ACTIVITIES

Site Clearing
Site Layout
Mobilization
Installation of Construction Plants
Excavation for Footings and Wall Footings
Fabrication of Forms for Columns
Fabrication of Rebar for Column Footing and Wall Footings
Installation of forms for Columns
Rebar Installation for Footing-Columns and Wall Footings
Concrete Pouring for Footings and Wall Footings
Concrete pouring for Columns
Erection of CHB
Scafoldings
Fabrication of Doors and Windows
Installation of Doors and Windows
Fabrication of Forms for Beams
Fabrication of Rebar for Beams
Installation of forms for Beams (1st Floor)
Rebar Installation for Beams(1st Floor)

Concrete Pouring for Beams(1st Floor)


Fabrication of Forms for stairs
Fabrication of Rebar for stairs
Installation of forms for stair (1st Floor)
Rebar Installation for stairs(1st Floor)
Pouring of concrete for Stairs
Plumbing Rough Installation wew
Electric Rough Installation
Back Filling of soil for floor slab
Soil poisoning and Compacting
Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)
Installation of Reinforcing Bars for Floor Slabs (1st floor)
Concrete Pouring for Floor Slabs (1st Floor)
Installation of forms for Columns(2nd floor)
Rebar Installation for Column (2d floor)
Concrete pouring for Columns(2nd floor)
Erection of CHB(2nd floor)
Fabrication of Doors and Windows

Installation of Doors and Windows


Fabrication of Forms for Beams
Fabrication of Rebar for Beams
Installation of forms for Beams (2nd Floor)
Rebar Installation for Beams(2nd Floor)
Concrete Pouring for Beams(2nd Floor)
Fabrication of Forms for stairs
Fabrication of Rebar for stairs
Installation of forms for stair (2nd Floor)
Rebar Installation for stairs(2nd Floor)
Pouring of concrete for Stairs
Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor)
Installation of Reinforcing Bars for Floor Slabs (2nd floor)
Concrete Pouring for Floor Slabs (2nd Floor)
Installation of forms for Columns(3rd floor)
Rebar Installation for Column (3rd floor)
Concrete pouring for Columns(3rd floor)
Erection of CHB(3rd floor)

Fabrication of Doors and Windows(3rd floor)


Installation of Doors and Windows (3rd loor)
Fabrication of Rebar for Beams
Installation of forms for Beams (2nd Floor)
Rebar Installation for Beams(2nd Floor)
Concrete Pouring for Beams(2nd Floor)
Fabrication of Forms for stairs
Fabrication of Rebar for stairs
Installation of forms for stair (2nd Floor)
Rebar Installation for stairs(2nd Floor)
Pouring of concrete for Stairs
Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor)
Installation of Reinforcing Bars for Floor Slabs (3rd floor)
Concrete Pouring for Floor Slabs (3rd Floor)
Fabrication of Reinforcing Bars for Floor Slabs(top Floor)
Installation of Reinforcing Bars for Floor Slabs (top floor)
Concrete Pouring for Floor Slabs (top Floor)
Installation of Floor Tiles

Removing of Forms for Columns/ Beams


Finishing of Walls and Columns
Removal of scafolds
Septic tank Construction
Final Cleaning
Turn Over

TYPES OF WORKS
Peon

NO. OF WORKERS
4

DURATION (DAYS)
2
1

Carpenter
Peon
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Mason
Peon
Peon

1
2
4
2
4
2
2
2
2
2
2
4
4
4
4
4

1
1
1
4
4
4
4
4
4
4
4
4
1
1
1
1
12

Steelman
Peon
Carpenter

1
4
4

1
1
1

Carpenter
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon

1
1
2
2
2
4
2
2
2
2

1
1
2
2
4
4
4
4
3
3

Mason
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Plumber
Peon
Electrician
Peon
Peon

4
4
1
1
2
1
1
1
1
1
1
1
2
1
1
3
4

1
1
1
1
1
1
1
1
1
1
1
1
7
7
7
7
1

Peon

Steelman
Peon
Steelman
Peon
Mason
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Peon

3
3
4
4
2
2
2
2
2
2
4
4
4

7
7
15
15
3
3
4
4
4
4
4
4
12

Carpenter

Carpenter
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Steelman
Peon
Steelman
Peon
Mason
Peon
Steelman
Peon
Mason
Peon
Peon

1
1
2
2
2
4
2
2
2
2
4
4
1
1
2
1
1
1
1
1
1
1
3
3
4
4
2
2
2
2
4
4
4

1
1
2
2
4
4
4
4
3
3
3
3
1
1
1
1
1
1
1
1
1
1
7
7
12
12
3
3
4
4
4
4
1

Carpenter

12

Carpenter
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Steelman
Peon
Steelman
Peon
Mason
Peon
Steelman
Peon
Steelman
Peon
Mason
Peon
Mason
Peon

1
1
2
2
2
4
2
2
2
2
4
4
1
1
2
1
1
1
1
1
1
1
3
3
4
4
2
2
3
3
4
4
2
2
3
3

1
1
1
1
2
2
4
4
4
4
3
3
1
1
1
1
1
1
1
1
1
1
7
7
15
15
3
3
7
7
15
15
3
3
15
15

Peon

Mason
Painter
Peon

3
6
4

15
15
1

Mason
Peon
Peon

2
2
3

2
2
5
1

Engineer
Foreman

1
1

233

COST/DAY(PHP)
200

TOTAL AMOUNT
1600

250
200
200
250
200
300
200
250
200
300
200
300
200
300
200
200

250
400
3200
2000
3200
2400
1600
2000
1600
2400
1600
1200
800
1200
800
9600

300
200
250

300
800
1000

250
200
250
200
300
200
250
200
300
200

250
200
1000
800
2400
3200
2000
1600
1800
1200

TOTAL DAYS OF WORK= 233D

300
200
250
200
300
200
250
200
300
200
300
200
300
200
300
200
200

1200
800
250
200
600
200
250
200
300
200
300
200
4200
1400
2100
4200
800

200

800

300
200
300
200
300
200
250
200
300
200
300
200
200

6300
4200
18000
12000
1800
1200
2000
1600
2400
1600
4800
3200
9600

250

1000

250
200
250
250
300
200
250
200
300
200
300
200
250
200
300
200
250
200
300
200
300
200
300
200
300
200
300
200
300
200
300
200
200

250
200
1000
1000
2400
3200
2000
1600
1800
1200
3600
2400
250
200
600
200
250
200
300
200
300
200
6300
4200
14400
9600
1800
1200
2400
1600
4800
3200
800

250

12000

250
200
250
200
300
200
250
200
300
200
300
200
250
200
300
200
250
200
300
200
300
200
300
200
300
200
300
200
300
200
300
200
300
200
300
200

250
200
500
400
1200
1600
2000
1600
2400
1600
3600
2400
250
200
600
200
250
200
300
200
300
200
6300
4200
18000
12000
1800
1200
6300
4200
18000
12000
1800
1200
13500
9000

200

800

300
500
200

13500
45000
800

300
200
200

1200
800
3000

500

116500
total

GRAND TOTAL

TOTAL DAYS OF WORK= 233DAYS

537500

php

DESCRIPTION

UNIT
A. MANSONRY AND CONCRETE WORKS

1.FOOTING (Class A)

cu.m

Portland Cement (40kgs)


Sand
Gravel
G-2Filing

bags
cu.m
cu.m
cu.m

2. Column (Class A)

cu.m

Portland Cement (40kgs)


Sand
Gravel

bags
cu.m
cu.m

3. Tie Beam (Class A)

cu.m

Portland Cement (40kgs)


Sand
Gravel

bags
cu.m
cu.m

4. Wall Footing (Class B)

cu.m

Portland Cement (40kgs)


Sand
Gravel
G-2Filing

bags
cu.m
cu.m
cu.m

5. Wall(Class B)

cu.m

CHB
Portland Cement (40kgs)
Sand

pcs
bags
cu.m

6. Floor Slab

cu.m

Portland Cement (40kgs)


Sand
Gravel
G-2Filing

bags
cu.m
cu.m
cu.m

7. Beam(Class A)

cu.m

Portland Cement (40kgs)


Sand
Gravel

bags
cu.m
cu.m

8. Stairway (Class B)

cu.m

Portland Cement (40kgs)


Sand
Gravel

bags
cu.m
cu.m

9. Plastering (Class C)

cu.m

Portland Cement (40kgs)


Sand

bags
cu.m
B. REBARS

1. Footing
12mmx 6m bars
#16 G.I wire

pcs
kgs

2. Column
20mmx6m bars
20mmx7,5m bars
10mmx7.5m bars

pcs
pcs
pcs

10mmx6m
#16 G.I wire

pcs
kgs

3. CHB
12mmx6mbars
#16 G.I wire

pcs
kgs

4. Two-way slab
10mmx6mbars
#16 G.I wire

pcs
kgs

5. Wall-Footing
12mmx7.5m bars
10mmx6m bars
#16 G.I wire

pcs
pcs
kgs

6. Beam
20mmx6m bars
#16 G.I wire

pcs
kgs

7. Tie Beam
16mmx6m bars
#16 G.I wire

pcs
kgs

C. EQUIPMENT
Bar Cutter (45days)
Bulldozer(20days)
Concrete Mixer(82days)
Dump Truck(20 days)

Pay Loader(20days)
Water Tank and etc(82days)
D. FORMS AND SCAFFOLDING
Forms: Steel
Scaffolding: Steel
Plywood
E. DOORS AND WINDOWS
Fire Exit Steel Ladder
Glass Door
Sliding Door
Wooden Door
CR Door
Glass Windows etc
F. ELECTRICAL AND PLUMBING FIXTURES
Plumbing installation and Fixtures
Electrical installation and Fixtures
G. PAINTING

sq.m

Acrylic Gloss Latex Paint (G07)


Acrylic Concrete Sealer
Acrylic Gloss Latex Paint (D05)

gallons
gallons
gallons
H. TILE WORKS

Walls for Comfort Rooms, and Flooring


Portland Cement (40 kg)
White Cement Joint Filler
8in. x 8in. Ceramic Tile
12in. x 12in. Ceramic Tile

bags
kg
pcs
pcs
I. LANDSCAPE

Concrete
Rebars
Painting
Grass
Plants
Guard house and tec
lights
pavement
TOTAL
TOTAL DIRECT COST
OVER HEAD COST(Engineer's Salary 8%)
VAT(12%)
Contengency fund (5%)
GRAND TOTAL

6723449.05
470641.4335
893081.886
336172.4525
8423344.822

QUANTITY

UNIT COST

AMOUNT

235
800
800
750

17390
3283.2
6566.4
2052

235
800
800

36660
6930.4
13860

235
800
800

16215
3044.8
6088.8

235
800
800
750

22325
5077.6
10155.2
9520.5

11
235
800

104467
200925
45581.6

CONCRETE WORKS
8.208
74
4.104
8.208
2.736
17.325
156
8.663
17.325
7.611
69
3.806
7.611
12.694
95
6.347
12.694
12.694
113.953
9497
855
56.977

70.435
634
35.218
70.435
7.043

235
800
800
750

148990
28174.4
56348
5282.25

235
800
800

43005
8104
16208

235
800
800

9165
308
616

235
800
TOTAL

32665
9234.4
868242.55

63
7

193
75

12159
525

140
128
145

350
438
220

49000
56064
31900

20.26
183
10.13
20.26
5.6
39
0.385
0.77
23.085
139
11.543

BARS

PHP

PMENT

29
48

178
75

5162
3600

573
22

193
75

110589
1650

2052
279

178
75

365256
20925

30
12
3.5

193
178
75

5790
2136
262.5

324
70

350
75

113400
5250

72
16

193
75

13896
1200
798764.5

PHP

1500000

60000

D WINDOWS

700000

PLUMBING FIXTURES
275000
150000
759.7
26
22
3

580
690
510

15080
15180
1530

41
235
888
4822

235
25
49
30

9635
5875
43512
144660
203682

WORKS

SCAPE

1600000

TAL
PHP
PHP
PHP
PHP
PHP

cost of materials + labor cost

ACTIVITIES

TYPES OF WORKS

NO. OF WORKERS

Site Clearing
Site Layout

Peon

Mobilization
Installation of Construction Plants

Carpenter
Peon
Peon
Excavation for Footings and Wall Footings
Carpenter
Fabrication of Forms for Columns
Peon
Fabrication of Rebar for Column Footing and Wall Footings
Steelman
Peon
Installation of forms for Columns
Carpenter
Peon
Rebar Installation for Footing-Columns and Wall Footings
Steelman
Peon
Concrete Pouring for Footings and Wall Footings
Mason
Peon
Mason
Concrete pouring for Columns
Peon
Peon
Erection of CHB

1
2
4
2
4
2
2
2
2
2
2
4
4
4
4
4

Steelman
Peon
Carpenter

1
4
4

Carpenter
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon

1
1
2
2
2
4
2
2
2
2

Mason

Peon
Carpenter
Peon
Steelman
Peon
Carpenter

4
1
1
2
1
1

Scafoldings
Fabrication of Doors and Windows
Installation of Doors and Windows
Fabrication of Forms for Beams
Fabrication of Rebar for Beams
Installation of forms for Beams (1st Floor)
Rebar Installation for Beams(1st Floor)
Concrete Pouring for Beams(1st
Floor)
Fabrication of Forms for stairs
Fabrication of Rebar for stairs
Installation of forms for stair (1st Floor)

Back Filling of soil for floor slab

Peon
Steelman
Peon
Mason
Peon
Plumber
Peon
Electrician
Peon
Peon

1
1
1
1
1
2
1
1
1
4

Soil poisoning and Compacting

Peon

Rebar Installation for stairs(1st Floor)


Pouring of concrete for Stairs
Plumbing Rough Installation wew
Electric Rough Installation

Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)


Steelman
Peon
Installation of Reinforcing Bars for Floor Slabs (1st floor)
Steelman
Peon
Concrete Pouring for Floor Slabs (1st Floor)
Mason
Peon
Carpenter
Installation of forms for Columns(2nd floor)
Peon
Steelman
Rebar Installation for Column (2d floor)
Peon
Mason
Concrete pouring for Columns(2nd floor)
Peon
Peon
Erection of CHB(2nd floor)

3
3
4
4
2
2
2
2
2
2
4
4
4

Fabrication of Doors and Windows

Carpenter

Installation of Doors and Windows

Carpenter
Peon
Carpenter
Peon
Steelman
Peon
Carpenter
Peon
Steelman
Peon
Mason
Peon
Carpenter
Peon
Steelman
Peon

1
1
2
2
2
4
2
2
2
2
4
4
1
1
2
1

Fabrication of Forms for Beams


Fabrication of Rebar for Beams
Installation of forms for Beams (2nd Floor)
Rebar Installation for Beams(2nd Floor)
Concrete Pouring for Beams(2nd Floor)
Fabrication of Forms for stairs
Fabrication of Rebar for stairs

Carpenter
Peon
Steelman
Rebar Installation for stairs(2nd Floor)
Peon
Mason
Pouring of concrete for Stairs
Peon
Steelman
Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor)
Peon
Steelman
Installation of Reinforcing Bars for Floor Slabs (2nd floor)
Peon
Concrete Pouring for Floor Slabs (2nd Floor)
Mason
Peon
Installation of forms for Columns(3rd floor)
Steelman
Peon
Rebar Installation for Column (3rd floor)
Mason
Peon
Concrete pouring for Columns(3rd floor)
Peon
Installation of forms for stair (2nd Floor)

Erection of CHB(3rd floor)

1
1
1
1
1
1
3
3
4
4
2
2
2
2
4
4
4

Carpenter

Carpenter
Peon
Carpenter
Installation of Doors and Windows (3rd loor)
Peon
Steelman
Fabrication of Rebar for Beams
Peon
Carpenter
Installation of forms for Beams (2nd Floor)
Peon
Steelman
Rebar Installation for Beams(2nd Floor)
Peon
Mason
Concrete Pouring for Beams(2nd Floor)
Peon
Fabrication of Forms for stairs
Carpenter
Peon
Fabrication of Rebar for stairs
Steelman
Peon
Installation of forms for stair (2nd Floor)
Carpenter
Peon
Rebar Installation for stairs(2nd Floor)
Steelman
Peon
Mason
Pouring of concrete for Stairs
Peon
Steelman
Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor)
Peon
Steelman
Installation of Reinforcing Bars for Floor Slabs (3rd floor)

1
1
2
2
2
4
2
2
2
2
4
4
1
1
2
1
1
1
1
1
1
1
3
3
4

Fabrication of Doors and Windows(3rd floor)

Peon
Mason
Concrete Pouring for Floor Slabs (3rd Floor)
Peon
Steelman
Fabrication of Reinforcing Bars for Floor Slabs(top Floor)
Peon
Steelman
Installation of Reinforcing Bars for Floor Slabs (top floor)
Peon
Mason
Concrete Pouring for Floor Slabs (top Floor)
Peon
Mason
Installation of Floor Tiles
Peon
Removing of Forms for Columns/ Beams
Peon
Finishing of Walls and Columns
Removal of scafolds
Septic tank Construction
Final Cleaning
Turn Over

4
2
2
3
3
4
4
2
2
3
3
4

Mason
Peon
Peon

3
3
4

Mason
Peon
Peon

2
2
3

DURATION (DAYS) COST/DAY(PHP)


TOTAL AMOUNT
2
1
1
1
4
4
4
4
4
1
1
12
1
1
1
2
4
4
3
1
1
1
1

200

1600

250
200
200
250
200
300
200
250
200
300
200
300
200
300
200
200

250
400
3200
2000
3200
2400
1600
2000
1600
2400
1600
1200
800
1200
800
9600

300
200
250

300
800
1000

250
200
250
200
300
200
250
200
300
200

250
200
1000
800
2400
3200
2000
1600
1800
1200

300

1200

200
250
200
300
200
250

800
250
200
600
200
250

200
300
200
300
200
500
200
500
200
200

200
300
200
300
200
7000
1400
3500
1400
800

200

800

12

300
200
300
200
300
200
250
200
300
200
300
200
200

6300
4200
18000
12000
1800
12000
2000
1600
2400
1600
4800
3200
9600

250

1000

250
200
250
200
300
200
250
200
300
200
300
200
250
200
300
200

250
200
1000
800
2400
3200
2000
1600
1800
1200
3600
2400
250
200
600
200

1
1
7
7

15
3
4
4
4

2
4
4
3
3
1
1

250
200
300
200
300
200
300
200
300
200
300
200
300
200
300
200
200

250
200
300
200
300
200
6300
4200
18000
12000
1800
1200
2400
1600
4800
3200
800

12

250

12000

250
200
250
200
300
200
250
200
300
200
300
200
250
200
300
200
250
200
300
200
300
200
300
200
300

250
200
500
400
1200
1600
2000
1600
2400
1600
3600
2400
250
200
600
200
250
200
300
200
300
200
6300
4200
18000

1
1
7
15
3
4
4

1
2
4
4
3
1
1
1
1
1
7
15

3
7
15
3
15
1
24
1
2
5

200
300
200
300
200
300
200
300
200
300
200
200

12000
1800
1200
6300
4200
18000
12000
1800
1200
13500
9000
800

300
200
200

21600
14400
800

300
200
200

1200
800
3000

1
416500

php GRAND TOTAL

Task Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Site Clearing
Site Layout
Mobilization
Installation of Construction Plants
Excavation for Footings and Wall Footings
Fabrication of Forms for Columns
Fabrication of Rebar for Column Footing and Wall Footings
Installation of forms for Columns
Rebar Installation for Footing-Columns and Wall Footings
Concrete Pouring for Footings and Wall Footings
Concrete pouring for Columns
Erection of CHB
Scafoldings
Fabrication of Doors and Windows
Installation of Doors and Windows
Fabrication of Forms for Beams
Fabrication of Rebar for Beams
Installation of forms for Beams (1st Floor)
Rebar Installation for Beams(1st Floor)
Concrete Pouring for Beams(1st Floor)
Fabrication of Forms for stairs
Fabrication of Rebar for stairs
Installation of forms for stair (1st Floor)
Rebar Installation for stairs(1st Floor)
Pouring of concrete for Stairs
Plumbing Rough Installation
Electric Rough Installation
Back Filling of soil for floor slab
Soil poisoning and Compacting
Fabrication of Reinforcing Bars for Floor Slabs(1st Floor)
Installation of Reinforcing Bars for Floor Slabs (1st floor)
Concrete Pouring for Floor Slabs (1st Floor)
Installation of forms for Columns(2nd floor)
Rebar Installation for Column (2d floor)
Concrete pouring for Columns(2nd floor)
Erection of CHB(2nd floor)
Fabrication of Doors and Windows
Installation of Doors and Windows
Fabrication of Forms for Beams
Fabrication of Rebar for Beams
Installation of forms for Beams (2nd Floor)
Rebar Installation for Beams(2nd Floor)
Concrete Pouring for Beams(2nd Floor)

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

Fabrication of Forms for stairs


Fabrication of Rebar for stairs
Installation of forms for stair (2nd Floor)
Rebar Installation for stairs(2nd Floor)
Pouring of concrete for Stairs
Fabrication of Reinforcing Bars for Floor Slabs(2nd Floor)
Installation of Reinforcing Bars for Floor Slabs (2nd floor)
Concrete Pouring for Floor Slabs (2nd Floor)
Installation of forms for Columns(3rd floor)
Rebar Installation for Column (3rd floor)
Concrete pouring for Columns(3rd floor)
Erection of CHB(3rd floor)
Fabrication of Doors and Windows(3rd floor)
Installation of Doors and Windows (3rd loor)
Fabrication of Rebar for Beams
Installation of forms for Beams (2nd Floor)
Rebar Installation for Beams(2nd Floor)
Concrete Pouring for Beams(2nd Floor)
Fabrication of Forms for stairs
Fabrication of Rebar for stairs
Installation of forms for stair (2nd Floor)
Rebar Installation for stairs(2nd Floor)
Pouring of concrete for Stairs
Fabrication of Reinforcing Bars for Floor Slabs(3rd Floor)
Installation of Reinforcing Bars for Floor Slabs (3rd floor)
Concrete Pouring for Floor Slabs (3rd Floor)
Fabrication of Reinforcing Bars for Floor Slabs(top Floor)
Installation of Reinforcing Bars for Floor Slabs (top floor)
Concrete Pouring for Floor Slabs (top Floor)
Installation of Floor Tiles
Removing of Forms for Columns/ Beams
Finishing of Walls and Columns
Removal of scafolds
Septic tank Construction
Final Cleaning
Turn Over

Duration

Predecessors

2 days
1 day
1 day
1 day
4 days
4 days
4 days
4 days
4 days
1 day
1 day
12 days
1 day
1 day
1 day
2 days
4 days
4 days
3 days
1 day
1 day
1 day
1 day
1 day
1 day
7 days
7 days
1 day
1 day
7 days
12 days
3 days
4 days
4 days
4 days
12 days
1 day
1 day
2 days
4 days
4 days
3 days
3 days

none
1
1
3
2
4
4
5,6
5,6
8,9
9
11,10,9
5,12
10,13
14
8,9
8,9
12,17
18,17
19
11,20
11,21
21,22
22,23
12,24
9,19,25
9,19,25,26
10,27
10,27
12,29
30
31
25,32
25,32
34
34
34
36,37
36,38
36,39
40,39
40,41
42

1 day
1 day
1 day
1 day
1 day
7 days
12 days
3 days
4 days
4 days
1 day
12 days
1 day
1 day
2 days
4 days
4 days
3 days
1 day
1 day
1 day
1 day
1 day
5 days
12 days
3 days
7 days
12 days
3 days
12 days
1 day
15 days
1 day
2 days
2 days
1 day

42,40
42,41,44
43
43
47
34,46,48
36
50
34
52
53
52
55
55
52
52
59
60
60
60
63
63
65
53
67
68
69
70
71
72
72
72
75
75
77
78,74,75,76