You are on page 1of 2

Std WI Plated

Process Flow No
Document No
Revision NO
Revision Date
Operation Name

CFT Sign

WI/AS/39

Doc Prepared By

Engineer

QA

Doc Reviewed By

HOD

Prodction

Doc Approved BY

MR

Engineering

03.07.15

Inspection at EZIPL Unit I & II / At Customer END.

Responsibility

a. Head - Quality , b. Engineers /Jr Engineers. & C. Quality Inspectors

Description of operation Elements


Pictorial View of Operation

Plating process flow

To Inspect all Painted Wheel Cover as per Quality Inspection Standards

Scope

SR. NO

Process Flow Name

Work Instruction for Visual Inspection of Wheel Cover U301 (0404CAA01950N)

Objective

Operatio
n
Sequenc
e no. as
per P.F.

446

What

Safety Points Description

How

Why

Who

Key
Point
Control

Process Points Description

Quality Points Description

Process Cycle Time

Use Hand gloves during


packing

37

1) Inspect Painted parts for


assy

Visually

Part will be rejected

Check for
Painting &
Quality Inspector moulding
defects
Visually

Do the inspection on F.W.


Table under lights ( 800-1000
Lux )

15 sec

Inspection as per Quality


plan QP/M/01 & Sampling
inspection plan QP/FM &
M/69

Use Hand gloves during Ring


fittment

1) Fix the ring with wheel cover


adjust the air valve groove of wheel
As per showing
cover with knotch of the ring
in WI
properly, 2) Ring fittment do as per
showing

Part will be rejected

Page 1

Check for
Painting &
Quality Inspector moulding
defects
Visually

To Ensure no handling
scratches on Painted parts
during ring fittment.

As per Quality Plan QP/FM


& M/69

20

Std WI Plated

Use Hand gloves during


packing

After completion of all activity put


one part in bag as per shown in
sketch

1. To put the OK Part in


As per shown in plastic bag as per std. Packing
sketch
& also to avoid the handling
scratches in OK part

Operator

Verify the
part in
plastic bag

To put the OK Part in


corrugated Box as per std.
Packing & also to avoid the
mixing of N.G. Part in OK
part

Free from Any damage of


Plastic bag.

10

Use Hand gloves during


packing

Put each assmbeld part in plastic


bag . Then put in Corrugated box
As per showing . 4 Parts in Each
box

1. To put the OK Part in box


As per shown in as per std Packing . & also to
sketch
avoid the handling scratches
in OK part

Operator

Verify the
part no.
and qty.

To put the OK Part in


corrugated Box as per std.
Packing & also to avoid the
mixing of N.G. Part in OK
part

Free from Any damage of OK


PP Box.

10

Use Hand gloves during


packing

STICK OK LABEL WITH (


INSPECTOR NAME &
SIGN ,PART NAME ,
OK QTY,DATE ) ON OK BOX .

Verify the
Physical
part in
1. To ensure no wrong
As per shown in
box & Part
physical part & wrong label go Quality Inspector
sketch
name ,
to customer
no. and
qty. on
label

Page 2

To put the OK Part in


corrugated Box as per std.
Packing & also to avoid the
mixing of N.G. Part in OK
part
Free from Any damage of OK
corrugated Box.

10

You might also like