Federal Register / Vol. 73, No.

81 / Friday, April 25, 2008 / Notices 22359

may be filed with the Board either DEPARTMENT OF ENERGY formed by a 70-foot-long masonry
before or after the meeting. Individuals gravity dam with a maximum height of
who wish to make oral statements Federal Energy Regulatory 72 feet consisting of a 51-foot-long non-
pertaining to agenda items should Commission overflow section and a 19-foot-wide
contact Gerri Flemming’s office at the [Project No.: 733–010] spillway; (2) a 6,130-foot-long pressure
address or telephone listed above. pipeline; (3) a 32-by-65-foot powerhouse
Requests must be received five days Eric Jacobson; Notice of Application containing three turbine-generating
prior to the meeting and reasonable Tendered for Filing With the units with a total authorized capacity of
provision will be made to include the Commission and Establishing 632 kilowatts (kW); and (4) appurtenant
presentation in the agenda. The Deputy Procedural Schedule for Licensing and facilities. The applicant proposes to
Designated Federal Officer is Deadline for Submission of Final upgrade turbine-generator unit No. 1
empowered to conduct the meeting in a Amendments and add a fourth turbine-generator unit
to increase the project’s total installed
fashion that will facilitate the orderly April 18, 2008. capacity to 775 kW.
conduct of business. Individuals Take notice that the following l. Locations of the Application: A
wishing to make public comment will hydroelectric application has been filed copy of the application is available for
be provided a maximum of five minutes with the Commission and is available review at the Commission in the Public
to present their comments. for public inspection. Reference Room or may be viewed on
Minutes: Minutes will be available by a. Type of Application: Minor the Commission’s Web site at http://
writing or calling Gerri Flemming at the License. www.ferc.gov using the ‘‘eLibrary’’ link.
address or phone number listed above. b. Project No.: 733–010. Enter the docket number excluding the
c. Date Filed: April 9, 2008. last three digits in the docket number
Minutes will also be available at the d. Applicant: Eric Jacobson.
following Web site: http://www.srs.gov/ e. Name of Project: Ouray field to access the document. For
general/outreach/srs-cab/srs-cab.html. Hydroelectric Project. assistance, contact FERC Online
f. Location: The project is located on Support at
Issued at Washington, DC on April 21,
the Uncompahgre River in Ouray FERCOnlineSupport@ferc.gov or toll-
2008.
County, Colorado. The project occupies free at (866) 208–3676, or for TTY, (202)
Rachel Samuel, 502–8659. A copy is also available for
lands within the Uncompahgre National
Deputy Committee Management Officer. inspection and reproduction by
Forest managed by the U.S. Forest
[FR Doc. E8–9083 Filed 4–24–08; 8:45 am] Service. contacting the applicant using the
BILLING CODE 6450–01–P g. Filed Pursuant to: Federal Power contact information in item (h) above.
Act 16 U.S.C. 791(a)–825(r). m. You may also register online at
h. Applicant Contact: Eric Jacobson, http://www.ferc.gov/esubscribenow.htm
P.O. Box 745, Telluride, CO 81435; to be notified via email of new filings
(970) 369–4662. and issuances related to this or other
i. FERC Contact: Steve Hocking, (202) pending projects. For assistance, contact
502–8753 or steve.hocking@ferc.gov. FERC Online Support.
j. This application is not ready for n. Procedural Schedule: The
environmental analysis at this time. application will be processed according
k. Project Description: The project to the following Hydro Licensing
consists of the following existing Schedule. Revisions to the schedule
facilities: (1) A 0.48-acre reservoir may be made as appropriate.

Milestone Target date

Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... September 1, 2008.


Interventions, Recommendations, Terms and Conditions due ............................................................................................... October 30, 2008.
Commission Issues Single Environmental Assessment (EA) ................................................................................................. January 13, 2009.
EA Comments due .................................................................................................................................................................. February 12, 2009.
Modified Terms and Conditions due ....................................................................................................................................... April 13, 2009.

o. Final amendments to the DEPARTMENT OF ENERGY the Federal Energy Regulatory


application must be filed with the Commission’s (Commission)
Commission no later than 30 days from Federal Energy Regulatory regulations, 18 CFR part 380 (Order No.
the issuance date of the notice of ready Commission 486, 52 FR 47897), the Office of Energy
for environmental analysis. [Project No. 2197–073 North Carolina; Projects has reviewed the applications
Project No. 2206–030 North Carolina] for licenses for Alcoa Power Generating,
Kimberly D. Bose,
Inc.’s 210-megawatt Yadkin
Secretary. Alcoa Power Generating, Inc.; Hydroelectric Project (Project No. 2197)
[FR Doc. E8–9022 Filed 4–24–08; 8:45 am] Progress Energy Carolinas; Notice of and Progress Energy Carolina’s 108.6-
BILLING CODE 6717–01–P Availability of the Final Environmental MW Yadkin-Pee Dee River
Impact Statement for the Yadkin Hydroelectric Project (Project No. 2206),
sroberts on PROD1PC70 with NOTICES

Project and the Yadkin-Pee Dee River located on the Yadkin and Pee Dee
Project rivers in the counties of Davidson,
April 18, 2008. Davie, Montgomery, Rowan, Stanly,
In accordance with the National Anson, and Richmond, near Charlotte,
Environmental Policy Act of 1969 and North Carolina. Based upon this review,

VerDate Aug<31>2005 20:20 Apr 24, 2008 Jkt 214001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\25APN1.SGM 25APN1
22360 Federal Register / Vol. 73, No. 81 / Friday, April 25, 2008 / Notices

the Office of Energy Projects has staff concludes that approval of the Comment option are placed in the
prepared a Final Environmental Impact proposed project, with appropriate public record for the specified docket.
Statement (final EIS) for the projects. mitigating measures, would not If you are filing written comments,
The final EIS contains staff’s constitute a major federal action please carefully follow these
evaluation of the applicant’s proposal significantly affecting the quality of the instructions to ensure that your
and alternatives for relicensing the human environment. comments are received in time and
Yadkin and Yadkin-Pee Dee River The EA assesses the environmental properly recorded:
Projects. The final EIS documents the impacts of constructing and operating • Send an original and two copies of
views of governmental agencies, non- the proposed Sentinel Expansion Project your comments to: Kimberly D. Bose,
governmental organizations, affected (Project). The purpose of the proposed Secretary, Federal Energy Regulatory
Indian tribes, the public, the license Project is to provide approximately Commission, 888 First St., NE., Room
applicants, and Commission staff. 142,000 dekatherms per day (Dt/d) of 1A, Washington, DC 20426;
A copy of the final EIS is available for natural gas delivery capacity to the • Reference Docket No. CP08–31–
review in the Commission’s Public northeastern United States through the 000;
Reference Branch, Room 2A, located at replacement of existing facilities and the • Label one copy of the comments for
888 First Street, NE., Washington, DC addition of looping and compression the attention of the Gas Branch 2, PJ–
20426. The final EIS also may be viewed facilities along Transco’s existing 11.2; and
on the Commission’s Web site at natural gas delivery system. • Mail your comments so that they
http://www.ferc.gov under the eLibrary The EA has been placed in the public will be received in Washington, DC on
link. Enter the docket number excluding files of the FERC. A limited number of or before May 19, 2008.
the last three digits in the docket copies of the EA are available for Comments will be considered by the
number field to access the document. distribution and public inspection at: Commission but will not serve to make
For assistance, contact FERC Online Federal Energy Regulatory Commission, the commentor a party to the
Support at Public Reference Room, 888 First Street, proceeding. Any person seeking to
FERCOnlineSupport@ferc.gov or toll- NE., Room 2A, Washington, DC 20426, become a party to the proceeding must
free at 1–866–208–3676, or for TTY, (202) 502–8371. file a motion to intervene pursuant to
(202) 502–8659. Copies of the EA have been mailed to Rule 214 of the Commission’s Rules of
You may also register online at federal, state, and local agencies, public Practice and Procedures (18 CFR
http://www.ferc.gov/docs-filing/ interest groups, interested individuals, 385.214).1 Only intervenors have the
esubscription.asp to be notified via e- newspapers, and parties to this right to seek rehearing of the
mail of new filings and issuances proceeding. Commission’s decision.
related to this or other pending projects. Any person wishing to comment on Affected landowners and parties with
For assistance, contact FERC Online the EA may do so. To ensure environmental concerns may be granted
Support. consideration prior to a Commission intervenor status upon showing good
For further information, contact decision on the proposal, it is important cause by stating that they have a clear
Stephen Bowler at (202) 502–6861 or that we receive your comments before and direct interest in this proceeding
stephen.bowler@ferc.gov or Lee Emery the date specified below. which would not be adequately
at (202) 502–8379 or represented by any other parties. You do
Please note that the Commission
lee.emery@ferc.gov. not need intervenor status to have your
strongly encourages the electronic filing
comments considered.
Kimberly D. Bose, of any comments or interventions or
Additional information about the
Secretary. protests to this proceeding, see 18 Code
project is available from the
[FR Doc. E8–9021 Filed 4–24–08; 8:45 am] of Federal Regulations
Commission’s Office of External Affairs,
385.2001(a)(1)(iii) and the instructions
BILLING CODE 6717–01–P at 1–866–208–FERC or on the FERC
on the Commission’s Internet Web site
Internet Web site (http://www.ferc.gov)
at http://www.ferc.gov under the link to
using the eLibrary link. Click on the
DEPARTMENT OF ENERGY ‘‘Documents and Filings’’ and ‘‘eFiling.’’
eLibrary link, click on ‘‘General Search’’
eFiling is a file attachment process and
and enter the docket number excluding
Federal Energy Regulatory requires that you prepare your
the last three digits in the Docket
Commission submission in the same manner as you
Number field. Be sure you have selected
would if filing on paper, and save it to
[Docket No. CP08–31–000] an appropriate date range. For
a file on your hard drive. New eFiling
assistance, please contact FERC Online
Transcontinental Gas Pipe Line users must first create an account by
Support at FercOnlineSupport@ferc.gov
Corporation; Notice of Availability of clicking on ‘‘Sign up’’ or ‘‘eRegister.’’
or toll free at 1–866–208–3676, or for
the Environmental Assessment for the You will be asked to select the type of
TTY, contact (202) 502–8659. The
Proposed Sentinel Expansion Project filing you are making. This filing is
eLibrary link also provides access to the
considered a ‘‘Comment on Filing.’’ In
texts of formal documents issued by the
April 18, 2008. addition, there is a ‘‘Quick Comment’’
Commission, such as orders, notices,
The staff of the Federal Energy option available, which is an easy
and rulemakings.
Regulatory Commission (FERC or method for interested persons to submit
In addition, the Commission now
Commission) has prepared an text-only comments on a project. The
offers a free service called eSubscription
environmental assessment (EA) of the Quick-Comment User Guide can be
which allows you to keep track of all
natural gas pipeline facilities proposed viewed at http://www.ferc.gov/docs-
formal issuances and submittals in
by the Transcontinental Gas Pipe Line filing/efiling/quick-comment-guide.pdf.
sroberts on PROD1PC70 with NOTICES

specific dockets. This can reduce the


Corporation (Transco) in the above- Quick Comment does not require a
amount of time you spend researching
referenced docket. FERC eRegistration account; however,
The EA was prepared to satisfy the you will be asked to provide a valid e- 1 Interventions may also be filed electronically via
requirements of the National mail address. All comments submitted the Internet in lieu of paper. See the previous
Environmental Policy Act. The FERC under either eFiling or the Quick discussion on filing comments electronically.