Date

May

Equipment Name
Boosters
Compressor
Floor Crane
Jib Crane
Motor
Regulator (Low pressure)

Jun
Boosters
Compressor
Floor Crane
Hoists
Regulator(Back pressure)
Jul
Boosters
Compressor
Flow Meter (Coriolis)
HPT(YOKOGAWA )
Jib Crane
PLC
Pressure pid Controller
Aug
Boosters
Fork Lift
Motor
PLC
Valve(SV)
Sep
Boosters
Compressor
Floor Crane
Flow Meter (Brooks)
Flow Meter (Coriolis)
Helium recovery
Hoists
PLC
Pneumatic Actuator
Pressure pid Controller
Valve(PBV)
Oct
Boosters
Compressor
Floor Crane
Flow Meter (Coriolis)
Fork Lift
Helium recovery
300
HPT(YOKOGAWA )
Jib Crane
PLC
250
Regulator(HPER)
Valve(SV)
200

250

Nov

200

Boosters
Flow Meter (Coriolis)
Motor

Total Result

150

100

50

0
Jun

Jul

Data
Sum - Down Time(Hrs)

Sum - MaintenancSum - Cost($)


24.7
13.2
7,995
1.2
1.2
800
4
3.5
5,000
4
1
650
2
2
345
12
4
950
1.5
1.5
250
27.7
18
10,420
6
3
1,205
6
3
6,000
12.2
8.5
2,320
2.5
2.5
550
1
1
345
This shape represents a slicer. Slicers
15.3
8,880
can be used in at least Excel 2010. 41.3
6.8
3.8
2,340
2
2
If the shape was modified in an
This shape represents 250
a slicer. Slicers
earlier version of Excel, or if the
1.5
1.5in at least 920
can be used
Excel 2010.
workbook was saved in Excel 2003
3
3
590
or earlier, the slicer cannot be used.
0.5
If the shape
0.5was modified
50in an
earlier version
or if the
26
3 of Excel,
4,500
workbook
was
saved
in
Excel
1.5
1.5
230 2003
or
earlier,
the
slicer
cannot
22.3
14.8
4,170 be used.
6.8
6.8
1,730
8
2
600
6
4.5
1,300
0.5
0.5
0
1
1
540
85.1
47.1
13,245
7.1
7.1
900
9
6
8,300
10
10
1,230
2.2
2.2
245
0.5
0.5
50
22
4
150
2
2
200
23
6
920
1.3
1.3
350
6
6
450
2
2
450
57.4
38
6,930
7.7
7.7
1,540
16.6
8
3,550
2
2
240
1.5
1.5
160
2
2
95
This shape represents
a
slicer.
Slicers
represents a slicer. Slicers
4
4 This shape
320
can be used in at0.8
least Excel 2010. 0.8 can be used
40in at least Excel 2010.
2
2
160
If the shape was modified in an
If the shape was modified in an
12.3
8.5
550
earlier version of Excel, or if the
earlier version of Excel, or if the
0.5 in Excel 2003 0.5 workbook45
workbook was saved
was saved in Excel 2003
1 or earlier,230
or earlier, the slicer8cannot be used.
the slicer cannot be used.

If the shape was modified in an


If the shape was modified in an
earlier version of Excel, or if the
earlier version of Excel, or if the
workbook was saved in Excel 2003
workbook was saved in Excel 2003
or earlier, the slicer cannot be used.
or earlier, the slicer cannot be used.
10.6
9.5
1,710
2.5
2
560
2.1
2
230
6
5.5
920
269.1
155.9
53,350

Jun

Jul

Aug

Sep
Column B

24.7

13.2

$8,000
$7,000
$6,000
$5,000

$7,000
$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
$0
Oct
13.2

Nov

Total Result

$8,000
$7,000
$6,000
$5,000

$7,000
$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
$0

Date
May

Location
A
C
G

Jun
A
C
D
G
Jul
C
D
G
Aug
A
C
D
G
Sep
A
C
D
G
Oct
A
C
D
G
Nov
A
C
D
Total Result

Data
Sum - Cost($)

Sum - Down Time(Hrs)


7,995
24.7
250
1.5
1,750
13.2
5,995
10
10,420
27.7
450
2
755
4
345
1
8,870
20.7
8,880
41.3
6,430
33
2,150
5.8
300
2.5
4,170
22.3
860
2.8
520
3.5
2,190
8
600
8
13,245
85.1
450
3.5
1,000
27.4
2,065
33.2
9,730
21
6,930
57.4
870
14.5
1,220
5.2
795
15.1
4,045
22.6
1,710
10.6
230
2.1
560
2.5
920
6
53,350
269.1

12

10

Time(Hrs)

12

10

Data

Column B

60000

50000

40000

30000

20000

10000

olumn B

20000

10000

Dash Board 1
Date
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11-Jun
12-Jun
16-Jun
16-Jun
25-Jun
27-Jun
28-Jun
3-Jul
9-Jul
9-Jul
9-Jul
15-Jul
18-Jul
23-Jul
25-Jul
30-Jul
3-Aug
7-Aug
15-Aug
21-Aug
22-Aug
25-Aug
29-Aug
3-Sep
6-Sep
6-Sep
6-Sep
10-Sep
12-Sep
14-Sep
16-Sep
19-Sep

Dash Board 2

Equipment Name

Work Order No:

Compressor
1/5/1900
Floor Crane
Regulator (Low pressure)
Jib Crane
Motor
Floor Crane
Boosters
Floor Crane
Boosters
Floor Crane
Hoists
Regulator(Back pressure)
Compressor
PLC
Boosters
Flow Meter (Coriolis)
Jib Crane
Compressor
Boosters
Pressure pid Controller
HPT(YOKOGAWA )
Boosters
Boosters
Fork Lift
PLC
Boosters
Valve(SV)
Motor
Boosters
Flow Meter (Brooks)
Helium recovery
Floor Crane
Valve(PBV)
Pneumatic Actuator
Compressor
Flow Meter (Coriolis)
Boosters
Boosters

Data Base

5314
3479
6333
5621
7040
8375
9591
7510
8679
6005
4301
4646
9607
3459
6540
3741
6831
5602
3132
1438
5813
8470
5076
5461
8654
5595
5321
8745
2803
5274
8145
7007
7643
4479
2628
4683
2855
2220
2194

21-Sep
25-Sep
26-Sep
30-Sep
30-Sep
1-Oct
4-Oct
5-Oct
7-Oct
9-Oct
13-Oct
13-Oct
15-Oct
17-Oct
19-Oct
20-Oct
20-Oct
20-Oct
20-Oct
20-Oct
25-Oct
31-Oct
2-Nov
3-Nov
6-Nov

PLC
Hoists
Pressure pid Controller
Boosters
Floor Crane
Fork Lift
Boosters
PLC
Valve(SV)
Boosters
Compressor
Boosters
Flow Meter (Coriolis)
Helium recovery
Jib Crane
Boosters
HPT(YOKOGAWA )
Boosters
Regulator(HPER)
PLC
Floor Crane
Compressor
Boosters
Flow Meter (Coriolis)
Motor

1534
7115
5384
5069
6722
7732
1609
9352
4564
6100
2485
4891
1913
9844
8856
6264
8498
4452
1585
7244
6144
5749
5389
3151
3392

ata Base
Location
G
C
G
A
G
C
G
A
G
C
G
G
D
G
C
D
C
G
G
D
C
D
C
A
G
C
D
A
D
C
D
C
G
D
C
G
C
C
A

Tag No:

Problem

Action Taken

D
G
D
A
G
G
C
D
A
C
G
A
D
A
G
A
D
C
D
D
G
G
C
A
D

Saturday, June 20, 2015


Down Time(Hrs)
4
1.2
4
1.5
2
12
4
2
3.2
4
5
2.5
1
6
26
1.2
1.5
0.5
2
1.6
1.5
3
4
1.8
8
0.5
2
1
6
3
2.2
22
4
2
1.3
9
0.5
3.6
1.2

Maintenance work
time
3.5
1.2
1
1.5
2
4
1
2
3
1
4.5
2.5
1
3
3
1.2
1.5
0.5
2
1.6
1.5
3
1
1.8
2
0.5
2
1
4.5
3
2.2
4
4
2
1.3
6
0.5
3.6
1.2

Cost($)
5,000
800
650
250
345
950
560
450
1,560
755
200
550
345
6,000
4,500
890
920
50
250
670
230
590
780
320
600
0
890
540
1,300
520
245
150
560
450
350
8,300
50
450
230

23
2
6
2.3
6
2
1.1
6.3
8
1.1
13
1
1.5
4
2
1.5
0.8
3
0.5
6
2
3.6
2.5
2.1
6

6
2
6
2.3
6
2
1.1
4
1
1.1
5
1
1.5
4
2
1.5
0.8
3
0.5
4.5
2
3
2
2
5.5

920
200
450
220
670
95
450
0
230
150
3,200
100
160
320
160
220
40
620
45
550
240
350
560
230
920

Dash Board 1
This shape represents a
slicer. Slicers can be
used in at least Excel
2010.
If the shape was
modified in an earlier
version of Excel, or if
the workbook was
saved in Excel 2003 or
earlier, the slicer cannot
be used.

Dash Board 2

Data Base

This shape represents a slicer. Slicers can be used in at least Excel 2010.

This shape represents a slicer. Slicers can be used in

If the shape was modified in an earlier version of Excel, or if the workbook was
saved in Excel 2003 or earlier, the slicer cannot be used.

If the shape was modified in an earlier version of Ex

12

60000

10

50000

40000

30000

20000

10000

Data

Jun

Column B

Jul

Aug

Sep

Jun

Jul

Aug

Column B

Sep

24.7

Saturday, June 20, 2015


a slicer. Slicers can be used in at least Excel 2010.

fied in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Month
Rig
Breakdown time(Hrs)
Breakdown cost

Jun

$18.00

Total Break down


since

#REF!

Jul

hrs

$7,500
$6,000
$4,500
$3,000
$1,500
$0
Oct

Nov

Total Result

$1,500
$0

Oct

24.7

13.2

Nov

Total Result

Dash Board 1

Dash Board 2

23
This shape represents a slicer. Slicers can be used in at least Excel 2010.

Data Base

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cann

This shape represents a


slicer. Slicers can be used in
at least Excel 2010.
If the shape was modified in
an earlier version of Excel,
or if the workbook was
saved in Excel 2003 or
earlier, the slicer cannot be
used.

15
10
5
0

1-May

6-May

9-May

16-May

Sum of Maintenanc
12
10
8
6
4
2
0

a Base

2003 or earlier, the slicer cannot be used.

Daily Trend

16-May

22-May

Sum of Maintenance work time


Column B

26-May
Sum of Down Time(Hrs)
Data

3-Jun

11-Jun
Sum of Cost($)

12-Jun

Saturday, June 20, 2015


This shape represents a
slicer. Slicers can be used in
at least Excel 2010.
If the shape was modified in
an earlier version of Excel,
or if the workbook was
saved in Excel 2003 or
earlier, the slicer cannot be
used.
$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
12-Jun

$0

16-Jun

1500

Row Labels
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11-Jun
12-Jun
16-Jun
25-Jun
27-Jun
28-Jun
3-Jul
9-Jul
15-Jul
18-Jul
23-Jul
25-Jul
30-Jul
3-Aug
7-Aug
15-Aug
21-Aug
22-Aug
25-Aug
29-Aug
3-Sep
6-Sep
10-Sep
12-Sep
14-Sep
16-Sep
19-Sep
21-Sep
25-Sep
26-Sep
30-Sep
1-Oct
4-Oct
5-Oct

Sum of Maintenance work time

Sum of Down Time(Hrs)


3.5
1.2
1
1.5
2
4
1
2
3
5.5
2.5
1
3
3
3.2
2
1.6
1.5
3
1
1.8
2
0.5
2
1
4.5
3
2.2
10
1.3
6
0.5
3.6
1.2
6
2
6
8.3
2
1.1
4

4
1.2
4
1.5
2
12
4
2
3.2
9
2.5
1
6
26
3.2
2
1.6
1.5
3
4
1.8
8
0.5
2
1
6
3
2.2
28
1.3
9
0.5
3.6
1.2
23
2
6
8.3
2
1.1
6.3

7-Oct
9-Oct
13-Oct
15-Oct
17-Oct
19-Oct
20-Oct
25-Oct
31-Oct
2-Nov
3-Nov
6-Nov

1
1.1
6
1.5
4
2
10.3
2
3
2
2
5.5

8
1.1
14
1.5
4
2
11.8
2
3.6
2.5
2.1
6

Sum of Cost($)
5000
800
650
250
345
950
560
450
1560
955
550
345
6000
4500
1860
250
670
230
590
780
320
600
0
890
540
1300
520
245
1160
350
8300
50
450
230
920
200
450
890
95
450
0

Row Labels
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11-Jun
12-Jun
16-Jun

Sum of
Maintenance
Sum of Down
work time
Time(Hrs)
3.5
4
1.2
1.2
1
4
1.5
1.5
2
2
4
12
1
4
2
2
3
3.2
5.5
9

14
12
10
8
6
4
2
0
1-May

6-May

9-May

16-May

22-May

26-May

3-Jun

This shape represents a slicer. Slicers


can be used in at least Excel 2010.

This shape represents a slicer. Slicers


can be used in at least Excel 2010.

If the shape was modified in an earlier


version of Excel, or if the workbook was
saved in Excel 2003 or earlier, the slicer
cannot be used.

If the shape was modified in an earlier


version of Excel, or if the workbook
was saved in Excel 2003 or earlier, the
slicer cannot be used.

11

cannot be used.

230
150
3300
160
320
160
1475
240
350
560
230
920

slicer cannot be used.

May

Sum of
Cost($)
$5,000
$800
$650
$250
$345
$950
$560
$450
$1,560
$955

$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
$0
3-Jun

r. Slicers
2010.

an earlier
orkbook
earlier, the

11-Jun

12-Jun

16-Jun

This shape represents a slicer.


Slicers can be used in at least Excel
2010.
If the shape was modified in an
earlier version of Excel, or if the
workbook was saved in Excel 2003
or earlier, the slicer cannot be used.

Column H
Column I
Column J

workbook was saved in Excel 2003


or earlier, the slicer cannot be used.

Equipment Name
Boosters

Date
May
Jun
Jul
Aug
Sep
Oct
Nov

Compressor
May
Jun
Jul
Sep
Oct
Floor Crane
May
Jun
Sep
Oct
Flow Meter (Brooks)
Sep
Flow Meter (Coriolis)
Jul
Sep
Oct
Nov
Fork Lift
Aug
Oct
Helium recovery
Sep
Oct
Hoists
Jun
Sep
HPT(YOKOGAWA )
Jul
Oct
Jib Crane
May
Jul
Oct
Motor
May
Aug
Nov
PLC
Jul
Aug

Data
Sum - Down TimeSum - Cost($)
38.1
9,075
1.2
800
6
1,205
6.8
2,340
6.8
1,730
7.1
900
7.7
1,540
2.5
560
37.6
23,100
4
5,000
6
6,000
2
250
9
8,300
16.6
3,550
28.2
4,440
4
650
12.2
2,320
10
1,230
2
240
2.2
245
2.2
245
5.6
1,360
1.5
920
0.5
50
1.5
160
2.1
230
10
695
8
600
2
95
26
470
22
150
4
320
4.5
750
2.5
550
2
200
3.8
630
3
590
0.8
40
4.5
555
2
345
0.5
50
2
160
24
3,170
12
950
6
1,300
6
920
61.8
5,970
26
4,500
0.5
0

Sep
Oct
Pneumatic Actuator
Sep
Pressure pid Controller
Jul
Sep
Regulator (Low pressure)
May
Regulator(Back pressure)
Jun
Regulator(HPER)
Oct
Valve(PBV)
Sep
Valve(SV)
Aug
Oct
Total Result

23
12.3
1.3
1.3
7.5
1.5
6
1.5
1.5
1
1
0.5
0.5
2
2
9
1
8
269.1

920
550
350
350
680
230
450
250
250
345
345
45
45
450
450
770
540
230
53,350

Make a drop down list for selecting equipment

um - Cost($)

12
10
8
6
4
Axis Title

2
0

ment

Chart Title

1500

Equipment drop down


Boosters
Compressor
Floor Crane
Flow Meter (Brooks)
Flow Meter (Coriolis)
Fork Lift
Helium recovery
Hoists
Jib Crane
Motor
PLC
Pneumatic Actuator
POD
Pressure pid Controller
HPT(YOKOGAWA )
LPT(YOKOGAWA )
Regulator(HPER)
Regulator(LPER)
Regulator(MR)
Regulator(EBPR)
Valve(NOSV)
Valve(PBV)
Valve(MBV)
valve(CV)
Valve(MRV)
Valve(SV)

Test Rigs
A
C
D
G

Months
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

You might also like