You are on page 1of 1

12776 Federal Register / Vol. 73, No.

47 / Monday, March 10, 2008 / Notices

method and procedures at the MSHA an examination of the entire mine NUCLEAR REGULATORY
address listed in the notice. The according to the requirements in 30 CFR COMMISSION
petitioner states that the alternative 75.360; (8) persons will be allowed to
method will not be implemented until enter the mine after it is determined to Agency Information Collection
miners designated to examine the be safe and the pre-shift examination Activities: Submission for the Office of
integrity of the seals or locks verify the results have been recorded. The Management and Budget (OMB)
short-circuit settings, and proper petitioner further states that repeated Review; Comment Request
procedures training have been provided testing of methane concentrations have
AGENCY: U.S. Nuclear Regulatory
for examining trailing cables for defects shown that concentration levels at no
Commission (NRC).
and damage. The training for the miners time have risen above 0.0 percent. The
will include the following elements: (1) ACTION: Notice of the OMB review of
petitioner asserts that the proposed
Training in mining methods and alternative method will in no way information collection and solicitation
operating procedures for protecting the would provide less than the same of public comment.
trailing cables against damage; (2) measure of protection afforded the SUMMARY: The NRC has recently
training in the proper procedures for miners under the existing standard. submitted to OMB for review the
examining the trailing cables to ensure
Dated: March 4, 2008. following proposal for the collection of
safe operating conditions; (3) training in
Jack Powasnik, information under the provisions of the
the hazards of setting the instantaneous
Deputy Director, Office of Standards, Paperwork Reduction Act of 1995 (44
circuit breakers too high to adequately
Regulations, and Variances. U.S.C. Chapter 35). The NRC hereby
protect the trailing cables; and (4)
[FR Doc. E8–4758 Filed 3–7–08; 8:45 am] informs potential respondents that an
training on how to verify that
agency may not conduct or sponsor, and
interrupting device(s) protecting the BILLING CODE 4510–43–P
that a person is not required to respond
trailing cable(s) are properly set and
to, a collection of information unless it
maintained. The petitioner further state
displays a currently valid OMB control
that within 60 days after the petition is
granted, revisions to the Part 48 training NATIONAL SCIENCE FOUNDATION number.
1. Type of submission, new, revision,
plan will be submitted to the District
Advisory Committee for Environmental or extension: Revision.
Manager for the area in which the mine
Research and Education; Notice of 2. The title of the information
is located. The petitioner asserts that the
Meeting collection:
proposed alternative method will at all
times guarantee no less than the same NUREG/BR–0238, Materials Annual Fee
measure of protection to the miners as In accordance with the Federal Billing Handbook.
would be provided by the existing Advisory Committee Act (Pub. L. 92– NRC Form 628, ‘‘Financial EDI
standard. 463, as amended), the National Science Authorization.’’
Docket Number: M–2008–005–C. Foundation announces the following NUREG/BR–0254, Payment Methods.
Petitioner: Bear Gap Coal Company, meeting: NRC Form 629, ‘‘Authorization for
74 Kushwa Road, Spring Glen, Name: Advisory Committee for Payment by Credit Card.’’
Pennsylvania 17978. Environmental Research and Education 3. The form numbers if applicable:
Mine: N & L Slope Mine, MSHA I.D. (9487). NRC Form 628 and NRC Form 629.
No. 36–02203, located in Dates: April 9, 2008, 9 a.m.–5 p.m.; April 4. How often the collection is
Northumberland County, Pennsylvania. 10, 2008, 9 a.m.–1 p.m. required: Annually.
Regulation Affected: 30 CFR 75.311(a) Place: Stafford I, Room 1235, National 5. Who will be required or asked to
(Main mine fan operation). Science Foundation, 4201 Wilson Blvd., report: Anyone conducting business
Modification Request: The petitioner Arlington, Virginia 22230. with the Nuclear Regulatory
requests a modification of the existing Type of Meeting: Open. Commission including licensees,
standard to allow the main mine fan to Contact Person: Alan Tessier, National
applicants and individuals who are
be idle during non-working hours. The Science Foundation, Suite 635, 4201 Wilson
Blvd., Arlington, Virginia 22230. Phone 703–
required to pay a fee for inspections and
petitioner states that historically, the licenses.
292–7198.
main mine fan operation has been shut Minutes: May be obtained from the contact 6. An estimate of the number of
down during non-working shifts, person listed above. annual responses: 466 (10 for NRC Form
because of icing during the winter Purpose of Meeting: To provide advice, 628 and 456 for NRC Form 629 and
months. The petitioner proposes to use recommendations, and oversight concerning NUREG/BR–0254).
the following stipulations in the fan support for environmental research and 7. The estimated number of annual
stoppage plan: (1) Shut the main mine education. respondents: 466 (10 for NRC Form 628
fan down during idle periods; (2) no Agenda: and 456 for NRC Form 629 and NUREG/
mechanized equipment will be used April 9 BR–0254).
underground when the fan is idle; (3) no Introduction of New Members. 8. An estimate of the total number of
electric power circuits will be energized Update on recent NSF environmental hours needed annually to complete the
when the fan is idle; (4) the main mine activities. requirement or request: 38 (.8 hour for
fan will be operated for a minimum of Discussion of Sustainability Science.
NRC Form 628 and 37 hours for NRC
Break Out Groups.
one-half hour after the pressure recorder April 10 Form 629 and NUREG/BR–0254).
indicates that the normal mine Meeting with the Director (or 9. An indication of whether section
ventilating pressure has been reached Representative). 3507(d), Public Law 104–13 applies:
prior to any one entering the mine; (5) Discussion of Future AC/ERE activities. N/A.
pwalker on PROD1PC71 with NOTICES

the slope gunboat may be used to make 10. Abstract: The U.S. Department of
the required per-shift examination; (6) Susanne Bolton, the Treasury encourages the public to
the communication circuit 9-volts will Committee Management Officer. pay monies owed the government
be energized prior to the pre-shift being [FR Doc. E8–4618 Filed 3–7–08; 8:45 am] through use of the Automated
made; (7) a certified person will conduct BILLING CODE 7555–01–P Clearinghouse Network and credit

VerDate Aug<31>2005 16:39 Mar 07, 2008 Jkt 214001 PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1