You are on page 1of 2

21124 Federal Register / Vol. 73, No.

76 / Friday, April 18, 2008 / Notices

DEPARTMENT OF ENERGY copying within 90 days on the High Summary: EPA has no objections to
Energy Physics Advisory Panel Web NPS’s Preferred (Alternative 4). Rating
High Energy Physics Advisory Panel site. Minutes will also be available by LO.
writing or calling John Kogut at the
AGENCY: Department of Energy, Office of Final EISs
address and phone number listed above.
Science. EIS No. 20080051, ERP No. F–AFS–
ACTION: Notice of open meeting.
Issued at Washington, DC, on April 15,
2008.
J65446–MT, Beaverhead-Deerlodge
National Forest Draft Revised Land
SUMMARY: This notice announces a Rachel Samuel,
and Resource Management Plan,
meeting of the High Energy Physics Deputy Committee Management Officer. Implementation, Beaverhead, Butte-
Advisory Panel (HEPAP). Federal [FR Doc. E8–8428 Filed 4–17–08; 8:45 am] Silver Bow, Deerlodge, Granite,
Advisory Committee Act (Pub. L. 92– BILLING CODE 6450–01–P Jefferson, Madison Counties, MT.
463, 86 Stat. 770) requires that public Summary: EPA continues to have
notice of these meetings be announced environmental concerns about impacts
in the Federal Register. ENVIRONMENTAL PROTECTION to fisheries, wildlife and other unique
DATES: Thursday, May 29, 2008; 9 a.m. AGENCY aquatic resources.
to 6 p.m. and Friday, May 30, 2008; 8:30 EIS No. 20080124, ERP No. F–USN–
[ER–FRL–6698–1]
a.m. to 4 p.m. D11043–MD, National Naval Medical
ADDRESSES: DoubleTree Hotel, 1515 Environmental Impact Statements and Center, Activities to Implement 2005
Rhode Island Ave, NW., Washington, Regulations; Availability of EPA Base Realignment and Closure
DC. Comments Actions, Construction and Operation
FOR FURTHER INFORMATION CONTACT: John of New Facilities for Walter Reed
Availability of EPA comments National Military Medical Center,
Kogut, Executive Secretary; High Energy prepared pursuant to the Environmental
Physics Advisory Panel; U.S. Bethesda, MD.
Review Process (ERP), under section
Department of Energy; SC–25/ Summary: EPA’s previous concerns
309 of the Clean Air Act and Section have been resolved; therefore, EPA does
Germantown Building, 1000 102(2)(c) of the National Environmental
Independence Avenue, SW., not object to the proposed action.
Policy Act as amended. Requests for
Washington, DC 20585–1290; copies of EPA comments can be directed EIS No. 20080093, ERP No. FS–AFS––
Telephone: 301–903–1298. L65382–ID, Meadow Face
to the Office of Federal Activities at
SUPPLEMENTARY INFORMATION: Stewardship Pilot Project,
202–564–7167. An explanation of the
Purpose of Meeting: To provide Improvement to Aquatic and
ratings assigned to draft environmental
advice and guidance on a continuing Terrestrial Vegetative Conditions,
impact statements (EISs) was published
basis to the high energy physics Supplement Information on the
in FR dated April 11, 2008 (73 FR
research program. Cumulative Effects Analysis, Nez
19833).
Tentative Agenda: Agenda will Perce National Forest, Clearwater
include discussions of the following: Draft EISs Ranger District, Idaho County, ID.
EIS No. 20070534, ERP No. D–AFS– Summary: No comment letter was
Thursday, May 29, 2008, and Friday, sent to the preparing agency.
May 30, 2008 L65546–ID, Idaho Roadless Area
Conservation Project, To Provide Dated: April 15, 2008.
• Discussion of Department of Energy State-Specific Direction for the Robert W. Hargrove,
High Energy Physics Program. Conservation and Management of Director, NEPA Compliance Division Office
• Discussion of National Science Inventoried Roadless Areas, National of Federal Activities.
Foundation Elementary Particle Physics Forest System Lands in Idaho. [FR Doc. E8–8396 Filed 4–17–08; 8:45 am]
Program. Summary: EPA expressed BILLING CODE 6560–50–P
• Reports on and Discussions of environmental concerns about impacts
Topics of General Interest in High to drinking water, ground water, and the
Energy Physics. potential impacts from expansions of ENVIRONMENTAL PROTECTION
• Public Comment (10-minute rule). phosphate mining. The final EIS should AGENCY
Public Participation: The meeting is clarify the disposition of temporary
open to the public. If you would like to [ER–FRL–6697–9]
roads, especially duration and closure,
file a written statement with the Panel, consistent with NFMA. Rating EC2. Environmental Impacts Statements;
you may do so either before or after the Notice of Availability
meeting. If you would like to make oral EIS No. 20080014, ERP No. D–NPS–
statements regarding any of these items L65547–WA, San Juan Island National Responsible Agency: Office of Federal
on the agenda, you should contact John Historical Park, General Management Activities, General Information (202)
Kogut, 301–903–1298 or Plan, Implementation, WA. 564–7167 or http://www.epa.gov/
John.Kogut@science.doe.gov (e-mail). Summary: EPA expressed compliance/nepa/.
You must make your request for an oral environmental concerns about impacts Weekly receipt of Environmental Impact
statement at least 5 business days before to air and water quality, and requested Statements filed 04/07/2008 through
the meeting. Reasonable provision will additional data on current water and air 04/11/2008 pursuant to 40 CFR
be made to include the scheduled oral quality within the park and mitigation 1506.9.
statements on the agenda. The for air and water quality impacts. Rating EIS No. 20080133, Draft EIS, NPS, TX,
Chairperson of the Panel will conduct EC2. Guadalupe Mountains National Park,
pwalker on PROD1PC71 with NOTICES

the meeting to facilitate the orderly EIS No. 20080068, ERP No. D–NPS– General Management Plan,
conduct of business. Public comment J61113–SD, Minuteman Missile Implementation, Culberson and
will follow the 10-minute rule. National Historic Site, General Hudspeth Counties, TX, Comment
Minutes: The minutes of the meeting Management Plan, Implementation, Period Ends: 06/09/2008, Contact:
will be available for public review and Jackson and Pennington Counties, SD. Roxanne Runkel 303–969–2377.

VerDate Aug<31>2005 17:38 Apr 17, 2008 Jkt 214001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1
Federal Register / Vol. 73, No. 76 / Friday, April 18, 2008 / Notices 21125

EIS No. 20080134, Draft EIS, NPS, MI, Proposes to Construct and Operate a A. Wyka 1–800–832–0885 Ext 63519.
Sleeping Bear Dunes National New 500-kilovolt (kV) Rutherford Revision of FR Notice Published 01/
Lakeshore, General Management Plan Substation, a New 27-mile 500-kV 11/2008: Extending Comment Period
and Wilderness Study, Transmission Line and Two New 9- from 04/09/2008 to 04/30/2008.
Implementation, Benzie and Leelanau and 15-mile 161-kV Transmission EIS No. 20080021, Draft EIS, SFW, AK,
Counties, MI, Comment Period Ends: Lines, Rutherford, Williamson and Yukon Flats National Wildlife Refuge
06/02/2008, Contact: Nick Chevance Maury Counties, TN, Wait Period Project, Proposed Federal and Public
402–661–1844. Ends: 05/19/2008, Contact: Anita E. Land Exchange, Right-of-Way Grant,
EIS No. 20080135, Draft EIS, COE, TN, Masters 423–751–8697. Anchorage, AK, Comment Period
PROGRAMMATIC—Hydropower EIS No. 20080142, Final EIS, COE, CA, Ends: 05/19/2008, Contact: Cyndie
Rehabilitations, Dissolved Oxygen Carryover Storage and San Vicente Wolfe 907–786–3463. Revision of FR
and Minimum Flow Regimes at Wolf Dam Raise Project, Providing Notice Published 01/25/2008:
Creek Dam, Kentucky and Center Hill Additional Storage Capacity for Reopening Comment Period from 03/
and Dale Hollow Dams, Tennessee, 100,000 area feet of Water by the Year 25/2008 to 05/19/2008.
Implementation, Comment Period 2011, Issuance of Permits, Section 10 EIS No. 20080088, Final EIS, FHW, MT,
Ends: 06/03/2008, Contact: Chip Hall and 404 Permits, San Diego County, Miller Creek Road Project, To Provide
615–736–7666. CA, Wait Period Ends: 05/19/2008, Safe and Improved Access between
EIS No. 20080136, Draft EIS, BIA, CA, Contact: Robert R. Smith 858–674– U.S. 93 and the Miller Creek Area,
Ione Band of Miwok Indians Project, 6784. Missoula County, MT, Wait Period
Proposed 228.04 Acre Fee-to-Trust EIS No. 20080143, Second Draft Ends: 05/01/2008, Contact: Craig
Land Transfer and Casino Project, Supplement, COE, MA, Boston Harbor Genzlinger 406–449–5302 Ext 240.
Amador County, CA, Comment Period Federal Deep Draft Navigation Revision to FR Notice Published 03/
Ends: 07/02/2008, Contact: John Improvement Project, To Evaluate the 14/2008: Extending Comment Period
Rydzik 916–978–6042. Feasibility of Channel Deepening and from 04/14/2008 to 05/1/2008.
EIS No. 20080137, Draft EIS, AFS, OR, Related Berth Improvements at the
East Maury Fuels and Vegetation Port of Boston, Chelsea and Revere, Dated: April 15, 2008.
Management Project, Proposed Fuels Boston, MA, Comment Period Ends: Robert W. Hargrove,
and Vegetation Treatments Reduce 06/02/2008, Contact: Catherine Rogers Director, NEPA Compliance Division, Office
the Risk of Stand Loss, Lookout 978–318–8231. of Federal Activities.
Mountain Ranger District, Ochoco EIS No. 20080144, Draft EIS, CGD, FL, [FR Doc. E8–8397 Filed 4–17–08; 8:45 am]
National Forest, Crook County, OR , Port Dolphin LLC Liquefied Natural BILLING CODE 6560–50–P
Comment Period Ends: 06/02/2008, Gas Deepwater Port License
Contact: Barb Fontaine 541–416– Application, Proposes to Own,
6500. Construct and Operate a Deepwater ENVIRONMENTAL PROTECTION
EIS No. 20080138, Final EIS, NOA, 00, Port, Outer Continental Shelf, AGENCY
Reef Fish Amendment 30A: Greater Manatee County, FL, Comment Period
Amberjack—Revise Rebuilding Plan, Ends: 06/02/2008, Contact: Raymond [EPA–HQ–OPP–2008–0274; FRL–8360–8]
Accountability Measures: Gray Martin 202–372–1449.
Triggerfish-Establish Rebuilding Plan, EIS No. 20080145, Final EIS, FRC, 00, FIFRA Scientific Advisory Panel;
End Overfishing, Accountability Rockies Express Pipeline Project Notice of Public Meeting
Measures, Regional Management, (REX-East), Construction and AGENCY: Environmental Protection
Management Thresholds and Operation of Natural Gas Pipeline Agency (EPA).
Benchmarks, Gulf of Mexico, Wait Facilities, WY, NE, MO, IL, IN and
Period Ends: 05/19/2008, Contact: ACTION: Notice.
OH, Wait Period Ends: 05/19/2008,
Roy E. Crabtree 727–824–5305. Contact: Andy Black 1–866–208– SUMMARY: There will be a 4 –day
EIS No. 20080139, Draft EIS, FHW, MN, 3372. meeting of the Federal Insecticide,
Trunk Highway 23 and U.S. Highway EIS No. 20080146, Final EIS, NOA, 00, Fungicide, and Rodenticide Act
71 Project, Construction of One or Amendment 2 to the Consolidated Scientific Advisory Panel (FIFRA SAP)
More Grade-Separated Bridge Atlantic Highly Migratory Species to consider and review The Agency’s
Crossings, Dovre Township, Northeast Fishery Management Plan, To Evaluation of the Toxicity Profile of
of Wilmar County, Kandiyohi, MN, Implement Management Measures Chlorpyrifos.
Comment Period Ends: 06/02/2008, that Prevent Overfishing and Rebuild
Contact: Lowell Flaten 320–214–6367. Overfished Stocks, Implementation, DATES: The meeting will be held on July
EIS No. 20080140, Final EIS, DOI, UT, Exclusive Economic Zone (EEZ) of the 15–18, 2008, from 9 a.m. to 5:30 p.m,
Lower Duchesne River Wetlands Atlantic Ocean, Gulf of Mexico and Eastern Time.
Mitigation Project (LDWP), Caribbean Sea, Wait Period Ends: 05/ Comments. The Agency encourages
Restoration Measures in the Lower 19/2008, Contact: Margo Schulze- that written comments be submitted by
Duchesne River Area, Strawberry Haugen 301–713–2347. July 7, 2008 and requests for oral
Aqueduct and Collection System comments be submitted by July 10,
(SACS) on portion of the Strawberry Amended Notices 2008. However, written comments and
Reservoir, Implementation, Ute Indian EIS No. 20080004, Draft EIS, NSA, 00, requests to make oral comments may be
Tribe, NPDES and U.S. Army COE PROGRAMMATIC—EIS—Complex submitted until the date of the meeting.
Section 404 Permits, Duchesne, Utah, Transformation, To Make the U.S. Anyone submitting written comments
Uintah Counties, UT , Wait Period Nuclear Weapon Complex Smaller, after July 7, 2008 should contact the
pwalker on PROD1PC71 with NOTICES

Ends: 05/19/2008, Contact: Ralph and more Responsive, Efficient and Designated Federal Official (DFO) listed
G.Swanson 801–379–1254. Secure in Order to Meet National under FOR FURTHER INFORMATION
EIS No. 20080141, Final EIS, TVA, TN, Security Requirements, CA, NV, NM, CONTACT. For additional instructions,
Rutherford-Williamson-Davidson SC, TN and TX, Comment Period see Unit I.C. of the SUPPLEMENTARY
Power Supply Improvement Project, Ends: 4/30/2008, Contact: Theodore INFORMATION.

VerDate Aug<31>2005 17:38 Apr 17, 2008 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\18APN1.SGM 18APN1