You are on page 1of 29

Application ID:

(For office use)

APPLICATION FORM FOR FINANCIAL ASSISTANCE UNDER PRIME MINISTERS


EMPLOYMENT GENERATION PROGRAMME (PMEGP)

Preference for sponsoring agency of the project to Bank: (mark )


KVIC

KVIB

DIC

RURAL

URBAN

TO
.
District Industries Center

PHOTO

State:
1

Name of the Applicant/Institution


7/2/1974

2
3
4
5

Date of Birth:

DD
2

MM
7

YYYY
1974

Age ( in Years)

41

Sex
Male
Female
Father's/Spouse's/Contact person Name (if Institution):

Khadi & V.I.


Khadi & V.I.
District Indu
District Indu

Communication Address:

Taluk/Block:
District:
Email:

Male
Female

Address of the Proposed location of Unit:

Pin

Rural
Urban

Contact No:

Rural

Urban

No
Yes

Taluk/Block:
District:
7

Name of the preferred Bank Name & Address in the Area for Project Sanction:

Taluk/Block:
District:
8

Pin:

Qualification
Academic
Under 8th

Branch Code:

SC
ST
OBC
PHC
Ex- Service
Minority
Hill Boarder
General

Technical

Manufactur

Whether Entrepreneur Development


programme (EDP at least 2 weeks)
under gone: (mark )

Yes

Certificate Issue ##
Date

Period of Training

Name & Address of Training Institute

No

From

To

Ex- Service
man

Minority

10 Whether the applicant belongs to (mark )


SC

ST

OBC

PHC

Hill
Boarder
Area

Whether the project


(mark )

Manufacturing Unit

Service
Unit

Post Gradu

12 Name of the project / business activity proposed :

Capital Expenditure Loan

Rented

Workshed Machinery/
Building Equipment/
etc.
Furniture

Pre
Operative
Cost

Working
Capital /
Cash Credit
Limit

Total

Details of earlier or current Loan/Grant and subsidy availed from

14 Central/State Govt. Scheme/ or any other Similar Scheme.


Activity of the Project with Address

Amount

Year of Sanction

I certify that all information furnished by me is true; and that I and any of my dependent have not
borrowed any money under subsidy linked scheme from any Central / State Government or bank for
establishing any such project

Place:
Date:
For Official Use only:
Reason (if Rejected):

Place:
Date:

PhD
Own
Rented
Leased

13 Amount of loan required (in Rs.)

Building Type

Under 8th
8th Pass
10th Pass
12th Pass
Graduate

General

11

Service

Signature of the Applicant


(Rejected / to be placed before District Task force Committee)

Signature, Name & Designation of Officer

NOTE

Own contribution must be invested 5% for SC/ST/OBC/PHC/woman/ Ex-serviceman/ North


East Reason/Hill Boarder Area and 10% for General
Total Project Cost should not exceed 25 lakhs for Manufacturing unit and 10 lakhs for service
unit.
Applicant will not be entitled for additional Margin Money(Subsidy) in case of Own
Contribution over and above the prescribed limit.
VIIIth pass for Manufacturing Unit above Rs.10 lakhs project cost and under Service Sector
above Rs.5 lakhs
Application should be submitted complete in all respect along with attested copies of the
following documents:
1. Certificate of qualification-academic and technical (if project cost above 5 lakhs under
service industry or above 10 lakhs under Manufacturing industry)
2. Relevant Certificate for SC/ST/OBC/Minority/Ex-Servicemen/PHC
3. if Entrepreneur Development programme(EDP) training undergone (at least for two weeks)
then submit photocopy of the certificate

DATA INPUT SHEET


Legal Status:

Land
BUILDING DETAILS
Particulars

Area

Rate/Sq.ft

Amount in Rs.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Particulars

MACHINERY DETAILS
Qty.
Rate

Amount in Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total

d. Preliminary & Pre-operative Cost :


e. Furniture & Fixtures

f. Contingency/Others/Miscellaneous

0.00

Working Capital

0.00

##

Means of Financing
Own Contribution

Bank Finance

5%
95%

Margin Money (Govt. Subsidy)

25%

DETAILS OF SALES
Rate/

Particulars of Products

Qantity

Unit

Stone carving products


Stone Artware & Decorative Prod.

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total

Particulars

Amount in Rs.

0.00

RAW MATERIALS
Unit
Rate/Unit Reqd. Unit

Total

Amount In Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Particulars

WAGES
No. of
Wages Per Month
Worker Total Month
12

Amount in Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total

0.00

SALARY DETAILS
No. of
Wages Per Month
Staff
12
Total Month

Particulars

Total

Amount in Rs.
0.00
0.00
0.00
0.00
0.00
0.00

WORKING CAPITAL ESTIMATE


Element of Working Capital
Raw materials

No. of Days

Stock in process
Finished goods
Receivable by

POWER ESTIMATE
Power Requirement

Repair and Maintanance

Rs.

0.00

Power and Fuel

Rs.

0.00

Other Overhead Expenses

Rs.

0.00

Telephone Expenses

Rs.

0.00

Stationery & Postage

Rs.

0.00

Advertisement & Publicity

Rs.

0.00

Building Rent

Rs.

1000.00

Other Miscelleneous Expenditure

Rs.

0.00

Rate of Interest
Depreciation
On Building
On Machinery

5.00%
10.00%

Pay back period

Project Implementation Period

12

INTRODUCTION

ABOUT THE PROMOTER

Office Address:
.
District Industries Center
0
0
0

State: 0

Name & Signature Incharge


with round seal

DISTRICT INDUSTRIES CENTER


PROJECT AT A GLANCE - TOP SHEET
1

Name of the Entreprenuer

Constitution (legal Status)

Individual

Father's/Spouce's Name

Unit Address

: 0
0
Taluk/Block 0
District :
Pin:
Phone
E-Mail

Product and By Product

Cost of Project

Means of Finance
Term Loan
KVIC Margin Money
Own Capital

0
0
0
0

State: 0

Rs. 0

Rs. 0.0
Rs. 0.00
Rs. 0.00

Debt Service
Coverage Ratio

#DIV/0!

Pay Back Period

10 Project
Implementation
Period

12

11 Break Even Point

#DIV/0!

12 Employment

13 Power Requirement

14 Major Raw materials

15 Estimated Annual
Sales Turnover

PMEGP Project Report

Years

Months

,,
Rs. 0.00

Page 10

DETAILED PROJECT REPORT


1

INTRODUCTION

ABOUT THE PROMOTER

COST OF PROJECT
A.
a.

Land

b.
0
0
0
0
0
0
0

Workshed

Fixed Capital Investment


:
0
Area Sq.ft
0
0
0
0
0
0
0

Rate in Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Own
Amt. In Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total
0
C. Machinery
0
0
0
0
0
0
0
0
0
0
0
0
Total

PMEGP Project Report

Qty.
0
0
0
0
0
0
0
0
0
0
0
0

Rate
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Amount in Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Page 11

d. Preliminary & Pre-operative Cost :

Rs. 0.00

e. Furniture & Fixtures

Rs. 0.00

f. Contingency/Others/Miscellaneous

Rs. 0.00

Total Capital Expenditure

Rs. 0.00

Working Capital

Total Cost Project

Rs. 0.00

3.1 Means of Financing


Own Contribution

Rs. 0.00

:
5%

Bank Finance
Term Loan
Working Capital

95%

Total

Rs. 0.00

Rs. 0.00
Rs. 0.00
Rs. 0.00

Margin Money (Govt. Subsidy) From KVIC

25%

Rs. 0.00

Margin Money Subsidy received From KVIC will be kept in term deposit as per norms of
PMEGP in the name of Beneficiary for three years in the financing branch.

3.2

STATEMENT SHOWING THE REPAYMENT OF TERM LOAN & WORKING CAPITAL :


TERM LOAN
Year

Opening Balance

Installment

Closing Balance

1st
2nd
3rd
4th
5th
6th
7th
8th

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

Interest @

0.00%
0
0
0
0
0
0
0
0

WORKING CAPITAL
Year

Opening Balance

Installment

Closing Balance

1st
2nd
3rd
4th
5th
6th
7th
8th

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

PMEGP Project Report

Interest @

0.00%
0
0
0
0
0
0
0
0

Page 12

3.3

STATEMENT SHOWING THE DEPRECIATION ON FIXED ASSETS:


WORKSHED
@
Particulars
1st Year
2nd Year
3rd Year
4th Year
Opening Balance
0
0
0
0
Depreciation
0
0
0
0
Closing Balance
0
0
0
0
MACHINERY
@
Opening Balance
0
0
0
Depreciation
0
0
0
Closing Balance
0
0
0
TOTAL DEPRECIATION
Workshed
0
0
0
Machinery
0
0
0
Total
0
0
0

4 Schedule of Sales Realization


4.1 Details of Sales

Rate/
Pair/Unit

0
Stone carving products
Stone Artware & Decorative Prod.
0
0
0
0
0
Total

Capacity Utilization

Rawmaterials
Particulars
0
0
0
0
0
0
0
0
0
Total
5.1 Wages
Particulars
0
0
0
0
0
0
0
Total

PMEGP Project Report

No. of
Pair/Unit

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0

0
0
0

0
0
0

Amount in Rs.
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1st Year

2nd Year

3rd Year

4th Year

5th Year

70%

80%

90%

90%

90%

Sales / Receipts
5

0
0
0

Particulars of Product

4.2 Capacity Utilization of Sales


Particulars

5.00%
5th Year
0
0
0
10.00%

:
Unit
0
0
0
0
0
0
0
0
0
:

No. of
Worker
0
0
0
0
0
0
0
0

Rate/unit
Reqd.Unit
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0

Wages
Per Month

Amount in Rs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amount in Rs.
(Per Annum)

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Page 13

5.2 Repairs and Maintenance

PMEGP Project Report

Rs. 0.00

Page 14

5.3 Power and Fuel

Rs. 0.00

5.4 Other Overhead Expenses

Rs. 0.00

6 Administrative Expenses
6.1 Salary
0
0
0

Total

:
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

6.2 Telephone Expenses

0.00

6.4 Stationery & Postage

0.00

6.5 Advertisement & Publicity

0.00

6.6 Workshed Rent

12000.00

6.7 Other Miscellaneous Expenses


0.00
Total
12000.00
7 Capacity Utilization of Manufacturing & Administrative Expenses :
Particulars
1st Year 2nd Year
3rd Year
4th Year
5th Year
Capacity Utilization
70%
80%
90%
90%
90%
Manufacturing Expenses
Rawmaterials
0
0
0
0
0
Wages
0
0
0
0
0
Repairs & Maintenance
0
0
0
0
0
Power & Fuel
0
0
0
0
0
Other Overhead Expenses
0
0
0
0
0
Administrative Expenses
Salary
0
0
0
0
0
Postage Telephone Expenses
0
0
0
0
0
Stationery & Postage
0
0
0
0
0
Advertisement & Publicity
0
0
0
0
0
Workshed Rent
12000
12000
12000
12000
12000
Other Miscellaneous Expenses
0
0
0
0
0
Total:
12000
12000
12000
12000
12000
8 Assessment of Working Capital
:
Particulars
Amount in Rs.
Sale
0.00
Manufacturing Expenses
Raw Material
Wages
Repair & Maintenance
Power & Fuel
Other Overhead Expenses
Production Cost
Administrative Cost
Manufacturing Cost

PMEGP Project Report

0.00
0.00
0.00
0.00
0.00
0.00
12000.00
12000.00

Page 15

Working Capital Estimate


Element of Working Capital
Raw materials

:
No of Day
0

Basis
Material Cost

Stock in process

Production Cost

0.00

Finished goods

Manufacturing Cost

0.00

Receivable by

Manufacturing Cost

0.00

Per Cycle

0.00

Total Working Capital Requirement


9 Financial Analysis
9.1 Projected Profit & Loss Account :
Particulars
0 Year
Sales / Receipts
Manufacturing Expenses
Rawmaterials
Wages
Repairs & Maintenance
Power & Fuel
Other Overhead Expenses
Depreciation
Production Cost
Administrative Expenses
Salary
Postage Telephone Expenses
Stationery & Postage
Advertisement & Publicity
Workshed Rent
Other Miscellaneous Expenses
Administrative Cost
Interest on Bank credit @ 0%
Term Loan
Working Capital Loan
Cost of Sale
Net Profit Before Tax
Less Tax
Net Profit

1st Year

0.00

2nd Year

3rd Year

4th Year

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
12000
0
12000

0
0
0
0
12000
0
12000

0
0
0
0
12000
0
12000

0
0
0
0
12000
0
12000

0
0
12000
-12000
0.00
-12000

0
0
12000
-12000
0.00
-12000

0
0
12000
-12000
0.00
-12000

0
0
12000
-12000
0.00
-12000

9.2 CALCULATION OF DEBT SERVICE CREDIT RATIO (D.S.C.R)


Particulars
0 Year
1st Year
Net Profit
-12000
Add :
Depreciation
0
TOTAL - A
-12000
Payments :
On Term Loan :
Interest
0
Installment
0
On Working Capital
Interest
0
TOTAL - B
0
D.S.C.R = A/B
#DIV/0!
Average D.S.C.R

PMEGP Project Report

Amount in Rs.

:
2nd Year
-12000

3rd Year
-12000

4th Year
-12000

0
-12000

0
-12000

0
-12000

0
0

0
0

0
0

0
0

0
0

0
0

#DIV/0!

#DIV/0!

#DIV/0!

Page 16

9.3 PROJECTED BALANCE SHEET


Particulars
LIABILITIES :
Promoters Capital
Profit
Term Loan
Working Capital Loan
Current Liabilities
Sundry Creditors

:
0 Year

ASSETS :
Gross Fixed Assets :
Less : Depreciation
Net Fixed Assets
Preliminary & Pre-Op. Expenses
Current Assets
Cash in Bank/Hand
Total
9.4 CASH FLOW STATEMENT
Particulars
Net Profit
Add : Depreciation
Term Loan
Working Capital Loan
Promoters Capital
Total

1st Year

2nd Year

3rd Year

4th Year

0
-12000
0
0
0
0
-12000

0
-12000
0
0
0
0
-12000

0
-12000
0
0
0
0
-12000

0
-12000
0
0
0
0
-12000

0
0
0
0
0
-12000
-12000

0
0
0
0
0
-12000
-12000

0
0
0
0
0
-12000
-12000

0
0
0
0
0
-12000
-12000

1st Year
-12000
0
0
0
0
-12000

2nd Year
-12000
0
0
0
0
-12000

3rd Year
-12000
0
0
0
0
-12000

4th Year
-12000
0
0
0
0
-12000

:
0 Year

Total Fixed Capital Invested

Repayment of Term Loan


Repayment of WC Loan
Current Assets
Total

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
-12000
-12000

-12000
-12000
-24000

-24000
-12000
-36000

-36000

2nd Year
12000
0
12000

3rd Year
12000
0
12000

4th Year
12000
0
12000

Opening Balance
Surplus
Closing Balance

9.5 BREAK EVEN POINT AND RATIO ANALYSIS :


Particulars
0 Year
1st Year
Fixed Cost
12000
Variable Cost
0
Total Cost
12000

-12000
-48000

Sales

Contribution (Sales-VC)

B.E.P in %

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Break Even Sales in Rs.

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Break Even Units

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Current Ratio

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

PMEGP Project Report

Page 17

Net Profit Ratio

PMEGP Project Report

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Page 18

This Project Report has been prepared based on the data furnished by the entrepreneur whose
details are given in the application.
Place : 0
Date: 30-Dec-99
Prepared by
:
.
District Industries Center
0
0
0

State 0

Full Name :

e-Mail: 0
Ph. No.: 0

Signature of the Beneficiary

Fax: 0

Name & Signature Office Incharge


with round seal

PMEGP Project Report

Page 19

PROJECT REPORT FOR

Affix latest
attested
Photograph

Name of the Entreprenuer

Constitution (legal Status)

Individual

Father's/Spouce's Name

5 Unit Address

0
0
Taluk/Block:

Background of the Proprietor/Partners/Directors :

District :
Pin:

Phone
E-Mail

State:

Furnished detailed information in the DPR

Name of Business House/Group if any :

Details Other Companies/Units in the group


Name & Address
of Company / Unit

* Profit Before Tax

Other Companies / Units in the Group


Business
Equity
Reserves
Loans

Turnover

*P.B.T

(Rs. in Lakhs)
**P.A.T

** Profit After Tax

8.1 How the activity was financed so far :


*Source of Funds

Security

Rate of
Interest

8.2 If the Unit is an ancillary one, undertaking to


which it is catering and its address

( To be filled up in case of existining unit Only )


Repayment per
Present O/s
Month
( Rs. in '000 )

Amount of Default
(if any)

8.3 Employment
0
0
0
0
0
0
0
0
0
0
0
0

Present

0
0
0
0
0
0
0
0
0
0
0
0
0

Total
9

Proposed

Project Details for Proposed New Unit


a
Expansion / Mordenisation
b

Setting up of New unit

Activity for proposed new unit

Product / Item proposed to undertake :

: Copy of detailed project report is enclosed.


:
:
:

9.1 Capacity (Furnish the details of Installed capacity & production :


(No. in Units/ Qty. in Kg./Volume in liter per annum)
Capacity is arrived at on the basis of
Days working on
shift basis
Product &
Present Installed
Maximum Prod.
Maximum Prod.
Proposed Installed
By-product if any
Capacity
Achieved
envisaged
Capacity of 1st Year
70.00%
0

9.3 State the manufacturing process in brief

9.4 Has the proposed process ever been tried in the


country or newly adopted?

9.5 Technical Arrangements

9.6 Describe arrangement for Key Official


for managing the proposed unit

Technical Manpower
Administrative Manpower
Accounting personnel

9.7 Particulars of Land


Location of the Land
Area of Land
Status of the Land
Nature of Land
Availability of Water

Existing

9.8 Particulars of Building

Existing
Area

(Enclose the plan & Estimation for the proposed Building)

Factory Building

Proposed

Value in Rs.

Proposed
Status

Area

Value

Status

Ancillary Building
Storage
Total

9.9 Plant and Machinery


Indigenous

0.00

Existing (Value in Rs.)

0.00

Proposed (Value in Rs.)


0.00

Imported
(Enclose the plan layout of the existing plant and machinery )

9.10 Rawmaterials / Components


Req. of Raw material/Components/Chemicals

Qty. in Nos./Kgs./Ton

Rate/Nos./Kgs/Tons

Total

0.00

9.11 Utilities (Furnish details on requirement, availability, adequacy, qualitative aspects etc..)
Particulars of Utilities
Contracted Load
Connected Load
in HP/KW/W

Power
Water
Fuel
Others (Specify)

Value in Rs.

in HP/KW/W

Further requirement
in HP/KW/W

9.12 Environment Aspect of the Project

9.13 Requirement of Manpower for the Project


:
Particulars of Manpower
Total Requirement
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
0

9.14 Schedule of Implementation

Activities

a. Acquisition of Land
b. Development of Land
c. Civil Works for Factory / Building
Machinery / Foundation etc..
d. Plant & Machinery
Imported
Indigenous
e. Arrangement for power
f. Arrangement for water
g. Errection of equipment
h. Commissioning
I.

Procurement of Raw materials/Chemicals

j. Trail Runs
k. Commercial Production

Salary/Wages per month

Cost per Annum

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

BAR
Date of Commencement

CHART
Expected Date of Completion

10 Cost of Project

Sr.No.
Particulars
A
Land including Development

Already Incurred

To be Incurred
0.00

(Rs. in '000)
Total Cost
0.00

Building & Other Civil Works

0.00

0.00

Plant and Machinery


1. Indigenous
2. Imported

0.00

0.00
0.00

Furniture & Fixture

0.00

0.00

Testing equipment

0.00

Miscellaneous Fixed Assets

0.00

Errection & Installation Charges

0.00

Contingency

0.00

0.00

Preliminary & Pre-Op. Cost

0.00

0.00

Provision for
1. Buildings
2. Plant & Machinery
3. Other Fixed Assets

0.00
0.00
0.00

Working Capital for one


Operating Cycle

Total

0.00

0.00

0.00

0.00

0.00

11 Means of Financing
Sr.No.

Particulars

Equity / Promoters Contribution

Reserves

Term Loans

Unsecured Loans and Deposits

Amount already
Raised

Amount Proposed

(Rs. in '000)
Total

to be Raised
0.00

0.00
0.00

0.00

0.00
0.00

(Indicate sources, roi, repayment etc)

Deferred Payment

0.00

Arrangements including Suppliers credit

Subsidy
Central Government
State Government

0.00

0.00
0.00

Seed Capital

0.00

Internal Cash Accruals

0.00

Other Sources (Specify)

0.00

Total

0.00

11.1 In case internal accruals are taken as

source of finance explain the basis of


estimation of internal accruals
:

11.2 Indicate source from which expenditure

already incurred has been financed

11.3 % of Promoters contribution of the

total cost of project

0.00

0.00

12 Marketing & Selling Arrangements of the Product

13 Projected Profitability

Projected Profitability Statement given in the


Detailed Project Report.

14 Projected Cash flow Statement

Projected Cash flow Statement given in the


Detailed Project Report.

% of Cash Sales in Total Sales

Period in which payment is received


in respect of Credit Sales

Days

Average Credit Available on Purchase :

Days

15 Working Capital Required for the


anticipated turnover

16 Repayment Programme

Rs.

0.00

: Detailed Repayment programme for Term loan and


Working capital loan have been given in the DPR.

17 Details of Securities to be Offered


17.1 Primary ( Furnish details for term loan and :
working capital loan separately )

:
:

17.2 Collateral, if any (Details)

17.3 Details of Guarantor(s)

1. Name
2. Residential Address

3. Occupation
4. Details of movable & immovable

properties owned by him /her/other

family members
5 Details of any other similar guarantees:

if any, given to other institutions

18 Government Consents

(Give deatails of various licenses / consents required to be obtained from various authorities for the proposed project)

19

DECLARATION
I / We hereby declare that the information given herein before and the statements and other
papers enclosed are, to the best of our knowledge and belief, true and correct in all particulars

Date :
Place :

0
0

Signature of the Borrower


Name & Designation (In case of Regd. Inst.)

Project Report on

Prepared By:
.
District Industries Center
0
0
0
State: 0
e-Mail:
Ph. No.:
Fax:

You might also like