ANNEXURE - 10

EQPT. No.
Major Part

WBM801-MT-T12-T4027

Major Part Desc


BOTTOM PLATE

Minor Part Desc


BP01
Annular Plate

BOTTOM PLATE

BP02
Sacrificial Anodes

Minor Part Code

BOTTOM PLATE
ROOF
ROOF

ROOF

REMARKS BY IRS

Check the dip hatch pipe for corrosion. Check the bottom

Visually checked the dip hatch pipe and its supports. Found good working condition.

Dip Hatch

supports of the dip hatch pipe. Check for severe rubbing marks
between the roof plate and the dip hatch.
Check the emergency drain nozzle for corrosion, damage. Check for
dirt/ foreign bodies clogging the emergency drain nozzle.
Check the foam seal for any damage by opening the weather

BP04
Sump
RO01
Roof Deck Plate (Bottom For Ddfr)
RO02
Breather Vent

Emergency Roof Drain


RO05

ROOF

Foam Seal

RO06

Shield. Foam bag should be free from tear marks. Note down
excessive gap more than (250mm) between the shell and foam seal.
Check the weather seal for intergrity. Ensure provision of the
rubber beadi
Check man way nozzle and the nozzle flange for corrosion, damage

Roof Man ways

etc. Check thickness of nozzle pipes

RO07

Check the pontoons internally for any liquid entrainment. Liquid

Pontoons

Entrainment indicates cracked welds or leaking plates. Ensure that the


pontoon covers are having a rubber sealing

RO08
ROOF

Rim Vent

ROOF

RO09
Rolling Ladder

ROOF

Check Point

RO03

Sketch Plate

ROOF

ROOF

IR No.: CAL/SPT/RS/0206/01

Visually examined in paninted coindition and found pitting


Welding checked found ok.
Thickness report reviewed.

RO04

ROOF

HSD1

Check the annular plate for corrosion. Check for condition of


welds between the annular plate and the shell course for damage,
corrosion etc.Check thickness of the annular plate. Check for the
cathodic protection values of the bottom plate and scan for
thickness
Check for corrosion of sacrificial anodes. Replace if the
remaining useful life is less than that of the next internal
inspection frequency.
Check the sketch plate for corrosion .Check for condition of welds
between the annular plate and the shell course for damage,
corrosion etc. Check thickness of the annular sketch plate. Check
for the cathodic protection values of the bottom plate and scan
for thickness. Check bottom plate for excessive
Bulging/buckling. Check thickness of outer portion of bottom plate
protruding from the shell. Check bottom plate to shell weld and
bottom plate welds by MPI test.
Check sump for fouling. Check sump plate for corrosion. Check
thickness of sump plate.
Check visually for corrosion of the plate. Check thickness of
The plate.

BP03
BOTTOM PLATE

Product:

Ensure that rim vent PVSV is calibrated on the test bench.


Check rolling ladder for corrosion/damage.Check the railing on which the
wheels for severe scoring which would indicate not a free movement of
wheels.

RO10

NA

Minor Pitting observed in sketch plate,Condition of welds between Annular plate and
shell courses checked found satisfactory. Bottom Plate checked visually found free from
bucling / bulging. Thickness & MPI reports to review.

Sump plate checked found in good working condition, Thickness report reviewed.
Visually checked and observed minor pitting.
Thickness report reviewed.

No Rubber marks observed.


Visually inspected the drain nozzles found free from dirt/ foreign bodies , minor loose
scale / rust observed.

Not checked

Manhole nozzles & flanges checked and found satisfactory.Thickness report reviewed.

Carried out visual Inspection internally found satisfactory, free from moisture also newly
installed rubber lining found intact and in good working condition.
Visually checked found satisfactory.
Verification of Calibration records to be done.
Satisfactory.
Greasing has been carried out and ladder seems to be in good servisable condition.
Roof Drain pipe checked visually and pitting observed

Central Roof Drain

Check the roof drain piping for external corrosion. Check the roof drain top
NRV for passing and good operation. Check the roof drain piping hydro test
at 3.0 bar. Check thickness of roof drain piping.

RO11

Check support legs for corrosion at the bottom end. Check the support legs
drain holes are not clogged.

Hydro test was carried out by RIL and test report was reviewed found satisfactory.@
3.5bar
Roof Drain thickness report reviewed.

ROOF

Internal Shell Surface

Support legs at bottom end checked found satisfactory.


Drain hole found clean.

ANNEXURE - 10
EQPT. No.
Major Part

WBM801-MT-T12-T4027

Major Part Desc

Minor Part Desc

Minor Part Code


RO12

ROOF

Roof Support Legs


RO13

ROOF

Roof Drain Swivel Pipe


RO14

ROOF

Roof Deck Plate (Top For Ddfr)


SH01

SHELL

Dip Pipe
SH02

SHELL

External Painting
SH03

SHELL

Inlet Nozzles
SH04

SHELL

Shell Manhole Nozzle


SH05

SHELL

Outlet Nozzles
SH06

SHELL

.
SHELL

.
SHELL

.
SHELL

.
SHELL

.
SHELL

Shell 1St Course

Product:

HSD1

IR No.: CAL/SPT/RS/0206/01
Check Point

REMARKS BY IRS

Check support legs for corrosion at the bottom end. Check the support legs
drain holes are not clogged. Check whether the support legs are touching
Support legs checked at bottom end found satisfactory.
the bottom plate.
Drain hole found clean.
Check the swivel pipe for corrosion.
Check the deck plate for corrosion from outside. Check the condition of
paint. Check thickness of the roof plate.
Check dip pipe internally for corrosion and damage to supports.
Check the external shell surface for paint blisters.
Check the nozzles for damage. Check thickness to detect corrosion.
Check the nozzles for damage. Check thickness to detect corrosion.
Check the nozzles for damage.Check thickness to detect corrosion.

Externally checked and found pitting


visually checked at painted condition and found ok.
Thickness report reviewed.
Pitting observed on external surface.
Bottom side of Dip plate checked found satisfactory.
Painting(New Coat) checked visually and found satisfactory.
Inlet nozzles checked found free from damage.
Thickness report reviewed.
Manhole nozzle checked and observed pitting.
Thickness report reviewed.
Outlet nozzles checked found free from damage.

Thickness report reviewed.


Visually checked minor scaling/ pitting observed from inside in first shell course &
Externally found satisfactory.
Check the plates externally and internally for corrosion. Check the thickness
Thickness report reviewed.
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.
Welds checked, scale observed form inside in first shell.

SH07
Shell 10Th Course

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

SH08
Shell 11Th Course

SH09
Shell 12Th Course

SH10
Shell 2Nd Course

SH11
Shell 3Rd Course

ANNEXURE - 10
EQPT. No.
Major Part

WBM801-MT-T12-T4027

Major Part Desc

Minor Part Desc

Minor Part Code


.

SHELL

.
SHELL

.
SHELL

Product:

HSD1

IR No.: CAL/SPT/RS/0206/01
Check Point

REMARKS BY IRS

SH12
Shell 4Th Course

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the plates externally and internally for corrosion. Check the thickness
of the plate. Check the plates for excessive bulging or bowing. Check with
plumb & bob if required. Check the welds for any corrosion.

---

Check the internal shell surface for paint blisters.

N/A

SH13
Shell 5Th Course

SH14
Shell 6Th Course

SH15
SHELL

.
SHELL

Shell 7Th Course

SH16
Shell 8Th Course

SH17
SHELL

Shell 9Th Course

SH18
SHELL
Tank structures
Tank structures

Tank structures
Tank structures
Tank structures

Internal Painting
SP01
Foundation bolt
SP02
Concrete ring wall
SP03
Staircase
SP04
Earthing boss
SP05
MVWS sprinkler

Check foundation bolts for losseness, corrosion.

Bolts are not found in losse condition and also found free from corresion.

Check concrete ring wall for damage.Check gap between bottom plate and
the foundation. Recommend filling with bitumen

No Damage observed in wall. Gap observed b/w Bottom plate and foundation.

Check the condition of stair cases/hand railing for corrosion / mechanical


damage.

Visually checked found satisfactory. In good working condition

Check whether earthing boss connection is intact.

Earthing checked found Intact in good working condition.

Check the MVWS sprinkler pipes for corrosion / damage.

Visually checked and found free from corrosion & damage.