324,537.90
6,856,212.21
(1,371,242.44)
5,484,969.77
(685,621.22)
4,799,348.55
863,882.74
5,663,231.29

12.40%

40,900,893.48
5,255,764.81
2,293,376.00
48,450,034.30
(9,690,006.86)
38,760,027.44
(4,845,003.43)
33,915,024.01
6,104,704.32
40,019,728.33

87.60%

VALORIZACIN N 04_ REV 00


Ppto. 133-13AC_ Rev N00 ZC
Para
:GERENPRO
Att.
: Ing Jose Martinez Woodman
Obra
: Planta Industrial Pucusana
Partida
: Estructuras de Concreto
Propietario
: Corporacion J.R. Lindley
Ubicacin
: Pucusana, Lima - Peru
Fecha
: 31 de Octubre 2013
PRESUPUESTO BASE
ITEM
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.01.08
01.01.09
01.01.10
01.02
01.02.01

DESCRIPCION
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OBRAS PROVISIONALES
Contenedores para oficinas del contratista y la supervisin
Contenedores para almacenes
Ambientes para comedor y vestuario
Caseta de guardiania
Servicios higienicos para obreros y staf
Guardiania
Instalacion provisional de energa elctrica en obra
Suministro de agua para la obra
Equipos de acarreo y montaje
Limpieza de terreno durante la obra
TRABAJOS PRELIMINARES
Movilizacin y desmovilizacin de equipos

UNIDAD

mes
mes
glb
mes
mes
mes
glb
glb
mes
mes
glb

01.02.02
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.01.05
02.02.01.06
02.02.02
02.02.02.01
02.02.02.01.01
02.02.02.01.02
02.02.02.02
02.02.02.02.01
02.02.02.03
02.02.02.03.01
02.02.02.03.02
02.02.02.03.03
02.02.03
02.02.03.01
02.02.03.01.01
02.02.03.01.02
02.02.03.01.03
02.02.03.06
02.02.03.06.01
02.02.03.06.02
02.02.03.06.03
02.02.03.06.04
02.03
02.03.01

Trazo y replanteo durante la obra


FUERZA I B
Movimiento de tierras
Excavacion Localizada para cimentacin.
Relleno con material afirmado (Con motoniveladora, Rodillo y Cargador Frontal) para capa de
base Inc. Compactacin.
Relleno manual con material de prestamo. Inc. Compactacin.
Acarreo interno de material procedente de excavaciones.
Nivelacion y compactacion con plancha compactadora (para cimentaciones)
Eliminacin material excedente acarreado Inc. Carguo (volq.6m3 d=5km).
Obras de Concreto Simple
Falsa zapata
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cemento tipo v
concreto 1:8+25%p.m. f'c =100kg/cm3 para cimiento corrido cemento tipo v
Cimiento
concreto ciclopeo 1:10+30%p.m. f'c =210kg/cm2 cemento tipo v
Sobrecimiento
concreto ciclopeo 1:8+25%p.m. f'c =210kg/cm2 cemento tipo v
encofrado y desencofrado normal en sobrecimiento
curado de estructuras con curador antisol
Obras de Concreto Armado
Zapatas aisladas
concreto premezclado en zapatas, f'c=210 kg/cm2 cemento tipo v
acero fy=4200 kg/cm2, en zapatas
curado de estructuras con curador antisol
Columnas
columnas f'c= 280 kg/cm2 cemento tipo l
encofrado y desencofrado normal en columnas
acero fy=4200 kg/cm2, en columnas
curado de estructuras con curador antisol
FUERZA II
Movimiento de tierras

mes

m3
m3
m3
m3
m2
m3

m3
m3
m3
m3
m2
m2

m3
kg
m2
m3
m2
kg
m2

02.03.01.01
02.03.01.02
02.03.01.03
02.03.01.04
02.03.01.05
02.03.01.06
02.03.02
02.03.02.01
02.03.02.01.01
02.03.02.01.02
02.03.02.02
02.03.02.02.01
02.03.02.03
02.03.02.03.01
02.03.02.03.02
02.03.02.03.03
02.03.02.04
02.03.02.04.01
02.03.02.04.02
02.03.02.04.03
02.03.02.10
02.03.02.10.01
02.03.02.10.02
02.03.02.10.03
02.03.02.10.04
03
03.01
03.01.03
03.01.03.01
03.01.03.01.01
03.01.03.01.02

Excavacion localizada para cimentacin


relleno con material afirmado (con motoniveladora, rodillo y cargador frontal) para capa de base
e= 20 cm. inc. compactacin.
Relleno manual con material de prestamo. Inc. Compactacin
acarreo interno de material procedente de excavaciones d prom= 20 m
Nivelacion y compactacion con plancha compactadora (para cimentaciones)
Eliminacin material excedente acarreado Inc. Carguo.
Concreto
Falsa zapata
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cemento tipo v
concreto 1:8+25%p.m. f'c =100kg/cm3 para cimiento corrido cemento tipo v
Cimiento
concreto ciclopeo 1:10+30%p.m. f'c =210kg/cm2 cemento tipo v
Sobrecimiento
concreto ciclopeo 1:8+25%p.m. f'c =210kg/cm2 cemento tipo v
encofrado y desencofrado normal en sobrecimiento
curado de estructuras con curador antisol
Zapatas aisladas
concreto premezclado en zapatas, f'c=210 kg/cm2 cemento tipo v
acero fy=4200 kg/cm2, en zapatas
curado de estructuras con curador antisol
Columnas
columnas f'c= 280 kg/cm2 cemento tipo l
encofrado y desencofrado normal en columnas
acero fy=4200 kg/cm2, en columnas
curado de estructuras con curador antisol
PROCESOS (P)
PROCESOS P1 Y P2
Obras de Concreto Armado
Zapata
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Encofrado y desencofrado de madera

m3
m3
m3
m3
m2
m3

m3
m3
m3
m3
m2
m2
m3
kg
m2
m3
m2
kg
m2

m3
m2

03.01.03.01.03
03.01.03.01.04
03.01.03.05
03.01.03.05.01
03.01.03.05.02
03.01.03.05.03
03.01.03.05.04
03.01.03.06
03.01.03.06.01
03.01.03.06.02
03.01.03.06.03
03.01.03.06.04
03.01.03.06.05
04
04.01
04.01.02
04.01.02.01
04.01.02.01.01
04.01.02.02
04.01.02.02.01
04.01.02.02.02
04.01.02.02.03
04.01.06
04.01.06.01
04.01.06.02
04.01.06.03
04.01.06.04
04.02
04.02.02
04.02.02.01
04.02.02.01.01
04.02.02.02

Acero f'y=4200 kg/cm2


Revestimiento con pintura bituminosa
Columnas
Concreto f'c= 280 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Curado de estructuras con curador antisol.
Vigas
Concreto f'c= 350 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Vigas postensadas - Fuerza tensora
Curado de estructuras con curador antisol
CABECERA DE LNEA
CABECERA DE LNEA I
Concreto simple
Falsa zapata
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cem. tipo v
Zapatas aisladas
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
acero fy=4200 kg/cm2
curado de estructuras con curador antisol
Columnas
concreto f'c= 210 kg/cm2 cemento tipo I
Encofrado y desencofrado metlico
acero fy=4200 kg/cm2
curado de estructuras con curador antisol
CABECERA DE LNEA II
Concreto simple
Falsa zapata
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cem. tipo v
Zapatas aisladas

kg
m2
m3
m2
kg
m2
m3
m2
kg
ton
m2

m3
m3
kg
m2
m3
m2
kg
m2

m3

04.02.02.02.01
04.02.02.02.02
04.02.02.02.03
04.02.03
04.02.03.04
04.02.03.04.01
04.02.03.04.02
04.02.03.04.03
04.02.03.04.04
04.02.03.06
04.02.03.06.01
04.02.03.06.02
04.02.03.06.03
04.02.03.06.04
04.03
04.03.02
04.03.02.01
04.03.02.01.01
04.03.03
04.03.03.01
04.03.03.01.01
04.03.03.01.02
04.03.03.02
04.03.03.02.01
04.03.03.02.02
04.03.03.02.03
05
05.01
05.01.03
05.01.03.01
05.01.03.01.01
05.01.03.01.02

Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2


acero fy=4200 kg/cm2
curado de estructuras con curador antisol
Concreto armado
Columnas
concreto f'c= 210 kg/cm2 cemento tipo I
Encofrado y desencofrado metlico
acero fy=4200 kg/cm2,
curado de estructuras con curador antisol
Vigas
vigas f'c= 210 kg/cm2 cemento tipo I
Encofrado y desencofrado metlico
acero fy=4200 kg/cm2, en vigas
curado de estructuras con curador antisol
CABECERA DE LNEA III
Concreto simple
Falsa zapata
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cem. tipo v
Concreto armado
Cimiento armado
concreto f'c= 210 kg/cm2 cemento tipo I
acero fy=4200 kg/cm2
Zapatas aisladas
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
acero fy=4200 kg/cm2
curado de estructuras con curador antisol
NAVES DE PRODUCCION (N)
NAVE N1
Obras de Concreto Armado
Zapatas
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Encofrado y desencofrado con madera

m3
kg
m2

m3
m2
kg
m2
m3
m2
kg
m2

m3

m3
kg
m3
kg
m2

m3
m2

05.01.03.01.03
05.01.03.01.04
05.01.03.04
05.01.03.04.01
05.01.03.04.02
05.01.03.04.03
05.01.03.04.04
05.01.03.05
05.01.03.05.01
05.01.03.05.02
05.01.03.05.03
05.01.03.05.04
05.01.03.05.05
05.03
05.03.03
05.03.03.01
05.03.03.01.01
05.03.03.01.02
05.03.03.01.03
05.03.03.01.04
05.03.03.04
05.03.03.04.01
05.03.03.04.02
05.03.03.04.03
05.03.03.04.04
05.03.03.05
05.03.03.05.01
05.03.03.05.02
05.03.03.05.03
05.03.03.05.04
05.03.03.05.05
05.05

Acero f'y=4200 kg/cm2


Revestimiento con pintura bituminosa
Columnas
Concreto f'c= 280 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Curado de estructuras con curador antisol.
Vigas
Concreto f'c= 350 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Vigas postensadas - Fuerza tensora
Curado de estructuras con curador antisol
NAVE N3
Obras de Concreto Armado
Zapatas
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Encofrado y desencofrado con madera
Acero f'y=4200 kg/cm2
Revestimiento con pintura bituminosa
Columnas
Concreto f'c= 280 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Curado de estructuras con curador antisol.
Vigas
Concreto f'c= 350 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Vigas postensadas - Fuerza tensora
Curado de estructuras con curador antisol
NAVE N5

kg
m2
m3
m2
kg
m2
m3
m2
kg
ton
m2

m3
m2
kg
m2
m3
m2
kg
m2
m3
m2
kg
ton
m2

05.05.03
05.05.03.01
05.05.03.01.01
05.05.03.01.02
05.05.03.01.03
05.05.03.01.04
05.05.03.05
05.05.03.05.01
05.05.03.05.02
05.05.03.05.03
05.05.03.05.04
05.07
05.07.03
05.07.03.01
05.07.03.01.01
05.07.03.01.02
05.07.03.01.03
05.07.03.01.04
05.07.03.05
05.07.03.05.01
05.07.03.05.02
05.07.03.05.03
05.07.03.05.04
01
01.01
01.01.01
01.01.02
01.01.03

Obras de Concreto Armado


Zapatas
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Encofrado y desencofrado con madera
Acero f'y=4200 kg/cm2
Revestimiento con pintura bituminosa
Columnas
Concreto f'c= 280 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Curado de estructuras con curador antisol.
NAVE N7
Obras de Concreto Armado
Zapatas
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Encofrado y desencofrado con madera
Acero f'y=4200 kg/cm2
Revestimiento con pintura bituminosa
Columnas
Concreto f'c= 280 kg/cm2 cemento Tipo I
Encofrado y desencofrado metlico
Acero f'y=4200 kg/cm2
Curado de estructuras con curador antisol.
ADICIONALES

m3
m2
kg
m2
m3
m2
kg
m2

m3
m2
kg
m2
m3
m2
kg
m2

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


TRABAJOS PRELIMINARES Y PROVISIONALES
Sistema integral de gestion y seguridad Laboral, (Incluye Examen Medico Ocupacional Ingreso, No in
Plataforma de control de erosin producida por vehiculos y Gestin Ambiental
Servicio de control de polucin en obra
COSTO DIRECTO
GASTOS GENERALES

Glb.
mes
mes

UTILIDADES
VALOR VENTA
AMORTIZACION ADELANTO
SUB TOTAL N 01
RETENCIN POR GARANTIA TECNICA
SUB TOTAL N 02
I.G.V.
TOTAL A FACTURAR

Av. Benavides 195 of. 204 Miraflores


Telefax 445-8389

Rev. N: 0.00

ANTERIOR ACUMULADO
METRADO

PRECIO
UNITARIO

P.PARCIAL S/.

SUBTOTAL S/.

CANTIDAD

1.75
1.75
0.12
2.00
1.75
0.00
0.08
0.12
1.50
1.50

10.61%
10.61%
12.12%
12.12%
10.61%
0.00%
8.00%
12.12%
9.09%
9.09%

0.40

40.00%

4,263,353.28
3,346,404.75
16.50
16.50
1.00
16.50
16.50
16.50
1.00
1.00
16.50
16.50

12,107.53
1,604.10
54,279.28
1,103.82
6,688.31
38,044.87
1,000,081.90
265,329.71
49,335.57
13,946.94

199,774.26
26,467.62
54,279.28
18,212.98
110,357.17
627,740.30
1,000,081.90
265,329.71
814,036.96
230,124.57
916,948.53

1.00

302,343.33

302,343.33

16.50

37,248.80

614,605.20

1.50

9.09%

260.77

62.38%

0.00
0.00
260.77
173.21
260.77

0.00%
0.00%
62.38%
12.64%
62.38%

0.00
41.95

0.00%
56.50%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

10.08
800.00
0.00

27.16%
74.66%
0.00%

0.00
0.00
4,757.15
0.00

0.00%
0.00%
75.97%
0.00%

371,655.58
39,401.51
418.04

8.41

3,515.83

274.08

52.26

14,324.17

62.09
418.04
1370.4
418.04

39.24
11.07
5.89
15.37

2,436.68
4,627.05
8,072.86
6,424.92
56,619.85
47,660.42

134.78
74.24

231.51
221.67

31,203.56
16,456.86
4,300.03

15.19

283.08

4,300.03
4,659.40

5.89
53.17
53.17

291.57
53.20
2.13

1,717.36
2,828.68
113.36
275,634.22
16,311.23

37.12
1071.5
20.8

324.20
3.95
2.13

12,034.45
4,232.43
44.35
69,713.64

47.38
484.55
6261.91
484.55

361.79
55.32
3.95
2.13

17,141.78
26,804.22
24,734.54
1,033.10
1,139,181.40
94,714.49

1,240.73

8.41

10,434.88

532.84

52.26

27,847.68

202.21
1,240.73
2,664.19
1,240.73

39.24
11.07
5.89
15.37

7,935.60
13,732.95
15,694.41
19,068.97

543.01

43.77%

0.00
0.00
543.01
301.67
543.01

0.00%
0.00%
43.77%
11.32%
43.77%

134.24
0.00

35.05%
0.00%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

32.55
4,349.76
0.00

16.99%
82.86%
0.00%

0.00
0.00
12,273.74
0.00

0.00%
0.00%
71.68%
0.00%

197.88
46.40

43.06%
36.83%

1,044,466.91
141,286.48
383.05
237.31

231.51
221.67

88,681.73
52,604.75
31,526.98

111.37

283.08

31,526.98
25,958.69

32.80
296.30
296.30

291.57
53.20
2.13

9,563.58
15,763.37
631.74
83,588.04

191.53
5,249.60
355.22

324.20
3.95
2.13

62,094.76
20,735.92
757.36
180,405.32

111.70
1,259.49
17,122.90
1,259.49

361.79
55.32
3.95
2.13

40,412.35
69,672.17
67,635.46
2,685.34
4,101,495.46
4,101,495.46
3,692,368.36
212,092.38

459.57
126.00

324.20
51.75

148,994.35
6,520.27

14,022.36
126.00

3.95
9.44

55,388.32
1,189.44

8,413.42
0.00

60.00%
0.00%

29.45
0.00
97,996.12
94.32

2.01%
0.00%
69.10%
1.86%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

387.71

57.54%

0.00
7,003.19
0.00

0.00%
60.00%
0.00%

0.00
0.00
35,772.53
0.00

0.00%
0.00%
60.00%
0.00%

341.04
0.00

57.28%

1,502,320.22
1,465.23
5,073.73
141,816.94
5,073.73

361.79
76.28
4.05
2.13

530,110.95
387,033.04
574,358.61
10,817.62
1,223,844.12

515.66
2,732.12
65,463.58
187,594.92
2,732.12

380.71
110.37
4.05
2.43
2.13

196,318.73
301,555.60
265,127.50
455,017.18
5,825.11
4,075,857.39
1,326,418.48
1,250,733.74
155,992.34

673.79

231.51

155,992.34
141,008.60

288.93
11,671.98
577.87

324.20
3.95
2.13

93,672.21
46,104.32
1,232.07
458,754.57

337.40
2,040.33
59,620.89
2,040.33

324.29
53.66
3.95
2.13

109,414.14
109,487.75
235,502.52
4,350.16
1,371,294.95
270,981.44
137,850.84

595.43

231.51

137,850.84
115,942.68

235.2
9794.18
470.4

324.20
3.95
2.13

76,252.74
38,687.01
1,002.93

142.80
8,000.00
0.00

60.71%
81.68%
0.00%

0.00
0.00
43,062.32
0.00

0.00%
0.00%
78.15%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

117.60

17.40%

0.00
0.00

0.00%
0.00%

0.00
6,786.41
0.00

0.00%
60.00%
0.00%

209.63
195.84

32.98%
31.61%

1,031,198.78
438,697.04
325.87
2067.64
55103.87
2067.64

324.29
53.66
3.95
2.13

105,675.12
110,953.25
217,660.29
4,408.38
144,467.95

69.49
581.96
20,774.28
581.6

328.63
65.87
3.95
2.13

22,836.63
38,332.89
82,058.41
1,240.02
1,378,143.96
182,275.34
156,455.37

675.79

231.51

156,455.37
1,118,478.51
18,918.42

48.01
723.63

334.52
3.95

16,060.08
2,858.34
132,969.39

268.8
11310.68
537.6

324.20
3.95
2.13

87,145.99
44,677.19
1,146.21
10,867,180.33
1,635,631.01
1,432,334.82
240,447.81

635.66
619.50

324.20
51.75

206,083.41
32,057.99

81.43
210.25

3.95
9.44

321.65
1,984.76

81.43
0.00

100.00%
0.00%

57.67
981.40
52,829.59
174.36

10.94%
59.84%
77.63%
10.63%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

60.75
0.00
0.00
0.00

11.16%
0.00%
0.00%
0.00%

0.00
840.73
35,000.00
0.00

0.00%
59.84%
60.04%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

594,923.35
527.18
1,639.93
68,049.32
1,639.93

361.79
76.28
4.05
2.13

190,730.39
125,096.74
275,599.75
3,496.47
515,685.18

189.55
1,218.54
27,074.77
81,126.45
1,218.54

380.71
110.37
4.05
2.43
2.13

72,164.25
134,495.40
109,652.82
196,774.68
2,598.03
1,380,482.66
1,210,045.49
205,981.01

544.54
530.71
69.76
180.11

324.20
51.75
3.95
9.44

176,541.95
27,463.27
275.55
1,700.24

451.62
1,404.88
58,295.50
1,404.88

361.79
76.28
4.05
2.13

163,393.26
107,166.72
236,096.78
2,995.32

509,652.08

441,768.22
162.38
1,043.88
23,194.02
69,497.83
1,043.88

380.71
110.37
4.05
2.43
2.13

61,820.26
115,217.44
93,935.78
168,569.10
2,225.64
2,174,123.90

1,939,272.56
388,181.51
789.38
690.03
22,794.89
690.03

324.20
51.75
3.95
9.44

255,920.02
35,707.79
90,039.82
6,513.88

157.98
0.00
10,000.00
0.00

20.01%
0.00%
43.87%
0.00%

0.00
1,094.50
36,776.08
0.00

0.00%
59.84%
48.46%
0.00%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
545.42
0.00
0.00

0.00%
59.84%
0.00%
0.00%

0.12
0.00
2.00

12.12%
0.00%
12.12%

663,482.25
587.93
1,828.92
75,891.42
1,828.92

361.79
76.28
4.05
2.13

212,709.36
139,513.23
307,360.25
3,899.41
1,107,338.93
990,306.08
193,441.70

393.37
343.86
11,359.36
343.86

324.20
51.75
3.95
9.44

127,532.06
17,794.13
44,869.47
3,246.04
330,635.72

292.99
911.41
37,818.92
911.41

361.79
76.28
4.05
2.13

106,001.93
69,523.96
153,166.63
1,943.20
708,632.48
708,632.48

1.00
16.50
16.50

209,900.00
17,445.26
12,780.95

209,900.00
287,846.77
210,885.71
S/.

12.85%

S/.

30,877,535.44
3,967,763.30

10.22%

5.61%
-20.00%

S/.

1,731,350.90

S/.

36,576,649.65

S/.

-7,315,329.93
29,261,319.72

-10.00%
18.00%

-3,657,664.96
S/.

25,603,654.76

S/.

4,608,657.86

S/.

30,212,312.62

VALORIZACION

R ACUMULADO

ESTE PERIODO VAL. 4


COSTO

CANTIDAD

AVANCE ACUMULADO

COSTO

CANTIDAD

21,188.18
2,807.17
6,579.31
2,207.63
11,704.55
0.00
80,006.55
32,161.18
74,003.36
20,920.42

0.50
0.50
0.48
0.50
0.50
2.50
0.07
0.03
0.50
0.50

3.03%
3.03%
48.00%
3.03%
3.03%
15.15%
7.15%
3.03%
3.03%
3.03%

6,053.77
802.05
26,054.06
551.91
3,344.16
95,112.17
71,521.01
8,040.29
24,667.79
6,973.47

2.25
2.25
0.60
2.50
2.25
2.50
0.15
0.15
2.00
2.00

13.64%
13.64%
60.12%
15.15%
13.64%
15.15%
15.15%
15.15%
12.12%
12.12%

120,937.33

0.03

3.03%

9,161.92

0.43

43.03%

55,873.20

0.50

3.03%

18,624.40

2.00

12.12%

2,193.14

14.52

3.47%

122.10

275.29

65.85%

0.00
0.00
2,886.31
1,020.35
4,007.81

0.00
0.00
14.52
12.10
14.52

0.00%
0.00%
3.47%
0.88%
3.47%

0.00
0.00
160.69
71.27
223.12

0.00
0.00
275.29
185.31
275.29

0.00%
0.00%
65.85%
13.52%
65.85%

0.00
9,297.99

0.00
23.42

0.00%
31.54%

0.00
5,191.07

0.00
65.36

0.00%
88.04%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

8.90
200.00
20.00

23.98%
18.67%
96.15%

2,885.41
790.00
42.64

18.98
1,000.00
20.00

51.13%
93.33%
96.15%

0.00
0.00
1,200.00
0.00

0.00%
0.00%
19.16%
0.00%

0.00
0.00
4,740.00
0.00

0.00
0.00
5,957.15
0.00

0.00%
0.00%
95.13%
0.00%

3,267.97
3,160.00
0.00
0.00
0.00
18,790.73
0.00

4,566.85

70.20

5.66%

590.40

613.21

49.42%

0.00
0.00
6,010.25
1,777.11
8,345.57

0.00
0.00
70.20
39.00
70.20

0.00%
0.00%
5.66%
1.46%
5.66%

0.00
0.00
777.00
229.74
1,078.91

0.00
0.00
613.21
340.67
613.21

0.00%
0.00%
49.42%
12.79%
49.42%

31,079.47
0.00

47.25
0.00

12.34%
0.00%

10,939.07
0.00

181.49
0.00

47.38%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

10,551.38
17,181.55
0.00

89.25
0.00
214.53

46.60%
0.00%
60.39%

28,935.19
0.00
457.40

121.80
4,349.76
214.53

63.59%
82.86%
60.39%

0.00
0.00
48,481.27
0.00

13.82
99.84
0.00
99.84

12.38%
7.93%
0.00%
7.93%

5,001.44
5,522.93
0.00
212.87

13.82
99.84
12,273.74
99.84

12.38%
7.93%
71.68%
7.93%

64,152.16
2,401.12

261.69
0.00

56.94%
0.00%

84,842.20
0.00

459.57
46.40

100.00%
36.83%

33,232.99
0.00

5,000.00
0.00

35.66%
0.00%

19,750.00
0.00

13,413.42
0.00

95.66%
0.00%

10,654.10
0.00
396,884.30
201.10

162.10
519.17
27,355.17
613.49

11.06%
10.23%
19.29%
12.09%

58,646.62
39,603.25
110,788.44
1,308.01

191.55
519.17
125,351.29
707.81

13.07%
10.23%
88.39%
13.95%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
30,000.00
0.00
0.00

0.00%
0.00%
45.83%
0.00%
0.00%

0.00
0.00
121,500.00
0.00
0.00

0.00
0.00
30,000.00
0.00
0.00

0.00%
0.00%
45.83%
0.00%
0.00%

0.00%

0.00

387.71

57.54%

89,759.55

0.00

0.00
27,662.59
0.00

188.58
4,000.00
95.88

65.27%
34.27%
16.59%

61,138.36
15,800.00
204.42

188.58
11,003.19
95.88

65.27%
94.27%
16.59%

0.00
0.00
20,000.00
0.00

0.00%
0.00%
33.55%
0.00%

0.00
0.00
79,000.00
0.00

0.00
0.00
55,772.53
0.00

0.00%
0.00%
93.55%
0.00%

0.00%

0.00

341.04
0.00

57.28%

0.00
0.00
141,301.51
0.00

78,955.80

0.00

46,296.31
31,600.00
0.00

92.40
1,500.00
122.13

39.29%
15.32%
25.96%

29,956.43
5,925.00
260.39

235.20
9,500.00
122.13

100.00%
97.00%
25.96%

0.00
0.00
170,096.17
0.00

164.12
945.18
10,000.00
945.18

50.36%
45.71%
18.15%
45.71%

53,221.84
50,720.05
39,500.00
2,015.20

164.12
945.18
53,062.32
945.18

50.36%
45.71%
96.30%
45.71%

0.00
0.00
0.00
0.00

0.00
0.00
10,000.00
0.00

0.00%
0.00%
48.14%
0.00%

0.00
0.00
39,500.00
0.00

0.00
0.00
10,000.00
0.00

0.00%
0.00%
48.14%
0.00%

176.40

26.10%

40,839.21

294.00

43.50%

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

27,226.14

0.00
0.00

0.00
0.00

0.00
26,806.31
0.00

83.24
0.00
42.96

30.97%
0.00%
7.99%

26,986.73
0.00
91.59

83.24
6,786.41
42.96

30.97%
60.00%
7.99%

67,962.04
10,134.36

195.85
0.00

30.81%
0.00%

63,493.70
0.00

405.47
195.84

63.79%
31.61%

321.65
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

81.43
0.00

100.00%
0.00%

20,864.06
74,862.70
213,959.85
371.75

202.72
0.00
10,000.00
623.33

38.45%
0.00%
14.70%
38.01%

73,341.33
0.00
40,500.00
1,328.99

260.38
981.40
62,829.59
797.69

49.39%
59.84%
92.33%
48.64%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
20,000.00
0.00
0.00

0.00%
0.00%
73.87%
0.00%
0.00%

0.00
0.00
81,000.00
0.00
0.00

0.00
0.00
20,000.00
0.00
0.00

0.00%
0.00%
73.87%
0.00%
0.00%

15.62%
0.00%
100.00%
0.00%

27,573.54
0.00
275.55
0.00

145.80
0.00
69.76
0.00

26.77%
0.00%
100.00%
0.00%

19,695.38
0.00
0.00
0.00

85.05
0.00
69.76
0.00

0.00
64,132.68
141,750.00
0.00

40.49
0.00
20,000.00
123.47

8.97%
0.00%
34.31%
8.79%

14,649.60
0.00
81,000.00
263.24

40.49
840.73
55,000.00
123.47

8.97%
59.84%
94.35%
8.79%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
20,000.00
0.00
0.00

0.00%
0.00%
86.23%
0.00%
0.00%

0.00
0.00
81,000.00
0.00
0.00

0.00
0.00
20,000.00
0.00
0.00

0.00%
0.00%
86.23%
0.00%
0.00%

51,217.72
0.00
39,500.00
0.00

182.29
0.00
12,000.00
0.00

23.09%
0.00%
52.64%
0.00%

59,099.12
0.00
47,400.00
0.00

340.27
0.00
22,000.00
0.00

43.11%
0.00%
96.51%
0.00%

0.00
83,490.08
148,943.12
0.00

47.85
0.00
35,000.00
147.03

8.14%
0.00%
46.12%
8.04%

17,313.56
0.00
141,750.00
313.48

47.85
1,094.50
71,776.08
147.03

8.14%
59.84%
94.58%
8.04%

0.00
0.00
0.00
0.00

97.20
0.00
10,000.00
0.00

24.71%
0.00%
88.03%
0.00%

31,512.61
0.00
39,500.00
0.00

97.20
0.00
10,000.00
0.00

24.71%
0.00%
88.03%
0.00%

0.00
41,605.81
0.00
0.00

0.00
0.00
35,000.00
0.00

0.00%
0.00%
92.55%
0.00%

0.00
0.00
141,750.00
0.00

0.00
545.42
35,000.00
0.00

0.00%
59.84%
92.55%
0.00%

25,442.42
0.00
25,561.90

0.55
2.50
0.50

55.00%
15.15%
3.03%

115,445.00
43,613.15
6,390.48

0.67
2.50
2.50

67.12%
15.15%
15.15%

7.54%

2,328,989.34

3,155,321.20
405,458.77

299,275.13

17.76%

176,923.71

130,590.01

3,737,703.68

2,758,854.48

-747,540.74

-551,770.90

2,990,162.94

2,207,083.58

-373,770.37

-275,885.45

2,616,392.57

1,931,198.13

470,950.66

347,615.66

3,087,343.23

2,278,813.79

CE ACUMULADO

SALDO POR EJECUTAR


COSTO

CANTIDAD

COSTO

27,241.95
3,609.22
32,633.36
2,759.54
15,048.71
95,112.17
151,527.56
40,201.47
98,671.15
27,893.89

14.25
14.25
0.40
14.00
14.25
14.00
0.85
0.85
14.50
14.50

86.36%
86.36%
39.88%
84.85%
86.36%
84.85%
84.85%
84.85%
87.88%
87.88%

172,532.32
22,858.40
21,645.92
15,453.43
95,308.47
532,628.13
848,554.34
225,128.24
715,365.81
202,230.68

130,099.25

0.57

56.97%

172,244.08

74,497.60

14.50

87.88%

540,107.60

2,315.24

142.75

34.15%

1,200.59

0.00
0.00
3,047.00
1,091.61
4,230.93

274.08
62.09
142.75
1,185.09
142.75

100.00%
100.00%
34.15%
86.48%
34.15%

14,324.17
2,436.68
1,580.05
6,981.24
2,193.99

0.00
14,489.06

134.78
8.88

100.00%
11.96%

31,203.56
1,967.80

0.00

15.19

100.00%

4,300.03

0.00
0.00
0.00

5.89
53.17
53.17

100.00%
100.00%
100.00%

1,717.36
2,828.68
113.36

6,153.39
3,950.00
42.64

18.14
71.50
0.80

48.87%
6.67%
3.85%

5,881.06
282.43
1.71

0.00
0.00
23,530.73
0.00

47.38
484.55
304.76
484.55

100.00%
100.00%
4.87%
100.00%

17,141.78
26,804.22
1,203.82
1,033.10

5,157.25

627.52

50.58%

5,277.64

0.00
0.00
6,787.26
2,006.85
9,424.49

532.84
202.21
627.52
2,323.52
627.52

100.00%
100.00%
50.58%
87.21%
50.58%

27,847.68
7,935.60
6,945.69
13,687.56
9,644.49

42,018.54
0.00

201.56
237.31

52.62%
100.00%

46,663.19
52,604.75

0.00

111.37

100.00%

31,526.98

0.00
0.00
0.00

32.80
296.30
296.30

100.00%
100.00%
100.00%

9,563.58
15,763.37
631.74

39,486.57
17,181.55
457.40

69.73
899.84
140.69

36.41%
17.14%
39.61%

22,608.19
3,554.37
299.96

5,001.44
5,522.93
48,481.27
212.87

97.88
1,159.65
4,849.16
1,159.65

87.62%
92.07%
28.32%
92.07%

35,410.92
64,149.25
19,154.18
2,472.47

148,994.35
2,401.12

0.00
79.60

0.00%
63.17%

0.00
4,119.15

52,982.99
0.00

608.94
126.00

4.34%
100.00%

2,405.33
1,189.44

69,300.72
39,603.25
507,672.74
1,509.11

1,273.68
4,554.56
16,465.65
4,365.92

86.93%
89.77%
11.61%
86.05%

460,810.23
347,429.79
66,685.87
9,308.51

0.00
0.00
121,500.00
0.00
0.00

515.66
2,732.12
35,463.58
187,594.92
2,732.12

100.00%
100.00%
54.17%
100.00%
100.00%

196,318.73
301,555.60
143,627.50
455,017.18
5,825.11

89,759.55

286.08

42.46%

66,232.79

61,138.36
43,462.59
204.42

100.35
668.79
481.99

34.73%
5.73%
83.41%

32,533.85
2,641.73
1,027.64

0.00
0.00
220,301.51
0.00

337.40
2,040.33
3,848.36
2,040.33

100.00%
100.00%
6.45%
100.00%

109,414.14
109,487.75
15,201.01
4,350.16

78,955.80

254.39

42.72%

58,895.04

76,252.74
37,525.00
260.39

0.00
294.18
348.27

0.00%
3.00%
74.04%

0.00
1,162.01
742.54

53,221.84
50,720.05
209,596.17
2,015.20

161.75
1,122.46
2,041.55
1,122.46

49.64%
54.29%
3.70%
54.29%

52,453.28
60,233.21
8,064.11
2,393.18

0.00
0.00
39,500.00
0.00

69.49
581.96
10,774.28
581.60

100.00%
100.00%
51.86%
100.00%

22,836.63
38,332.89
42,558.41
1,240.02

68,065.34

381.79

56.50%

88,390.03

0.00
0.00

48.01
723.63

100.00%
100.00%

16,060.08
2,858.34

26,986.73
26,806.31
91.59

185.56
4,524.27
494.64

69.03%
40.00%
92.01%

60,159.26
17,870.87
1,054.61

131,455.74
10,134.36

230.19
423.66

36.21%
68.39%

74,627.67
21,923.63

321.65
0.00

0.00
210.25

0.00%
100.00%

0.00
1,984.76

94,205.39
74,862.70
254,459.85
1,700.74

266.80
658.53
5,219.73
842.24

50.61%
40.16%
7.67%
51.36%

96,525.00
50,234.05
21,139.90
1,795.73

0.00
0.00
81,000.00
0.00
0.00

189.55
1,218.54
7,074.77
81,126.45
1,218.54

100.00%
100.00%
26.13%
100.00%
100.00%

72,164.25
134,495.40
28,652.82
196,774.68
2,598.03

47,268.92
0.00
275.55
0.00

398.74
530.71
0.00
180.11

73.23%
100.00%
0.00%
100.00%

129,273.04
27,463.27
0.00
1,700.24

14,649.60
64,132.68
222,750.00
263.24

411.13
564.15
3,295.50
1,281.41

91.03%
40.16%
5.65%
91.21%

148,743.66
43,034.04
13,346.78
2,732.08

0.00
0.00
81,000.00
0.00
0.00

162.38
1,043.88
3,194.02
69,497.83
1,043.88

100.00%
100.00%
13.77%
100.00%
100.00%

61,820.26
115,217.44
12,935.78
168,569.10
2,225.64

110,316.84
0.00
86,900.00
0.00

449.11
690.03
794.89
690.03

56.89%
100.00%
3.49%
100.00%

145,603.18
35,707.79
3,139.82
6,513.88

17,313.56
83,490.08
290,693.12
313.48

540.08
734.42
4,115.34
1,681.89

91.86%
40.16%
5.42%
91.96%

195,395.79
56,023.15
16,667.13
3,585.94

31,512.61
0.00
39,500.00
0.00

296.17
343.86
1,359.36
343.86

75.29%
100.00%
11.97%
100.00%

96,019.45
17,794.13
5,369.47
3,246.04

0.00
41,605.81
141,750.00
0.00

292.99
365.99
2,818.92
911.41

100.00%
40.16%
7.45%
100.00%

106,001.93
27,918.15
11,416.63
1,943.20

140,887.42
43,613.15
31,952.38

0.33
14.00
14.00

32.88%
84.85%
84.85%

69,012.58
244,233.62
178,933.33

82.24%

25,393,224.92

5,484,310.53
704,733.90

3,263,029.40

307,513.73

1,423,837.18

6,496,558.16

30,080,091.50

-1,299,311.63

-6,016,018.30

5,197,246.53

24,064,073.20

-649,655.82

-3,008,009.15

4,547,590.71

21,056,064.05

818,566.33

3,790,091.53

5,366,157.04

24,846,155.58

ac
Aceros y Concretos S.A.C.
Contratistas Generales
Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha

SUSTENTO

SE
02.02.01
ITEM
02.02.01.01
02.02.01.04
02.02.01.06

ITEM
02.02.01.05

02.02.02.01
ITEM
02.02.02.01.02

02.02.03.01
ITEM
02.02.03.01.01

ITEM
02.02.03.01.03

ITEM
02.03.01.01
02.03.01.04
02.03.01.06

ITEM
02.03.01.05

02.03.02.01

ITEM
02.03.02.01.01

02.03.02.04
ITEM
02.03.02.04.01

ITEM
02.03.02.04.03

02.03.02.10
ITEM
02.03.02.10.01

ITEM
02.03.02.10.02

ITEM
02.03.02.10.04

03.01.03.01
ITEM
03.01.03.01.01

03.01.03.05
ITEM
03.01.03.05.01

ITEM
03.01.03.05.02

ITEM
03.01.03.05.04

ZO
04.01.02.02
ITEM
04.01.02.02.01

ITEM
04.01.02.02.03

ZO
04.02.02.02
ITEM
04.02.02.02.01

ITEM
04.02.02.02.03

04.02.03.04
ITEM
04.02.03.04.01

ITEM
04.02.03.04.02

ITEM
04.02.03.04.04

ZO
04.03.02.01
ITEM
04.03.02.01.01

04.03.03.02
ITEM
04.03.03.02.01

ITEM
04.03.03.02.03

ITEM
05.01.03.01.01

ITEM
05.01.03.04.01

ITEM
05.01.03.04.02

ITEM
05.01.03.04.04

ITEM
05.03.03.01.01

05.03.03.04
ITEM
05.03.03.04.01

ITEM
05.03.03.04.02

ITEM
05.03.03.04.04

05.05.03.01
ITEM
05.05.03.01.01

05.05.03.05
ITEM
05.05.03.05.01

ITEM
05.05.03.05.02

ITEM
05.05.03.05.04

05.07.03.01
ITEM
05.07.03.01.01

ITEM
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
9.00
10.00
10.00
10.00
11.00

11.00
11.00
12.00
12.00
12.00
13.00
14.00
15.00
16.00
16.00
16.00
17.00
17.00
18.00
18.00
18.00
18.00
18.00

ITEM
02.02
02.02.03.01
02.02.03.01.02
02.02.03.06
02.02.03.06.03
03.01
03.01.03.01
03.01.03.01.03
03.01.03.05
03.01.03.05.03
03.01.03.06
03.01.03.06.04
04.01
04.01.02.02
04.01.02.02.02
04.01.06
04.01.06.03
04.02
04.02.02.02

04.02.02.02.02
04.02.03.04
04.02.03.04.03
04.02.03.06
04.02.03.06.03
05.01
05.01.03.04
05.01.03.04.03
05.01.03.05
05.01.03.05.03
05.03
05.03.03.01
05.03.03.01.03
05.03.03.04
05.03.03.04.03
05.03.03.05
05.03.03.05.03
05.05
05.05.03.05
05.05.03.05.03
05.05.03.01
05.05.03.01.03
05.07
05.07.03.01
05.07.03.01.03
05.07.03.05
05.07.03.05.03

PROYECTO PLANTA INDUSTRIAL DE CORP

os S.A.C.

erales
: GERENPRO
: Ing Jose Martinez Woodman
: Mto. 019GP0043A-000-99-101

PROYECTO PLANTA INDUSTRIAL DE CORPORACION LINDLEY- PUCUSANA


: Corporacion Lindley- Pucusana
:Pucusana
22 de Junio - 2013

SUSTENTO DE METRADOS

SECTOR DE FUERZA
Movimiento de tierras
DESCRIPCION
Excavacion Localizada para cimentacin.
Acarreo interno de material procedente de excavaciones.
Eliminacin material excedente acarreado Inc. Carguo (volq.6m3 d=5km).
Cerramiento
Eje G1 entre 14A y 14D

DESCRIPCION
Nivelacion y compactacion con plancha compactadora (para cimentaciones)
Cerramiento
Eje G1 entre 14A y 14D

Falsa zapata
DESCRIPCION
concreto 1:8+25%p.m. f'c =100kg/cm3 para cimiento corrido cemento tipo v
Cerramiento
Eje E1
Eje G1 entre 14A y 14D
Eje 14D entre E1 y F2
Eje 15A entre F1 y G1
Eje F2 entre 14D y 15A
Eje F2 entre 15C y 15D

Zapatas aisladas
DESCRIPCION
concreto premezclado en zapatas, f'c=210 kg/cm2 cemento tipo v
Z-3

15A/F2-G1
Z-4
15A/F2-G1

DESCRIPCION
curado de estructuras con curador antisol
VAL02
Z-5
Eje G1 y F2 entre 15B Y 16 A
Z-3
15A/F2-G1
Z-4
15A/F2-G1

SECTOR DE FU
DESCRIPCION
Excavacion localizada para cimentacin
acarreo interno de material procedente de excavaciones d prom= 20 m
Eliminacin material excedente acarreado Inc. Carguo.
Zapata Z3
Eje G entre 16B Y 18A
Zapata Z-1A
Eje F2 Y Eje 16B
Eje 18B y D

DESCRIPCION
Nivelacion y compactacion con plancha compactadora (para cimentaciones)
Zapata Z3
Eje G entre 16B Y 18A
Zapata Z-1A
Eje F2 Y Eje 16B
Eje 18B y Eje 16B

Falsa zapata

DESCRIPCION
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cemento tipo v
Zapata Z7
Eje 17A entre D Y C1

Zapatas aisladas
DESCRIPCION
concreto premezclado en zapatas, f'c=210 kg/cm2 cemento tipo v
Zapata Z1
Eje 16B y Eje E3
Zapata Z7
Eje 17A entre D y C1
Zapata Z6
Eje 18A entre D y C1
Zapata Z8
Eje 18A entre C4 y C1

DESCRIPCION
curado de estructuras con curador antisol
VAL02
Zapata Z1
Zapata Z4

VAL03
Zapata Z1
Eje 16B entre E2-E1
VAL04
Zapata Z1
Eje 16B y Eje E3
Zapata Z7
Eje 17A entre D y C1
Zapata Z6
Eje 18A entre D y C1
Zapata Z8
Eje 18A entre C4 y C1

Columnas
DESCRIPCION
columnas f'c= 280 kg/cm2 cemento tipo l
Columna C-1

Eje 18B del Eje E2 y D1


Eje 16B del Eje D3 y D1

DESCRIPCION
encofrado y desencofrado normal en columnas
Columna C-1
Eje 18B del Eje E2 y D1
Eje 16B del Eje D3 y D1

DESCRIPCION
curado de estructuras con curador antisol
Columna C-1
Eje 18B del Eje E2 y D1
Eje 16B del Eje D3 y D1

ZONA DE PROCES
Zapata
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
PROCESOS N2
Zapata Z4
Eje 20
Zapata Z5
Eje 20
PROCESOS N1
Zapata Z2
Entre ejes F'/20
En Valorizacion N3 se cobro con un ancho de 2.90 medida correcta 3.50
Entre ejes F/19
Entre ejes E/19
Entre ejes D'/19
Entre ejes D'/20
Entre ejes C'/19

Entre ejes C'/20


Entre ejes C/19
Entre ejes C/19'
Zapata Z1
Entre ejes 19'-19''
Entre ejes 19'-19''
Entre ejes 19'-19''
Entre ejes 19'-19''
Zapata Z3
Entre ejes 19 /E'
Entre ejes 19' /E'
Entre ejes 19'' /E'
Entre ejes 20 /E'
Entre ejes 19 /D
Entre ejes 19' /D
Entre ejes 19'' /D

/F
/E
/D'
/C'

Columnas
DESCRIPCION
Concreto f'c= 280 kg/cm2 cemento Tipo I
PROCESOS N2
Columna C2
En el Eje C y Eje 21
En el Eje C y Eje 22
En el Eje C y Eje 23
En el Eje C y Eje 24
Columna C1
En el Eje C y Eje 20
Columna C4
En el Eje D y Eje 20
Columna C7
En el Eje G y Eje 20
Columna C5
En el Eje D y Eje 21
En el Eje D y Eje 22
En el Eje D y Eje 23
En el Eje E y Eje 21
En el Eje E y Eje 22
En el Eje F y Eje 21
En el Eje F y Eje 22

DESCRIPCION
Encofrado y desencofrado metlico
PROCESOS N2
Columna C2
En el Eje C y Eje 21
En el Eje C y Eje 22
En el Eje C y Eje 23
En el Eje C y Eje 24
Columna C1
En el Eje C y Eje 20
Columna C4
En el Eje D y Eje 20
Columna C7
En el Eje G y Eje 20
Columna C5
En el Eje D y Eje 21
En el Eje D y Eje 22
En el Eje D y Eje 23
En el Eje E y Eje 21
En el Eje E y Eje 22
En el Eje F y Eje 21
En el Eje F y Eje 22

DESCRIPCION
Curado de estructuras con curador antisol.
PROCESOS N2
Columna C2
En el Eje C y Eje 21
En el Eje C y Eje 22
En el Eje C y Eje 23
En el Eje C y Eje 24
Columna C1
En el Eje C y Eje 20
Columna C4
En el Eje D y Eje 20
Columna C7
En el Eje G y Eje 20
Columna C5
En el Eje D y Eje 21
En el Eje D y Eje 22
En el Eje D y Eje 23

En
En
En
En

el
el
el
el

Eje
Eje
Eje
Eje

E y Eje 21
E y Eje 22
F y Eje 21
F y Eje 22

ZONA DE CABECERA
Zapatas aisladas
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
CABECERA DE LINEA 1
Z-2
Eje 21A, 21B, 23A, 23B, 24A, 24B
Z-3
Eje 22, 23, 24
Z-5
Eje 25
Z-1
Eje 25, 24, 23, 22

DESCRIPCION
curado de estructuras con curador antisol
CABECERA DE LINEA 1
Z-2
Eje 21A, 21B, 23A, 23B, 24A, 24B
Z-3
Eje 22, 23, 24
Z-5
Eje 25
Z-1
Eje 25, 24, 23, 22

ZONA DE CABECERA
Zapatas aisladas
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Z-2
eje 15-20
Z-1

eje 15-20
Z-3
eje 15-20
% Esponjamiento

DESCRIPCION
curado de estructuras con curador antisol
Z-2
eje 15-20
Z-1
eje 15-20
Z-3
eje 15-20
% Esponjamiento

Columnas
DESCRIPCION
concreto f'c= 210 kg/cm2 cemento tipo I
C-4
Eje 15A al 50%
Eje 15A al 100%
C-5
eje 16 al 100% (exterior)
C-1
eje 16 al 100% (exterior)
Eje 17 y 17'al 100% (exterior)
Eje 18 al 100% /(ambos ejes)
C-2
eje 16A, 16B (ambos ejes) al 100%
eje 17A, 17B (ambos ejes) al 50%
eje 18A, 18B (ambos ejes) al 100%
eje 19A (exterior) al 50%
% Esponjamiento

DESCRIPCION
Encofrado y desencofrado metlico
C-4
Eje 15A al 50%
Eje 15A al 100%
C-5
eje 16 al 100% (exterior)

C-1
eje 16 al 100% (exterior)
Eje 17 y 17'al 100% (exterior)
Eje 18 al 100% /(ambos ejes)
C-2
eje 16A, 16B (ambos ejes) al 100%
eje 17A, 17B (ambos ejes) al 50%
eje 18A, 18B (ambos ejes) al 100%
eje 19A (exterior) al 50%
% Esponjamiento

DESCRIPCION
curado de estructuras con curador antisol
C-4
Eje 15A al 50%
Eje 15A al 100%
C-5
eje 16 al 100% (exterior)
C-1
eje 16 al 100% (exterior)
Eje 17 y 17'al 100% (exterior)
Eje 18 al 100% /(ambos ejes)
C-2
eje 16A, 16B (ambos ejes) al 100%
eje 17A, 17B (ambos ejes) al 50%
eje 18A, 18B (ambos ejes) al 100%
eje 19A (exterior) al 50%
% Esponjamiento

ZONA DE CABECERA
Falsa zapata
DESCRIPCION
concreto 1:8+25%p.m. f'c =120kg/cm2 para sub zapatas cem. tipo v
Z-1
eje 10( exterior)
Z-2
eje 10A, 10B, 11A, 11B, 12A, 12B
Z-3
eje 11-12.
% Esponjamiento

Zapatas aisladas
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Z-1
eje 10 y Eje H
eje 10( exterior)
Z-2
eje 10A, 10B, 11A, 11B
Z-3
eje 11
% Esponjamiento

DESCRIPCION
curado de estructuras con curador antisol
Z-1
eje 10 y Eje H
eje 10( exterior)
Z-2
eje 10A, 10B, 11A, 11B
Z-3
eje 11
% Esponjamiento

ZONA DE NA

ZONA DE NAV
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2

Eje H` entre los ejes 21 a 25


Z-5
Z-1
Eje J entre los ejes 21 a 25
Z-3
Eje K entre los ejes 21 a 25
Z-3
% Esponjamiento

DESCRIPCION
Concreto f'c= 280 kg/cm2 cemento Tipo I
Columna
Eje J y Eje 25 C-2 al 100%
Eje J y Eje 24 C-1 al 100%
Eje J y Eje 23 C-1 al 100%
Eje J y Eje 22 C-1 al 50%
Eje J y Eje 21 C-2 al 50%
Eje J y Eje 21' C-2 al 50%
Eje K y Eje 25 C-5 al 100%
Eje K y Eje 24 C-3 al 100%
Eje K y Eje 23 C-3 al 100%
Eje K y Eje 22 C-3 al 100%
Eje K y Eje 21 C-3 al 50%
% Esponjamiento

DESCRIPCION
Encofrado y desencofrado metlico
Columna
Eje J y Eje 25 C-2 al 100%
Eje J y Eje 24 C-1 al 100%
Eje J y Eje 23 C-1 al 100%
Eje J y Eje 22 C-1 al 50%
Eje J y Eje 21 C-2 al 50%
Eje J y Eje 21' C-2 al 50%
Eje K y Eje 25 C-5 al 100%
Eje K y Eje 24 C-3 al 100%
Eje K y Eje 23 C-3 al 100%
Eje K y Eje 22 C-3 al 100%
Eje K y Eje 21 C-3 al 50%
% Esponjamiento

DESCRIPCION
Curado de estructuras con curador antisol.
Columna
Eje J y Eje 25 C-2 al 100%
Eje J y Eje 24 C-1 al 100%
Eje J y Eje 23 C-1 al 100%
Eje J y Eje 22 C-1 al 50%
Eje J y Eje 21 C-2 al 50%
Eje J y Eje 21' C-2 al 50%
Eje K y Eje 25 C-5 al 100%
Eje K y Eje 24 C-3 al 100%

Eje K y Eje 23 C-3 al 100%


Eje K y Eje 22 C-3 al 100%
Eje K y Eje 21 C-3 al 50%
% Esponjamiento

ZONA DE NAV
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Eje H entre los ejes 18 al 20
Z-1
Eje I entre los ejes 18 al 20
Z-2
Eje K entre los ejes 18 al 20
Z-2

% Esponjamiento

Columnas
DESCRIPCION
Concreto f'c= 280 kg/cm2 cemento Tipo I
Eje J y Eje 20 C-1 al 50%
Eje J y Eje 19 C-1 al 50%
Eje K y Eje 20 C-3 al 50%
Eje K y Eje 19 C-3 al 50%
Eje K y Eje 18 C-3al 50%

% Esponjamiento

DESCRIPCION
Encofrado y desencofrado metlico
Eje J y Eje 20 C-1 al 50%
Eje J y Eje 19 C-1 al 50%
Eje K y Eje 20 C-3 al 50%
Eje K y Eje 19 C-3 al 50%
Eje K y Eje 18 C-3al 50%

% Esponjamiento

DESCRIPCION
Curado de estructuras con curador antisol.
Eje J y Eje 20 C-1 al 50%
Eje J y Eje 19 C-1 al 50%
Eje K y Eje 20 C-3 al 50%
Eje K y Eje 19 C-3 al 50%
Eje K y Eje 18 C-3al 50%

% Esponjamiento

ZONA DE NAV
Zapatas
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Eje H entre los ejes 12 al 17
Eje 17, Z-5
Eje 15, 16 Z-1
Eje I entre los ejes 12 al 17
Z-3
Z-2
Eje J entre los ejes 12 al 17
Z-3
Z-1
Eje K entre los ejes 12 al 17
Z-3
Z-2

% Esponjamiento

Columnas
DESCRIPCION
Concreto f'c= 280 kg/cm2 cemento Tipo I
Eje J y Eje 17 C-2 al 50%
Eje J y Eje 16 C-2 al 50%
Eje K y Eje 17 C-5 al 50%
Eje K y Eje 16 C-3 al 50%
% Esponjamiento

DESCRIPCION
Encofrado y desencofrado metlico
Eje J y Eje 17 C-2 al 50%
Eje J y Eje 16 C-2 al 50%
Eje K y Eje 17 C-5 al 50%
Eje K y Eje 16 C-3 al 50%
% Esponjamiento

DESCRIPCION
Curado de estructuras con curador antisol.
Eje J y Eje 17 C-2 al 50%
Eje J y Eje 16 C-2 al 50%
Eje K y Eje 17 C-5 al 50%
Eje K y Eje 16 C-3 al 50%
% Esponjamiento

ZONA DE NAV
Zapatas
DESCRIPCION
Concreto premezclado en zapatas, cemento tipo V f'c=210 kg/cm2
Eje H` entre los ejes 10 al 11
Z-2
Eje I entre los ejes 10 al 11
Z-2
Eje J entre los ejes 10 al 11
Z-2
Eje K entre los ejes 10 al 11
Z-2
% Esponjamiento

GUIAS DE
DESCRIPCIN
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA

DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE

CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN

ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM

A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615

GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO

60
60
60
60
60
60
60
60
60
60
60
60
60
60

BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA
BARRA

DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE

CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN
CONSTRUCCIN

ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM
ASTM

A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615
A615

GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO
GRADO

60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60

Costo Total en Obra


Costo por Acero en obra

PARTIDO
FUERZA I B
Zapatas aisladas
acero fy=4200 kg/cm2, en zapatas
Columnas
acero fy=4200 kg/cm2, en columnas
PROCESOS P1 Y P2
Zapata
Acero f'y=4200 kg/cm2
Columnas
Acero f'y=4200 kg/cm2
Vigas
Vigas postensadas - Fuerza tensora
CABECERA DE LNEA I
Zapatas aisladas
acero fy=4200 kg/cm2
Columnas
acero fy=4200 kg/cm2
CABECERA DE LNEA II
Zapatas aisladas

acero fy=4200 kg/cm2


Columnas
acero fy=4200 kg/cm2,
Vigas
acero fy=4200 kg/cm2, en vigas
NAVE N1
Columnas
Acero f'y=4200 kg/cm2
Vigas
Acero f'y=4200 kg/cm2
NAVE N3
Zapatas
Acero f'y=4200 kg/cm2
Columnas
Acero f'y=4200 kg/cm2
Vigas
Acero f'y=4200 kg/cm2
NAVE N5
Columnas
Acero f'y=4200 kg/cm2
Zapatas
Acero f'y=4200 kg/cm2
NAVE N7
Zapatas
Acero f'y=4200 kg/cm2
Columnas
Acero f'y=4200 kg/cm2

L DE CORPORACION LINDLEY- PUCUSANA


Av. Benavides 195 of. 204 Miraflores
Telefax 445-8389

METRADOS

OR DE FUERZA 1- ZONA B

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

12.098

1.000

1.200

1.00

1.00
TOTAL

LONGITUD

ANCHO

12.098

1.000

ALTURA

N DE CAPAS

N VECES

1.00

1.00
TOTAL

LONGITUD

ANCHO

ALTURA

12.623
12.098
7.554
6.622
6.187
5.392

1.000
1.000
1.000
0.800
0.800
0.800

0.500
0.500
0.500
0.500
0.500
0.500

N DE CAPAS

N VECES

1.00
1.00
1.00
1.00
1.00
1.00
TOTAL

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

1.60

1.60

0.50

1.00

3.00

2.20

2.30

0.50

1.00

2.00
TOTAL

LONGITUD

ANCHO

2.520

ALTURA

N DE CAPAS

N VECES

1.000

1.00

8.00

2.56

1.00

###

3.00

5.06

1.00

###

2.00

TOTAL
CONTRACTUAL
MAYOR METRADO

ECTOR DE FUERZA 2
LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

2.00

2.00

1.80

6.00

2.50
2.50

3.00
3.00

1.80
1.80

1.00
1.00

TOTAL
LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

2.00

2.00

6.00

2.50
2.50

3.00
3.00

1.00
1.00

TOTAL

LONGITUD

ANCHO

ALTURA

2.500

4.200

0.900

N DE CAPAS

N VECES

5.00
TOTAL

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

1.800

2.300

0.500

1.00

1.00

2.500

4.200

0.600

1.00

5.00

2.800

4.800

0.600

1.00

5.00

2.000

3.200

0.600

1.00

4.00
TOTAL

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

4.140

1.000

1.00

7.00

27.830

1.000

1.00

1.00

4.140

1.000

1.00

2.00

4.140

1.000

1.00

1.00

10.500

1.000

1.00

5.00

13.440

1.000

1.00

5.00

6.400

1.000

1.00

4.00

TOTAL

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

0.400
0.400

0.900
0.900

4.800
4.800

1.00
1.00

5.00
3.00

TOTAL
LONGITUD

ANCHO

1.300
1.300

ALTURA

N DE CAPAS

N VECES

4.800
4.800

2.00
2.00

5.00
3.00

TOTAL
LONGITUD

ANCHO

1.300
1.300

ALTURA

N DE CAPAS

N VECES

4.800
4.800

2.00
2.00

5.00
3.00

TOTAL

NA DE PROCESOS 1 Y 2

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

3.50

4.50

0.50

4.00

5.00

5.00

0.50

1.00

3.50
3.50
3.50
3.50
3.50
3.50
3.50

3.50
0.60
3.50
3.50
3.50
3.50
3.50

0.55
0.55
0.55
0.55
0.55
0.55
0.55

1.00
4.00
1.00
1.00
1.00
1.00
1.00

3.50
3.50
3.50

3.50
3.50
3.50

0.55
0.55
0.55

1.00
1.00
1.00

4.60
4.60
4.60
4.60

4.60
4.60
4.60
4.60

0.55
0.55
0.55
0.55

2.00
2.00
2.00
2.00

4.60
4.60
4.60
4.60
4.60
4.60
4.60

4.60
4.60
4.60
4.60
4.60
4.60
4.60

0.55
0.55
0.55
0.55
0.55
0.55
0.55

1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
SALDO DEL CONTRACTUAL
AREA

ALTURA

N DE CAPAS

N VECES

1.23
1.23
1.23
1.23

6.20
6.03
5.80
5.68

1.00
1.00
1.00
1.00

###
###
###
###

1.23

12.39

1.00

###

1.39

6.00

1.00

###

1.23

12.39

1.00

###

1.23
1.23
1.23
1.23
1.23
1.23
1.23

13.34
13.19
13.01
11.92
6.00
13.34
6.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00

###
###
###
###
###
###
###

TOTAL

AREA

ALTURA

N DE CAPAS

N VECES

3.93
3.93
3.93
3.93

6.20
6.03
5.80
5.68

1.00
1.00
1.00
1.00

###
###
###
###

3.93

12.39

1.00

###

4.46

6.00

1.00

###

3.93

12.39

1.00

###

3.93
3.93
3.93
3.93
3.93
3.93
3.93

13.34
13.19
13.01
11.92
6.00
13.34
6.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00

###
###
###
###
###
###
###

TOTAL

AREA

ALTURA

N DE CAPAS

N VECES

3.93
3.93
3.93
3.93

12.20
12.03
11.80
11.68

1.00
1.00
1.00
1.00

###
###
###
###

3.93

12.39

1.00

###

4.46

6.00

1.00

###

3.93

12.39

1.00

###

3.93
3.93
3.93

13.34
13.19
13.01

1.00
1.00
1.00

###
###
###

3.93
3.93
3.93
3.93

1.00
1.00
1.00
1.00

11.92
6.00
13.34
6.00

###
###
###
###

TOTAL

DE CABECERA DE LINEA 1

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

4.80

3.50

0.60

1.00

12.00

3.25

3.50

0.60

1.00

3.00

3.25

3.50

0.60

1.00

1.00

3.50

4.80

0.60

1.00

4.00
TOTAL

LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

8.30

0.60

1.00

12.00

6.75

0.60

1.00

3.00

6.75

0.60

1.00

1.00

8.30

0.60

1.00

4.00
TOTAL

DE CABECERA DE LINEA 2
ANCHO

LONGITUD

ALTURA

4.80

3.50

0.50

N DE CAPAS

N VECES

12.00

4.80

3.50

0.50

2.00

3.25
0.00

4.10

0.50

5.00
TOTAL
SALDO POR COBRAR

ANCHO

LONGITUD

ALTURA

N DE CAPAS

N VECES

8.30

0.50

20.00

8.30

0.50

5.00

7.35
0.00

0.50

5.00
TOTAL

AREA

ALTURA

N DE CAPAS

N VECES

0.92
0.92

3.60
7.25

2.00
2.00

1.28

7.25

1.00

1.28
1.28
1.28

7.25
7.25
7.25

1.00
2.00
4.00

0.92
0.92
0.92
0.92
0.00

7.25
3.60
7.25
3.60

4.00
4.00
4.00
1.00
TOTAL

AREA

ALTURA

N DE CAPAS

N VECES

5.40
5.40

3.60
7.25

2.00
2.00

7.20

7.25

1.00

7.20
7.20
7.20

7.25
7.25
7.25

1.00
2.00
4.00

5.40
5.40
5.40
5.40
0.00

7.25
3.60
7.25
3.60

4.00
4.00
4.00
1.00
TOTAL

AREA

ALTURA

N DE CAPAS

N VECES

5.40
5.40

3.60
7.25

2.00
2.00

7.20

7.25

1.00

7.20
7.20
7.20

7.25
7.25
7.25

1.00
2.00
4.00

5.40
5.40
5.40
5.40
0.00

7.25
3.60
7.25
3.60

4.00
4.00
4.00
1.00
TOTAL

DE CABECERA DE LINEA 3
ANCHO

LONGITUD

ALTURA

N DE CAPAS

N VECES

4.80

3.50

0.70

1.00

1.00

4.80

3.50

0.70

1.00

12.00

4.80

3.50

0.70

1.00

2.00

0.00
TOTAL

ANCHO

LONGITUD

ALTURA

N DE CAPAS

N VECES

4.80
2.35

3.50
3.00

0.50
0.50

1.00
1.00

1.00
1.00

4.80

3.50

0.50

1.00

8.00

2.35
0.00

3.50

0.50

1.00

1.00
TOTAL

ANCHO

LONGITUD

ALTURA

N DE CAPAS

N VECES

8.30
5.35

0.50
0.50

1.00
1.00

1.00
1.00

8.30

0.50

1.00

8.00

5.85
0.00

0.50

1.00

1.00
TOTAL

ZONA DE NAVES
ZONA DE NAVES 1
LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

6.800
4.500

5.500
4.500

1.500
1.500

1.00
3.00

6.800

5.500

0.650

1.00

6.800

5.500

0.650

1.00

0%
TOTAL

AREA

ANCHO

1.227
1.227
1.227
1.227
1.227
1.227
1.431
1.431
1.431
1.431
1.431

ALTURA

N DE CAPAS

N VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00

14.11
14.49
14.46
6.00
14.14
14.81
15.42
15.60
15.773
15.949
6.000

0%
TOTAL
PERIMETRO

ANCHO

3.927
3.927
3.927
3.927
3.927
3.927
4.241
4.241
4.241
4.241
4.241

ALTURA

N DE CAPAS

N VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00

14.11
14.49
14.46
6.00
14.14
14.81
15.42
15.60
15.773
15.949
6.000

0%
TOTAL

PERIMETRO

3.927
3.927
3.927
3.927
3.927
3.927
4.241
4.241

ANCHO

ALTURA

14.11
14.49
14.46
6.00
14.14
14.81
15.42
15.60

N DE CAPAS

N VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.241
4.241
4.241
0%

1.00
1.00
2.00

15.773
15.949
6.000

TOTAL

ZONA DE NAVES 3
LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

4.500

4.500

0.600

3.00

4.500

4.500

0.600

2.00

4.500

4.500

0.600

2.00

0%
TOTAL

AREA

ANCHO

1.227
1.227
1.431
1.431
1.431

ALTURA

N DE CAPAS

6.00
6.00
6.00
6.00
6.00

N VECES

1.00
1.00
1.00
1.00
1.00

0%
TOTAL

PERIMETRO

3.927
3.927
4.241
4.241
4.241

ANCHO

ALTURA

6.00
6.00
6.00
6.00
6.00

N DE CAPAS

N VECES

1.00
1.00
1.00
1.00
1.00

0%
TOTAL

PERIMETRO

3.927
3.927
4.241
4.241
4.241

ANCHO

ALTURA

6.00
6.00
6.00
6.00
6.00

N DE CAPAS

N VECES

1.00
1.00
1.00
1.00
1.00

0%
TOTAL

ZONA DE NAVES 5
LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

6.800
4.500

5.500
4.500

0.650
0.600

1.00
2.00

6.800
4.500

5.500
4.500

0.650
0.600

1.00
4.00

6.800
4.500

5.500
4.500

0.650
0.600

1.00
1.00

6.800
4.500

5.500
4.500

0.650
0.600

1.00
0.00

0%
TOTAL

AREA

ANCHO

1.227
1.227
1.431
1.431

ALTURA

N DE CAPAS

N VECES

2.00
1.00
2.00
1.00

6.00
6.00
6.00
6.00

0%
TOTAL

PERIMETRO

3.927
3.927
4.241
4.241

ANCHO

ALTURA

6.00
6.00
6.00
6.00

N DE CAPAS

N VECES

2.00
1.00
2.00
1.00

0%
TOTAL

PERIMETRO

ANCHO

3.927
3.927
4.241
4.241

ALTURA

N DE CAPAS

N VECES

2.00
1.00
2.00
1.00

6.00
6.00
6.00
6.00

0%
TOTAL

ZONA DE NAVES 7
LONGITUD

ANCHO

ALTURA

N DE CAPAS

N VECES

4.500

4.500

0.600

2.00

4.500

4.500

0.600

2.00

4.500

4.500

0.600

2.00

4.500

4.500

0.600

2.00

0%
TOTAL

GUIAS DE REMISIN - ACERO EN OBRA


GUIA
003
003
003
003
003
003
003
003
003
003
003
003
003
003

FECHA
0494386
0494804
0495660
0495667
0496068
0496517
0483075
0483074
0483073
0483073
0483030
0483030
0483030
0482778

10/23/2013
10/24/2013
10/28/2013
10/28/2013
10/29/2013
10/30/2013
9/6/2013
9/6/2013
9/6/2013
9/6/2013
9/6/2013
9/6/2013
9/6/2013
9/5/2013

DIAMETRO
[Plg]
1"
1"
1"
1/2"
1"
1"
3/8"
5/8"
3/8"
6mm
5/8"
1/2"
3/8"
3/4"

UNIDAD
[m]
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA

003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003
003

Metrado
469,242.45

0482778
0482778
0482690
0482690
0482690
0482642
0482141
0482138
0482006
0482006
0482006
0481638
0481638
0480859
0480859
0480859
0480859
0480859

INCIDENCIA
0.64

9/5/2013
9/5/2013
9/5/2013
9/5/2013
9/5/2013
9/5/2013
9/3/2013
9/3/2013
9/2/2013
9/2/2013
9/2/2013
8/31/2013
8/31/2013
8/29/2013
8/29/2013
8/29/2013
8/29/2013
8/29/2013

Total
301,324.93
301,324.93

UND

kg

Metrado

200.00

kg

1,200.00

kg

5,000.00

kg

27,355.17

kg

30,000.00

kg

4,000.00

kg

20,000.00

5/8"
3/8"
1"
3/4"
5/8"
3/8"
1"
1"
1"
3/4"
5/8"
5/8"
3/8"
1"
3/4"
5/8"
1/2"
3/8"

VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA
VARILLA

kg

1,500.00

kg

10,000.00

kg

10,000.00

kg

10,000.00

kg

20,000.00

kg

69.76

kg

20,000.00

kg

20,000.00

kg

35,000.00

kg

12,000.00

kg

10,000.00

kg

35,000.00

TOTAL

271,324.93

VOLUMEN

14.52
14.52 m3
VOLUMEN

12.10
12.10 m2

VOLUMEN

6.31
6.05
3.78
2.65
2.47
2.16
23.42 m3

VOLUMEN

3.84

5.06
8.90 m3
VOLUMEN

20.16
7.68

10.12
37.96 m2
20.00 m2
17.96 m2

VOLUMEN

43.20
13.50
13.50

70.20 m3
VOLUMEN

24.00
7.50
7.50

39.00 m2

VOLUMEN

47.25
47.25 m3

VOLUMEN

2.07
31.50
40.32
15.36
89.25 m3
VOLUMEN

28.98
27.83

8.28

4.14
52.50
67.20
25.60

214.53 m2

VOLUMEN

8.64
5.18

13.82 m3
VOLUMEN

62.40
37.44

99.84 m3
VOLUMEN

62.40
37.44

99.84 m3

VOLUMEN

31.50

12.50

6.74
4.62
6.74
6.74
6.74
6.74
6.74

6.74
6.74
6.74
23.28
23.28
23.28
23.28
11.64
11.64
11.64
11.64
11.64
11.64
11.64

283.83 m3
261.69 m3
VOLUMEN

7.61
7.40
7.12
6.97
15.20
8.37
15.20
16.37
16.18
15.96
14.63
7.36
16.37
7.36

162.10 m3

VOLUMEN

24.37
23.70
22.79
22.32
48.69
26.78
48.69
52.43
51.84
51.13
46.85
23.58
52.43
23.58

519.17 m3

VOLUMEN

47.95
47.28
46.37
45.90
48.69
26.78
48.69
52.43
51.84
51.13

46.85
23.58
52.43
23.58

613.49 m3

VOLUMEN

120.96
20.48
6.83
40.32
188.58 m3

VOLUMEN

59.76
12.15
4.05
19.92
95.88 m3

VOLUMEN

100.80

16.80
33.31
150.91 m3
92.40 m3

VOLUMEN

83.00
20.75
18.38
122.13 m2

VOLUMEN

6.62
13.34
9.28
9.28
18.56
37.12

26.68
13.25
26.68
3.31
164.12

VOLUMEN

38.88
78.30
52.20

52.20
104.40
208.80

156.60
77.76
156.60
19.44
945.18
VOLUMEN

38.88
78.30
52.20
52.20
104.40
208.80

156.60
77.76
156.60
19.44
945.18

VOLUMEN

11.76
141.12
23.52

176.40

VOLUMEN

8.40
3.53
67.20
4.11
83.24

VOLUMEN

4.15
2.68
33.20
2.93
42.96

VOLUMEN

56.10
91.13
24.31
24.31
0.00
195.85 m3

VOLUMEN

17.32
17.78
17.75
7.36
17.35
18.18
22.08
22.33
22.58
22.83
17.18
0.00
202.72 m3
VOLUMEN

55.41
56.90
56.79
23.56
55.51
58.16
65.41
66.15
66.90
67.64
50.89
0.00
623.33 m3

VOLUMEN

55.41
56.90
56.79
23.56
55.51
58.16
65.41
66.15

66.90
67.64
50.89
0.00
623.33 m3

VOLUMEN

36.45
24.30
24.30

0.00
85.05 m3

VOLUMEN

7.36
7.36
8.59
8.59
8.59

0.00
40.49 m3

VOLUMEN

23.56
23.56
25.45
25.45
25.45

0.00
123.47 m3

VOLUMEN

23.56
23.56
25.45
25.45
25.45

0.00
123.47 m3

VOLUMEN

24.31
24.30
24.31
48.60
24.31
12.15
24.31
0.00

0.00
182.29 m3

VOLUMEN

14.73
7.36
17.18
8.59
0.00
47.85 m3

VOLUMEN

47.12
23.56
50.89
25.45
0.00
147.03 m3

VOLUMEN

47.12
23.56
50.89
25.45
0.00
147.03 m3

VOLUMEN

24.30
24.30
24.30
24.30

97.20 m3

UNIDAD
[m]
9
9
9
9
9
9
9
9
9
9
9
9
9
9

CANTIDAD
[und]
876
876
876
2100
876
876
340
140
900
850
350
800
4100
960

PESO
[kg/m]
3.97
3.97
3.97
0.99
3.97
3.97
0.56
1.55
0.56
0.22
1.55
0.99
0.56
2.24

PESO TOTAL
[kg]
31299.48
31299.48
31299.48
18711
31299.48
31299.48
1713.6
1953
4536
1698.3
4882.5
7128
20664
19353.6

9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9

740
575
200
570
1000
4625
910
910
455
600
300
110
6190
320
400
460
500
460
TOTAL

1.55
0.56
3.97
2.24
1.55
0.56
3.97
3.97
3.97
2.24
1.55
1.55
0.56
3.97
2.24
1.55
0.99
0.56

10323
2898
7146
11491.2
13950
23310
32514.3
32514.3
16257.15
12096
4185
1534.5
31197.6
11433.6
8064
6417
4455
2318.4
469,242.45

Ppto. 133-13AC_ Rev N00 ZC

Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha
PRESUPUESTO BASE
ITEM
06
06.03
06.03.01
06.03.01.01
06.03.01.01.01
06.03.01.01.01.01
06.03.01.01.02
06.03.01.01.02.01
06.03.01.01.02.01.01
06.03.01.01.02.01.02
06.03.01.01.02.01.03
06.03.01.01.02.01.04
06.03.01.01.02.01.05

06.03.01.01.02.01.06
06.03.01.01.02.02
06.03.01.01.02.02.01
06.03.01.01.02.03
06.03.01.01.02.03.01
06.03.01.01.02.04
06.03.01.01.02.04.01
06.03.01.01.02.04.02
06.03.01.01.02.04.03
06.03.01.01.02.04.04
06.03.01.01.02.04.05
06.03.01.01.02.04.06
06.03.01.01.03
06.03.01.01.03.01
06.03.01.01.04
06.03.01.01.04.01
06.03.01.01.04.02
06.03.01.01.04.03
06.03.01.01.04.04
06.03.01.01.04.05
06.03.01.01.04.06
06.03.01.01.05
06.03.01.01.05.01
06.03.01.02
06.03.01.02.01
06.03.01.02.01.01
06.03.01.02.02
06.03.01.02.02.01
06.03.01.02.02.01.01
06.03.01.02.02.01.02
06.03.01.02.02.01.03
06.03.01.02.02.01.04

06.03.01.02.02.01.05
06.03.01.02.02.01.06
06.03.01.02.02.01.07
06.03.01.02.02.01.08
06.03.01.02.02.01.09
06.03.01.02.02.01.10
06.03.01.02.02.01.11
06.03.01.02.02.01.12
06.03.01.02.02.01.13
06.03.01.02.02.01.14
06.03.01.02.02.01.15
06.03.01.02.02.02
06.03.01.02.02.02.01
06.03.01.02.02.02.02
06.03.01.02.02.03
06.03.01.02.02.03.01
06.03.01.02.02.03.02
06.03.01.02.02.04
06.03.01.02.02.04.01
06.03.01.02.02.04.02
06.03.01.02.02.04.03
06.03.01.02.02.04.04
06.03.01.02.02.04.05
06.03.01.02.02.04.06
06.03.01.02.03
06.03.01.02.03.01
06.03.01.02.03.02
06.03.01.02.03.03
06.03.01.02.03.04
06.03.01.02.04
06.03.01.02.04.01
06.03.01.02.04.02

06.03.01.02.04.03
06.03.01.02.05
06.03.01.02.05.01
06.03.01.03
06.03.01.03.01
06.03.01.03.01.01
06.03.01.03.02
06.03.01.03.02.01
06.03.01.03.02.01.01
06.03.01.03.02.01.02
06.03.01.03.02.01.03
06.03.01.03.02.02
06.03.01.03.02.02.01
06.03.01.03.02.03
06.03.01.03.02.03.01
06.03.01.03.02.04
06.03.01.03.02.04.01
06.03.01.03.02.04.02
06.03.01.03.03
06.03.01.03.03.01
06.03.01.03.04
06.03.01.03.04.01
06.03.01.03.04.02
06.03.01.03.04.03

VALORIZACIN N 04_ REV 00

_ Rev N00 ZC

:GERENPRO
: Ing Jose Martinez Woodman
: Planta Industrial Pucusana
: Sanitarias - Obras Exteriores
: Corporacion J.R. Lindley
: Pucusana, Lima - Peru
: 31 de Octubre 2013
PRESUPUESTO BASE
DESCRIPCION
OBRAS EXTERIORES
REDES EXTERIORES
INSTALACIONES SANITARIAS DE REDES EXTERIORES
SISTEMA DE DESAGE DOMSTICO
TRABAJOS PRELIMINARES
Trazo y replanteo durante la instalacin de tuberas
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin c/equipo T.N p/Tub. DN 200 mm, H=1.25m
Excavacin c/equipo T.N p/Tub. DN 200 mm, H=1.26 - 1.50m
Excavacin c/equipo T.N p/Tub. DN 200 mm, H=1.51 - 1.75m
Excavacin c/equipo T.N p/Tub. DN 200 mm, H=1.76 - 2.00m
Excavacin c/equipo T.N p/Tub. DN 200 mm, H=2.01 - 2.50m

UNIDAD

m
m
m
m
m

Excavacin c/equipo T.N p/Tub. DN 200 mm, H=2.51 - 3.00m


REFINE Y NIVELACIN
Refine y Nivelacin de zanja T.N DN 200 mm para toda profundidad
CAMA DE APOYO
Cama de arena manual e=0.10m zanja P/Tub. DN 200 mm
RELLENO COMPACTADO
Relleno compactado zanja T.N DN 200 mm, H=1.25m
Relleno compactado zanja T.N DN 200 mm, H=1.26 - 1.50m
Relleno compactado zanja T.N DN 200 mm, H=1.51 - 1.75m
Relleno compactado zanja T.N DN 200 mm, H=1.76 - 2.00m
Relleno compactado zanja T.N DN 200 mm, H=2.01 - 2.50m
Relleno compactado zanja T.N DN 200 mm, H=2.51 - 3.00m
REDES
Suministro e Instalacin de Tuberia UPVC-ISO 4435 S-20, DN 200 mm
BUZONES
Buzoneta tipo "A" T.normal, D=0.60m . Hasta 1.20m
Buzon D=1.20m Hasta 1.50m Profund, T. normal.
Buzon D=1.20m Hasta 1.75m Profund, T. normal.
Buzon D=1.20m Hasta 2.00m Profund, T. normal.
Buzon D=1.20m Hasta 2.50m Profund, T. normal.
Buzon D=1.20m Hasta 3.00m Profund, T. normal.
PRUEBA HIDRAULICA
Prueba Hidrulica de tuberia p/desage DN 110 - 200mm.
SISTEMA DE DESAGE INDUSTRIAL
TRABAJOS PRELIMINARES
Trazo y replanteo durante la instalacin de tuberas
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=1.25m
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=1.26 - 1.50m
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=1.76 - 2.00m
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=2.01 - 2.50m

m
m
m
m
m
m
m
m
m
m
und
und
und
und
und
und
m

m
m
m
m

Excavacin c/equipo T.N p/Tub. DN 315 mm, H=2.51 - 3.00m


Excavacin c/equipo T.N p/Tub. DN 355 mm, H=1.25m
Excavacin c/equipo T.N p/Tub. DN 355 mm, H=1.51 - 1.75m
Excavacin c/equipo T.N p/Tub. DN 355 mm, H=2.51 - 3.00m
Excavacin c/equipo T.N p/Tub. DN 400 mm, H=1.25m
Excavacin c/equipo T.N p/Tub. DN 400 mm, H=1.26 - 1.50m
Excavacin c/equipo T.N p/Tub. DN 400 mm, H=1.76 - 2.00m
Excavacin c/equipo T.N p/Tub. DN 400 mm, H=2.01 - 2.50m
Excavacin c/equipo T.N p/Tub. DN 400 mm, H=2.51 - 3.00m
Excavacin c/equipo T.N p/Tub. DN 450 mm, H=2.01 - 2.50m
Excavacin c/equipo T.N p/Tub. DN 450 mm, H=2.51 - 3.00m
REFINE Y NIVELACIN
Refine y Nivelacin de zanja T.N DN 315-355 mm para toda profundidad
Refine y Nivelacin de zanja T.N DN 400-450 mm para toda profundidad
CAMA DE APOYO
Cama de arena manual e=0.10m zanja P/Tub. DN 315-355 mm
Cama de arena manual e=0.10m zanja P/Tub. DN 400-450 mm
RELLENO COMPACTADO
Relleno compactado zanja T.N DN 315-355 mm, H=1.50m
Relleno compactado zanja T.N DN 315-355 mm, H=2.00m
Relleno compactado zanja T.N DN 315-355 mm, H=3.00m
Relleno compactado zanja T.N DN 400-450 mm, H=1.50m
Relleno compactado zanja T.N DN 400-450 mm, H=2.00m
Relleno compactado zanja T.N DN 400-450 mm, H=3.00m
REDES
Suministro e Instalacin de tubera HDPE PE-80 SDR 21 D=315mm, Inc. Prueba
Suministro e Instalacin de tubera HDPE PE-80 SDR 21 D=355mm, Inc. Prueba
Suministro e Instalacin de tubera HDPE PE-80 SDR 21 D=400mm, Inc. Prueba
Suministro e Instalacin de tubera HDPE PE-80 SDR 21 D=450mm, Inc. Prueba
BUZONES
Buzon D=1.20m Hasta 1.50m Profund, T. normal.
Buzon D=1.20m Hasta 2.00m Profund, T. normal.

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
hidrulica
hidrulica
hidrulica
hidrulica

m
m
m
m
und
und

Buzon D=1.20m Hasta 3.00m Profund, T. normal.


PRUEBA HIDRAULICA
Prueba Hidrulica de tuberia p/desage DN 315 - 450mm.
SISTEMA DE DESAGE SALMUERA
TRABAJOS PRELIMINARES
Trazo y replanteo durante la instalacin de tuberas
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=1.25m
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=1.26 - 1.50m
Excavacin c/equipo T.N p/Tub. DN 315 mm, H=1.51 - 1.75m
REFINE Y NIVELACIN
Refine y Nivelacin de zanja T.N DN 315-355 mm para toda profundidad
CAMA DE APOYO
Cama de arena manual e=0.10m zanja P/Tub. DN 315-355 mm
RELLENO COMPACTADO
Relleno compactado zanja T.N DN 315-355 mm, H=1.50m
Relleno compactado zanja T.N DN 315-355 mm, H=2.00m
REDES
Suministro e Instalacin de tubera HDPE PE-80 SDR 21 D=315mm, Inc. Prueba hidrulica
BUZONES
Buzon D=1.20m Hasta 1.25m Profund, T. normal.
Buzon D=1.20m Hasta 1.50m Profund, T. normal.
Buzon D=1.20m Hasta 1.75m Profund, T. normal.
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
VALOR VENTA
AMORTIZACION ADELANTO
SUB TOTAL N 01

und
m

m
m
m
m
m
m
m
m
und
und
und

RETENCIN POR GARANTIA TECNICA


SUB TOTAL N 02
I.G.V.
TOTAL A FACTURAR

Av. Benavides 195 of. 204 Miraflores


Telefax 445-8389

Rev. N: 0.00

ANTERIOR ACUMULADO
METRADO

PRECIO
UNITARIO

P.PARCIAL S/.

SUBTOTAL S/.

CANTIDAD

705.42

20.18%

223.87
224.75
0.00
0.00
0.00

16.46%
34.44%
0.00%
0.00%
0.00%

2,326,882.73
2,317,688.13
2317688.13
742840.86
8,502.84
3496.29

2.43

8,502.84
201,525.69
46,020.44

1360.26
652.58
382.02
312.15
337.01

9.32
11.19
13.05
14.91
18.64

12,679.42
7,299.49
4,985.30
4,655.44
6,282.76

452.28

22.37

10,118.03

0.00

0.00%

608.62

17.41%

224.59

6.42%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

726.57

20.66%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00%

506.39

16.18%

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

20,047.27
3496.29

5.73

20,047.27
19,432.59

3496.29

5.56

19,432.59
116,025.39

1360.26
652.58
382.02
312.15
337.01
452.28

23.50
28.20
32.90
37.60
47.00
56.40

31,966.98
18,403.26
12,568.80
11,737.16
15,839.90
25,509.29

3516.29

111.84

393,262.45

393,262.45
129,071.34
26
3
5
3
5
9

1,337.53
2,407.55
2,808.81
3,210.06
4,012.58
4,815.10

34,775.70
7,222.65
14,044.03
9,630.19
20,062.90
43,335.87
10,478.54

3516.29

2.98

10,478.54
1,271,790.73
7,610.65

3129.43

2.43

7,610.65
289,396.36
57,835.05

627.23
238.27
78.4
78.4

9.32
11.19
13.05
14.91

5,846.61
2,665.19
1,023.11
1,169.27

72.16
801.09
55.19
61.34
301.91
87.41
78.4
327.11
69.4
170.61
82.5

18.64
22.37
13.98
16.78
22.37
27.96
33.56
15.54
21.75
37.29
15.54

1,345.25
17,921.32
771.67
1,029.19
6,754.08
2,444.33
2,630.85
5,081.83
1,509.43
6,361.24
1,281.68

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

195.27
0.00
0.00
0.00

17.43%
0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

26,060.58
2012.08
1117.35

7.65
9.56

15,382.68
10,677.90
25,261.51

2012.08
1117.35

7.41
9.26

14,911.01
10,350.50
180,239.22

1666.59
133.59
211.9
389.32
78.4
649.63

42.30
56.40
84.60
47.00
62.67
94.00

70,498.68
7,534.68
17,927.23
18,298.54
4,913.20
61,066.89

1,120.00
1,270.00
802.00
290.00

211.06
232.49
269.48
293.14

236,392.53
295,267.26
216,123.93
85,010.99

832,794.71

131,612.65
28.00
2.00

2,407.55
3,210.06

67,411.36
6,420.13

12.00

4,815.10

57,781.16

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%
0.00%

0.00

0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

10,376.36
3,482.00

2.98

10,376.36
303,056.54
2,237.40

920.00

2.43

2,237.40
67,316.27
13,772.25

705.00
160.00
55.00

13.98
16.78
22.37

9,857.30
2,684.54
1,230.41
7,033.55

920.00

7.65

7,033.55
6,817.89

920.00

7.41

6,817.89
39,692.58

865.00
55.00

42.30
56.40

36,590.50
3,102.08
194,179.58

920.00

211.06

194,179.58

13.00
1.00
2.00

2,407.55
2,407.55
2,808.81

31,298.13
2,407.55
5,617.61

39,323.29

S/.

2,326,882.73

12.85%

S/.

5.61%

S/.

130,471.89

S/.

2,756,359.05

S/.

-551,271.81

-20.00%

299,004.43

2,205,087.24

5.79%

-10.00%
18.00%

-275,635.91
S/.

1,929,451.33

S/.

347,301.24

S/.

2,276,752.57

VALORIZACION

R ACUMULADO

ESTE PERIODO VAL. 4


COSTO

CANTIDAD

1,715.55

0.00

2,086.76
2,513.96
0.00
0.00
0.00

0.00
147.55
0.00
0.00
0.00

AVANCE ACUMULADO

COSTO

CANTIDAD

0.00%

0.00

705.42

20.18%

0.00%
22.61%
0.00%
0.00%
0.00%

0.00
1,650.43
0.00
0.00
0.00

223.87
372.30
0.00
0.00
0.00

16.46%
57.05%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3,489.75

0.00

0.00%

0.00

608.62

17.41%

1,248.28

298.02

8.52%

1,656.41

522.61

14.95%

0.00
0.00
0.00
0.00
0.00
0.00

70.84
443.50
0.00
0.00
0.00
0.00

5.21%
67.96%
0.00%
0.00%
0.00%
0.00%

1,664.79
12,507.04
0.00
0.00
0.00
0.00

70.84
443.50
0.00
0.00
0.00
0.00

5.21%
67.96%
0.00%
0.00%
0.00%
0.00%

81,259.62

299.62

8.52%

33,509.55

1,026.19

29.18%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1,231.52

0.00

0.00%

0.00

506.39

16.18%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

41,214.42
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

195.27
0.00
0.00
0.00

17.43%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

195.27

21.22%

41,214.42

195.27

21.22%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

3.96%

92,202.64

134,759.86
17,316.64

11,848.04

7,556.19

5,169.94

159,632.69

109,220.62

-31,926.54

-21,844.12

127,706.15

87,376.50

9.75%

-15,963.27

-10,922.06

111,742.88

76,454.44

20,113.72

13,761.80

131,856.60

90,216.24

CE ACUMULADO

SALDO POR EJECUTAR


COSTO

CANTIDAD

COSTO

1,715.55

2,790.87

79.82%

6,787.28

2,086.76
4,164.39
0.00
0.00
0.00

1,136.39
280.28
382.02
312.15
337.01

83.54%
42.95%
100.00%
100.00%
100.00%

10,592.66
3,135.10
4,985.30
4,655.44
6,282.76

0.00

452.28

100.00%

10,118.03

3,489.75

2,887.67

82.59%

16,557.53

2,904.70

2,973.68

85.05%

16,527.89

1,664.79
12,507.04
0.00
0.00
0.00
0.00

1,289.42
209.08
382.02
312.15
337.01
452.28

94.79%
32.04%
100.00%
100.00%
100.00%
100.00%

30,302.20
5,896.22
12,568.80
11,737.16
15,839.90
25,509.29

114,769.17

2,490.10

70.82%

278,493.28

0.00
0.00
0.00
0.00
0.00
0.00

26.00
3.00
5.00
3.00
5.00
9.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

34,775.70
7,222.65
14,044.03
9,630.19
20,062.90
43,335.87

0.00

3,516.29

100.00%

10,478.54

1,231.52

2,623.04

83.82%

6,379.13

0.00
0.00
0.00
0.00

627.23
238.27
78.40
78.40

100.00%
100.00%
100.00%
100.00%

5,846.61
2,665.19
1,023.11
1,169.27

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

72.16
801.09
55.19
61.34
301.91
87.41
78.40
327.11
69.40
170.61
82.50

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1,345.25
17,921.32
771.67
1,029.19
6,754.08
2,444.33
2,630.85
5,081.83
1,509.43
6,361.24
1,281.68

0.00
0.00

2,012.08
1,117.35

100.00%
100.00%

15,382.68
10,677.90

0.00
0.00

2,012.08
1,117.35

100.00%
100.00%

14,911.01
10,350.50

0.00
0.00
0.00
0.00
0.00
0.00

1,666.59
133.59
211.90
389.32
78.40
649.63

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

70,498.68
7,534.68
17,927.23
18,298.54
4,913.20
61,066.89

41,214.42
0.00
0.00
0.00

924.73
1,270.00
802.00
290.00

82.57%
100.00%
100.00%
100.00%

195,178.11
295,267.26
216,123.93
85,010.99

0.00
0.00

28.00
2.00

100.00%
100.00%

67,411.36
6,420.13

0.00

12.00

100.00%

57,781.16

0.00

3,482.00

100.00%

10,376.36

0.00

920.00

100.00%

2,237.40

0.00
0.00
0.00

705.00
160.00
55.00

100.00%
100.00%
100.00%

9,857.30
2,684.54
1,230.41

0.00

920.00

100.00%

7,033.55

0.00

920.00

100.00%

6,817.89

0.00
0.00

865.00
55.00

100.00%
100.00%

36,590.50
3,102.08

41,214.42

724.73

78.78%

152,965.16

0.00
0.00
0.00

13.00
1.00
2.00

100.00%
100.00%
100.00%

31,298.13
2,407.55
5,617.61

90.25%

2,099,920.23

226,962.51
29,164.68

269,839.75

12,726.14

117,745.76

268,853.33

2,487,505.74

-53,770.67

-497,501.15

215,082.66

1,990,004.59

-26,885.33

-248,750.57

188,197.33

1,741,254.02

33,875.52

313,425.72

222,072.85

2,054,679.74

ac
Aceros y Concretos S.A.C.
Contratistas Generales
Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha

SUSTENT

ITEM
06.03.01.01.02.01.02

ITEM
06.03.01.01.02.03.01

ITEM
06.03.01.01.03.01

ITEM
06.03.01.01.02.04.01

ITEM
06.03.01.01.02.04.02

OJO: ENLA PARTIDA DE RELLENO COMPACTADO, NO SE ESTA CONSIDERANDO EL RELL


TAMBIEN NO SE ESTA CONSIDERANDO LA PRUEBA DE DENSIDAD DE CAMPO

ITEM
06.03.01.03.03.01

PROYECTO PLANTA INDUSTRIAL DE CORPO

: GERENPRO
: Ing Jose Martinez Woodman
: Mto. 019GP0043A-000-99-101

PROYECTO PLANTA INDUSTRIAL DE CORPORACION LINDLEY- PUCUSANA


: Corporacion Lindley- Pucusana
:Pucusana
22 de Junio - 2013

SUSTENTO DE METRADOS

REDES EXTERIORE
SISTEMA DE DESAGE
DESCRIPCION
Excavacin c/equipo T.N p/Tub. DN 200 mm, H=1.26 - 1.50m
DE BZN DOM # 26 al BZN DOM # 27 referencia al eje "Q"
DE BZN DOM # 28 al BZN DOM # 29 referencia al eje "Q"

DESCRIPCION
Cama de arena manual e=0.10m zanja P/Tub. DN 200 mm
DE BZN DOM # 26 al BZN DOM #27
DE BZN DOM #27 al BZN DOM #28
DE BZN DOM #28 al BZN DOM #29
DE BZN DOM #29 al BZN DOM #30

DESCRIPCION
Suministro e Instalacin de Tuberia UPVC-ISO 4435 S-20, DN 200 mm
DE BZN DOM # 26al BZN DOM #27
DE BZN DOM #27 al BZN DOM #28
DE BZN DOM # 28 al BZN DOM # 29
DE BZN DOM #29 al BZN DOM # 30

DESCRIPCION
Relleno compactado zanja T.N DN 200 mm, H=1.25m
DE BZN DOM #52 al BZN DOM #53

DE BZN DOM #53 al BZN DOM #27

DESCRIPCION
Relleno compactado zanja T.N DN 200 mm, H=1.26 - 1.50m
DE BZN DOM #54 al BZN DOM #55
DE BZN DOM #55 al BZN DOM #56
DE BZN DOM #56 al BZN DOM #29
DE BZN DOM #55 al BZN DOM # 57
DE BZN DOM # 26 al BZN DOM #27
DE BZN DOM #27 al BZN DOM #28
DE BZN DOM #28 al BZN DOM #29
DE BZN DOM #29 al BZN DOM #30

E RELLENO COMPACTADO, NO SE ESTA CONSIDERANDO EL RELLENO CON MATERAL DE AFIRM


ESTA CONSIDERANDO LA PRUEBA DE DENSIDAD DE CAMPO

SUMINISTRO DE MATE
SISTEMA DESAGUE SAL

DESCRIPCION
Suministro e Instalacin de tubera HDPE PE-80 SDR 21 D=315mm, Inc. Prueba h
Material

L DE CORPORACION LINDLEY- PUCUSANA


Av. Benavides 195 of. 204 Miraflores
Telefax 445-8389

TRADOS

ES EXTERIORES

DE DESAGE DOMSTICO
CANTIDAD

LONGITUD

1.000
1.000

69.050
78.500

CANTIDAD

LONGITUD

1.000
1.000
1.000
1.000

69.050
78.480
78.500
71.990

ALTURA

ANCHO

VECES

ALTURA

ANCHO

VECES

TOTAL

CANTIDAD

LONGITUD

1.000
1.000
1.000
1.000

69.450
78.880
78.900
72.390

ALTURA

ANCHO

VECES

TOTAL

CANTIDAD

LONGITUD

1.000

43.500

ALTURA

ANCHO

VECES

1.000

27.340
TOTAL

CANTIDAD

LONGITUD

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

43.680
43.500
27.420
30.880
69.050
78.480
78.500
71.990

ALTURA

ANCHO

VECES

TOTAL

ATERAL DE AFIRMADO DE CANTERA ESCORPION PARA UNA ALTURA DE H=0.30m PARA NPT.

TRO DE MATERIAL
DESAGUE SALMUERA
CANTIDAD

LONGITUD

INCIDENCIA

6.000

0.814

mm, Inc. Prueba hidrulica

40.000

ANCHO

VECES

TOTAL

69.05
78.50
147.55 ml

TOTAL

69.05
78.48
78.50
71.99
298.02 ml

TOTAL

69.45
78.88
78.90
72.39
299.62 ml

TOTAL

43.50

27.34
70.84 ml

TOTAL

43.68
43.50
27.42
30.88
69.05
78.48
78.50
71.99
443.50 ml

30m PARA NPT.

TOTAL

195.27

Ppto. 133-13AC_ Rev N00 ZC


Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha

PR
ITEM
01.00.00.00
01.01.00.00
01.02.00.00
01.03.00.00
01.04.00.00
01.05.00.00
02.00.00.00
02.01.00.00
02.01.01.00
02.01.02.00
02.01.03.00
02.01.04.00
02.01.05.00
02.01.06.00
02.01.07.00
02.02.00.00
02.02.01.00
02.03.00.00
02.03.01.00
02.03.01.01
02.03.01.02
02.03.01.03
02.03.01.04
02.03.01.05
02.03.02.00
02.03.02.01

02.03.03.00
02.03.03.01
02.03.03.02
02.03.03.03
02.04.00.00
02.04.00.01
02.05.00.00
02.05.00.01
02.06.00.00
02.06.00.01
02.06.00.02

VALORIZACIN N 04_ REV 00

33-13AC_ Rev N00 ZC


:GERENPRO
: Ing Jose Martinez Woodman
: Planta Industrial Pucusana
: Obras Civiles Sistema contraincendio
: Corporacion J.R. Lindley
: Pucusana, Lima - Peru
: 31 de Octubre 2013

PRESUPUESTO BAS
DESCRIPCION
OBRAS CIVILES S.C.I.
OBRAS PRELIMINARES:
Trazos, replanteo y topografia
Implementos y equipos de seguridad, sealizacin , sctr, examen medico
Baos quimicos
Limpieza permanente de obra
Iluminacion para trabajos nocturnos
OBRAS CIVILES RED CONTRA INCENDIO:
Movimiento de tierras :
Excavaciones con maquinaria
Perfilado nivelado y compactado de fondo de excavacion
Relleno compactado con material propio
Colocacin de 1 capas de arena gruesa inf=4" fondo de tuberas
Colocacin de 1 capas de arena gruesa sup=8" costados y sobre tuberas
Acarreo de material sobrante
Eliminacion de material excedente
Colocacion de tuberias con maquinaria :
Colocacion de tuberias con maquinaria pesada
Bloques de concreto para retencion de accesorios :
Movimiento de tierras :
Excavaciones con maquinaria
Perfilado nivelado y compactado de fondo de excavacion
Relleno compactado con material propio
Acarreo de material sobrante
Eliminacion de material excedente
Concreto simple :
Solado

Concreto :
Concreto fc=175kg/cm2
Encofrado y desencofrado
Acero para anclajes
Pases para tuberias :
Pases de tuberias a nave
Cisterna de agua para pruebas de presion :
Provicion de agua para pruebas de presion en tuberias
Pases para tuberias dentro de cisterna :
Colocacion de pases para tuberias a cisterna
Preparacion de nicho para colocar rompe agua
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
VALOR VENTA
AMORTIZACION ADELANTO
SUB TOTAL N 01
RETENCIN POR GARANTIA TECNICA
SUB TOTAL N 02
I.G.V.
TOTAL A FACTURAR

Av. Benavides 195 of. 204 Miraflores


Telefax 445-8389

Rev. N: 0.00

UNIDAD

METRADO

PRECIO
UNITARIO

P.PARCIAL S/.

SUBTOTAL S/.
0.00

mes
glb
Und/mes
mes
mes

4.00
12.00
12.00
12.00
3.00

0.00
0.00
0.00
0.00
0.00
687,888.62

m3
m2
m3
m2
m2
m3
m3

4,620.00
3,080.00
918.00
3,080.00
3,080.00
594.00
594.00

10.51
5.89
18.86
11.17
19.53
14.09
17.15

48,569.35
18,143.90
17,317.17
34,397.13
60,165.34
8,367.74
10,188.93

dia

140.00

1,360.00

190,400.00

m3
m2
m3
m3
m3

200.00
100.00
45.00
10.00
10.00

10.51
5.89
18.86
14.09
17.15

2,102.57
589.09
848.88
140.87
171.53

m2

200.00

16.82

3,363.90

m3
m2
kg

800.00
400.00
3,500.00

314.32
42.64
4.03

251,459.69
17,057.53
14,105.00

und

16.00

300.00

4,800.00

Tancada

30.00

147.00

4,410.00

4.00
1.00

185.00
550.00

740.00
550.00

und
und

S/.
12.85%
5.61%
-20.00%

S/.

687,888.62
88,393.69

S/.

38,570.97

S/.

814,853.28

S/.

-162,970.66
651,882.62

-10.00%
18.00%

-81,485.33
S/.

570,397.29

S/.

102,671.51

S/.

673,068.80

VALORIZACION
ANTERIOR ACUMULADO

ESTE PERIODO VAL. 4

CANTIDAD

COSTO

CANTIDAD

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

232.70
0.00
0.00
0.00
0.00
0.00
0.00

5.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

2,446.38
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.36%

2,446.38
314.36
137.17
2,897.91
-579.58
2,318.33
-289.79
2,028.54
365.14
2,393.68

VALORIZACION
AVANCE ACUMULADO

ESTE PERIODO VAL. 4


%

COSTO

CANTIDAD

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

232.70
0.00
0.00
0.00
0.00
0.00
0.00

5.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00

0.00

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%

0.00

0.00

0.00%

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.36%

CUMULADO

SALDO POR EJECUTAR


COSTO

CANTIDAD

COSTO

0.00
0.00
0.00
0.00
0.00

4.00
12.00
12.00
12.00
3.00

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

2,446.38
0.00
0.00
0.00
0.00
0.00
0.00

4,387.30
3,080.00
918.00
3,080.00
3,080.00
594.00
594.00

94.96%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

46,122.97
18,143.90
17,317.17
34,397.13
60,165.34
8,367.74
10,188.93

0.00

140.00

100.00%

190,400.00

0.00
0.00
0.00
0.00
0.00

200.00
100.00
45.00
10.00
10.00

100.00%
100.00%
100.00%
100.00%
100.00%

2,102.57
589.09
848.88
140.87
171.53

0.00

200.00

100.00%

3,363.90

0.00
0.00
0.00

800.00
400.00
3,500.00

100.00%
100.00%
100.00%

251,459.69
17,057.53
14,105.00

0.00

16.00

100.00%

4,800.00

0.00

30.00

100.00%

4,410.00

0.00
0.00

4.00
1.00

100.00%
100.00%

740.00
550.00

99.64%

685,442.24

2,446.38
314.36

88,079.33

137.17

38,433.80

2,897.91

811,955.37

-579.58

-162,391.07

2,318.33

649,564.30

-289.79

-81,195.54

2,028.54

568,368.76

365.14

102,306.38

2,393.68

670,675.14

ac
Aceros y Concretos S.A.C.
Contratistas Generales
Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha

SUSTENTO D

PROYECTO PLANTA INDUSTRIAL DE CORPO

os S.A.C.

erales
: GERENPRO
: Ing Jose Martinez Woodman
: Mto. 019GP0043A-000-99-101

PROYECTO PLANTA INDUSTRIAL DE CORPORACION LINDLEY- PUCUSANA


: Corporacion Lindley- Pucusana
:Pucusana
22 de Junio - 2013

SUSTENTO DE METRADOS

L DE CORPORACION LINDLEY- PUCUSANA

METRADOS

Av. Benavides 195 of. 204 Miraflores


Telefax 445-8389

Ppto. 133-13AC_ Rev N00 ZC

Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha
PRESUPUESTO BASE
ITEM
07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.01.06
07.01.07
07.01.08
07.01.09
07.01.10
07.02

07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06
07.02.07
07.02.08
07.02.09
07.02.10

VALORIZACIN N 04_ REV 00

33-13AC_ Rev N00 ZC

:GERENPRO
: Ing Jose Martinez Woodman
: Planta Industrial Pucusana
:Electricas Obras Exteriores
: Corporacion J.R. Lindley
: Pucusana, Lima - Peru
: 31 de Octubre 2013
PRESUPUESTO BASE
DESCRIPCION
INSTALACIONES ELECTRICAS DE REDES EXTERIORES
REDES EXTERIORES PARA ALIMENTADORES EN B.T.
Cinta de Sealizacin
Excavacin de zanja
Relleno y compactacin de zanja
Eliminacin de Material Excedente
Buzones BT
Ductos de Concreto de 02 vas
Ductos de Concreto de 04 vas
Ductos de Concreto de 08 vas
Ductos de Concreto de 16 vas
Tuberias PVC-P 100mm (inc. accesorios)
REDES EXTERIORES PARA COMUNICACION

UNIDAD

m
m3
m3
m3
und
m
m
m
m
m

Cinta de Sealizacin
Excavacin de zanja
Relleno y compactacin de zanja
Eliminacin de Material Excedente
Buzones BC
Ductos de Concreto de 02 vas
Ductos de Concreto de 04 vas
Tuberias PVC-P 50mm (inc. accesorios)
Tuberias PVC-P 100mm (inc. accesorios)
Bandeja Metalica Portacables 200x100mm, fondo perforado con tapa (Elctrico)
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
VALOR VENTA
AMORTIZACION ADELANTO
SUB TOTAL N 01
RETENCIN POR GARANTIA TECNICA
SUB TOTAL N 02
I.G.V.
TOTAL A FACTURAR

m
m3
m3
m3
und
m
m
m
m
m

Av. Benavides 195 of. 204 Miraflores


Telefax 445-8389

Rev. N:

0.00

ANTERIOR ACUMULADO
METRADO

PRECIO
UNITARIO

P.PARCIAL S/.

SUBTOTAL S/.

CANTIDAD

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

768,499.86
202,675.45
1,344.00
1,655.84
827.92
827.92
40.00
280.00
494.00
140.00
200.00
250.00

2.81
15.90
15.29
21.42
529.23
50.46
75.07
121.43
210.14
43.05

3,772.80
26,336.06
12,654.99
17,737.35
21,169.36
14,128.23
37,085.79
17,000.19
42,028.98
10,761.70
565,824.41

1,440.00
1,695.10
847.55
847.55
44.00
80.00
960.00
300.00
100.00
2,360.00

2.81
15.90
15.29
21.42
529.23
50.46
75.07
19.55
43.05
167.01

4,042.28
26,960.49
12,955.04
18,157.90
23,286.30
4,036.64
72,069.55
5,864.56
4,304.68
394,146.97
S/.

492.64
118.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,549,299.61

12.85%

S/.

5.61%

S/.

86,871.61

S/.

1,835,256.22

S/.

-367,051.24

-20.00%

199,085.00

1,468,204.98
-10.00%
18.00%

-183,525.62
S/.

1,284,679.36

S/.

231,242.29

S/.

1,515,921.65

34.21%
7.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.21%

VALORIZACION

R ACUMULADO

ESTE PERIODO VAL. 4


COSTO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CANTIDAD

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

AVANCE ACUMULADO

COSTO

CANTIDAD

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1,382.91
1,891.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,274.52

0.00
0.00
19.16
9.58
0.00
80.00
0.00
0.00
0.00
0.00

0.00%
0.00%
2.26%
1.13%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
292.87
205.24
0.00
4,036.64
0.00
0.00
0.00
0.00

0.29%

4,534.75

420.78

582.72

183.61

254.27

3,878.91

5,371.74

-775.78

-1,074.35

3,103.13

4,297.39

-387.89

-537.17

2,715.24

3,760.22

488.74

676.84

3,203.98

4,437.06

492.64
118.93
19.16
9.58
0.00
80.00
0.00
0.00
0.00
0.00

34.21%
7.02%
2.26%
1.13%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.50%

CE ACUMULADO

SALDO POR EJECUTAR


COSTO

CANTIDAD

COSTO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,344.00
1,655.84
827.92
827.92
40.00
280.00
494.00
140.00
200.00
250.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

3,772.80
26,336.06
12,654.99
17,737.35
21,169.36
14,128.23
37,085.79
17,000.19
42,028.98
10,761.70

1,382.91
1,891.61
292.87
205.24
0.00
4,036.64
0.00
0.00
0.00
0.00
7,809.27

947.36
1,576.17
828.39
837.97
44.00
0.00
960.00
300.00
100.00
2,360.00

65.79%
92.98%
97.74%
98.87%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%

2,659.37
25,068.88
12,662.17
17,952.66
23,286.30
0.00
72,069.55
5,864.56
4,304.68
394,146.97

99.50%

1,541,490.34

1,003.49

198,081.51

437.88

86,433.73

9,250.64

1,826,005.58

-1,850.13

-365,201.12

7,400.51

1,460,804.46

-925.06

-182,600.56

6,475.45

1,278,203.90

1,165.58

230,076.70

7,641.03

1,508,280.60

ac
Aceros y Concretos S.A.C.
Contratistas Generales
Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha

SUSTENTO D

REDES E
ITEM

07.02
07.02.03

ITEM
07.02.04

ITEM
07.02.06

OJO: EN LA PARTIDA DE RELLENO COMPACTADO, NO SE ESTA CONSIDERANDO EL REL


TAMBIEN NO SE ESTA CONSIDERANDO LA PRUEBA DE DENSIDAD DE CAMPO

PROYECTO PLANTA INDUSTRIAL DE CORPO

os S.A.C.

erales
: GERENPRO
: Ing Jose Martinez Woodman
: Mto. 019GP0043A-000-99-101

PROYECTO PLANTA INDUSTRIAL DE CORPORACION LINDLEY- PUCUSANA


: Corporacion Lindley- Pucusana
:Pucusana
22 de Junio - 2013

SUSTENTO DE METRADOS

REDES EXTERIORES PARA


DESCRIPCION

REDES EXTERIORES PARA COMUNICACION


Relleno y compactacin de zanja
Volumen de relleno en Excavacion de Voz y Data

DESCRIPCION
Eliminacin de Material Excedente
Volumen de material a eliminar

DESCRIPCION
Ductos de Concreto de 02 vas
Ductos a Instalar

ARTIDA DE RELLENO COMPACTADO, NO SE ESTA CONSIDERANDO EL RELLENO CON MATERAL


EN NO SE ESTA CONSIDERANDO LA PRUEBA DE DENSIDAD DE CAMPO
PRUEBA DE DENSIDAD DE CAMPO

L DE CORPORACION LINDLEY- PUCUSANA


Av. Benavides 195 of. 204 Miraflores
Telefax 445-8389

METRADOS

ERIORES PARA COMUNICACION


CANTIDAD

LONGITUD

ALTURA

ANCHO

VECES

1.000

95.800

0.500

0.40

1.00

CANTIDAD

LONGITUD

ALTURA

ANCHO

VECES

material excavado
28.740

CANTIDAD

LONGITUD

95.800

ALTURA

material relleno
19.16

ANCHO

VECES

TOTAL
METRADO CONTRACTUAL
MAYOR METRAOD

O CON MATERAL DE AFIRMADO DE CANTERA ESCORPION PARA UNA ALTURA DE H=0.30m PA

MATERIAL ESCORPION

TOTAL

19.16 m3

OJO : NO SE ESTA CONSIDERANDO


RELLENO CON MATERIAL DE AFIRMADO

TOTAL

Vol. a eliminar
9.58 m3

TOTAL
95.80 ml
80.00 ml
15.80 ml

DE H=0.30m PARA NPT.

SE CREA UN ADICIONAL, YA QUE SE


SUPERAN LOS ML PRESUPUESTADOS

Ppto. 133-13AC_ Rev N00 ZC

Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha
PRESUPUESTO BASE
ITEM
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.02
01.02.01
01.02.02
01.02.03

01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
01.04.07
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.01.03
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.06

01.06.01
01.07
01.07.01
01.07.02

VALORIZACIN N 00_ REV 04

33-13AC_ Rev N00 ZC

:GERENPRO
: Ing Jose Martinez Woodman
: Planta Industrial Pucusana
:DRENAJE
: Corporacion J.R. Lindley
: Pucusana, Lima - Peru
: 31 de Octubre 2013
PRESUPUESTO BASE
DESCRIPCION
SISTEMA DE DRENAJE
CUNETA CON REJILLA
Excavacin manual en terreno arenoso, hasta 1.0m.
Concreto f'c= 20 MPa
Concreto f'c= 10 MPa (Solado)
Encofrado y desencofrado caravista
Juntas elastomrica (e=2.5cm)
Rejillas tipo I modulo de 0.40x1.00m; plancha 1/2"x3"
Eliminacin de material excedente con equipo; botadero d=6km
BUZONES DE DRENAJE - TIPO I Y II
Excavacin manual en terreno arenoso, hasta 1.0m.
Relleno compactado con plancha compactadora de 5.8 HP, con material propio
Concreto f'c= 20 MPa

UNIDAD

m3
m3
m3
m2
m
m
m3
m3
m3
m3

Concreto f'c= 10 MPa (Solado)


Encofrado y desencofrado caravista
Rejillas de buzn de 1.10x0.70m; plancha 2"x1/4"
Eliminacin de material excedente con equipo; botadero d=6km
TUBERIA SIN PERFORAR
Excavacin manual en terreno arenoso, hasta 1.0m.
Relleno compactado con plancha compactadora de 5.8 HP, con material propio
Tubera PVC SAP C-10 200mm
Tubera PVC SAP C-10 250mm
Arena e=0.10m
Eliminacin de material excedente con equipo; botadero d=6km
ZANJA DE INFILTRACION
Excavacin manual en terreno arenoso, hasta 1.5m.
Filtro de material granular (3/4" - 4")
Tubera perforada PVC SAP C-10 100mm
Tubera perforada PVC SAP C-10 200mm
Tubera perforada PVC SAP C-10 250mm
Geotextil
Eliminacin de material excedente con equipo; botadero d=6km
ZANJAS DE CONDUCCION Y POZAS DE INFILTRACION
Pozas de infiltracin con vegetacin
Excavacin manual en terreno arenoso, hasta 1.0m.
Tierra de chacra
Eliminacin de material excedente con equipo; botadero d=6km
Pozas de infiltracin sin vegetacin
Excavacin manual en terreno arenoso, hasta 1.0m.
Tierra de chacra
Eliminacin de material excedente con equipo; botadero d=6km
Zanjas de conduccin
Excavacin manual en terreno arenoso, hasta 1.0m.
Eliminacin de material excedente con equipo; botadero d=6km
CANALETAS DE TECHOS

m3
m2
m2
m3
m3
m3
m
m
m3
m3
m3
m3
m
m
m
m2
m3

m3
m3
m3
m3
m3
m3
m3
m3

Canaletas
BAJADA DE DRENAJE DE TECHO
Tubera PVC SAP C-10 100mm
Tubera PVC SAP C-10 150mm
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
VALOR VENTA
AMORTIZACION ADELANTO
SUB TOTAL N 01
RETENCIN POR GARANTIA TECNICA
SUB TOTAL N 02
I.G.V.
TOTAL A FACTURAR

m
m
m

Av. Benavides 195 of. 204 Miraflores


Telefax 445-8389

Rev. N: 0.00

ANTERIOR ACUMULADO
METRADO

PRECIO
UNITARIO

P.PARCIAL S/.

SUBTOTAL S/.

CANTIDAD

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

789,964.52
51,755.70
182.56
109.03
12.07
150.65
135.00
402.45
182.56

11.38
309.78
275.99
58.86
4.25
17.15

2,077.27
33,775.52
3,331.18
8,867.07
573.19
0.00
3,131.47
68,885.75

378.50
295.75
50.61

11.38
60.28
309.78

4,306.78
17,827.81
15,678.06

4.10
477.35
53.90
107.58

275.99
58.86
17.15

1,131.55
28,096.22
0.00
1,845.33

470.40
395.75
906.51
72.69
41.44
97.05

11.38
60.28
72.14
83.14
69.64
17.15

5,352.46
23,855.81
65,393.16
6,043.25
2,885.91
1,664.71

0.00
0.00

0.00%
0.00%

0.00

0.00%

248.59
0.00
683.24
0.00
29.51
0.00

52.85%
0.00%
75.37%
0.00%
71.22%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00%
0.00%

105,195.30

264,790.84
1,185.39
1,151.20
77.20
349.13
464.42
5,443.86
44.44

11.38
80.05
43.03
98.36
166.49
7.97
17.15

13,488.00
92,156.78
3,321.76
34,340.43
77,323.14
43,398.45
762.28
276,069.77
110,044.15

1,086.64
1,086.64
1,086.64

11.38
72.74
17.15

12,364.37
79,040.56
18,639.22

1,287.87
1,287.87
1,287.87

11.38
72.74
17.15

14,654.08
93,677.73
22,090.93

1,247.84
1,247.84

11.38
17.15

14,198.59
21,404.29

130,422.74

35,602.88

0.00

1,322.95

0.00

0.00

0.00%

0.00
0.00

0.00%
0.00%

23,267.16
67.35
327.48

44.00
62.00

2,963.40
20,303.76
S/.

789,964.52

12.85%

S/.

101,510.44

5.61%

S/.
S/.

44,294.53
935,769.49

-20.00%

S/.

-187,153.90
748,615.59

-10.00%
18.00%

S/.

-93,576.95
655,038.64

S/.

117,906.95

S/.

772,945.59

6.86%

VALORIZACION

R ACUMULADO

ESTE PERIODO VAL. 4


COSTO

CANTIDAD

AVANCE ACUMULADO

COSTO

CANTIDAD

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00%
46.65%
0.00%
0.00%
0.00%
65.90%

0.00
11,129.26
0.00
0.00
0.00
1,097.11

248.59
184.63
683.24
0.00
29.51
63.96

52.85%
46.65%
75.37%
0.00%
71.22%
65.90%

2,828.55
0.00
49,286.89
0.00
2,055.38
0.00

0.00
184.63
0.00
0.00
0.00
63.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

1.55%

12,226.37

54,170.82
6,960.95

1,571.09

3,037.44
64,169.21

685.55
14,483.01

-12,833.84

-2,896.60

51,335.37

11,586.41

-6,416.92
44,918.45

-1,448.30
10,138.11

8,085.32

1,824.86

53,003.77

11,962.97

8.41%

CE ACUMULADO

SALDO POR EJECUTAR


COSTO

CANTIDAD

COSTO

0.00
0.00
0.00
0.00
0.00
0.00
0.00

182.56
109.03
12.07
150.65
135.00
402.45
182.56

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2,077.27
33,775.52
3,331.18
8,867.07
573.19
0.00
3,131.47

0.00
0.00
0.00

378.50
295.75
50.61

100.00%
100.00%
100.00%

4,306.78
17,827.81
15,678.06

0.00
0.00

4.10
477.35

100.00%
100.00%

1,131.55
28,096.22

0.00

107.58

100.00%

1,845.33

2,828.55
11,129.26
49,286.89
0.00
2,055.38
1,097.11

221.81
211.12
223.27
72.69
11.93
33.09

47.15%
53.35%
24.63%
100.00%
28.78%
34.10%

2,523.92
12,726.56
16,106.27
6,043.25
830.54
567.60

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,185.39
1,151.20
77.20
349.13
464.42
5,443.86
44.44

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

13,488.00
92,156.78
3,321.76
34,340.43
77,323.14
43,398.45
762.28

0.00
0.00
0.00

1,086.64
1,086.64
1,086.64

100.00%
100.00%
100.00%

12,364.37
79,040.56
18,639.22

0.00
0.00
0.00

1,287.87
1,287.87
1,287.87

100.00%
100.00%
100.00%

14,654.08
93,677.73
22,090.93

0.00
0.00

1,247.84
1,247.84

100.00%
100.00%

14,198.59
21,404.29

0.00

1,322.95

100.00%

0.00

0.00
0.00

67.35
327.48

100.00%
100.00%

2,963.40
20,303.76

91.59%

723,567.36

66,397.19
8,532.04

92,978.41

3,722.99
78,652.22

40,571.53
857,117.30

-15,730.44

-171,423.46

62,921.78

685,693.84

-7,865.22
55,056.56

-85,711.73
599,982.11

9,910.18

107,996.78

64,966.74

707,978.89

ac
Aceros y Concretos S.A.C.
Contratistas Generales
Para
Att.
Obra
Partida
Propietario
Ubicacin
Fecha

SUSTENTO D
ITEM
01.03.02

ITEM
01.03.06

OBSERVACION:

PROYECTO PLANTA INDUSTRIAL DE CORPO

os S.A.C.

erales
: GERENPRO
: Ing Jose Martinez Woodman
: Mto. 019GP0043A-000-99-101

PROYECTO PLANTA INDUSTRIAL DE CORPORACION LINDLEY- PUCUSANA


: Corporacion Lindley- Pucusana
:Pucusana
22 de Junio - 2013

SUSTENTO DE METRADOS
DESCRIPCION
Relleno compactado con plancha compactadora de 5.8 HP, con material propio
TRAMO I
TRAMO I
TRAMO II
TRAMO II
TRAMO II
TRAMO III
TRAMO III
TRAMO IV
TRAMO IV

DESCRIPCION
Eliminacin de material excedente con equipo; botadero d=6km
TRAMO I
TRAMO I
TRAMO II
TRAMO II
TRAMO II
TRAMO III
TRAMO III
TRAMO IV
TRAMO IV

EN LA PARTIDA DE RELLENO COMPACTADO NO SE ESTA CONSIDERANDO RELLENO CON MATERIAL DE AFIRMAD


TAMBIEN NO SE ESTA CONSIDERANDO LA PRUEBA DE DENSIDAD DE COMPACTACION SEGN NORMA Y EXIGIDA

PRUEBA DE DENSIDAD DE CAMPO

L DE CORPORACION LINDLEY- PUCUSANA


Av. Benavides 195 of. 204 Miraflores
Telefax 445-8389

METRADOS
CANTIDAD

LONGITUD

ALTURA

ANCHO

VECES

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

37.830
71.670
37.320
48.610
28.300
45.610
71.760
66.130
71.750

0.700
0.700
0.700
0.700
0.700
0.700
0.700
0.500
0.500

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

ial propio

TOTAL

CANTIDAD

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

LONGITUD

EXCAVACION

RELLENO

20.871
39.863
20.660
27.389
15.282
25.002
39.879
28.644
30.996

15.89
30.10
15.67
20.42
11.89
19.16
30.14
19.84
21.53

VECES

TOTAL

ATERIAL DE AFIRMADO DE CANTERA ESCORPIO PARA NPT; FALTANDO MATERIAL VALORIZADO H=0.30m
N NORMA Y EXIGIDA POR SUPERVISION

BATIDO INSITU DE AFIRMADO DE CANTERA ESCORPION PARA RELLENO

TOTAL

15.89
30.10
15.67
20.42
11.89
19.16
30.14
19.84
21.53
184.63 m3

TOTAL

4.982
9.762
4.986
6.973
3.396
5.846
9.740
8.805
9.471
63.96 m3