You are on page 1of 141

QMT140 Quality Master Data

Introductions

Agenda
1.
2.
3.
4.
5.
6.

Welcome & Introductions


Quality Management (QM) Overview
Manage QM Master Data
Manage Quality Info Records (QIRs)
QM Reports
Summary

Course Objectives
After completing this course, you will be able to:
Create, change, and track changes to QM master data
Create, change, and track changes to the Q-info record
Generate QM reports

Ground Rules and Logistics


Attendance - Sign In

Logistics

Please ensure you have


signed the Training
Attendance Sheet.

Emergencies
Alarms
Stairwells/Exits

Restrooms
Break Areas

Ground Rules

Expectations
Introduce the training materials

All cell phones and


pagers must be turned off
during the class.
Parking Lot

Course Format
Tell me
Concepts
Instructor-delivered information you need to
know to successfully perform job-related tasks
Show me
Demonstrations
Demonstrations of job-related tasks performed
in SAP
Let me
Exercises
Student practice tasks performed in the
(program name) solution
Help me
Help/Handouts
Training tools to assist you back on the job

Show Me
Let Me

Assessments
At the end of the course, there will be a ten question assessment:
The passing score is 80% (8 out of 10 correct)
You can use your training materials as reference

Agenda
1.
2.
3.
4.
5.
6.

Welcome & Introductions


Quality Management (QM) Overview
Manage QM Master Data
Manage Quality Info Records (QIRs)
QM Reports
Summary

Quality Management (QM) Overview

Lesson Objectives
Upon the completion of this lesson, you should be able to:
Describe the Quality Management (QM) process in (program name)
Define key (program name) terms and concepts relevant to performing QM
Explain integration points between QM and Procurement, Planning, Production,
Inventory/Warehouse Management and Finance

(program name) Process Scope


Process

Sub-process

Planning and Manufacturing


Execution

Perform short, medium, and long range production planning


Schedule and execute production
Plan and maintain production related data, and reporting parameters
Control and report production operations

Procurement

Maintain supplier certification and monitor performance


Create and maintain purchase requisitions, and purchase materials
Create and manage supplier contracts
Create Supplier Network Collaboration Hub

Quality Management

Perform incoming quality assurance, and manage product disposition


Determine discrepant material disposition

Inventory & Warehouse


Management

Receive and put away materials supplier, non supplier


Manage inventory storage and movement
Manage consignment materials and inventory program
Plan and manage shipping

Finance

Support product costing


Manage multiple valuation situations
Invoice verification & accounts payable

Master Data

Manage product obsolescence


Maintain product related data
9

System Benefits
Automated cycle time metrics
Traceability of materials in SAP
Common definition of requirements for (name of site) sites
Standard SAP among (name of site) sites
Optimized workflows
Real time information
Data handling by electronic means
Compliance with 21 CFR Part 11

10

The (program name) Process Map (Top Level)


Control & Report
Production Operations

Goods Issue
To production 1
Support Product Costing
Manufacturing
Execution

Demand
Plan

Perform Demand Input


& Supply Planning

3 Goods Issue
To sub-con

Perform Production
Planning

Schedule
Production
Supply Area
replenishment
4

5 External operation

Manage
Subcontractor
Manufacturing

Procure Materials
and Services

Execute Production

Perform Overhead
Accounting & Allocation
5

Manage Line
Replenishments
Imperfection
Tracking
Manage Supplier
Agreements

Perform In-process
Inspection

Goods Issue
To shipments

Create & Maintain


Purchase Requisitions

Manage Supplier
Managed Inventory

Final Inspection /
Disposition

Receive Material non suppliers

1
Manage Lots/Batches
2

Receive Materials & Services

Miscellaneous
Quality Processes

Process Sales Order

3
Receive and Put Away
Product

Manage Inventory, Storage &


Movement

Perform Receiving
Inspection

1
Recurring
Inspection /
Samples

Calculate Order Price

Pick Order

Discrepant Material
Disposition

2
3

Pack Order

4
Purchased Material
Disposition

Maintain Approved Suppliers

Billing for Sales Order Item


6
Perform Transaction
Processing

Enable Payment

Maintain New Product Code


Registration

Master Data

Planning and
Manufacturing

Procurement

Quality

Maintain Production Related


Data

Inventory /
Warehouse Mgt

Finance

Maintain Suppliers Related


Data

Execution
Operations

Maintain Customer Master


Related Data

QM High Level Process Integration Diagram


Recurring Inspection
Intervals

Procurement:
- Purchase Orders
-Subcontracting

Batch Expiry

Inventory:
- Goods movement

Vendor Block / Un-Block

Nonconformance

First Article Inspection


Materia
l
Setting
s

NCs impacting
Batches &
Vendors

Purchase Orders /
Incoming Batch

Perform
Receiving
Inspection

Miscellaneou
s Quality
Processes

In-Process Inspection
of Material Batch
Manufacturing:
- Work Orders
- Order Status
Inventory:
- Goods movement

Semi-finished
materials
available for
production

Manufacturing: WIP QA
Release for Production /
Process Order

Discrepant
Material
Disposition

Perform InProcess
Inspection

Incoming: QA
Disposition of material

Expiring/ed Materials
Batches Restricted
Vendor Block/Un-Blocked
First Article Inspection
established / dropped
Retained Sample
Management

Final
Inspection
Disposition

Raw Material /
Component
available for
production

Plant, Material, and


Vendor Controls

Recurring Inspection: Lot

Finished Product
Batches available
for Disposition

Hold/Quarantine, Scrap,
Rework, Re-inspect, Accept
Decisions
Vendor QA Scorecard input
Manufacturing at Risk
12Quarantine
Ship Under

Manufacturing: Final QA Release


for Production / Process Order
Inventory: Update batch status
Calculate Expiry Date

X
Imperfection
Tracking

Key Terms
Term

Definition

Batch Management

Batches are subsets of the total quantity of a material held in stock.


Batches are managed separately from other subsets of the same
material

Batch Status

Indicates the availability of a specific batch for use. Comprised of two


statuses: restricted use and unrestricted use. Controls usability at the
batch level

Characteristic Values

Product quality characteristic specifications that are measured for


QA purposes

Doc URLs

Hyper link within inspection lots to access the controlled documents


in PLM System(i.e., OTIS).

13

Key Terms (contd)


Term

Definition

Dynamic Modification
Rule(DMR)

A master data record that contains the definition of inspection


stages(Normal, Tightened, Reduced) and conditions that lead to
inspection stage changes

Goods Movement

Physical or logical movement of materials leading to a change in


stock levels or resulting in the direct consumption of the material

Inspection Lot

Batch of materials subject to quality inspection. Created to document


or trigger an inspection request and used to store inspection results
and usage decisions

Inspection Plan

Describe the series of processing steps that take place to inspect or


test a material in order to sample and record results

Inspection type

Determines when and how an Inspection Lot is to be created

14

Key Terms (contd)


Term

Definition

Inventory Status

Comprised of three statuses: Quality Inspection, Blocked Stock,


Unrestricted Stock. Controls usability at the inventory level.

Master Data

Static data which represents things, rather than events

Master Inspection
Characteristic (MIC)

Describes what needs to be inspected and defines the testing


requirements for materials and products

Material Master

A data record containing all the information required to manage a


material.

Posting Change

Refers to a bookkeeping change (a change of information) about a


particular material or batch

15

Key Terms (contd)


Term

Definition

Qualitative

Attributive parameters

Quantitative

Measurable Quantifiable data

Quality Info Record


(QIR)

Record which gives information about the qualification status of a


vendor based on a material/vendor/plant combination

Sampling Procedure

Defines the rules for calculating the sample size for an inspection.

Sample Scheme

A sampling plan which contains information about the sample size


for a specific lot size and defines how acceptance or rejection
decisions are made and why(ANSI/AQL).

Storage Location

Area within a plant where materials are stored

16

Key Terms (contd)


Term

Definition

Usage Decision

Final SAP disposition of a material based on SAP results recording


of the quality inspection. Note: formal material GxP batch release is
conducted outside of SAP via specific company procedures.

Warehouse

Area within a storage location where material is stored

17

(program name) Quality Management


(program name) deployment is implementing a basic and simple QM
configuration with minimal interfaces and enhancements
Fully leveraging existing product lifecycle management (PLM), non-conformance
(NC), and inspection systems
QM is established to support and standardize existing processes and terminology
across the (name of site) locations providing:
Additional safeguards for QA in monitoring varied batch, material, vendor and order
statuses
Additional controls over production/process orders
Enhanced statuses for controlling batches (such as Manufacturing At Risk (MAR), Ship
Under Quarantine (SUQ), First Article Inspection (FAI)
Automated processes (auto restrictions, HardStop, auto Usage Decision (UD)
A direct systematic linkage and control for QA over the planning, movement, and
disposition of material

18

(program name) Quality Management Key Features


Integration with inspection systems (LIMS)
Integration with Non-conformance systems (QERTS)
Manual integration with PLM systems
Direct-Ship scenarios and use of Advance Ship Notices

19

QM Integration with Materials Management


Triggers inspections for goods movements, for example, goods receipt
Blocks vendor actions (ordering, receiving, payments)
Manages the inventory of goods during the inspection and remains visible
for MRP planning purposes
Carries out batch determination using characteristic values from batches
(restricted/unrestricted) quality inspections
Monitors the shelf-life of batches and the deadline for recurring
inspections
Evaluates vendors on the basis of quality using quality scores from
audits, goods receipt inspections, and nonconformances

20

QM Integration with Production


Integrates inspection planning and work scheduling
Handles inspection characteristics and operations
Manages quality inspections for manufacturing orders
Triggers the creation of the finished goods inspection lot at the time of
order release
There are exceptions where the inspection lot is triggered at the time of goods
receipt

Provides batch control when noncomformances exists

21

Quality Inspection Cycle


1. Maintain Master Data: The required data
created and maintained in the QM module
before a material or process is inspected
and the result of the inspection is recorded.
2. Inspection Trigger: The prerequisite SAP
transaction required to trigger the QM
process and initiate the inspection lots for
inspection. Usually this is a goods receipt
against an incoming shipment or a
production / process order release.
3. Inspect: Inspection, test, or examination of
a material or documentation. Inspection and
evaluation are performed externally to SAP.
4. Record Inspection Data: Recording of the
qualitative (pass/fail) and quantitative results
of the inspection in SAP. Specific
quantitative inspection results are recorded
outside of SAP. Defects or non-conforming
data are captured and managed in external
systems outside of SAP.
5. Usage Decision: Captures the decision on
disposition of the material, based on the
results of the inspection event(s).

2
Maintain
Master Data

Usage
Decision

22

Quality
Inspection

Inspection
Trigger

Record
Inspection Data

Inspect

Master Data
Master data is data that is centrally stored and used across all SAP
application modules and all functional areas within (name of site).
Master data remains static over an extended period, and contains
information that is needed often and in the same form. It is required to
perform transactions such as results recording.
Org
Structure

SAP

Plant

Master Data
Inspection Plan

Input

SAP Document

Output

Transactions
Inspection Lot

23

Examples QM Master Data Uses


The following are examples of QM Master Data and their use:

Triggers inspection lots giving quality control of batches


Identifies where inspection is performed
Provides planning data for inspection
Provides re-inspection intervals
Enables automatic usage decision
Triggers first article inspection, dock-to-stock scenarios, and blocking of
vendor/material
Provides data for sample management
Supports the vendor evaluation process

24

Elements of an Inspection Plan


Defines how the inspection will occur
Made up of the following master data:
Material Master

MIC
Inspection
Plan

What

Work Center
Where

Sampling Scheme

Sampling Procedure
How
(External to CR)

25

Inspection
Lot

Sampling Procedure
Defines the rules on how a sample size is calculated and provides details
on how inspection characteristics are evaluated(attributive, Variable,
Manual) during results recording

26

Quality Information Record


Created for a specific materialvendor-plant combination
Uses:

Vendor

Flag a material-vendor combination


as first-article inspection (FAI)
Designate a material-vendor
combination as dock-to-stock (no
inspection)
Block a material-vendor
combination.

QIR
Site

27

Material

Inspection Lot Creation


Inspection lots are created each time a Quality inspection is required
Request to a work center to carry out a quality inspection

on demand

automatic

Inspection lots can be created automatically or on demand

01

Goods Receipt for PO Receiving/Incoming Insp

0101

Goods Receipt for PO First Article Inspection

04

Goods Receipt from process order or the release of a


process order

09

Recurring Inspection of Batches

08

On-Demand (creation via QA01 not stock relevant)

08

On-Demand (creation via MIGO_TR stock relevant)

28

Simple Inspection / UD Process Flow


GR In-coming
(01)

Process Order
Release (04)

GR Production
(04)

Posting
Change Notice
(WM)
Inspection
Lot Trigger

Auto
Creation of
IL

Transfer
Posting (IM)

Batch Status

Generate IL
Lot Work
List
(QA33/QE72)

Record
Results
(QA32)

Stock
Posting
(QA32)

Usage
Decision
(QA32)
Stock Status

On Demand
(08)

Expiry Date
Note: 08 Inspection Lot Types are triggered by a manually initiated goods transfer
or a manual creation of an inspection lot.

Recurring
(09)

IL Closed
Abbreviations:
GR Goods Receipt
IL Inspection Lot
IM Inventory Management
IT Inspection Type
WM Warehouse Management

Legend:
(XXXX) Transaction
relevant for performing
the activity

29

Recording Results
The documentation of quantitative and/or qualitative results for inspection
performed
Criteria for results determination and documentation is
maintained/performed externally via legacy systems and processes
Recording Results allows you to:

Record if the result(s) is acceptable or not


Create a history of defects for the material, product or process
Trigger notifications to external nonconformance systems of failures
Perform UD

30

Usage Decision
Determines the final disposition on materials after the inspection process
is completed
Includes all materials
Incoming
Process/WIP
Finished

31

Purpose of Usage Decision Process


Change the status of a material
Move material from quality inspection (QI) stock to blocked stock or unrestricted
stock in the inventory system

Inventory Status Types


Quality Inspection (QI): material quarantined pending QA decision on
status/disposition
Blocked stock: used to isolate material from being used in the production
process or from being distributed
Unrestricted stock: material available for use in production process and
available to be distributed
Scrap: used to scrap material and charge the appropriate cost center. Material
is not available for planning or use.

32

Purpose of Usage Decision Process (cont'd)


Change the status of a batch
Batch statuses control the entire inventory quantity assigned to the batch,
meaning a batch can have only one of two status types

Batch status types


Unrestricted: the entire batch is available for use
Restricted: the entire batch is unavailable for general use, certain restrictions
apply to the batch and manufacturing or distribution of a batch in this status is
limited

Closes the inspection lot record in SAP

33

Set the Stage - Stock Status

Stock status

Definition

Unrestricted

Available; approved

Blocked

Not available

Quality Inspection

Not tested; under testing

34

Key Status Types

UNRESTRICTED

= Available for use

RESTRICTED

= Unavailable for use

QUALITY INSPECTION

= Unavailable for use

UNRESTRICTED STOCK

= Available for use

BLOCKED STOCK

= Unavailable for use and


planning

Batch Status

Stock Status

35

Key Status Types


Batch
Batch Status
Status

Stock
Stock Status
Status
RESTRICTED
RESTRICTED
BLOCKED
BLOCKED

RESTRICTED
RESTRICTED

QUALITY
QUALITY INSPECTION
INSPECTION

UNRESTRICTED
UNRESTRICTED
UNRESTRICTED
UNRESTRICTED

BLOCKED
BLOCKED
QUALITY
QUALITY INSPECTION
INSPECTION

Note: When batch status is changed to


restricted, the stock status becomes
restricted as well.
36

Usage decision Codes - (program name)


UD
codes

Score

Posting Proposal

Valuation

Batch status

Stock status

Meets all Quality Requirements


01/04/08
Meets Requirements for
Reclassification 01/04/08/09
Partial Batch Accept - Meets Qlty
reqmts
Reset Expiry date - Meets Quality
reqmts - 09
Unconditional accept after Repair
04/08
Conditional accept-Ship under
Quarantine 04/01/08/09

100

To Un-restricted use, Un-restricted


batch status
To Un-restricted use, Un-restricted
batch status

Accept

Unrestricted

Unrestricted

Accept

Unrestricted

Unrestricted

50

RRTV

Unconditional acceptance-Disposition
NC 01/04/08/09
Unconditional accept after
Rwk/Reinsp 04/08
Conditional accept InspLot - Mfg at
Risk 01/04/08
Entire batch is rejected - RTV'd

RRWK

Entire batch rejected for Rwk/Reinsp

RSCP

Entire batch is rejected - Scrap

ACCP
ALTU
APAR
ARED
ARPR
ASUQ
AUAI
AWRK
MAR

Description

75
75

75
90

50
1
1

Accept
To Un-restricted use, Un-restricted
batch status
To Un-restricted use, Un-restricted
batch status
To Un-restricted use, Blocked batch
status

Accept

Unrestricted

Unrestricted

Accept

Unrestricted

Unrestricted

Accept

Restricted

Restricted

To Un-restricted use, Un-restricted


batch status
To Un-restricted use, Un-restricted
batch status
To Un-restricted use, Blocked batch
status
To Blocked stock, Blocked batch
status
To Blocked stock, Blocked batch
status
To Blocked stock, Blocked batch
status

Accept

Unrestricted

Unrestricted

Accept

Unrestricted

Unrestricted

Accept

Restricted

Restricted

Reject

Restricted

Blocked

Reject

Restricted

Blocked

Reject

Restricted

Blocked

Note:- Block batch status means restricted batch status


37

Checkpoint
1. Give examples of where QM master data is used. (Select all that apply)
a.
b.
c.
d.

Triggers Inspection lots


Provides data for inspection
Support vendor evaluation
Enables automatic usage decision

2. What is the name of the (program name) QM enhancement that


prevents restricted batches from being distributed to end customers?
a.
b.
c.
d.

Hold
HardStop
First Article Inspection
Distribution Hold

38

Agenda
1.
2.
3.
4.
5.
6.

Welcome & Introductions


Quality Management (QM) Overview
Manage QM Master Data
Manage Quality Info Records (QIRs)
QM Reports
Summary

39

Manage QM Master Data

Lesson Objectives
Upon the completion of this lesson, you should be able to:
Extend the quality view of the material master
Change and maintain quality view of the material master
Create and change inspection methods, inspection plans, work centers, and
Quality Information Records (QIR)

41

Master Data
Master Data is information that is setup in SAP which does not change
frequently. Examples include: Material Master, Inspection Plan, Master
Inspection Characteristics(MIC).
Transactional Data is a data record which is created frequently. It applies
to specific batches or quantities

42

QM Master Data Flow

43

Work Centers
A work center is where inspections are
conducted
QM work centers are used in the
inspection plans
Several inspection
characteristics(parameters like Viscosity,
pH) can be inspected in each work
center

44

CRQ1 QM Work Center - Create


Use transaction CRQ1 to create a new
quality management (QM) work center
The work center designates where the
inspection occurs and is referenced in
an inspection plan
It should be created prior to the creation
of the inspection plan

The fields, Plant, Work center, and


Work center cat. are mandatory fields
on the initial screen

45

Exercise 3.01: CRQ1 - Create QM Work Center


You need to create a quality management work center
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: CRQ1 Create QM Work Center

46

CRQ2 QM Work Center - Change


Use transaction CRQ2 to change an existing QM work center
Reference the existing work center using the required fields, Plant and
Work center on the initial screen

47

Exercise 3.02: CRQ2 - Change QM Work Center


You need to change a quality management work center
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: CRQ2 Change QM Work Center

48

Document Info. Record


Use this procedure to create a document that will be linked to an
Inspection Method. (program name) uses the document to house
information specific to a material's inspection plan.
This document resides in a method that resides in an inspection plan

When users record results, these documents are available and guide
them to the relevant system where the formal Procedures are
documented. The document is linked to the Inspection Method contains
an embedded link.
This document will contain a URL that links to the relevant inspection
method stored in system.

49

CV01N Document Info. Record - Create


Use transaction CV01N to create a
document and link it to an Inspection
Method
A document can be created from a
copy or a new one

50

Exercise 3.03: CV01N - Create Document


You need to create a document that is linked to an inspection method
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: CV01N Create Document

51

CV02N Inspection Method Document - Change


Use transaction CV02N to update a document that is linked to an
inspection method
Use the Document field to lookup the document that requires modification

Modifications that can be made once the document is retrieved, include


the following:
Description of the document
Hyperlink that the document points to (Originals tab)
Method(Object Links tab)

52

Exercise 3.04: CV02N - Change Document


You need to change a document that is linked to an inspection method
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: CV02N Change Document

53

Material Master Quality Management View


The Quality Management View
contains data required to prepare a
material for inspections when the
material is received or produced
The settings must be activated in the
material master record in order to trigger
inspection Lots for that material

The Quality Management View is


maintained for all material types
except for NLAG (Non-Stock Material)

54

Material Master Quality Management View (contd)


Open the Inspection setup screen by clicking on the
the Quality View

55

button on

Material Master Quality View: Inspection Setup Screen


Access the Inspection type section of the screen by clicking on the
button on Inspection setup screen

56

Material Master Quality View: Inspection type Section


The Inspection type must be selected
and activated in this section for the
material to identify when the
inspection is performed
Inspection types used can be 01, 04, 05,
08, 09, or 0101
Any material that are expiry relevant
should always have a 09 inspection type
associated with it.
Every material must have 08 inspection
type active.

57

MM01 Create Material: Master Quality View


Use transaction MM01 to extend the
quality view in the material master and
assign the appropriate inspection
types for a given material
Use MM01 only when the material
master for a given material has been
created and was not created with a
quality view

58

Demo 3.05: MM01 - Create Material: Extend Quality View


You need to extend the quality view in the material master
Watch the Demo executed by the trainer
Work Instruction: MM01 Create Material Extend Quality View

59

MM02 Change Material: Quality View


Use transaction MM02 to change the field values of the quality view in the
material master for a given material
Use when you need to add or delete inspection types, change the Auto UD
setting or change the trigger of the inspection lot creation in the quality view of a
material master

Use the field, Material on the initial screen to search for the required
material

60

Exercise 3.06: MM02 - Change Material Quality View


You need to update a material master
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: MM02 Change Material Change Quality View

61

Create Change Master Record


Requestor initiates in SAP ECO as usual and upon SAP ECO approval,
the planner or engineer will populate the change control number
Local data owner creates a change master record in (program name)
Parameters and validity dates are maintained in the change master
record

62

CC01 - Create Change Master


Use transaction CC01 to keep a record of all the changes for a particular
object, in this case, routings

63

CC01 - Create Change Master (contd)


Following are some of the critical
steps needed to create a change
master:

1. Leave Change Number field blank if


you want a system generated number
2. In the Type section, select Change
Master (only option currently available)
3. In the Function section, select Without
Release Key (only option currently
available)
4. Press Enter

64

CC01 - Create Change Master (contd)


5.
6.
7.
8.

Enter the Change Master Without Release Key


In the Description section, enter a Valid From date
Enter Reason for Change (Agile number)
Click
icon in the Change no. status field and select Active to allow for
change number
9. Press Enter
5

6
7
8

65

CC01 - Create Change Master (contd)


10. Check boxes as applicable
11. Click Save a confirmation message appears

11
66

Exercise 3.07: CC01 - Create a Change Master Record


You need to create a change number to create an inspection plan
Watch the Demo executed by the trainer
Complete the exercise using Exercise Guide
Work Instruction: CC01 Create Change Master Record

67

Inspection Planning in (program name)


An inspection plan is a template indicating how a quality inspection is to
take place. Other QM master data elements like QM data in material
master, inspection methods, work centers are prerequisites before you
create an inspection plan.
The inspection plan includes:
One or more inspection operations
Characteristics to be inspected in each operation
The range of expected results or specifications available for each
characteristic(MIC).
The sample calculations can be included for certain materials.
For Quantitative results calculations may be included.

68

QP01 - Create Inspection Plan


Use transaction QP01 to create an inspection plan
An inspection plan is a comprehensive description of the inspection
process for materials, including attributes, specifications, testing
requirements, and sample sizes
Once a plan is created and materials assigned to the plan, the inspections are
carried out according to the plan

69

Exercise 3.08: QP01 - Create Inspection Plan


You need to create an inspection plan
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP01 Create Inspection Plan

70

QP02 Change Inspection Plan


Use transaction QP02 to change an
inspection plan for a specific materialplant combination
Update the Usage
Update the definition
Add a new MIC

71

Exercise 3.09: QP02 - Change Inspection Plan


You need to update an inspection plan
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP02 Change Inspection Plan

72

QP02 Change Inspection Plan With Quantitative


Characteristics
Use transaction QP02 to modify an
inspection plan with quantitative
characteristics for a specific material
and plant combination

73

Exercise 3.10: QP02 - Change Inspection Plan With


Quantitative Characteristics
You need to change an inspection plan with quantitative characteristics
for a specific material and plant combination
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP02 Inspection Plan - Change

74

QP06 Missing/Non-Usable Plans Report


Use transaction QP06 to generate a
list of missing or non-usable inspection
plans to facilitate data cleansing
Use the fields on the initial screen to
run a list is focused to your needs.
Examples include:
All plants and materials
Single material
A range of materials in a plant

75

Exercise 3.11: QP06 Missing/Non-Usable Plans Report


You are helping to clean up inspection plans and need to generate a list
of missing/non-usable inspection plans for a material
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP06 Run report of missing/non-usable inspection

76

QP07 Missing or Unusable Goods Receipt Plans Report


Use transaction QP07 to generate a list of missing or unusable goods
receipt inspection plans
A goods receipt inspection plan is considered missing if the quality view
specifies an inspection type(01 and 0101 only) that has not been created
for materials that have an incoming inspection type and a planned receipt
within the specified lead time
It is considered unusable if the inspection plan is incomplete or has not been
released

77

Exercise 3.12: QP07 Missing or Unusable Goods Receipt


Plans Report
You need to generate a list of missing/unusable good receipt inspection
plans
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP07 Run report of missing/unusable goods receipt
inspection plans

78

QP60 Inspection Plan Changes


Use transaction QP60 to generate a
list of updates made to the inspection
plan for a specific material in a plant
This transaction generates the change
history including type of change, date
of change and the person responsible

79

Exercise 3.13: QP60 - Display inspection plan changes


You need to view a list of updates for an inspection plan
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP60 Inspection Plan Changes

80

QP05 Inspection Plan - Print


Use transaction QP05 to print an
inspection plan
The initial screen provides various
fields such as Material, Plant, Group
etc.
To specify the task list usage, use the
Use field

81

Exercise 3.14: QP05 - Generate an inspection plan printable


report
You want to generate a printable report of an existing inspection plan
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QP05 Inspection Plan - Print

82

QS31 Inspection Method - Create


Use transaction QS31 to create a new
inspection method
Standard methodology to perform a test
Describes how the inspection is to be
carried out for an inspection
characteristic
Used as a link to the document info
records via embedded URL

83

Exercise 3.15: QS31 - Create Inspection Method


You need to set up a new inspection method which indicates how the
inspection is to be carried out for an inspection characteristic
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QS31 Inspection Method - Create

84

QS32 Create Inspection Method Version


Use transaction QS32 to update an inspection method or to create
another version of an existing inspection method

85

Exercise 3.16: QS32 - Change Inspection Method


You need to update an inspection method
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QS32 Change Inspection Method

86

Checkpoint
1. What object serves as a template to indicate how a quality inspection
is to take place? (Select the best answer.)
a.
b.
c.
d.

Inspection Lot
Usage decision
Inspection Plan
Routing

2. Where are the inspections conducted? (Select the best answer.)


a.
b.
c.
d.

Profit Centers
Work Centers
Costs Centers
Work Shops

87

Checkpoint
3. What transaction code is used to create inspection plans? (Select the
best answer.)
a.
b.
c.
d.

QA01
MM01
MM03
QP01

88

Agenda
1.
2.
3.
4.
5.
6.

Welcome & Introductions


Quality Management (QM) Overview
Manage QM Master Data
Manage Quality Info Records (QIRs)
QM Reports
Summary

89

Manage Quality Info Records

Lesson Objectives
Upon the completion of this lesson, you should be able to:
Create Quality Info Record
Change Quality Info record

91

Quality Information Record


Created for a specific materialvendor-plant combination

Vendor

Uses:

Flag a material-vendor
combination as first-article
inspection (FAI)
Designate a material-vendor-plant
combination as dock-to-stock (no
inspection)
Block a material-vendor
combination.

QIR
Site

92

Material

Quality Info Records (cont'd)


(program name) uses the Quality Info Record (QIR) to:
Block a vendor for a particular material on an as-needed basis
Provides QA with the means to prevent ordering and receipts of materials from
specified vendors

Flag First Article Inspection (FAI) vendor/material combinations


Provides the business with an additional means of flagging for unique inspection
handling, materials designated as FAI (0101 inspection type and Inspection Lot User
Status of FAI)
Provides with a safeguard to prevent FAI batches from being released until an
authorized user changes the batch status

Flag a specific vendor, material and plant combination for dock-to-stock


handling (no inspection lot upon goods receipt)

93

Quality Info Records (cont'd)


If a QIR is created for a material-vendor-plant combination, then a QIR
must be created for each vendor of the same material for that plant to
allow continued ordering on those other vendors.
For example, three vendors supply a material, three QIRs need to be created
with the combination material-vendor-plant

(name of site) establishes QIRs on an exception basis to block


material/vendors or establish dock-to-stock models.
(name of site) establishes QIRs as a matter of default to facilitate dual
sourcing of materials from external vendors and affiliates, whereby
affiliate materials would be dock-to-stock. (name of site) will also create a
QIR to block material-vendor-plant combination or establish a materialvendor-plant combination for first article inspection (FAI) handling.

94

Selected Codes for Vendor Evaluation


Quality Scores associated with UDs made for (name of site) vendors are
maintained using QS52 to facilitate automated calculation of this portion
of the Quality Score
QA at (name of site) will maintain the Complaint portion of the Quality
Score manually via ME61

95

QI01 Quality Info Record - Create


Use transaction QI01 to create a
quality info record (QIR) for a materialvendor-plant combination
Use when a material at a specific
plant, from a specific vendor should be
one of the following:
Blocked
Set up for "dock-to-stock
Established for "first article inspection"
(FAI)

To be able to create a QIR, the "QM


proc active" and the "QM control key =
ZQM1" must be populated in the
Material master quality view

96

Exercise 4.01: QI01 - Create Quality Info Record


Use transaction QI01 to create a info record
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QI01 Create Quality Info Record

97

QI02 Quality Info Record - Change


Use transaction QI02 to make updates to an existing quality info record
(QIR) for a material-vendor-plant combination

98

Exercise 4.02: QI02 - Change Quality Info Record


You need to change a quality info record
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QI02 Change Quality Info Record

99

QDV1 Sampling Procedure - Create


Use transaction QDV1 to create a new sampling procedure
A sampling procedure provides the rule for the calculation of the sample
size that is required input during creation of Inspection Plan

100

Exercise 4.03: QDV1 - Create Sampling Procedure


You need to create a sampling procedure
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDV1 - Sampling Procedure - Create

101

QDV2 Sampling Procedure - Change


Use transaction QDV2 to update an existing sampling procedure
You should change only the text description for the sampling procedure.

102

Exercise 4.04: QDV2 - Change Sampling Procedure


You need to update an existing sampling procedure
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDV2 - Sampling Procedure - Change

103

QDB1 Assign Sampling Procedure


Use transaction QDB1 to maintain the relationship between a Sampling
Procedure and Dynamic Modification Rule
Use when a new Sampling Procedure or a new Dynamic Modification rule
has been created, and you want to link them for the inspection severity
change to work

104

Exercise 4.05: QDB1 - Assign Sampling Procedure


You need to maintain the relationship or link between a Sampling
Procedure and Dynamic Modification Rule
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDB1 Change View Allowed Relationships Sampling
Procedures/Dynamic Mod Rules

105

QDB3 Display Sampling Procedure


Use transaction QDB3 to display the relationship between a Sampling
Procedure and Dynamic Modification Rule
Perform this procedure when you need to view the link between the two
entities

106

Exercise 4.06: QDB3 - Display Sampling Procedure


You need to display the relationship between a Sampling Procedure and
Dynamic Modification Rule
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDB3

107

QDP1 Create Sampling Scheme


Use transaction QDP1 to create a new sampling scheme to draw samples
Always enter a maximum sample size of 10000000000 in the sample plan
Maintain sample plans for all the required severity levels and AQL values

108

Exercise 4.07: QDP1 - Create Sampling Scheme


You need to create a new sampling scheme
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDP1 Create Sampling Scheme

109

QDP2 Change Sampling Scheme


Use transaction QDP2 to change an existing sampling scheme
Perform this procedure when you need to:
Add a new sample plan to the existing scheme
Copy an existing plan and modify it to create a new plan

110

Exercise 4.08: QDP2 - Change Sampling Scheme


You need to change an existing sampling scheme
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDP2 Change Sampling Scheme

111

Dynamic Modification Rule


Dynamic Modification Rule contains :
the definition of the inspection stages
the dynamic modification time (at lot
creation or after the usage decision has
been made),
the conditions for the inspection stage
change

Inspection stage changes occur on the


on the basis of their acceptance or
rejection

112

QDR1 Create Dynamic Modification Rule


Use transaction QDR1 to create dynamic modification rule.
The inspection scope can be varied using dynamic modification rules. A
dynamic modification rule can be assigned in one of the following places:
In the inspection plan at the header level
In the inspection plan at the characteristic level
In the inspection setup of the material master record at the inspection type level

113

Exercise 4.09: QDR1 - Create Dynamic Modification Rule


You need to create new Dynamic Modification Rule
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDR1 Create Dynamic Modification Rule

114

QDR2 Change Dynamic Modification Rule


Use transaction QDR2 to change an existing dynamic modification rule
One example of a modification would be a need to add an inspection
severity or change the initial stage of inspection
When adding an inspection severity, ensure that the sampling scheme
assigned to the linked sampling procedure has the same severity and AQL
value entry

115

Exercise 4.10: QDR2 - Change Dynamic Modification Rule


You need to change the initial stage of inspection for an existing Dynamic
Modification Rule
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QDR2 Change Dynamic Modification Rule

116

QS21 Create Master Inspection Characteristic


Use transaction QS21 to create a master inspection characteristic (MIC) for a
specific plant
When creating a new MIC, always select Released from the Status drop-down menu
For Quantitative MIC, Use the QuantData button to enter the unit of measure for a
characteristic

117

Exercise 4.11: QS21 - Create or Update Quantitative MIC


You need to create a quantitative master inspection characteristic (MIC)
for a specific plant
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QS21 Master Inspection Characteristic - Create

118

Checkpoint
1. What transaction code do you use to create a quality info record?
(Select the best answer)
a.
b.
c.
d.

QA01
QI01
QA32
QE72

2. If a QIR is created for a material-vendor-plant combination, a QIR have


to be created for each of the three vendors of the same material for that
plant to allow continued ordering on those other vendors. (True or
False)
a. True
b. False

119

Checkpoint (contd)
3. QIRs - Quality Info Records are used to block vendors, flag first article
inspections, and flag vendor, material and plant combinations. (True or
False?)
a. True
b. False

4. Inspection stage changes occur on the on the basis of their acceptance


or rejection. (True or False)
a. True
b. False

120

Agenda
1.
2.
3.
4.
5.
6.

Welcome & Introductions


Quality Management (QM) Overview
Manage QM Master Data
Manage Quality Info Records (QIRs)
QM Reports
Summary

121

QM Reports

Lesson Objectives
Upon the completion of this lesson, you should be able to:
Display inspection lot selections, catalogs, selected sets, and quality
notifications

123

Display Usage Decision


Usage decision (UD) specifies whether the inspected goods are accepted or rejected for use
The UD displays basic inspection lot information and UD information
Examples of UD codes:

ACCP: meets all quality requirements


ALTU: meets requirements for reclassification
ARPR: unconditional accept after repair
ASUQ: conditional accept ship under quarantine
AUAI: unconditional acceptance disposition NC
AWRK: unconditional accept after rework/reinspection
MAR: conditional accept manufacture at risk
RRWK: entire batch rejected for rework/reinspection
RSCP: entire batch rejected - scrap

124

QA33 Inspection Lot - Display Usage Decision


Use transaction QA33 to display a
single inspection lot or a worklist of
inspection lots
The worklist can be executed to focus
on various criteria such as batch,
material, or plant
It can also be used to display one or
more usage decisions at the batch,
material, or plant level depending on
whether a usage decision has been
performed

125

Exercise 5.01: QA33 - Display Usage Decision


You need to display a usage decision for a batch
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QA33 Display inspection lot selection Display UD

126

ZQM_PT_BRULE Business Readiness Report Quality


Management
Use transaction ZQM_PT_BRULE to
generate a business readiness report
for Quality management
Check to see if the correct inspection
types are assigned to a material based
on procurement types
If the assignment is incorrect, the report
checks to see if inspection plans exist
for them or not

QA would typically run this report


when a new material is setup to check
the master data and settings against
standard business rules

127

Exercise 5.02: ZQM_PT_BRULE - Display Business


Readiness Report Quality Management
You need to obtain a business readiness report for Quality Management
master data objects
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: ZQM_PT_BRULE Business Readiness Report Quality
Management

128

QS42 Catalog - Display


Use transaction QS42 to display a
catalog of usage decision (UD) codes
or characteristic attributes
Catalogs make it easier to record
inspection results during inspection lot
processing
The catalog contains unique, nonnumerical data in the system that is
defined at client or plant level
You can directly assign catalogs to
master inspection characteristics

129

Exercise 5.03: QS42 - Display Catalog


You need to display a catalog of usage decision codes and characteristic
attributes
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QS42 Display Catalog

130

QS52 Selected Sets - Display


Use transaction QS52 to display
selected sets of UD codes or
characteristics for a specific plant
In the Catalog field select one of the
following:
Characteristic attributes to display a
selected set of characteristic attributes
that are used in results recording (such
as "PASSFAIL")
Usage decisions to display a selected
set of UD codes

131

Exercise 5.04: QS52 - Display Selected Sets


You need to display UDs for a specific plant
Watch the Demo executed by the trainer
Complete the exercise using the Exercise Guide
Work Instruction: QS52 Display selected sets

132

Checkpoint
1. All of the following are examples of a Usage Decision except: (Select
the best answer.)
a.
b.
c.
d.

ACCP
ALTU
ARPR
MARS

133

Agenda
1.
2.
3.
4.
5.
6.

Welcome & Introductions


Quality Management (QM) Overview
Manage QM Master Data
Manage Quality Info Records (QIRs)
QM Reports
Summary

134

Quality Master Data


Summary

Work Instruction List


CRQ1 - Create QM Work Center
CRQ2 - Change QM Work Center
CV01N - Create Document
CV02N - Change Document
MM01 - Create Material: Extend
Quality View
MM02 - Change Material Quality View
CC01 - Create a Change Master
Record
QP01 - Create Inspection Plan
QP02 - Change Inspection Plan
QP02 - Change Inspection Plan With
Quantitative Characteristics
QP06 Missing/Non-Usable Plans
Report

QP07 - Run report of missing/unusable


goods receipt inspection plans
QP60 - Display inspection plan
changes
QP05 - Inspection Plan Print
QS31 - Create Inspection Method
QS32 - Change Inspection Method
QI01 - Create Quality Info Record
QI02 - Change Quality Info Record
QDV1 - Create Sampling Procedure
QDV2 - Change Sampling Procedure
QDB1 - Assign Sampling Procedure
QDB3 - Display Sampling Procedure

136

Work Instruction List (cont'd)


QDP1 - Create Sampling Scheme
QDP2 - Change Sampling Scheme
QDR1 - Create Dynamic Modification
Rule
QDR2 - Change Dynamic Modification
Rule
QS21 - Create or Update Quantitative
MIC
QA33 - Display inspection lot selection
Display UD
ZQM_PT_BRULE - Display Business
Readiness Report Quality
Management
QS42 - Display Catalog
QS52 - Display Selected Sets

137

Course Objectives Review


You should now be able to:
Create, change, and track changes to QM master data
Create, change, and track changes to the Q-info record
Generate QM reports

138

Assessments
Now that you have completed the course, it is time to complete the
assessment
The passing score is 80% (8 out of 10 correct)
You can use your training materials as reference

139

Evaluation
Please complete the evaluation for the course prior to leaving the
classroom

140

You might also like