BSOP 334 Week 1 Lab Overview of Operations Planning & Control and Aggregate Planning
BSOP 334 Week 2 Lab Determining Order Quantity for Lowest Total Cost
BSOP 334 Week 3 Lab Bill of Materials
BSOP 334 Week 4 Lab Material Requirements Planning and Dependant Demand
BSOP 334 Week 5 Lab MRP Complicating Factors and MRP-II, ERP, & Supply Chain Management
BSOP 334 Week 6 Lab Strategic Capacity Planning and CRP Logic

http://www.homeworkmotivator.com/product/bsop-334-all-ilabs

BSOP 334 ALL WEEKS DISCUSSIONS


Week 1 DQ 1 - Production Scheduling
Week 1 DQ 2 - Aggregate Planning
Week 2 DQ 1 - Inventory

Week 2 DQ 2 - Order Timing


Week 3 DQ 1 - MRP Process
Week 3 DQ 2 - Bill of Materials
Week 4 DQ 1 - Material Requirements Planning
Week 4 DQ 2 - MRP Dynamics
Week 5 DQ 1 - MRP II & ERP
Week 5 DQ 2 - Supply Chain Management
Week 6 DQ 1 - Rough-Cut Capacity Planning
Week 6 DQ 2 - CRP
Week 7 DQ 1 - Lean Systems
Week 7 DQ 2 - Global Competitiveness in Operations

http://www.homeworkmotivator.com/product/bsop-334-all-weeks-discussions

BSOP 334 ENTIRE COURSE


BSOP 334 Week 1 CheckPoint
BSOP 334 Week 1 DQs
BSOP 334 Week 1 Lab Overview of Operations Planning & Control and Aggregate Planning
BSOP 334 Week 2 CheckPoint
BSOP 334 Week 2 DQs
BSOP 334 Week 2 Homework
BSOP 334 Week 2 Lab Determining Order Quantity for Lowest Total Cost

BSOP 334 Week 3 CheckPoint


BSOP 334 Week 3 DQs
BSOP 334 Week 3 Homework
BSOP 334 Week 3 Lab Bill of Materials
BSOP 334 Week 4 CheckPoint
BSOP 334 Week 4 DQs
BSOP 334 Week 4 Homework
BSOP 334 Week 4 Lab Material Requirements Planning and Dependant Demand
BSOP 334 Week 5 CheckPoint
BSOP 334 Week 5 DQs
BSOP 334 Week 5 Homework
BSOP 334 Week 5 Lab MRP Complicating Factors and MRP-II, ERP, & Supply Chain Management
BSOP 334 Week 6 DQs
BSOP 334 Week 6 Homework
BSOP 334 Week 6 Lab Strategic Capacity Planning and CRP Logic
BSOP 334 Week 7 CheckPoint
BSOP 334 Week 7 DQs
BSOP 334 Week 7 Homework

http://www.homeworkmotivator.com/product/bsop-334-entire-course

BSOP 334 WEEK 1 LAB OVERVIEW OF OPERATIONS PLANNING & CONTROL AND
AGGREGATE PLANNING

Operations Planning & Control and Aggregate Planning


Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
(See the Syllabus section Due Dates for Assignments & Exams for due dates.)

Template and Tutorials


Please use the following Excel template and the tutorials below. They will help you work on the assignment listed at
the bottom of this page.
Excel template:

Aggregate Planning Template


Click the links below to view the tutorials. Please be patient as it takes time to download each tutorial.

Using Templates (Time: 6 min, 46 sec)

Introducing Excel (Time: 9 min, 27 sec)

Aggregate Planning (Time: 12 min, 21 sec)

Transportation Model (Time: 5 min, 28 sec)

http://www.homeworkmotivator.com/product/bsop-334-week-1-lab-overview-of-operationsplanning-control-and-aggregate-planning

BSOP 334 WEEK 2 LAB DETERMINING ORDER QUANTITY FOR LOWEST TOTAL COST

Lab 2 of 7: Determining Order Quantity for Lowest Total


Cost
Note!

Template and Tutorials


Please use the following Excel template and the tutorials below. These will help you work on the assignment listed at
the bottom of this page.
Excel template:

Inventory Management
Click the links below to view the tutorials. Please be patient as it takes time to download each tutorial.

Using Templates (Time: 6 min, 46 sec)

Introducing Excel (Time: 9 min, 27 sec)

Inventory (Time: 6 min, 31 sec)

http://www.homeworkmotivator.com/product/bsop-334-week-2-lab-determining-orderquantity-for-lowest-total-cost

BSOP 334 WEEK 3 LAB BILL OF MATERIALS


Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
(See the Syllabus section Due Dates for Assignments & Exams for due dates.)

Template
Please use the components requirement sheet of the Excel template. It will help you work on the assignment listed at
the bottom of this page.
Excel template:

MRP and ERP

Deliverables
Complete the following problems:

Chapter 12: Problems 1, 2, and 3 (pp. 543-544)

Submit your assignment to the Dropbox located on the silver tab at the top of this page.
See the Syllabus section Due Dates for Assignments & Exams for due date information.

http://www.homeworkmotivator.com/product/bsop-334-week-3-lab-bill-of-materials

BSOP 334 WEEK 4 LAB MATERIAL REQUIREMENTS PLANNING AND DEPENDANT


DEMAND

Lab 4 of 7: Material Requirements Planning and


Dependant Demand
Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
(See the Syllabus section Due Dates for Assignments & Exams for due dates.)

Template
Please use the components requirement sheet of the Excel template. It will help you work on the assignment listed at
the bottom of this page.
Excel template:

MRP and ERP

Deliverables
Complete the following problems:

Chapter 12: Problems 8, 10, 12, & 13 (pp. 545-547)


Submit your assignment to the Dropbox located on the silver tab at the top of this page.
See the Syllabus section Due Dates for Assignments & Exams for due date information.

http://www.homeworkmotivator.com/product/bsop-334-week-4-lab-material-requirementsplanning-and-dependant-demand

BSOP 334 WEEK 5 LAB MRP COMPLICATING FACTORS AND MRP-II, ERP, & SUPPLY
CHAIN MANAGEMENT
Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
(See the Syllabus section Due Dates for Assignments & Exams for due dates.)

Template
Please use the components requirement sheet of the Excel template. It will help you work on the assignment listed at
the bottom of this page.
Excel template:

MRP and ERP

Deliverables
Complete the following problems:

Chapter 12: Problems 5, 6, & 7 (pp. 544-545)


Submit your assignment to the Dropbox located on the silver tab at the top of this page.
See the Syllabus section Due Dates for Assignments & Exams for due date information

http://www.homeworkmotivator.com/product/bsop-334-week-5-lab-mrp-complicatingfactors-and-mrp-ii-erp-supply-chain-management

BSOP 334 WEEK 6 LAB STRATEGIC CAPACITY PLANNING AND CRP LOGIC
Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
(See the Syllabus section Due Dates for Assignments & Exams for due dates.)

Template
Please use the components requirement sheet of the Excel template. It will help you work on the assignment listed at
the bottom of this page.
Excel template:

Strategic Capacity Planning for Products and Services (for Chapter 5 problems)

MRP and ERP (for Chapter 12 problems)

Deliverables
Complete the following problems:

Chapter 5: Problems 1 & 3 (pp. 208-209)


Chapter 12: Problems 15 & 16 (pp. 547-548)
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
See the Syllabus section Due Dates for Assignments & Exams for due date information.

http://www.homeworkmotivator.com/product/bsop-334-week-6-lab-strategic-capacityplanning-and-crp-logic

BSOP 334 WEEK 1 CHECKPOINT


1. (TCO 1) The Industrial Revolution began in which decade?
2. (TCO 1) Which of the following is NOT one of the three basic business strategies?
3. (TCO 1) Determine the multifactor productivity using the following data.
4. (TCO 1) Which of the following is a proper expression of productivity?
5. (TCO 1) Aggregate planners are concerned with
6. (TCO 1) The following are options when managing demand, EXCEPT

http://www.homeworkmotivator.com/product/bsop-334-week-1-checkpoint

BSOP 334 WEEK 2 HOMEWORK

Chapter 13: Discussion & Review Questions: 3, 6, 10, 11, & 14 (p. 601)
Please answer each assigned question completely, and be sure to spell-check before posting your assignment. Your
assignment must be submitted as a MS Word document.
Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to
use the Dropbox, read these step-by-step instructions or watch this Dropbox Tutorial.
See the Syllabus section Due Dates for Assignments & Exams for due date information.

http://www.homeworkmotivator.com/product/bsop-334-week-2-homework

BSOP 334 WEEK 3 CHECKPOINT


1. (TCO 2) How does dependant demand differ from independent demand?
2. (TCO 2) MRP
3. (TCO 2) The master production schedule
4. (TCO 2) The hierarchical nature of a BOM means that
5. (TCO 2) Low-level coding

http://www.homeworkmotivator.com/product/bsop-334-week-3-checkpoint

BSOP 334 WEEK 3 HOMEWORK

Discussion and Review Questions: 1, 2, 3a, 3b, & 3c (p. 542), Case: Promotional Novelties (p. 549)
Please answer each assigned question completely, and be sure to spell-check before posting your assignment. Your
assignment must be submitted as a MS Word document.

Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to
use the Dropbox, read these step-by-step instructions or watch this Dropbox Tutorial

http://www.homeworkmotivator.com/product/bsop-334-week-3-homework

BSOP 334 WEEK 4 CHECKPOINT


1. (TCO 8) Of the following order quantity methods, which does not attempt to balance ordering (or setup) and
holding costs?
2. (TCO 8) All the following are inputs in an MRP system, except
3. (TCO 8) Of the MRP inputs, one of the following lists the assemblies, subassemblies, parts, and raw materials
needed to produce one unit of a finished product. Which of the following is it?
4. (TCO 4) Of the MRP inputs, one of the following stores information on the status of each item by time period (e.g.,
on-hand, scheduled receipts, lead time, lot size). Which of the following is it?
5. (TCO 5) Under lot-for-lot ordering, planned order receipts are
6. (TCO 4) In MRP, the multiplication process used to determine lower level requirements is called

http://www.homeworkmotivator.com/product/bsop-334-week-4-checkpoint

BSOP 334 WEEK 4 HOMEWORK

Chapter 12: Discussion and Review Questions: 8 & 13 (p. 542), Critical Thinking Exercise 1 (p. 543), Problem
14 (p. 547)
Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to
use the Dropbox, read these step-by-step instructions or watch this Dropbox Tutorial.
See the Syllabus section Due Dates for Assignments & Exams for due date information.

http://www.homeworkmotivator.com/product/bsop-334-week-4-homework

BSOP 334 WEEK 5 CHECKPOINT


1. (TCO 9) The following feature of ERP makes it valuable as a strategic planning tool
2. (TCO 7) Which MRP approach is used for components or subassemblies to compensate for variations in lead time?
3. (TCO 5) Net requirements for Component J are as follows: 60 units in Week 2, 40 units in Week 3, and 60 units in
Week 5. If a fixed-period, three-period lot-sizing method is used, what will be the quantity of the first planned
receipt?
4. (TCO 9) Which statement concerning MRP II is false?
5. (TCO 7) Small changes in consumer demand can result in large variations in orders placed because of the _____.
6. (TCO 7) Effective supply chain management has all of the following benefits, except

http://www.homeworkmotivator.com/product/bsop-334-week-5-checkpoint

BSOP 334 WEEK 5 HOMEWORK

Chapter 12: Discussion and Review Questions: 11, 14, 15, & 16 (p. 542)

Chapter 15: Discussion and Review Questions: 5, 9, & 11 (p. 695)


Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to
use the Dropbox, read these step-by-step instructions or watch this Dropbox Tutorial.
See the Syllabus section Due Dates for Assignments & Exams for due date information

http://www.homeworkmotivator.com/product/bsop-334-week-5-homework

BSOP 334 WEEK 6 HOMEWORK

Chapter 5: Discussion and Review Questions: 1, 2, 6, 11, & 15 (p. 208), Problem 13 (p. 210)
Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to
use the Dropbox, read these step-by-step instructions or watch this Dropbox Tutorial.
See the Syllabus section Due Dates for Assignments & Exams for due date information.

http://www.homeworkmotivator.com/product/bsop-334-week-6-homework

BSOP 334 WEEK 7 CHECKPOINT


1. (TCO 10) The ultimate goal of lean operations is to have
2. (TCO 10) Which of the following does not contribute to reduced setup time and cost?
3. (TCO 10) A basic requirement for operating with the low inventories present in lean systems is
4. (TCO 15) Organizations with fixed, perishable capacity can benefit from _____.
5. (TCO 15) The matrix below shows relative costs for various job-machine combinations. Which set of pairs
constitutes the minimum cost solution using the assignment method?
6. (TCO 16) Input/output (I/O) control refers to

http://www.homeworkmotivator.com/product/bsop-334-week-7-checkpoint

BSOP 334 WEEK 7 HOMEWORK

Chapter 14: Discussion and Review Questions: 2, 3, 4, 5, & 8 (pp.


650-651)

Chapter 16: Discussion and Review Questions: 1, 5, 7, & 8 (p.


732)
Submit your assignment to the Dropbox located on the silver tab at the
top of this page. For instructions on how to use the Dropbox, read
these step-by-step instructions or watch this Dropbox Tutorial.
See the Syllabus section Due Dates for Assignments & Exams for due
date information.
http://www.homeworkmotivator.com/product/bsop-334-week-7-homework

HomeworkMotivator.com

You might also like