Professional Documents
Culture Documents
May
Equipment Name
Boosters
Compressor
Floor Crane
Jib Crane
Motor
Regulator (Low pressure)
Jun
Boosters
Compressor
Floor Crane
Hoists
Regulator(Back pressure)
Jul
Boosters
Compressor
Flow Meter (Coriolis)
HPT(YOKOGAWA )
Jib Crane
PLC
Pressure pid Controller
Aug
Boosters
Fork Lift
Motor
PLC
Valve(SV)
Sep
Boosters
Compressor
Floor Crane
Flow Meter (Brooks)
Flow Meter (Coriolis)
Helium recovery
Hoists
PLC
Pneumatic Actuator
Pressure pid Controller
Valve(PBV)
Oct
Boosters
Compressor
Floor Crane
Flow Meter (Coriolis)
Fork Lift
Helium recovery
300
HPT(YOKOGAWA )
Jib Crane
PLC
250
Regulator(HPER)
Valve(SV)
200
250
Nov
200
Boosters
Flow Meter (Coriolis)
Motor
Total Result
150
100
50
0
Jun
Jul
Data
Sum - Down Time(Hrs)
Jun
Jul
Aug
Sep
Column B
24.7
13.2
$8,000
$7,000
$6,000
$5,000
$7,000
$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
$0
Oct
13.2
Nov
Total Result
$8,000
$7,000
$6,000
$5,000
$7,000
$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
$0
Date
May
Location
A
C
G
Jun
A
C
D
G
Jul
C
D
G
Aug
A
C
D
G
Sep
A
C
D
G
Oct
A
C
D
G
Nov
A
C
D
Total Result
Data
Sum - Cost($)
12
10
Time(Hrs)
12
10
Data
Column B
60000
50000
40000
30000
20000
10000
olumn B
20000
10000
Dash Board 1
Date
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11-Jun
12-Jun
16-Jun
16-Jun
25-Jun
27-Jun
28-Jun
3-Jul
9-Jul
9-Jul
9-Jul
15-Jul
18-Jul
23-Jul
25-Jul
30-Jul
3-Aug
7-Aug
15-Aug
21-Aug
22-Aug
25-Aug
29-Aug
3-Sep
6-Sep
6-Sep
6-Sep
10-Sep
12-Sep
14-Sep
16-Sep
19-Sep
Dash Board 2
Equipment Name
Compressor
1/5/1900
Floor Crane
Regulator (Low pressure)
Jib Crane
Motor
Floor Crane
Boosters
Floor Crane
Boosters
Floor Crane
Hoists
Regulator(Back pressure)
Compressor
PLC
Boosters
Flow Meter (Coriolis)
Jib Crane
Compressor
Boosters
Pressure pid Controller
HPT(YOKOGAWA )
Boosters
Boosters
Fork Lift
PLC
Boosters
Valve(SV)
Motor
Boosters
Flow Meter (Brooks)
Helium recovery
Floor Crane
Valve(PBV)
Pneumatic Actuator
Compressor
Flow Meter (Coriolis)
Boosters
Boosters
Data Base
5314
3479
6333
5621
7040
8375
9591
7510
8679
6005
4301
4646
9607
3459
6540
3741
6831
5602
3132
1438
5813
8470
5076
5461
8654
5595
5321
8745
2803
5274
8145
7007
7643
4479
2628
4683
2855
2220
2194
21-Sep
25-Sep
26-Sep
30-Sep
30-Sep
1-Oct
4-Oct
5-Oct
7-Oct
9-Oct
13-Oct
13-Oct
15-Oct
17-Oct
19-Oct
20-Oct
20-Oct
20-Oct
20-Oct
20-Oct
25-Oct
31-Oct
2-Nov
3-Nov
6-Nov
PLC
Hoists
Pressure pid Controller
Boosters
Floor Crane
Fork Lift
Boosters
PLC
Valve(SV)
Boosters
Compressor
Boosters
Flow Meter (Coriolis)
Helium recovery
Jib Crane
Boosters
HPT(YOKOGAWA )
Boosters
Regulator(HPER)
PLC
Floor Crane
Compressor
Boosters
Flow Meter (Coriolis)
Motor
1534
7115
5384
5069
6722
7732
1609
9352
4564
6100
2485
4891
1913
9844
8856
6264
8498
4452
1585
7244
6144
5749
5389
3151
3392
ata Base
Location
G
C
G
A
G
C
G
A
G
C
G
G
D
G
C
D
C
G
G
D
C
D
C
A
G
C
D
A
D
C
D
C
G
D
C
G
C
C
A
Tag No:
Problem
Action Taken
D
G
D
A
G
G
C
D
A
C
G
A
D
A
G
A
D
C
D
D
G
G
C
A
D
Maintenance work
time
3.5
1.2
1
1.5
2
4
1
2
3
1
4.5
2.5
1
3
3
1.2
1.5
0.5
2
1.6
1.5
3
1
1.8
2
0.5
2
1
4.5
3
2.2
4
4
2
1.3
6
0.5
3.6
1.2
Cost($)
5,000
800
650
250
345
950
560
450
1,560
755
200
550
345
6,000
4,500
890
920
50
250
670
230
590
780
320
600
0
890
540
1,300
520
245
150
560
450
350
8,300
50
450
230
23
2
6
2.3
6
2
1.1
6.3
8
1.1
13
1
1.5
4
2
1.5
0.8
3
0.5
6
2
3.6
2.5
2.1
6
6
2
6
2.3
6
2
1.1
4
1
1.1
5
1
1.5
4
2
1.5
0.8
3
0.5
4.5
2
3
2
2
5.5
920
200
450
220
670
95
450
0
230
150
3,200
100
160
320
160
220
40
620
45
550
240
350
560
230
920
Dash Board 1
This shape represents a
slicer. Slicers can be
used in at least Excel
2010.
If the shape was
modified in an earlier
version of Excel, or if
the workbook was
saved in Excel 2003 or
earlier, the slicer cannot
be used.
Dash Board 2
Data Base
This shape represents a slicer. Slicers can be used in at least Excel 2010.
If the shape was modified in an earlier version of Excel, or if the workbook was
saved in Excel 2003 or earlier, the slicer cannot be used.
12
60000
10
50000
40000
30000
20000
10000
Data
Jun
Column B
Jul
Aug
Sep
Jun
Jul
Aug
Column B
Sep
24.7
fied in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.
Month
Rig
Breakdown time(Hrs)
Breakdown cost
Jun
$18.00
#REF!
Jul
hrs
$7,500
$6,000
$4,500
$3,000
$1,500
$0
Oct
Nov
Total Result
$1,500
$0
Oct
24.7
13.2
Nov
Total Result
Dash Board 1
Dash Board 2
23
This shape represents a slicer. Slicers can be used in at least Excel 2010.
Data Base
If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cann
15
10
5
0
1-May
6-May
9-May
16-May
Sum of Maintenanc
12
10
8
6
4
2
0
a Base
Daily Trend
16-May
22-May
26-May
Sum of Down Time(Hrs)
Data
3-Jun
11-Jun
Sum of Cost($)
12-Jun
$0
16-Jun
1500
Row Labels
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11-Jun
12-Jun
16-Jun
25-Jun
27-Jun
28-Jun
3-Jul
9-Jul
15-Jul
18-Jul
23-Jul
25-Jul
30-Jul
3-Aug
7-Aug
15-Aug
21-Aug
22-Aug
25-Aug
29-Aug
3-Sep
6-Sep
10-Sep
12-Sep
14-Sep
16-Sep
19-Sep
21-Sep
25-Sep
26-Sep
30-Sep
1-Oct
4-Oct
5-Oct
4
1.2
4
1.5
2
12
4
2
3.2
9
2.5
1
6
26
3.2
2
1.6
1.5
3
4
1.8
8
0.5
2
1
6
3
2.2
28
1.3
9
0.5
3.6
1.2
23
2
6
8.3
2
1.1
6.3
7-Oct
9-Oct
13-Oct
15-Oct
17-Oct
19-Oct
20-Oct
25-Oct
31-Oct
2-Nov
3-Nov
6-Nov
1
1.1
6
1.5
4
2
10.3
2
3
2
2
5.5
8
1.1
14
1.5
4
2
11.8
2
3.6
2.5
2.1
6
Sum of Cost($)
5000
800
650
250
345
950
560
450
1560
955
550
345
6000
4500
1860
250
670
230
590
780
320
600
0
890
540
1300
520
245
1160
350
8300
50
450
230
920
200
450
890
95
450
0
Row Labels
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11-Jun
12-Jun
16-Jun
Sum of
Maintenance
Sum of Down
work time
Time(Hrs)
3.5
4
1.2
1.2
1
4
1.5
1.5
2
2
4
12
1
4
2
2
3
3.2
5.5
9
14
12
10
8
6
4
2
0
1-May
6-May
9-May
16-May
22-May
26-May
3-Jun
11
cannot be used.
230
150
3300
160
320
160
1475
240
350
560
230
920
May
Sum of
Cost($)
$5,000
$800
$650
$250
$345
$950
$560
$450
$1,560
$955
$6,000
$5,000
$4,000
$3,000
$2,000
$1,000
$0
3-Jun
r. Slicers
2010.
an earlier
orkbook
earlier, the
11-Jun
12-Jun
16-Jun
Column H
Column I
Column J
Equipment Name
Boosters
Date
May
Jun
Jul
Aug
Sep
Oct
Nov
Compressor
May
Jun
Jul
Sep
Oct
Floor Crane
May
Jun
Sep
Oct
Flow Meter (Brooks)
Sep
Flow Meter (Coriolis)
Jul
Sep
Oct
Nov
Fork Lift
Aug
Oct
Helium recovery
Sep
Oct
Hoists
Jun
Sep
HPT(YOKOGAWA )
Jul
Oct
Jib Crane
May
Jul
Oct
Motor
May
Aug
Nov
PLC
Jul
Aug
Data
Sum - Down TimeSum - Cost($)
38.1
9,075
1.2
800
6
1,205
6.8
2,340
6.8
1,730
7.1
900
7.7
1,540
2.5
560
37.6
23,100
4
5,000
6
6,000
2
250
9
8,300
16.6
3,550
28.2
4,440
4
650
12.2
2,320
10
1,230
2
240
2.2
245
2.2
245
5.6
1,360
1.5
920
0.5
50
1.5
160
2.1
230
10
695
8
600
2
95
26
470
22
150
4
320
4.5
750
2.5
550
2
200
3.8
630
3
590
0.8
40
4.5
555
2
345
0.5
50
2
160
24
3,170
12
950
6
1,300
6
920
61.8
5,970
26
4,500
0.5
0
Sep
Oct
Pneumatic Actuator
Sep
Pressure pid Controller
Jul
Sep
Regulator (Low pressure)
May
Regulator(Back pressure)
Jun
Regulator(HPER)
Oct
Valve(PBV)
Sep
Valve(SV)
Aug
Oct
Total Result
23
12.3
1.3
1.3
7.5
1.5
6
1.5
1.5
1
1
0.5
0.5
2
2
9
1
8
269.1
920
550
350
350
680
230
450
250
250
345
345
45
45
450
450
770
540
230
53,350
um - Cost($)
12
10
8
6
4
Axis Title
2
0
ment
Chart Title
1500
Test Rigs
A
C
D
G
Months
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec