ACI 522.1-08
Specification for
Pervious Concrete Pavement
An ACI Standard
Reported by ACI Committee 522
Cais American Concrete Institute°First Printirg
‘March 2008,
‘Specification for Pervious Concrete Pavement
Copyright by the American Concrete Institute, Farmington Hils, MI. All ight reserved. This material
‘may not be reproduced or copied, in whole or part. in any printed, mechanical, electronic, fim, or other
distribution and storage media, without the writen consent of ACI
“The technical commitees responsible for ACI commitee reports and standards sive to avoid ambiguities,
‘omissions, and emo in these documents. n pte ofthese ers, the users of ACI documents occasionally
{ind information or requirements that may be subject to more than one Interpretation or may Be
Incomplete or incorect. Users who have suggestions forthe Improvement of ACI documents
requested to contact ACI. Proper use of this document includes periodically checking for errata at
‘wwrw.concrete.org/committees/erata.asp for the most up-to-date revisions.
‘ACI committee documents are intended forthe use of individuals whe are competent to evaluat the
signfcance and imitations ofits content and recommendations and who wil accept responsibilty forthe
application of the material contains. ndfvduals who use this publication in any way assume all risk and
‘accept total responsibilty forthe application and use of his information.
‘All information inthis publication is provided "as is" without warranty of ary kind, ether express or implied,
Including but no limited to, the implied warranties of merchantabilty,finese for a particular purpose or
‘norintingoment
‘ACI and its members disclaim lability for damages of any kind, including ary speci, naire, incidental,
fF consequential damages, including without limitation, lost revenues or lost profits, wich may result
from the use of this publication,
Itis the esponsibity of the usor ofthis document to establish health ard safely practices appropriate to
the specific circumstances involved with is use. ACI does not make ary representations with regard fo
‘haalth and safaty issues and the use of this document. The user must determine the appicabily of al
regulatory imitans before applying the document and must comply wit all appicabl laws and regulations,
Including but not imited to, United States Occupational Safety and Heath Administration (OSHA) health
and safely standards.
‘Order information: ACI documents are available in print, by download, on CD-ROM, through electronic
‘subscription, of reprint and may be obtained by contacting ACI
"Most ACI standards and committee reports ae gathered together inthe annually revised ACI Manual of
‘Concrete Practice (MCP).
‘American Concrete Institute
‘38800 Country Club Drive
Farmington Hills, Mi 48331
USA.
Phone: 248-848-3700
248-848-3701
www.conerete.org
SON ove.c.07001271.7ACL522.1-08
Specification for Pervious Concrete Pavement
‘An ACI Standard
Reported by ACI Committee 522
ements
an A Dae sate Lo ere St
07 Bala Bree Amp Kier nit ‘DM Sc
Win Dot Toa Sra ets Deptt
Mas ape One Sox ute ay Want
er te De a Spee ach Wu oe
‘ya ie ‘eae hate “outs one ro Yor
ee Pepa at ee
ollowing he Spectition
PREFACE
PL, ACI Speicton 522 is intended to be wd by
reference orncoroation in ts eey inthe Projet Spec-
ation: Do nt copy individual Par, Secon, Arles or
Paragraphs in the Project Specification, because taking
them oat of content may change heir meaning.
2. Sections or Pats of ACI Specifietion $22.1 ae
copes the Project Specfeion or any ober document
4 ot refer to them a an ACI specication, brane the
‘ecitcatio hs ben aed
3. A sateen such te fllowing wil serve fo make
‘ACL Speciation $2. prof the Pj Specification:
Work on (Proj is shall confor all egies
of ACLS22 Specie fr Perso Conc Pvecet?
published by the Anerican Concrete nate, Fas
Ingion Hil, Michigan, except av modified by these
Contract Document
PA. Each echoes ction of ACI Speiiaton $22.1 i
wets in the hee par rection format of he Cnstcton
Specifications Insite, as waped for ACT requiem.
‘The language is imperive and tere
PS. The Specietonis write he Contactor, When 8
{valde be prang"eber-or_” is wed. Semen
vied in he Specfiean as inlomaton the Conte
{ie the verbs “may” of “will” Informational statements
‘yplaly len actvies ooo th "wl be ake” oe
"hay be ea” by the Over o Aehiocd Eager.
ZS pt ey 9 dN 2,
Sera yeererseets
Frere emer adsas
‘CONTENTS
Preface, p. 5221-4
Section 1—General, p 622.12
Tie Scope
12—Defnkons
13 Referenced sandr
4 Sundar protein resins
15—Sabmitale
16—Quaity conte
Section 2_Produeta,p.622:-4
Tr hikeae
22 Pervious concrete
23_tolto joint material
2A Roce
‘Section 3—Executon,p. 522-4
Si1—Sabpade pepunion
32—Subhuee
33Seting formwork
544 Buching, ming. and delivery
55Pcing and fishing fed frm pavement
56—Placing and ising sipform pavement
5.7—Fnal src texture
38 Eapig
39 Tolerances
310—Coring
$311 ad cold-weather consrction
312—oiing
3.13 Opening 0 wae
Foreword to checklts, p. 522.16
Mandatory requirements checks, p. 5221-8
‘Optional requirements checks, .822.1-7
‘Submitals chock, p. 5221-7
SECTION GENERAL,
dass he Work under Contet Dacre ih
Contract Documente—a st of docu sipplid by
the Ovner tote Coot the bass fr cotton,
thee documents contain coat forms, contact conn,
‘peslatons deans addenda and contact changes.
‘Contractor —the peso, fm, ray unde cota or
consrveton ofthe Work
earl-entry dy-ct sans tool designed to price
{ins i concee comment 11 4 hous ae Siting
{nd witout rveling the ct edges
exposure condition, moderate—sn envionment,
sormally fa teperate ciate reine in which once
‘lony occasionally beexpored to mostra wl atte
farted tore freezing and where no dicing agents
‘her aggresive chemicals re wed
‘exposure condion,severe—an enveoament, sormally
in cold climate epon, a which oncete may be trated
‘oF in alswst continuous contact with motte blo
‘ezing, nd wre cetang agent ae wed
Junt, comtrucion~ the rrace where two sieeve
rihcemes fone met, acess which may be dea
‘oaieve bond, and whee he rs has undergone fal set
fer the next placement
Isnt, contraction —formed sawed, o toed rove nt
‘once setre cress wenkeed pane oe te
Tocaion af eractng revaling fom the dimensional ange
of diferent pars of the rach
ola, lations normally vertical interfice allowing
sclaive movement witout tantoring sft tsson,
compression, of tacon forces wo sepuely alec the
Perfomance of scr or pavement
‘Owner-—the comporton, association, parteship,
Individual, pac Bay, o abot for whom the Work
‘coneucted
Panel conerete clement hat is relatively thin with
selpct to other dimension ah i bordered By jit ot
ges.
‘pavement, perviout—a pavement comprising meri
wi sufi cootianu oie llom water to par fo
‘here to the nding lye
Permiliedaccepted or accopable to the Arcitecy
Engineer, asally pertaining oa request by Contacto,
hen specified i Conract Dosen
Project Drawings—gaghe presenation of project
requrement.
Project Speletion—he writen document tht details
oqutemeat forthe Workin accordance with service
purmeters ad ber pei eter
reference standards sandarczed mandatory language
document often city, orion, or socio,
Sacuting the bing codes of lel or sate suber
‘hich are referenced i the Contact Doctmets
subbast—a lier ia a paveneat system Bere tbe
subgrade andthe base cous, between he obra and ¢
porlandcemeat once pavement
subgrade—ite sol prepare and compacted to sop 2
sercareor pavement em
submit document or mal povided he Acie
Bgineer for review or seep
‘Werke ene contruction or separly Wenible
pars threo required to be furnished under Contact
Documents,1.3—Retorenced standards
TA Sun of ACI and ASTM refered tin isspei-
‘ation ar ise with srl designation incuting year of
‘option or eis and wre part of is speiicaon
13.14 ACT standards
306190” Standard Speciation for Cold Weather
‘Concrete
1.12 ASTM sondards
‘C29C29M 971200 Sadar Tet Method for Balk Density
(Unit Weigh) and Voisin Aggregate
‘cxaci2M.04 Sundar Test Method fo Otining td
‘Tesing riled Coes an Swed Beas
cf Concrete
(COMcOsM-07 Standard Specification fr Ready Mixed
Conte
(C134C138N4O18 Standard Test Met for Density (it
Weigh), ies, and Air Comat (eave
‘mati of Concrete
‘Standard Test Methods fo Suing and
“eating Concrete Masonry Unite td
Related Units
Standard Practice for Sampling Freshly
ited Concrse
Sundard Test Metbod for Mesuing
“Thickness of Concrete Elemente Using
Dil Concrete Cores
‘Standard Speciation fr Pigments fr
InepalyCaored Coserete
Sniard Practice for Latosoie
‘esing Conse and Conse Aga
pts for Une in Constton and Cara
{or Laboratory Evaluation
Suniard Specification for Preformed
Expansion Jolat Filer for Conese
(Bitamious Type)
Sundard Specification for Preformed
ngusion Jit Filerfor Conte Paving
san Scud Contresion (Note
{teing and Resin Bituminous Types)
Standard Specification for Prefomed
‘Sponge Raber Cink and Recysed PVC
Expansion Jout Files fr Coste
Pavag and Stucurl Construction
Sundard Test Method for Iflaion
Rate of Sorin Fed Using Double
Sunda Prctie for Random Sampling
‘of Conetacon Matrils
Sinden Speistion for Agencee
Engaged in Contrcton Inpeton aa
Testing
14 sta tung organizations
“Atbreviations ft sad compicesumes an adres of
crgatzatons using docament refered toi hisses
Deas 932003)
bi7si.o
Di752.088
puso
1665.06
‘American Concrete (ACD)
P.O. Box
Farmington il, MIA853.9004
srw concrete org
ASTM letras (ASTM)
100 Bare Hsbor Deve
West Consbahocken, PA 19828,
masimong
‘National Ready MixedConcreteAsacinton (NRMCA)
500 Spring Stet
Silver Spring. MD 20810
1.5 —Submitale
‘TEI Constr sta mt drawing and documenta
ss raged in thi spectcation for acceptance bythe Ache
teclEagincer
1.52 Obtain writen eepance of submits efor xing
he materials or methods requig ccepince
1.53 Responsty of Conractr Before conection,
bit to Achieving
"L531 Quasi of Contactor ied wo consation
of prio cones prvements
1.532 Propel concrete mistwe proportions and
ex.
LESS When rguzed by the ArchiteevEngner, in:
place pavement test reals rom previous Wok, complted
In elast 2 mons, cating devin vod comeny density,
and conte mate proportions
153.4 Two tet pce ar desc in 162, pice,
elt, nt cured: a minima of 25 8 (20.9 ead
ving he mga thiches define by Cont Docu,
1.6 —Quaty contro!
TAs General Testand inspect concrete materi sd
operations a Work popes esrb in 1.6 Faire
1B dat detective Work or material aly wil ot prevent
jection ia defect is covered er, ol cose
nal scetance
L611 Conraciorqualfcation The Contactor shall
employ no lev han sae Natal Ready Mined Concee
‘Astociaton "(NRMCA) ceriied pervious concrete
‘zaluman Who mast be ont, overeing ech placement
ew ding al cont placeten, rte Conratorsall
fmplay 20 les than ee NRMCA ceri Pervious
Conte lasers, wc sl be onsite working as members
ofeach plicement rw ring al conte plc the
‘Contraco shall employ no les than five NRMCA cesiod
Pervious Concrete Techiiane wh sal ie wing
‘3 ember ofeach pocement crew during al cone
‘Placement les eters specified. Altmaivedocumen-
{sion of qualieatons dl be penited when approves by
the ArchiteeVEnginet
1.62 Test panesTut panes sal be placed wing the
mitre popens, tral, ad euipent ae proposed
fect projet Tes pnd if acepabl my be increas
law the project. Test desty of tes concrete forthe tet
puel ia acconance with ASTM CI3WCI3EM following
the consoldation procedures decibel In ASTM. C29/
‘C29M,ligging Procedure. Core hardesed concrete forthe
tet panels in accordance with ASTM CA2IC42M tat ick
eatin eroiance with ASTM CLIACI?AM, and tes
‘esi in nvordance with ASTM C40, Parga 93
1.42.1 Fea dec shallbe within 2519? Ogi)
ofthe specie eth density
1.622 Tolerance fr thickness and density repre at
the verge of ther cores of each fet pel tall be at
{shows
1.62.2. The average compacted tikes ot be
moe than I in (6m) ls than he speciiedthcknes,
‘with no single coe encadng 1/2. (13mm less han he
‘Species tices; nor shal te average compacted icknest
‘fe more than I-/2 in. (38 mun) more than the specified
thickness,
1162.3 When ts pal ison one or mre ofthe
limi of 1.6.2.1 and 1.6.22, the test pe shal be ejected,
remove and replaced a be Contacts expen.
11624 When the test pane complies wth L621 and
1.622, the panel maybe left in place and iced in he
competed Work
UGS Tesing apenciesAgenies tat perfor testing
secviceson covert mater shall eet be equiements of
‘ASTM CIOT. Ageacies inspecting the Work shall met he
Touremens of ASTM E329, Teng agencies performing
‘he testing shall be aceped by Archlec/Engacer before
forming any Wer
{L631 eld tests of concrete required in 1.64 sall be
performed by an individual erie a both an NRMCA
(Cerfed Pervious Concrete Technician or equivalent and
2 ACI Conese Field Testing Technician Grae 1 ot
quvaent
"M&A Testing resposibies of Contractor
1641 Advise he Arcteclagncer a least 4 bore
‘before conceeplacomeat
UBS Testing
1L65.1 Obtin « minimem 1 28 L) sample for
accepts ein acordance with ASTM C172 Meat «
‘inimum of one density est aig each day's placement in
tecortance wih CLSWCI3EM following the concldation
recedes esr in ASTM CO8VC29M, gig Procedure
Determine density wing a minimum 0.28 f° (0007 =)
‘yin meal mesa, Fl and compat te meats ia
‘Roondance with ASTM C20/C20M, ging Procedure
{LSS.LaFsh dest sb itn 251 kg?)
ofthe specified rex dens
{L682 Remove thes cores fom each ot of S000 12
(450 min accordance with ASTM C82/CAIM, no less
than 7 days afer placement ofthe pervious concrete. Cores
‘alba minimum seminal in (100 mm) amet Slot
thee lcatons in scordance with ASTM D364 Measure
the cores for thickness (ASTM CICI2M) and density
(ASTM C140, After Bicknest deteminsion, tm and
‘measure he cores fer dens inthe strated condition as
sented ia Pargagh 93, Sarraon, of ASTM CIA,
Aci srannano
Immerse the wine core in vatr for 24 our, in for
‘nina, remove surface wat With «damp cio, the
‘weigh mime
1U652:1 Tolan or thsknest and densi rept
1s he average fire eres of ach nal bea lows:
1682.18 The conpuced thekness sil ot be
sore an i n(n) lens ban the spect es
wih o single cre exceeding 12 in. (13 tm) less han be
‘Sess sor sal Be sege compact sts
‘be more than 1-1/2 a, (8 mn) more than the spcod
thicknes,
1652.1 Hardened dest sal be win 25% of
‘he approved hardnoldensty fom he test panels,
16522 Wen lots cauide one o mere ofthe
limits of 1.65.21, the lt shal be sujet 10 rection,
removed, and replaced atthe Contactr’s expense less
Accepted by the Owner.
1165.3 Core hoes shall te fled with conerete or
preblendod grout
‘SECTION 2~pRODUCTS
2.4—Subbase
‘Conse peeps shall mete sn and grading egie-
iments of Contact Docent.
2.2--Pervious concrete
Comply with ASTM COMCOEM and the following
requirements
221 ApereeteNomial maximum aggregte sie
shall not exe 1/5 ofthe specifed pavement ticket
12.2.2 Admisnres Chen amintres hat fait the
oduction and placement of gerviow conte shal Be
emited. The us of suchadmitare thal be notiid othe
‘AchiecuEgicer
1223 Pbers—The ws of en perio coneee mines
spin! when approved by be AceeV Exper
224 Pigmente—Ue pigments complying with ASTM.
(C979 pected in Contact Docent
23taolation joint material
TI or tlt jt mate, comply with ASTM.
‘D984, DI751,rDI752.
24—Forme
‘PAL Make for wih sec, wood, orate material that
|s suey sip to main specified tolemnes, sn
‘apble of supporting concrete and mechani! soncrete
Plsing equip.
7242 Fos sal be clean ante of dere of any Kind,
rs and hardened concrete
‘SECTION 3_EXECUTION
a4 es
{Lut pe pts eps i Cont Docent
3.12 Construct subgrade to ensure tht the regied
pavement hicks i obnned inal lcaons.
‘S13 Keep allel lf of he stad ding comsrton
to the mau exetpractial Regrade and resompct[SPECINCATION FOR PERVOUS CONCRETE PAVEMENT
sbrade disurbed by concrete dlvry vehicles or ober
‘constuction va, a need.
‘31.4 Compact the muta adedto obi final subgrade
318 Determine subgrade permeability in accordance
with ASTM DSS belore cone placemat, Coni
‘hat subgrade pernesbity mets requirements of Contact
Document.
32-Subbaso
‘S21 Use only when specified in Contact Documents
Where wed prepare subase in accordance wih Contact,
Docent
33Setting formwork
SSAU'Se ign, and race forme so tht the hardened
pavement mete olerances specified in 39.
"3.32 Apply form release agent othe form fc, which
il bein conte wth once, immediately befor lacing
‘3.33 The veel face of previuy paced concrete may
eed ara orm,
‘3354 Pet evouly placed payee! on damage.
3332 Doct sply form release apet 1 previously
pled ence
34 Placement wiih sul be as specified in Const
Documents Concrete placement wih shal nt exceed 20
(Gm mls otherwise speci.
34Batching, mixing, and delivery
‘SAL Buch and mut edipnc wisASTM C34IC94M
op ht discharge sal becomplctd witha 6 mints of
the insodsct of mire wate 10 the cement. Ineente
Time to 90 minutes when wing an exlended st contol
‘aime Wate aon perms at pit of charge
215 Pacing and iahng Mxearm pavement
i Depot conse eter dacy ton the as
fering optpest by someyer eno ie rece
‘bg erste ele oerwte specie
‘382 Donotplice coor cs ous bgrde rssh.
[353 Depot concrete between te forms to a pyro
say eo ge
‘S54 Spea th concrete ung 8 come slog, shon-
handle sarcnded shovel ore.
3.58 Do tallow fot afi onthe th cont
AS6 Sule of conse Betwecn fore ing em
‘eves yb aed when ncepcd
‘387 Do ote sel wowels or pow fig oes.
[35 Fala he pavement te cevaions ad tines
special a Cont Docent nd mes he eget
wo
'36—Placing and falshing slipform pavement
‘361 Sipfoo equipments permited.
1362 Depot nd fis concen accordance wth 3:5,
excep 354356.
3.7—Final surface texture
‘474 Conyac cone o ay wine ruins
0039
‘37.2 Compact te conte alon the sab eg wih hard
"373 Compact concrete toads, pervious surface
ST EE Pay tee radi of thn 1
om
3.9—Tolerances
"59:1 Contct pavement o copy withthe following
tolermce:
Hlevaton: +4 in (+19. ma)-Oin. Om)
‘Ticoess: 41-172 i, 10 (638mm, 600m)
Conracon joint ep 1/4 in (6), -0 nm)
38.1 Mestanicalysmep pavement bef tering or
cennplnnce with lence
3.10—curing
‘MOI Begin curing witin 20 minscs of covrte
ischarge unless longet working Une is scepted by he
‘AvchtecvEginer
‘3102 Completely cover the pavement scice with &
‘minium 6 mil (0.18 mas) dick ptyeyene she Cot
‘Sheeting ta miinam fl pacement wh,
‘3403 Coveralexposed edges of pavement wi pole
lene beet,
‘3104 Secure caring cover materi wihat sg dit
$3105 Care pavement fora minimum of 7 unter
ye unless oberwie sei.
3.41_Hot and cold-weather construction
‘MILI When bx weather ie ancipated, bmi dele
procednes for the produce, taniporaos, placement,
rotecton, crag and temperaze montering of once
Ging bot weather
‘SHLZ i cad weather, comply with ACI 56. recoding
conte emer oles han rice per hor prod.
3:12ointing
‘LIZ Uns terse specifd, constr jit a the
locations, depts, and wit bozos dmensoes eae
{in Contac Document
312.2 Whee jing requcements re satindctdonthe
Projet Drawings, eubat drewigs ceibing, proposed
Joining ie acordance wih 14 ant the requirements of
S122 de 3122.9 Do aoc proens wh Wok
the joing requcement ae cceptod by the Architect
Engaee
‘LIER Indicate tocaions of contacoa joins,
‘onstruction joins, and isolation Joins. Spag between
‘ontacton jt thal ot exceed 20f (6).
‘3122.2 The ger harzowal dimension of sb pel
stall nt exceed 129% of the slr dinenson
‘3122.3 The ange between tw necting joint sal
te between 80 and 10 depres, a specified in Contact
Document.oasa
3.12.24 Joints sal itesect pavement fee eges at
0-degre ample and shal extend sight fo ain of
72 8(03 m) fom the pavement ege where posible
‘LIZ25 Align joins of adaceat pavement pel
5.1226 Alig inti atacod or ajncent cube within
sin. (6 mm) of fins pavement
‘312.2. Contaton jot dept sll be 1 10 WS of the
pavement thickness: Min ont width for coting ie
{iu mm). When ung a exly-try dy mth
ep ofthe cat sal be at ast in 5 tm)
‘34228 Useslaton joints nly whee pavement buts
fixed objects, uch as baling foundations, and manos
‘31229 Extend islaton ots trough he fll dep of
the pavement. il theese oli ot with lation
joint mate
‘3123 Crea canracon joints by one ofthe following
matte
‘SHLAA Tool contraction joints to the specified depth
sd widhn es conramimedtely aferthe conc
compacted
"31232 Saweat concrete after conrete bas hardened
sulin to prevent aggegt rom being dislodged and
toon eoough o couel pavemet cracking To miinize
ying, ensure that coring mater te cemoved only at
rood make ets
£833 —Opening to trae
S31 Boas pene pseret veri
ste cone as Can orn nie yea
{tle pvement cep be Arco
‘pening re
FOREWORD TO CHECKLISTS
FL, This Foreword i inclnded for npanuory purposes
only it des nt form pat of Speciation ACT S221,
‘AcisTaNARO
F2. ACI Specfeation 22.1 may be referenced by the
Specter in the Projet Speifiestion for say building
moje, together with sopementary requirement for the
Specie poet. Responses for project purpans
be defined in the Poject Specification. The ACI
peciieaton cannot and dosnt aes expos or
‘hy projet paripant the than the Conractor
TF. Checklists do ot fom & pat of ACI Specfiaon
5221, Cec ste Set set spying
Project requirments nthe Project Speciation
4. The Speci shall ake sjstment othe needs of
articular project by reveving each of Be ems in the
‘hells Sad incling tbe tems the Specifier sles at
‘andor requirements in be Projet Specfeion
PS. The Mandatory Requirements Checklist indices
Work rguvemensepatng specie qults, procedures,
‘mses and perfomance ceria that are bt defied i
[ACL Specicaton 52
'F6. The Opdonal Requirements Checklist Metis
Specifier choices and alenatives The chests Heat
the Sections, Pars and Arties of he reference species
andthe action eued or ealable he Specie.
7. The Sabitals Checlst deatiies Specifier choices
{ox ntrmation rt tbe provided by Contract efr,
ing, rar consaction
"Recommended referents —Docapens an pation,
hat we referenced inthe checks of ACI Speciation
S221 we listed. These references provide guidance he
Spectr snd went cari be patof ACI Spaotion
S221
Amercon Concrete Insti
MANDATORY REQUIREMENTS CHECKLIST
a
nn od
in
Br pen emia ina OS
[3 [say ste reprton ai permet ogee a poptine wien of Cane Dace
[Srey a eons dept, an enon os Pet Drang3105)
sina
aa
Taz
_EPECINCATION FoR RGU CONCRETE PAVEMENT saasa
‘OPTIONAL REQUIREMENTS CHECKLIST
Raa Sr
Spel hr Conacr qalO
{Cerair may pve writ al potas sen yj epson rien in ceuay
‘onpleng prvi coure pene consi nd been of opti a eonalyrnpied
parton ones eafancottean pepe
{te Conners ince epee ith prvi cose ovement sa ecu jb), he
Conc al eno epernced courant om recon tng pet personae
(Counce sexys The ston oe const tl be ajo espe of he Aspe
Specify cause gui and ating iene
‘Specie pe of wt i Cone Documents, eh OE
Spey acai pnent wi
Spel if eh mal of cong PR
Spel if chr mtd of io ert
Plager neg ine ued porn pi se
Spey din ong
Spey spate mg aes
‘SUBMITTALS CHECKLIST
Saba ims abate Secor
Review and sept MEDICA estan Games TOR GRR W Gala eae NIC