ERRATA as of September 23, 2011

ACI 117-10 and 117M-10


Specification for Tolerances for Concrete Construction and Materials and Commentary
(and Metric version)
1st printing
Reported by ACI Committee 117

R2.2, page 17, revised as:


The tolerance for d, as stated in ACI 318, is for use in a strength calculation and should not be
used as a placement tolerance for construction.
4.8.4.4, page 41, revised as:
The composite FF and FL (if applicable) numbers for each Floor test surfaces shall be measured
and reported within 72 hours after completion of slab concrete finishing operations and before
removal of any supporting shores.

Updated September 23, 2011


--`,`,,,,```,``,`,`,`,``,,,,,-`-`,,`,,`,`,,`---