You are on page 1of 39

Danfoss Sea Recovery Corporation

19610 Rancho Way


Rancho Dominguez
California, 90220
Tel (800) 354-2000 Fax (310) 637-3430
www.searecovery.com

TECHNICAL PROPOSAL PACKAGE

REVISION DATE: May 2011


ITEM: DANFOSS Seawater Reverse Osmosis Fresh Water Maker
PROJECT: Water Vessel
PREPARED BY: Freddy Brandsborg

Content:

Company background
Scope of Supply of watermaker
Exception list
Customer requirements
Process & Instrumentation Drawing (P&ID)
Mechanical overview drawing
Membrane calculation sheets
FAT test protocol
ABS Certification
References
GENERAL TERMS AND CONDITIONS OF SALE

1
8
1
1
1
1
6
6
2
3
1

Presentation of Danfoss Sea Recovery and Danfoss Group


Danfoss Sea Recovery
Danfoss Sea Recovery is the pioneer of fresh water generators designed to accommodate industry demands. Our
high capacity water systems are built to be safe, easy to operate, and easy to maintain. Our innovative features such
as touch screen interfaces, network capable controls, and automated maintenance functions provide an easy,
reliable resource for fresh water production in the most extreme conditions. After 27 years of developing,
producing RO watermakers, Danfoss Sea Recovery is today the world leading supplier producing more than 1500
watermakers per year. With an extensive network of more than 250 dealers and certified service distributors we
ensure that wherever your need for service or consumables we will be available to serve you.
The Danfoss Group
Danfoss A/S is an international Group and a leader in research, development and production of mechanical and
electronic components and solutions.
Our products help to heat and cool homes and offices, refrigerate food and control production lines. In short,
Danfoss contributes to the conveniences of modern life as well as to a cleaner environment.
Our success as a producer stems from our ability to combine traditional mechanics based technologies with
electronic solutions. Through innovative mechanical design and electronics, often including embedded software,
we provide robust products of high quality, reliability and versatility.
Danfoss strives to meet its goals with minimal consumption of raw materials and energy, the least possible impact
on its surroundings, and the most efficient use of resources.
Danfoss is one of Denmarks largest industrial Groups and is based in Nordborg, in southern Denmark. In 2008,
the Danfoss Group acquired the controlling interest in Sauer-Danfoss Inc., a listed company.

SCOPE OF SUPPLY
MODEL: 1200M 3

ATLANTIC SEA iSave

UNIT PERFORMANCE DATA PER SYSTEM


Max. Capacity (Domestic Water) @250C:
Permeate Flow:
Feed Flow:
Concentrate Flow:
Primary Recovery:
Design feed water TDS:
Operating TDS Range:
Domestic Product water TDS:
Design Permeate Pressure:
Max. Operating Pressure:
Design Temperature:
Operating Temperature Range:

792,108 GPD
=
1200m3/ day
220 gpm
=
49.98 m3 / hr
550 gpm
=
124.94 m3 / hr
330 gpm
=
74.96 m3 / hr
40% (primary permeate feed flow)
38,600 PPM
15,000 PPM to 50,000 PPM
< 500 PPM (Compatible with WHO guidelines)
45 psi
=
3 bar(g)
975 psi
=
67,22 bar
250C
40C

Max. Capacity (Domestic Water) @250C:


Permeate Flow:
Feed Flow:
Concentrate Flow:
Primary Recovery:
Design feed water TDS:
Operating TDS Range:
Domestic Product water TDS:
Design Permeate Pressure:
Max. Operating Pressure:
Design Temperature:
Operating Temperature Range:

792,108 GPD
=
1200m3/ day
220 gpm
=
49.97 m3 / hr
550 gpm
=
124.94 m3 / hr
330 gpm
=
74.97 m3 / hr
39.99% (primary permeate feed flow)
38,600 PPM
15,000 PPM to 50,000 PPM
< 500 PPM (Compatible with WHO guidelines)
45 psi
=
3 bar(g)
975 psi
=
67,22 bar
40C
40C

Feed Pump Motor Power:


H.P. Pump Motor Power:
iSave Booster Pump Motor Power:
Product Delivery Pump:
Overall Total Nominal Power:

15,0 HP
75,0 HP X 2
30,0 HP X 2
5,0 HP
110,0 HP

=
=
=
=
=

11,19 KW
112,00KW
22.38 KW
3,72 KW
82,1 KW

Power consumption data is preliminary and subject to change. Actual details shall be provided with engineering
drawings generated after eventual contract is awarded.

UTILITY REQUIREMENTS
Inlet:
Permeate:
Concentrate:
Inlet Water Pressure:
Inlet Flow Rate:

DN100 PN16.
DN80 PN16.
DN100 PN16.
Flooded maximum of 1BAR
550 GPM (124.94 m3 / hr)

Pipe sizes & details in interface connections are preliminary and subject to change without notice. Actual details shall be
provided with engineering drawings generated after eventual contract is awarded
Power Supply:

690 VAC, 3-phase, 60 Hz.

MATERIALS OF CONSTRUCTION
High Pressure Piping:
Low Pressure Piping:
Pressure hoses - Low pressure:
Pressure hoses - High pressure:
Ball Valves- Low pressure:
Throttling Valve:
Vacuum Breaker:
Pressure Relief/Safety Valve:
Sample Valves:
Frame:

Super Duplex
PVC, PN16
Clear braided Vinyl hoses
Hydraulic rubber with SS316 connections
PVC PN16 body and ball/Buna-N seats
316 stainless steel body/ EPDM seats
Glass filled polypropylene (GPP) body, Viton seal
316 Stainless Steel body
PVC
Carbon steel frame with marine duty powder coating.

DIMENSIONS AND WEIGHTS


The plant shall not exceed the following dimensions:
10000 mm W x 2500 mm D x 3500 H
Approximate Unit Weight:
8500 Kg (Dry without multi-media filter material)
16000 Kg (Wet running condition)
System dimensions and weight are preliminary and subject to change, but not to exceed allowed space including spacing
specified for Compartment 13. Actual details shall be provided with engineering submission after eventual contract

MAIN COMPONENTS
The ATLANTIC SEA unit consists of one fully assembled and wired module supplied on a 3 part powder coated skid
frame. This frame can be separated to allow installation through standard hull doors etc.

Feed / Backwash Pump:


Quantity:

One (1) per system

Description:

Vertical type , Centrifugal, Stainless Steel case with 316L SS impeller, corrosion resistant, rated for 550
gpm (124.94 m3 / hr) @ 80 psi (5,50 bar), close coupled to a 30 HP, 3 Phase electric motor, 60Hz
configuration, 1800 rpm, 690VAC.

Location:

Installed on filtration skid frame

Automatic Backwashable Multi-Media Filter:


Quantity:

Three (3) per system

Description:

48" [1219.2 mm] Dia. x 72" [1829 mm] H vessel, loaded with sand & graded media, complete with
motorized PVC valving to allow for automatic control of service, backwash & rinse operations.
Removes suspended solids of 30 and larger. All three multi-media filters will be used in parallel.
During back wash no production of water.

Location:

Installed on filtration skid frame.

20u Cartridge Filter:


Quantity:

Eight (8) per system

Description:

Non-corrosive Fiber-glass filter housing, rated at 10 bar working pressure, complete with two (3) 20
nominal polypropylene filter cartridges, 102mm diameter x 254mm long, with an effective filtering
area of approximately 2.97 m2 each. Cartridge filters are all in parallel.

Location:

Installed on R.O skid frame.

5u Cartridge Filter:
Quantity:

Eight (8) per system

Description:

Non-corrosive Fiber-glass filter housing, rated at 10 bar working pressure, complete with two (3) 5
nominal polypropylene filter cartridges, 102mm diameter x 254mm long, with an effective filtering
area of approximately 2.97 m2 each. Cartridge filters are all in parallel.

Location:

Installed on R.O skid frame.

High Pressure Pump:


Quantity:

Two (2) per system

Description:

Axial Piston Positive Displacement Danfoss Pump (APP 26), rated at 110 gpm (25 m3/hr) @ 1000psi
(68.90 bar) max, Super Duplex material, Direct couple driven by a 75 HP (55.92kW), 1800 RPM,
690V/60Hz/3Phase, premium efficiency, marine duty, TEFC motor controlled via a Danfoss IP66
VFD with Modbus communication.

Location:

Installed on R.O skid frame

Isave Regeneration Booster Pump:


Quantity:

Two (2) per system

Description:

Vein pump coupled with pressure transfer device, rated at 147.5 gpm (33.5 m3/hr) @ 1000psi (68.90
bar) max, Super Duplex material, Direct couple driven by a 30 HP (22kW), 1800 RPM,
690V/60Hz/3Phase, premium efficiency, marine duty, TEFC motor controlled via a Danfoss IP66
VFD with Modbus communication.

Location:

Installed on R.O skid frame

Membrane Elements:
Quantity:

One-Hundred and Twenty-Eight (128) per system

Description:

Spiral-wound, Polyamide, Thin Film Composite, Extra High Rejection, Seawater Reverse Osmosis
Membrane Elements, 8" (202 mm) Dia. x 40" (1016 mm) L, 400 ft2 (37.16 m2) nominal active area,
nominal salt rejection is 99.6%. Expected membrane life range of 3-5 years under normal operation
conditions

Location:

Installed on membrane rack skid.

Membrane Housings:
Quantity:

Sixteen (12) per system

Description

8" (203 mm) diameter x 225" (5715 mm) L, Side or End-entry, FRP material,
1000psi (68.90 bar) rated, Super Duplex Victaulic connections, built to ASME code specifications.

Location:

Installed on membrane rack skid.

Automation Control Package:


Quantity:

One (1) per system

Description:

Fully integrated automation package allowing for turnkey operation of the system. This package
virtually removes the need for operation personnel. Feed water salinity and temperature are recorded
by the control system which automatically adjusts the system pressure to maintain maximum product
delivery. In addition to all of the features available in the Digital Instrumentation package the
Automation package also offers the following additional features:
Full communications ability via previously defined interfaces is provided as standard.
Fully automatic multi-media backwashing and rinsing system complete with backwash cycle
imminent warning notices. These notices displayed both locally and remotely identify the
requirement for a system backwash. When system demand drops the automatic backwash
cycle will activate, after which the control system will bring the unit back online and into full
production mode.
Filter element blockage prediction (produces warnings when filter elements are about to clog,
allowing required spares to be acquired from holding area before automatic shutdown takes
place, this minimizes down time).
Multi-level tank control (unit will start and stop automatically as needed to maintain water
level in product tank) provided as standard.
Automatic fresh water flush provided as standard.
Automatic pre and post treatment facilities provided as standard

Location:

Within control panel mounted on skid frame

Communications Package (included in Automatic Package):


Quantity:

One (1) per system

Description:

Integrated communications package allowing for remote monitoring of system performance, remote
notifications of system failures and root cause, remote start up and shut down of water maker system
and automatic notification of required system maintenance and performance issues.

Interface:

Available interfaces are as follows:


RS232C
RS485
RS422
Available interface communications protocols are as follows:
Modbus RTU
Modbus ASCII

Location:

2 wire communication terminal points provided within control panel (twisted pair plus signal
ground).

Automatic Fresh Water Flush/Membrane-In-Place (FWF) System:


Integrated fresh water flushing/membrane cleaning system can be included in the system allowing the operator to flush
the high pressure pump; piping, RO membranes and pressure vessels with non-chlorinated RO fresh water, after normal
system shutdown. If this system is fed from the customers potable water storage tank a pressure of no less than 60 PSI
must be present. This procedure prevents the membranes from dehydrating and sitting for extended periods of time in
salty water, it also reduces possibility of corrosion in the high pressure piping. In automatic mode (if purchased) this
procedure is taken care of automatically by the control system after a shutdown has taken place. In the event of a prolonged shutdown, the control system will repeat this process once every 7 days to protect membranes from dehydrating.
Description:

Non-corrosive thermoplastic cartridge filter housing, rated at 10 bar working pressure, complete with
carbon filter cartridge.

Location:

Installed on skid frame

Chemical Storage & Cleaning/Membrane-In-Place System:


The cleaning/storage tank, which is designed to be filled with strong alkaline cleaning solutions or storage solutions
allows for periodic membrane chemical cleaning and long term storage preparation without requiring the removal of
the membrane elements from the pressure vessels. This system uses the multi-purpose filter feed/backwash/cleaning
pump installed on the Skid Frame via PVC valves, allowing the tank to be permanently connected.
Description:

1.9 m3 Industrial PVC water/chemical storage tank. DN100 PN16 outlet piping connection and
DN100 return piping connection supplied.

Location:

Installed on skid frame

Anti-Scalant Dosing System:


Quantity:

One (1) per system

Description:

66 gallon / 250 l chemical storage tank, and chemical injection dosing pump (diaphragm based).
Single point dosing rate set by user during initial commissioning.

Location:

Installed on skid frame

Power Consumption: 0.1 kW


Electrical Motor: 0.2 kW
Flow Meters:
Description:

Locations:

Conductivity/Salinity Monitor:
Description:

Location:
Pressure Gauges:
Description:
Locations:

Pressure Transmitters:
Description:

Locations:
Pressure Switches:
Description:
Locations:

Temperature Transmitters:
Description:

Paddlewheel type with glass-filled polypropylene housing to withstand


harsh corrosive environments, 4-20ma transmitter to PLC control system
with preprogrammed acceptable flow ranges to ensure safe and efficient
operation of system components.
Domestic permeate line, Feed water line, Isave feed water line and Isave
brine discharge line.

HMI local display, 4-20ma transmitter to PLC system complete with


preprogrammed acceptable salinity levels to automatically divert high
salinity permeate water to waste via motorized PVC valve.
Permeate supply line. HMI Display on control panel door

316SS wetted parts, 2.5" gauge, Glycerin filled.


Feed Pump Inlet, Media filter inlet and outlet, Cartridge Filter inlets and
outlets, High-pressure pump suction and discharge, Concentrate line
before throttling valve, Permeate line.
316SS wetted parts, 4-20ma transmitter to PLC control system with
preprogrammed acceptable pressure ranges to ensure safe and efficient
operation of high pressure components.
Sand filter inlet and outlet, High-pressure pump suction and discharge.

316SS wetted parts, Buna N diaphragm High-pressure pump suction and


discharge.
High-pressure pump suction and discharge.

Locations:

316SS wetted parts, 4-20ma transmitter to PLC control system with


preprogrammed acceptable pressure ranges to ensure safe and efficient
operation of components.
Feed line before booster pump

Totaling Hour Meter:


Description:
Locations:

HMI local display. Hours and minutes


Control panel door

ELECTRICAL AND CONTROL


Control Panel:
Operator Interface:
Starters:
Disconnect:
Enclosure Rating:
Power supply:
Control Circuit:
Conduits:
Enclosure Location:

IDEC PLC, IDEC Touch screen, IDEC Pushbuttons, Lights & Switches.
Compact definite purpose contactor with overload and input circuit breaker.
ABB, 200Amp Disconnect with Panel Door Interlock
IP66
690 VAC, 3-phase, 60Hz
Internally sourced @ 24VDC, Via Power Supply.
Flexible/Rigid
Mounted on skid

ALARMS
The PLC based control system provides multiple fail-safe functions and constantly monitors the systems performance.
In the event of a system failure the unit will be safely shut down to prevent damage. Events monitored that will cause the
system to shut down are listed below:
High Pressure:

Should system pressure become greater than specified, the machine will shutdown to protect pumps
and membranes. A visual fault indication will be given.

Low Pressure:

Should system pressure become lower than specified, the machine will shutdown to protect pumps
and membranes. A visual fault indication will be given.

High Filtration System Loss:

When the pre-filtration stage begins to restrict feed water flow due to clogging of
filter elements. The system will shutdown to protect pumps and membranes. A
visual fault indication will be given.

Product diversion valve failure:

When in operation, the control system constantly monitors the permeate diversion
valve position. If for any reason this valve does not act as required or position of this
valve becomes unavailable the system will shut down to protect the integrity of the
potable water supply. A visual fault indication will be given.

Events monitored that will cause performance notifications are listed below
High Salinity:

When the permeate water salinity is greater than specified the machine will dump this water to brine.
While operating in this state the unit will display performance warning messages to alert the operator
that settings may need to be adjusted

OPTIONAL COMPONENTS

Heat Exchanger:
Quantity:

One (1) per system

Description:

Danfoss XGC vertical plate heat exchanger, titanium grade 1, fitted with four DN rated flanged service
connections for process and feed water. Capable of heating 0C water to a maximum of 15C using
36C water from ships heating water system, supplied with bypass valve(s) and temperature
monitoring device, controlled by R.O. PLC.

Location:

Installed on R.O skid frame.

Acoustic Enclosure:
Quantity:

One (1) per system

Description:

Noise absorbing acoustic enclosure to reduce reverberation from high pressure pump. Enclosure is
made of corrosion resistant material and is fitted with acoustic foam for effective noise reduction.
High pressure pump noise is rated 85dB at 1m.

Location:

Installed on R.O skid frame.

TESTING
The reverse osmosis water maker shall be extensively tested at our factory according to our standard FAT procedure. A
copy of the FAT procedure is attached to the appendices of this document.

Thursday, August 12, 2010

EXCEPTION LIST
No exceptions noted at this time, due to lack of specifications.

Thursday, August 12, 2010

CUSTOMER REQUIREMENTS
The Customer Shall Provide

All foundations required.

All floor drains and overboard discharge

All labor, materials and tools necessary to unload, set, and erect the equipment, to install all
corrosion resistant interconnecting piping between the system components (skids), to tighten
piping that was loosened during shipping, and to place the equipment in operation.

All sources of electrical power to each point of use, including any local and external disconnect
devices required.

All labor and material to install interconnecting control wiring and cabling.

All piping, valves and fittings to bring the feed water to the system (made of corrosion-resistant
material). All piping, valves and fittings to transfer the product water to the point of use and to
discharge the wastewater.

Electrical power supply including all interconnecting wiring, main three phase disconnect, wiring,
conduit, to MCC and between all control panels.

A
REVISIONS
ZONE

REV.

DESCRIPTION

DATE

APPROVED

ATLANTIC SEA 1200TON SYSTEM

CUSTOMER:

ORDER REF:

UNLESS OTHERWISE
SPECIFIED
DIMENSIONS ARE IN
INCHES

MODEL:
MRK

APPROVAL/REV

DATE

.XX = +/- .01


.XXX = +/- .005
ANGLES: +/- 1

DESIGN
APPROVAL:

CONFIDENTIAL:
PROPERTY OF DANFOSS A/S NORDBORG, DENMARK. NOT TO BE HANDED OVER TO COPIED OR USED BY
THIRD/PARTY. TWO OR THREE DIMENSIONAL REPRODUCTION OF CONTENTS TO BE AUTHORIZED BY DANFOSS
A/S
066223G2E2

TOLERANCES:

REPLACE:

ATLANTIC SEA

SIZE:

A3

SCALE:

REV.:

DESCRIPTION:

DRAWING NUMBER:

1:15

DANFOSS SEA RECOVERY


SHEET
NUMBER:
19610 S RANCO
WAY
RANCHO DOMINGUEZ, CA
1 OF 2
90220

162.0
4115

134.0
3404
106.0
2692

75.0
1905

170.0
4318

120.0
3048

114.5
2908
76.0
1930
3

18.4
467
100.0
2540
FRESH WATER FLUSH INLET

CHEMICAL CLEANING SKID

6.5
165

63.0
1600
7.0
178

PRE-FILTER SKID

BRINE OUTLET
FEED WATER INLET

MAIN CONTROL SKID

7.0
178

88.5
2248

DRAIN OUTLET

98.5
2502

PRODUCT WATER OUTLET

167.9
4264

UNLESS OTHERWISE
SPECIFIED

DANFOSS SEA RECOVERY


19610 S RANCO WAY
RANCHO DOMINGUEZ, CA
90220

DIMENSIONS ARE IN
INCHES
TOLERANCES:
.XX = +/- .01
.XXX = +/- .005
ANGLES: +/- 1
SCALE:

REV.:

DRAWI

ROSA Detailed Report

Page 1 of 3

Reverse Osmosis System Analysis for FILMTEC Membranes


Project: 1200 Ton NCL
C. Prado, Danfoss Sea Recovery

ROSA 7.0.1 ConfigDB u392554_98


Case: 1
2010-11-08

Project Information:
Case-specific:
System Details
Feed Flow to Stage 1
2998.45 m/d
Raw Water Flow to System
2998.45 m/d
Feed Pressure
65.88 bar
Fouling Factor
0.85
Chem. Dose (100% H2SO4)
0.00 mg/l
Total Active Area
4756.48 M
Water Classification: Seawater (Open Intake) SDI < 5

Stage

Element

#PV #Ele

SW30XHR-400i

16

Feed
Flow
(m/d)
2998.45

Feed
Press
(bar)
65.54

Pass 1 Permeate Flow 1199.18 m/d


Pass 1 Recovery
39.99 %
Feed Temperature
4.0 C
Feed TDS
38633.98 mg/l
Number of Elements
128
Average Pass 1 Flux
10.50 lmh

Recirc
Flow
(m/d)
0.00

Conc
Flow
(m/d)
1799.27

Conc
Press
(bar)
63.57

Perm
Flow
(m/d)
1199.18

Osmotic Pressure:
Feed
Concentrate
Average
Average NDP
Power
Specific Energy
Avg
Flux
(lmh)
10.50

Perm
Press
(bar)
0.00

25.50
43.35
34.42
30.17
285.86
5.72
Boost
Press
(bar)
0.00

bar
bar
bar
bar
kW
kWh/m
Perm
TDS
(mg/l)
52.43

Pass Streams
(mg/l as Ion)
Name
NH4
K
Na
Mg
Ca
Sr
Ba
CO3
HCO3
NO3
Cl
F
SO4
SiO2
Boron
CO2
TDS
pH

Feed
0.00
390.00
12150.00
1310.00
410.00
0.00
0.00
0.00
0.00
0.00
19000.00
0.00
2740.00
0.00
4.00
0.00
36022.85
8.10

Adjusted Feed
0.00
390.00
12150.00
1310.00
410.00
0.00
0.00
0.00
0.00
0.00
21611.13
0.00
2740.00
0.00
4.00
0.00
38633.98
8.10

Concentrate P
Stage 1
0.00
649.46
20235.23
2182.78
683.16
0.00
0.00
0.00
0.00
0.00
35993.94
0.00
4565.90
0.00
6.53
0.00
64347.81
8.12

ermeate
Stage 1
Total
0.00
0.00
0.69
0.69
18.76
18.76
0.46
0.46
0.14
0.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.87
30.87
0.00
0.00
0.38
0.38
0.00
0.00
0.20
0.20
0.00
0.00
52.43
52.43
7.94
7.94

Permeate Flux reported by ROSA is calculated based on ACTIVE membrane area. DISCLAIMER: NO WARRANTY, EXPRESSED OR IMPLIED, AND
NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, IS GIVEN. Neither FilmTec Corporation nor The Dow
Chemical Company assume any obligation or liability for results obtained or damages incurred from the application of this information. Because use
conditions and applicable laws may differ from one location to another and may change with time, customer is responsible for determining whether products
are appropriate for customers use. FilmTec Corporation and The Dow Chemical Company assume no liability, if, as a result of customer's use of the ROSA
membrane design software, the customer should be sued for alleged infringement of any patent not owned or controlled by the FilmTec Corporation nor The
Dow Chemical Company.

file://C:\Program Files\ROSA70\MyProjects\- 1200 Ton NCL01Detail.html

2010-12-10

ROSA Detailed Report

Page 2 of 3

Reverse Osmosis System Analysis for FILMTEC Membranes


Project: 1200 Ton NCL
C. Prado, Danfoss Sea Recovery

ROSA 7.0.1 ConfigDB u392554_98


Case: 1
2010-11-08

Design Warnings
-NoneSolubility Warnings
-NoneStage Details
Stage 1 Element Recovery
1
2
3
4
5
6
7
8

0.07
0.07
0.07
0.06
0.06
0.06
0.06
0.05

Perm Flow
(m/d)
12.54
11.68
10.79
9.86
8.92
7.97
7.04
6.14

Perm TDS
(mg/l)
31.35
35.92
41.48
48.27
56.65
67.03
79.97
96.15

Feed Flow
(m/d)
187.40
174.87
163.19
152.40
142.54
133.62
125.64
118.60

Feed TDS
(mg/l)
38633.98
41401.71
44362.54
47499.27
50782.48
54169.04
57603.01
61019.26

Feed Press
(bar)
65.54
65.21
64.90
64.63
64.38
64.15
63.94
63.75

Permeate Flux reported by ROSA is calculated based on ACTIVE membrane area. DISCLAIMER: NO WARRANTY, EXPRESSED OR IMPLIED, AND
NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, IS GIVEN. Neither FilmTec Corporation nor The Dow
Chemical Company assume any obligation or liability for results obtained or damages incurred from the application of this information. Because use
conditions and applicable laws may differ from one location to another and may change with time, customer is responsible for determining whether products
are appropriate for customers use. FilmTec Corporation and The Dow Chemical Company assume no liability, if, as a result of customer's use of the ROSA
membrane design software, the customer should be sued for alleged infringement of any patent not owned or controlled by the FilmTec Corporation nor The
Dow Chemical Company.

file://C:\Program Files\ROSA70\MyProjects\ 1200 Ton NCL01Detail.html

2010-12-10

ROSA Detailed Report

Page 3 of 3

Scaling Calculations

pH
Langelier Saturation Index
Stiff & Davis Stability Index
Ionic Strength (Molal)
TDS (mg/l)
HCO3
CO2
CO3
CaSO4 (% Saturation)
BaSO4 (% Saturation)
SrSO4 (% Saturation)
CaF2 (% Saturation)
SiO2 (% Saturation)
Mg(OH)2 (% Saturation)

Raw Water
8.10
-6.48
-7.38
0.75
36022.85
0.00
0.00
0.00
19.41
0.00
0.00
0.00
0.00
0.71

Adjusted Feed
8.10
-6.48
-7.38
0.79
38633.98
0.00
0.00
0.00
19.06
0.00
0.00
0.00
0.00
0.71

Concentrate
8.12
-6.04
-7.14
1.35
64347.81
0.00
0.00
0.00
34.90
0.00
0.00
0.00
0.00
1.30

To balance: 2611.13 mg/l Cl added to feed.

file://C:\Program Files\ROSA70\MyProjects 1200 Ton NCL01Detail.html

2010-12-10

ROSA Detailed Report

Page 1 of 3

Reverse Osmosis System Analysis for FILMTEC Membranes


Project: 1200 Ton NCL
C. Prado, Danfoss Sea Recovery

ROSA 7.0.1 ConfigDB u392554_98


Case: 1
2010-11-08

Project Information:
Case-specific:
System Details
Feed Flow to Stage 1
2998.45 m/d
Raw Water Flow to System
2998.45 m/d
Feed Pressure
54.84 bar
Fouling Factor
0.85
Chem. Dose (100% H2SO4)
0.00 mg/l
Total Active Area
4756.48 M
Water Classification: Seawater (Open Intake) SDI < 5

Stage

Element

#PV #Ele

SW30XHR-400i

16

Feed
Flow
(m/d)
2998.45

Feed
Press
(bar)
54.50

Pass 1 Permeate Flow 1199.44 m/d


Pass 1 Recovery
40.00 %
Feed Temperature
25.0 C
Feed TDS
38633.31 mg/l
Number of Elements
128
Average Pass 1 Flux
10.51 lmh

Recirc
Flow
(m/d)
0.00

Conc
Flow
(m/d)
1799.01

Conc
Press
(bar)
53.14

Perm
Flow
(m/d)
1199.44

Osmotic Pressure:
Feed
Concentrate
Average
Average NDP
Power
Specific Energy
Avg
Flux
(lmh)
10.51

Perm
Press
(bar)
0.00

27.69
47.32
37.50
16.46
237.95
4.76

bar
bar
bar
bar
kW
kWh/m

Boost
Press
(bar)
0.00

Perm
TDS
(mg/l)
181.11

Pass Streams
(mg/l as Ion)
Name
NH4
K
Na
Mg
Ca
Sr
Ba
CO3
HCO3
NO3
Cl
F
SO4
SiO2
Boron
CO2
TDS
pH

Feed
0.00
390.00
12150.00
1310.00
410.00
0.00
0.00
0.00
0.00
0.00
19000.00
0.00
2740.00
0.00
4.00
0.00
36022.85
8.10

Adjusted Feed
0.00
390.00
12150.00
1310.00
410.00
0.00
0.00
0.00
0.00
0.00
21610.46
0.00
2740.00
0.00
4.00
0.00
38633.31
8.10

Concentrate P
Stage 1
0.00
648.42
20207.49
2182.35
683.03
0.00
0.00
0.00
0.00
0.00
35947.59
0.00
4565.95
0.00
6.21
0.00
64270.30
8.14

ermeate
Stage 1
Total
0.00
0.00
2.41
2.41
64.80
64.80
1.58
1.58
0.49
0.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
106.61
106.61
0.00
0.00
1.31
1.31
0.00
0.00
0.68
0.68
0.00
0.00
181.11
181.11
7.64
7.64

Permeate Flux reported by ROSA is calculated based on ACTIVE membrane area. DISCLAIMER: NO WARRANTY, EXPRESSED OR IMPLIED, AND
NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, IS GIVEN. Neither FilmTec Corporation nor The Dow
Chemical Company assume any obligation or liability for results obtained or damages incurred from the application of this information. Because use
conditions and applicable laws may differ from one location to another and may change with time, customer is responsible for determining whether products
are appropriate for customers use. FilmTec Corporation and The Dow Chemical Company assume no liability, if, as a result of customer's use of the ROSA
membrane design software, the customer should be sued for alleged infringement of any patent not owned or controlled by the FilmTec Corporation nor The
Dow Chemical Company.

file://C:\Program Files\ROSA70\MyProjects\ 1200 Ton NCL01Detail.html

2010-12-10

ROSA Detailed Report

Page 2 of 3

Reverse Osmosis System Analysis for FILMTEC Membranes


Project: 1200 Ton NCL
C. Prado, Danfoss Sea Recovery

ROSA 7.0.1 ConfigDB u392554_98


Case: 1
2010-11-08

Design Warnings
-NoneSolubility Warnings
-NoneStage Details
Stage 1 Element Recovery
1
2
3
4
5
6
7
8

0.09
0.08
0.08
0.07
0.06
0.05
0.04
0.03

Perm Flow
(m/d)
16.55
14.17
11.87
9.74
7.83
6.20
4.84
3.76

Perm TDS
(mg/l)
83.16
104.75
133.74
172.80
225.60
296.58
391.67
517.10

Feed Flow
(m/d)
187.40
170.85
156.68
144.81
135.07
127.24
121.04
116.19

Feed TDS
(mg/l)
38633.31
42367.35
46189.78
49965.85
53556.58
56839.95
59735.98
62209.31

Feed Press
(bar)
54.50
54.26
54.05
53.86
53.70
53.54
53.40
53.27

Permeate Flux reported by ROSA is calculated based on ACTIVE membrane area. DISCLAIMER: NO WARRANTY, EXPRESSED OR IMPLIED, AND
NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, IS GIVEN. Neither FilmTec Corporation nor The Dow
Chemical Company assume any obligation or liability for results obtained or damages incurred from the application of this information. Because use
conditions and applicable laws may differ from one location to another and may change with time, customer is responsible for determining whether products
are appropriate for customers use. FilmTec Corporation and The Dow Chemical Company assume no liability, if, as a result of customer's use of the ROSA
membrane design software, the customer should be sued for alleged infringement of any patent not owned or controlled by the FilmTec Corporation nor The
Dow Chemical Company.

file://C:\Program Files\ROSA70\MyProjects\ 1200 Ton NCL01Detail.html

2010-12-10

ROSA Detailed Report

Page 3 of 3

Scaling Calculations

pH
Langelier Saturation Index
Stiff & Davis Stability Index
Ionic Strength (Molal)
TDS (mg/l)
HCO3
CO2
CO3
CaSO4 (% Saturation)
BaSO4 (% Saturation)
SrSO4 (% Saturation)
CaF2 (% Saturation)
SiO2 (% Saturation)
Mg(OH)2 (% Saturation)

Raw Water
8.10
-5.99
-6.99
0.75
36022.85
0.00
0.00
0.00
19.41
0.00
0.00
0.00
0.00
0.71

Adjusted Feed
8.10
-5.99
-6.99
0.79
38633.31
0.00
0.00
0.00
19.06
0.00
0.00
0.00
0.00
0.71

Concentrate
8.14
-5.53
-6.75
1.35
64270.30
0.00
0.00
0.00
34.92
0.00
0.00
0.00
0.00
1.45

To balance: 2610.46 mg/l Cl added to feed.

file://C:\Program Files\ROSA70\MyProjects\ 1200 Ton NCL01Detail.html

2010-12-10

Rev

Description

Date

Drawn

Initial release

July 21, 2009

AGE

APP

QUALITY PROCEDURE
PROPRIETARY AND CONFIDENTIAL:
THE INFORMATION CONTAINED IN THIS
DOCUMENT IS THE SOLE PROPERTYOF SEA
RECOVERY CORP. AND ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
SEA RECOVERY CORP. IS PROHIBITED.

Factory Acceptance Test,


Atlantic Sea RO Systems
PREPARED BY: AGE

B65000008

Sheet 1 of 6

Quality Procedure, FAT Atlantic Sea RO Systems

1.

TITLE

Factory Acceptance Test (FAT), Atlantic Sea RO System


2.

SCOPE

This FAT will consist of preliminary checks, pressure testing requirements, mechanical interface
verification, visual inspection of piping and tubing, and a final inspection to ensure that the unit is in a fit
condition for delivery to the client.
3.

PURPOSE

This procedure defines the method by which the Atlantic Sea RO system can be fully factory acceptance
tested to permit Client approval.
4.

REFERENCED DOCUMENTS

Verify that all documentation is available for review and correct.


Document

Document/drawing number

Revision

Assembly drawing(s)
P&ID
Electrical schematic
System manual
ROSA performance analysis
SCD, Powder Coating

B65000001

ABS type approval


CE approval
Verified _________________________

B65000006 Rev A

Sheet 2 of 6

Quality Procedure, FAT Atlantic Sea RO Systems

Paint
Check that the system paint work is complete and has been repaired where necessary in
accordance with Specification Control Document, Powder Coating, B65000001.
Verified _________________________
4.1.1

Markings
Check that all markings, serial numbers, connection identifications, gauge identifications, valve
control identifications, etc. are correct and distinct.
Verified _________________________

4.1.2

Complete an overall dimensional and component check of each system skid to ensure that it has
been assembled in accordance with the assembly drawings (refer to section 4)
Verified _________________________

4.1.3

Visually inspect any rigid/flexible piping runs, paying attention to fluid couplings to ensure that
they have not been damaged.
Verified _________________________

4.1.4

Photographs
On completion of this FAT, photograph the system skids and append the photographs to this FAT.
Verified _________________________

Notes:

B65000006 Rev A

Sheet 3 of 6

Quality Procedure, FAT Atlantic Sea RO Systems

4.2
4.2.1

Acceptance Test
Before performing acceptance test the following shall be recorded:

FAT date:
Serial No:
System:
System size:
HW version:
SW version:
HP pump serial no:
HPP motor serial no:
HPP motor:

HP

Volts

Hz

Phase

HP

Volts

Hz

Phase

Booster pump serial no:


BP motor serial no:
BP motor:
Verified _________________________
Notes:

B65000006 Rev A

Sheet 4 of 6

Quality Procedure, FAT Atlantic Sea RO Systems


4.2.2

Step

Before performing acceptance test, refer to system operating instructions.

Process

Expected
Value(s)

Recorded
Value(s)

Pass

Fail

System Setup
1

Connect between-skid fluid couplings per P&ID,


see ref 4

Connect feed, brine, and permeate hose, see ref 4

Connect power per electrical schematic, see ref 4


Operational Verification

Start system per operating instructions

Ensure no leaks overall

Visual

Ensure no pulsations hoses/gauges

Visual

HP pump flow rate obtained (GPM)

HP motor amp draw @ 0 psi (amp)

10

HP motor amp draw @ 800 psi (amp)

11

High pressure shutdown setting (psi)

975

12

Low pressure shutdown setting (psi)

4-6

13

Three way valve operation verified

14

Booster pump pressure (psi)

60 10

15

Booster pump motor amp draw (amp)

4.8 2

16

UV sterilizer operation verified

Visual

17

Fresh water flush operation verified

Visual

18

Screens and menus operation verified

Visual

19

Two hour operation verified

Visual

20

Quality of product water (mg/l)

21

HP Booster motor amp draw @ 0 psi (amp)

22

HP Booster motor amp draw @ 800 psi (amp)

---

Visual

< 500
---

Verified _________________________

B65000006 Rev A

Sheet 5 of 6

Quality Procedure, FAT Atlantic Sea RO Systems

FACTORY ACCEPTANCE TEST PROCEDURE TEST CERTIFICATE


This to confirm that the Atlantic Sea RO system
Serial number: ____________________
Quality procedure: _________________________

Revision: ____________________

Has been inspected and tested and has been found to meet the requirements of the above
specification.
Comments:

APPROVAL AND ACCEPTANCE


TECHNICIAN: ___________________________________

DATE: _______________

INSPECTION: ___________________________________

DATE: _______________

CLIENT: _______________________________________

DATE: _______________

B65000006 Rev A

Sheet 6 of 6

Certificate Number: 05-HS122694D/1-PDA

Confirmation of Product Type Approval 01/MAY/2010


Please refer to the "Service Restrictions" shown below to determine if Unit Certification is required for this product.
This is to certify that, pursuant to the Rules of the American Bureau of Shipping (ABS), the manufacturer of the
below listed product held a valid Manufacturing Assessment (MA) with expiration date of 19/MAY/2014. The
continued validity of the Manufacturing Assessment is dependent on completion of satisfactory audits as required
by the ABS Rules.
And; a Product Design Assessment (PDA) valid until 11/JAN/2011 subject to continued compliance with the Rules
or standards used in the evaluation of the product.
The above entitle the product to be called Product Type Approved.
The Product Design Assessment is valid for products intended for use on ABS classed vessels, MODUs or facilities
which are in existence or under contract for construction on the date of the ABS Rules used to evaluate the
Product.
ABS makes no representations regarding Type Approval of the Product for use on vessels, MODUs or facilities
built after the date of the ABS Rules used for this evaluation.
Due to wide variety of specifications used in the products ABS has evaluated for Type Approval, it is part of our
contract that; whether the standard is an ABS Rule or a non-ABS Rule, the Client has full responsibility for
continued compliance with the standard.

SEA RECOVERY CORP.


Model Name(s): North Sea Series
Presented to:
SEA RECOVERY CORP.
19610 S. RANCHO WAY
RANCHO DOMINGUEZ
United States
Intended Service:

Production of Fresh Water by Sea Desalination

Description:

Reverse Osmosis Desalination Unit

Ratings:

Model: SRC 42M3: Rating Gallons Per Day (GPD): 11,000; Model: SRC 76M3:
Rating (GPD): 20,000; Model: SRC 98M3: Rating (GPD): 26,000; Model: SRC
55M3: Rating (GPD): 14,530; Model: SRC 70M3: Rating (GPD): 18,515; Model:
SRC 75M3: Rating (GPD): 20,235; Model: SRC 121M3: Rating (GPD): 32,000;
Model: SRC 132M3: Rating (GPD): 35,000; Model: SRC 144M3: Rating (GPD):
38,000; Model: SRC 159M3: Rating (GPD): 42,000; Model: SRC 167M3: Rating
(GPD): 44,000.

Service Restrictions:

Unit Certification is not required for this product.

Comments:

1) If the system is to be installed on a US Flag Vessel, the hoses and associated


fittings are to be manufactured to SAE J1942 standard and are to be suitable for
the intended application; 2) The use of PVC piping is limited to 225 psi for water
application.

Notes / Documentation:
Term of Validity:

ABS Rules:

This product/model is covered under Product Design Assessment (PDA) Certificate


# 05-HS122694D/1-PDA, dated 12/Jan/2006. This PDA Certificate expires Jan of
2011. It will remain valid for the 5 years from date of issue or until the Rules or
specifications used in the assessment are revised (whichever occurs first).
2006 Steel Vessel Rules 1-1-4/7.7, 4-6-2/5.7

National Standards:
Page 83
05/01/2010 4:18:13 PM

Copyright 2001 American Bureau of Shipping. All rights reserved.

Page 1 of 2

Certificate Number: 05-HS122694D/1-PDA

International Standards:
Government Authority:
EUMED:
Others:

None

Model Certificate
PDA

Model Certificate No
05-HS122694D/1-PDA

Issue Date
12/JAN/2006

Expiry Date
11/JAN/2011

ABS Programs
ABS has used due diligence in the preparation of this certificate and it represents the information on the product in the ABS Records as of the
date and time the certificate was printed. Type Approval requires Drawing Assessment, Prototype Testing and assessment of the
manufacturer's quality assurance and quality control arrangements. Limited circumstances may allow only Prototype Testing to satisfy Type
Approval. The approvals of Drawings and Products remain valid as long as the ABS Rule, to which they were assessed, remains valid. ABS
cautions manufacturers to review and maintain compliance with all other specifications to which the product may have been assessed. Further,
unless it is specifically indicated in the description of the product; Type Approval does not necessarily waive witnessed inspection or survey
procedures (where otherwise required) for products to be used in a vessel, MODU or facility intended to be ABS classed or that is presently in
class with ABS. Questions regarding the validity of ABS Rules or the need for supplemental testing or inspection of such products should, in all
cases, be addressed to ABS.

Page 84
05/01/2010 4:18:13 PM

Copyright 2001 American Bureau of Shipping. All rights reserved.

Page 2 of 2

Page 85

Bremerhafen Retrofi
Svendborg

NCP retrofit
NCP retrofit

Denmark
Denmark

Croatia
Croatia
Croatia

Land Based System

Mururoa Island

Lloyd Werft Bremerhaven GmbH NB 112


Lloyd Werft Bremerhaven GmbH NB 113
Lloyd Werft Bremerhaven GmbH

French Polynesia

Germany
Germany
Germany
Germany
Germany
Germany

YN-715 Merwede
YN-715 Merwede
YN-717 Merwede
YN-717 Merwede
Wind Mill Park Service Plfrm
Ramco Express
AIR-07
Vrouwe Maria
Alexander von Humboldt
Clasified
Clasified
Clasified
Glomar Venture
FCS3307-1
FCS3307-2
Hos Achiever
YN-714 Merwede
Henri P. Lading
New Granger
Marsdiep
Andfjord
Seaspan
TakLift 7
Omega
Orion

Merwerde
Merwerde
Merwerde
Merwerde

Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland
Holland

Merwerde
Merwerde

Porto Heli
Skiathos Island
Santorini Island

Georg Covas
Fotopoulos Chris
Synodinos Helias

Greece
Greece
Greece

Mediterranean

BUQUE ORION

ECUADOR
ECUADOR

LAND BASED
M/Y NERAIDA
M/Y NERAIDA

t
M/S Sia

TBA
TBA
TBA

Abbey Working
AIRES
Boer en Ruiten
Club Cruise
Dutch Royal Navy
Dutch Royal Navy
Dutch Royal Navy
Glomar Ship Management
Harbour authorities
Harbour authorities
Hornbeck Offshore
Hornbeck Offshore
JD Contractors A/S
Larr Maritime
Marsdiep Offshore
Northsea Offshore Services
Seaspan bv
Smit Inernational
Workships Africa bv
Workships Africa bv

Reederei Harren & Partner


Reederei Harren & Partner
Reederei Harren & Partner
Royal Navy of Oman
Triton Format

French Army

ECUADORIAN NAVY
ECUADORIAN NAVY

ACI- CROATIA

Erria A/S
CT Offshore

TBA
TBA
TBA

CHILEAN NAVY

Buque Chenook

Nanjing East Star Shipyard


Dongnan Shipyard
Dongnan Shipyard

China
China
China

CANADIAN COAST GUARD


PEARL SEAS

Aramco Oil
Aramco
Aramco
Aramco
Aramco
Aramco

JOHSTON INTERNATIONAL

Frontline FPSO Ltd

Owner/Operator
Prosafe
WORKSHIPS AFRICA LIMITED

PEARL SEAS

CHILE

CANADA
CANADA

IRVING
HALLIFAX

Saudi Aramco Barge Arabiyah 7


Arabiha 2
Arabiha 3
Arabiha 4
ARB-3
ARB-4

Arab Ship Building & Repair Yard


Arabian Sea
Arabian Sea
Arabian Sea
Arabian Sea
Arabian Sea

Bahrain
Bahrain
Bahrain
Bahrain
Bahrain
Bahrain

Al Mahmood

LAS TERRAZAS RESORT


COCOPLUM RESORT

BELIZE
BELIZE

Brazil

Front Puffin

LAS TERRAZAS RESORT


COCOPLUM RESORT

Australia

Danfoss Sea Recovery Reference List


04/14/2010
Country - LOCATION
Yard
Vessel/Hull no.
Africa
Congo / Offshore
Africa
Built in Norway 1984 / Nigeria 09 OCEANIX ORION

Offshore support vessel


Offshore support vessel
Offshore support vessel
Offshore support vessel
Wind Mill Park Service Plfrm
Vessel
VESSEL
Guardian Vessel
Cruise Vessel
Clasified
Clasified
Clasified
Working Vessel
Fast Crew Supply Vessel
Crew Vessel
Diving support vessel
Diving support vessel
Pipe Laying Barge
Guardean Vessel
Guardian Vessel
Working Vessel
Guardian Vessel
Crane Barge
Working Vessel
Working Vessel

Land System
Land System
Land System

Heavy Lift / Roll-on-Roll-off


Heavy Lift / Roll-on-Roll-off
Heavy Lift / Roll-on-Roll-off
Frigate
Diving Support Vessel
Fish Trawler

Land

COAST GUARD
COAST GUARD

LAND BASED
LUXURY YACHT
LUXURY YACHT

Tug Boat
Cable Layer

Accommadation Barge
Working Barge
Working Barge

Oceanographic vessel

PATROL BOAT
CRUISE SHIP

FPSO

Barge
Jack Up Barge
Jack Up Barge
Jack Up Barge
Jack Up Barge
Jack Up Barge

LAND BASE
LAND BASE

FPSO

Vessel type
FPSO
Dive, support 505 ton

Coral Sea 4200


Coral Sea 6800
Coral Sea 6800
Coral Sea 6800
Tasman Sea 38m3
Tasman Sea 38m3

Coral Sea 2800


Coral Sea 2800
Coral Sea 2800
Coral Sea 4200
Tasman Sea 38m3
Coral Sea 5200

Tasman Sea 38m3


Tasman Sea 38m3
Tasman Sea 21m3
Tasman Sea 21m3
AquaMatic
AquaMatic
CORAL SEA 6800
Coral Sea 6800
North Sea 150m3
Clasified
Clasified
Clasified
AquaMatic
AquaWhisper
AquaWhisper
Tasman Sea 38m3
Tasman Sea 38m3
AquaMatic
AquaMatic
AquaWhisper
AquaMatic
AquaMatic
AquaWhisper
Coral Sea 6800
Coral Sea 6800

1993 North Sea 100 m3


1993 Coral Sea 15m3
2000 Coral Sea 15m3

2008
2008
2008
2006
2007
2009

2008 Tasman Sea 79 m3

2008 CORAL SEA 2800


2008 AQUA WHISPER 900-2

2005 Tasman Sea 38m3


2006 Coral Sea 3600
2007 Coral Sea 3600

2009 Seafari Mini 350


2009 Coral Sea 5200

2009 Tasman Sea 38m3


2008 Coral Sea
2008 Coral Sea

2006 CORAL SEA 2800

2007 CORAL SEA 3600


2007 Tasman Sea 64m3

2005 North Sea 95m3

2010
2006
2006
2006
2006
2006

2007 NORTH SEA 132m3


2006 CORAL SEA 2800

2007 Tasman Sea 64m3

Year
Product 1
2008
2009 Coral Sea 3600

2008
2008
2009
2009
2009
ABS
2007
2008
ABS
2008
ABS
2008
Clasified 2007
Clasified 2008
Clasified 2009
ABS
2008
ABS
2009
ABS
2009
ABS
2008
ABS
2008
ABS
2008
ABS
2008
ABS
2008
ABS
2008
ABS
2008
ABS
2008
ABS
2008
ABS
2009

ABS
ABS
ABS
ABS

ABS
ABS

ABS
ABS
ABS

Class

Frontline FPSO Ltd

CLIENT
Prosafe
OCEANIX Offshore NL

Coral Sea 4200

Tasman Sea 64m3

Dutch Royal Navy


Dutch Royal Navy
Dutch Royal Navy

Royal Navy of Oman


Cal Dive Corp USA

French Army

ECUADORIAN NAVY
ECUADORIAN NAVY

ACI-CROATIA
NCP
NCP

Erria A/S
CT Offshore Denmark

CHILEAN NAVY

CANADIAN COAST GUARD


PEARL SEAS

Aramco Oil
Aramco
Aramco
Aramco
Aramco
Aramco

LAS TERRAZAS RESORT


AQUAWHISPER 1800 COCOPLUM RESORT

Product 2

05/01/2010

Page 86

Nort Sea installation


Nort Sea installation
Ship installation

Oman
Oman

LISBON
LISBON

Norway
Norway
Norway
Norway

Oman
Oman

Portugal
Portugal

AUSTAL - AUSTRALIA
AUSTAL - AUSTRALIA
AUSTAL - AUSTRALIA
AUSTAL - AUSTRALIA
AUSTAL - AUSTRALIA
AUSTAL - AUSTRALIA

Dubai Shipyard
Dubai Shipyard
Abu Dhabi site installation

TRINIDAD & TOBAGO


TRINIDAD & TOBAGO
TRINIDAD & TOBAGO
TRINIDAD & TOBAGO
TRINIDAD & TOBAGO
TRINIDAD & TOBAGO
TRINIDAD & TOBAGO
TRINIDAD & TOBAGO

UAE
UAE
UAE

DLB 264
DLB 332
Barge Kanta

TTS Hibiscus
TTS Hummingbird
TTS 4
TTS 5
TTS 6

TTS Scarlet IBIS

PET-207
PET-008

55m LCU

Landing Craft Utility

Seismic vessel

Working Vessel
Working Barge
Construction Vessel
Barges
Barge
Platform Rig
Jack up rig
FPSO
FPSO
Working Vessel
Barge
Working Vessel
Jackup oilrig

Jack Up Barge
Jack Up Barge
Jack Up Barge

ICE BREAKER

Jack up Rig

passenger/cruiser
passenger/cruiser

Corvette QAHIR AL AMWAJ


Corvette QAHIR AL AMWAJ

ROC support vessel


Drilling Rig
Drilling Rig
Ssupport vessel

FPSO
SUPPLY VESSEL
Jack up Rig
LAND BASE
Jack up Rig
Patrol vessel

Diving Support Vessel

Platform Seligi Oil Rig


Platform Seligi Oil Rig
Patrol Craft

DRILLSHIP

97K Drillship
97K Drillship
97K Drillship
Drillship

Global Industries Internationa


Global Industries Internationa
Ocean Centre India

Construction Vessel
Construction Vessel
Diving and Support vessel

PETROTRIN
PLATFORM
PETROTRIN
PLATFORM
Trinidad and Tobago Coast Guard (TTCG)30m (98ft) PATROL BOAT
Trinidad and Tobago Coast Guard (TTCG)30m (98ft) PATROL BOAT
Trinidad and Tobago Coast Guard (TTCG)30m (98ft) PATROL BOAT
Trinidad and Tobago Coast Guard (TTCG)30m (98ft) PATROL BOAT
Trinidad and Tobago Coast Guard (TTCG)30m (98ft) PATROL BOAT
Trinidad and Tobago Coast Guard (TTCG)30m (98ft) PATROL BOAT

Royal Thai Navy

Neptune Offshore

M/V Scan Stigandi

Marsun shipyard

South America

ASETANIAN MARINE
BROSEAR
Global Industrial ( Batam)
IMC
Kim Heng Offshore Services
NABORS
OCEANEX SUPPLY OFFSHORE
Prosafe Production
Prosafe Production
SAAG Drilling & Well service
Seismic
Swiber Marine
Frontier Drilling

K300
QWA-125
Seminole
Mark 5
KH 300
P18
QM19
M/T Kudam
M/T Navarin
MR047
Q0843-68m
AK215

Thailand

Indonesian Shipyard
Batam Shipyard
GI Batam Shipyard
IMC Nanjing
Smith Shipyard
Keppel Fels
Pasir Gudang Shipyard
Keppel Fels
Keppel Fels
Jurong Shipyard
Penguin Shipyard
Swiber Shipyard
SembCorp

Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore

Saipem
Saipem
Saipem

C&M

Perro Negro V
Perro Negro VII
Perro Negro VII

ICE MAIDEN

Arabian Sea
Arabian Sea
Arabian Sea

RUSSIA

Saudi Arabia
Saudi Arabia
Saudi Arabia

HERCULES OFFSHORE

RIG 205

QUATAR

PERUVIAN NAVY

Royal Navy of Oman


Royal Navy of Oman

Cob Line Shipping


Dolphin Drilling Ltd
Statoil
Sea Support

High School Ouvea

BW Offsshore AS
CAMSA
HERCULES OFFSHORE
HOTEL PENASCO DEL SOL
PEMEX
MEXICAN NAVY

Cal Dive

ExxonMobile Sdn Bhd


ExxonMobile Sdn Bhd
Royal Malaysia Marine Police

FUGRO

Cardiff
Cardiff
Cardiff
Cardiff 97K

GOLDEN LAUREL MARITIME INC.


GREAT WARWICK INC.

EMPERADOR

Pan Trader
Byford Dolphin
Oseberg st
MV Guard Celena

Land Based System

KMZ
BPD - OCEANIC 1
RIG 170
HOTEL PENASCO DEL SOL
AKAL-J
HUASTECO

Seligi A
Seligi B
Patrol Craft

EXPLORER

HN1838
HN1865
HN1866
HN1837

M/V OCEAN MONARCH


M/V FUNCHAL

PERU

TAMPICO, TAMAULIPAS

New Caledonia

New Caledonia

PUERTO PENASCO

CIUDAD DEL CARMEN

Malta Shipyard

Malta

MEXICO
MEXICO
MEXICO
MEXICO
MEXICO
MEXICO

ExxonMobil Service Centre


ExxonMobil Service Centre
Marine Police Shipyard

Samsung Heavy Industries


Samsung Heavy Industries
Samsung Heavy Industries
Samsung Heavy Industries

Malaysia
Malaysia
Malaysia

LIBERIA - West Africa

Korea
Korea
Korea
Korea

ABS
ABS

DNV

ABS
ABS
ABS
BV/ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS

BV

DNV

ABS
ABS
ABS

ABS
ABS
ABS
ABS

Tasman Sea 64m3/S2


Tasman Sea 64m3/S2
Tasman Sea 64m3/S2
Tasman Sea 64m3/S2

Tasman Sea 64m3


NORTH SEA 76m3
NORTH SEA 121m3
TASMAN SEA 53m3
TASMAN SEA 79m3
TASMAN SEA 38M3

Coral Sea 5200


Tasman Sea 53m3
Coral Sea 5200
Aqua Matic 1800

Tasman Sea 64m3


Coral Sea 3600
Tasman Sea 79m3
Coral Sea 6800
Tasman Sea 38m3
Tasman Sea 53m3
Tasman Sea 79m3
Tasman Sea 38m3
Tasman Sea 38m3
Tasman Sea 38m3
Coral Sea 6800
Tasman Sea 79m3
Tasman Sea 38m3/S1

TASMAN SEA 53m3


TASMAN SEA 53m3
Aqua Whisper 900-2
Aqua Whisper 900-2
Aqua Whisper 900-2
Aqua Whisper 900-2
Aqua Whisper 900-2
Aqua Whisper 900-2
2006 Tasman Sea 79m3
2006 Tasman Sea 79m3
2009 Tasman Sea 38m3

2006
2008
2009
2009
2009
2009
2009
2009

2009 Aqua Whisper 1400-2

2009 Coral Sea 5200

2008
2008
2008
2008
2008
2007
2009

2008
2007
2008
2009
2008

2009 Tasman Sea 64m3


2009 Tasman Sea 64m4
2010 Tasman Sea 64m4

2007 NORTH SEA 121m3

2008 TASMAN SEA 64m3

2008 North Sea 159m3/D3


2008 Tasman Sea 79m3/D1

2004 CORAL SEA 2800

2007 Coral Sea 5200


2007 Coral Sea 5200

2008
2009
2010
2009

2009 North Sea 167m3

2006
2007
2008
2007
2006
2006

2008 Tasman Sea 38m3

2004 Tasman Sea 38m3


2004 Tasman Sea 38m3
2008 AquaWhisper 900

2004 Tasman Sea 64m3

2010
2010
2010
2010

ENDEAVOUR SHIPPING CO
ENDEAVOUR SHIPPING CO

PERUVIAN NAVY

Royal Navy of Oman


Royal Navy of Oman

Dolphin Drilling Ltd


Statoil Norway
Sea Support Tanager Norway

High School Ouvea

HOTEL PENASCO DEL SOL


PEMEX
MEXICAN NAVY

BW Offsshore AS
PEMEX

Cal Dive Int. Singaproe

Coral Sea 3600

Ocean Centre India

05/01/2010

PETROTRIN
PETROTRIN
Trinidad and Tobago Coast Guard (TTCG)
Trinidad and Tobago Coast Guard (TTCG)
Trinidad and Tobago Coast Guard (TTCG)
Trinidad and Tobago Coast Guard (TTCG)
Trinidad and Tobago Coast Guard (TTCG)
Trinidad and Tobago Coast Guard (TTCG)

Royal Thai Navy

Neptune Offshore

Petrobras

Saipem
Saipem
Extension of the system Saipem

NORTH SEA 121m3

TASMAN SEA 53m3

Tasman Sea 64m3

Tasman Sea 64m3

Page 87

LEEVAC INDUSTRIES
LEEVAC INDUSTRIES

USA
USA
USA - ALASKA
USA - India
USA - India
USA - Indonesia
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - ANGOLA
USA - BRAZIL
USA - BRAZIL
USA - BRAZIL
USA - GULF
USA - GULF
USA - LYBIA
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - MEXICO
USA - SOUTH AFRICA
USA - US GULF
USA - US GULF
USA
USA
USA
USA - CONGO
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA
USA

Fulmar Rig

M/V Toisa Pisces


M/V Toisa Perseus
M/V Toisa Polaris
M/V Toisa Valiant
M/V Toisa Vigliant
M/V Toisa Voyager
Lowline Searcher

Classified
North Sea Producer
M/V Bibby Aquamarine
M/V Vestfonn
M/V Norlift
M/V Albatross 1
Ben Avon
M/V Discovery

OSG UK
Talisman Energy UK

A.P. Moeller / Maersk


Bibby Ship Managment
BJ Services
ETPM
Gems International
KCA Deutag
NERC
Royal Navy of Oman
Royal Navy of Oman
Royal Navy of Oman
Royal Navy of Oman
Royal Navy of Oman
Royal Navy of Oman
Sea Lion Shipping
Sea Lion Shipping
Sea Lion Shipping
Sea Lion Shipping
Sea Lion Shipping
Sea Lion Shipping

HOS ACHIEVER
HORNBECK OFFSHORE
HOS IRON HORSE
HORNBECK OFFSHORE
SEAPRO
FUGRO
Super Sundowner VI
NABORS
Sun Downer SD7
NABORS
Mase 803
NABORS
NABORS 659
NABORS
Mase 802
NABORS
Super Sundowner X
NABORS
super Sundowner XI
NABORS
Super SundownerXIV
NABORS
Super Sundowner XVII
NABORS
VENEZUELA
PRIDE
M. LeTourneau, TX
MEXICO
PRIDE
PORTLAND
PRIDE
RIO DE JANEIRO
PRIDE
Bethlehem Steel Corp
Alaska
PRIDE
Bethlehem Steel Corp
Nevada
PRIDE
SEA EXPLORER
PRIDE
Bethlehem Steel Corp
Alabama
PRIDE
Bethlehem Steel Corp
Arkansas
PRIDE
M. LeTourneau, TX
Wisconsin
PRIDE
Ingalls Shipbuilding
Tennessee
PRIDE
Bethlehem Steel Corp
Mississippi
PRIDE
Bethlehem Steel Corp
Colorado
PRIDE
Bethlehem Steel Corp
Nebraska
PRIDE
Bethlehem Steel Corp
Texas
PRIDE
Bethlehem Singapore
South Carolina
PRIDE
Bethlehem Singapore
California
PRIDE
Bethlehem Steel Corp
Louisiana
PRIDE
1002E
PRIDE
1005E
PRIDE
OKLAHOMA
PRIDE
WISCONSIN
PRIDE
SOUTH SEAS
PRIDE
1003E
PRIDE
KANSAS
PRIDE
SAMSUNG HEAVY IND - KORE PS1 - DEEP OCEAN ASCENSIONPRIDE
SAMSUNG HEAVY IND - KORE PS2 - DEEP OCEAN CLARION PRIDE
SAMSUNG HEAVY IND - KORE PS3 - DEEP OCEAN MENDOCINPRIDE
Gen yard - Namibia
CABINDA
PRIDE
Guam Ship Yard
USNS RICHARD BYRD
US Navy
VT Marine
Various
US Navy
BOCONCO / GULF ISLAND FABINFLUENCE
SUPERIOR ENERGY
BOCONCO / GULF ISLAND FABRESPECT
SUPERIOR ENERGY
DAKOTA CREEK IND / BOLLIN ROSS CANDIES
OTTO CANDIES
CANDIES SHIPBUILDERS
CHLOE CANDIES
OTTO CANDIES
DAKOTA CREEK IND / BOLLIN GRANT CANDIES
OTTO CANDIES
GULF PROVIDER
GULF FLEET MANAGEMENT
GULF SERVICE
GULF FLEET MANAGEMENT
GLOBAL COMANCHE
GLOBAL INDUSTRIES
GLOBAL HERCULES
GLOBAL INDUSTRIES
GLOBAL TITAN II
GLOBAL INDUSTRIES
GLOBAL CHEROKEE
GLOBAL INDUSTRIES
GLOBAL SHAWNEE
GLOBAL INDUSTRIES
GLOBAL CHEYENEE
GLOBAL INDUSTRIES
GLOBAL DLB 264
GLOBAL INDUSTRIES
GLOBAL DLB 322
GLOBAL INDUSTRIES

UK
North Sea (Aberdeen)
Finland
UK
UK
Norway
Davie Shipyard Quebec Canada
UK
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
UK
UK
UK
UK
UK
UK
UK
Ship installation Canada
North Sea (Aberdeen)

UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK
UK

Tasman Sea 38m3


North Sea 98m3 Modular
Coral Sea 6800
Coral Sea 4200
Coral Sea 4200
Tasman Sea 25m3
Aquawhisper
North Sea 98m3
Coral Sea 10m3
Coral Sea 3600 Vertical
Coral Sea 3600 Vertical
Coral Sea 3600 Vertical
Coral Sea 3600 Vertical
Coral Sea 3600 Vertical
Coral Sea 3600 Vertical
Coral Sea
Tasman Sea
Tasman Sea
Coral Sea 6800
Coral Sea 5200
Coral Sea 6800
Coral Sea 13m3
Coral Sea 5200
Tasman Sea 60 m3

2008 TASMAN SEA 38m3


2009 TASMAN SEA 38m3
2009 CORAL SEA 3600
CoralSea 6800
Tasman Sea 53m3
Tasman Sea 53m3
Tasman Sea 53m3
Tasman Sea 53m3
Tasman Sea 53m3
Tasman Sea 53m3
Tasman Sea 53m3
Tasman Sea 53m3
2007 NORTH SEA 42m3
2007 North Sea
Coral Sea 6800
2008 NORTH SEA 42m3
NORTH SEA 42m3
2008 NORTH SEA 42m3
NORTH SEA 42m3
2007 North Sea
2008 North Sea
CORAL SEA 6800
2007 NORTH SEA
2007 North Sea
2009 North Sea
CORAL SEA 6800
2008 North Sea
2009 North Sea
2006 North Sea
2007 North Sea
2007 North Sea
2009 North Sea & Coral Sea CORAL SEA 6800
2008 North Sea
2007 North Sea
CORAL SEA 6800
2009 North sea
CORAL SEA 6800
CORAL SEA 6800
CORAL SEA 6800
CORAL SEA 6800
NORTH SEA
NORTH SEA
NORTH SEA
CORAL SEA 6800
CORAL SEA 6800
TASMAN SEA 79m3
2008 TASMAN SEA 64m3 -S2
2009 TASMAN SEA 64m3 -S2
2010 TASMAN SEA 64m3 -S2
2009 NORTH SEA 42m3
2009 Tasman Sea 53m3
2009 Aqua Whisper DX
2009 AQUAMATIC 1800
AQUAMATIC 1800
2009 AQUAMATIC 1800
AQUAMATIC 1800
2009 CORAL SEA 5200 Vertical
2009 CORAL SEA 5200 Vertical
2009 CORAL SEA 5200 Vertical
2007 CORAL SEA 5200 Vertical
2007 CORAL SEA 5200 Vertical
1969 TASMAN SEA 79M3
TASMAN SEA 79M3
1963 NORTH SEA 121M3
NORTH SEA 121M3
1985 NORTH SEA 121M3
1969 TASMAN SEA 72M3
1966 TASMAN SEA 38M3
TASMAN SEA 38M3
1969 TASMAN SEA 38M3
TASMAN SEA 38M3
1966 TASMAN SEA 38M3
1971 TASMAN SEA 53M3
TASMAN SEA 53M3

2009
ABS/LRS 2009
2008
2007
2000
2006
2009
1999
2008
2008
2008
2008
2009
2009
2003
2003
2003
2005
2005
2006
1996
2010
2010

MPSV (Multipurpuse supply vesse SOLAS


MPSV (Multipurpuse supply vesse SOLAS
ABS
Platform Rig
ABS
Platform Rig
ABS
Platform Rig
ABS
Jack up
ABS
Platform Rig
ABS
Platform Rig
ABS
Platform Rig
ABS
Platform Rig
ABS
Platform Rig
ABS
Semisubmersible
ABS
Semi Submersible
ABS
Semisubmersible
ABS
Semisubmersible
ABS
Jack up rig
ABS
Jack up rig
ABS
ABS
Jack up rig
ABS
Jack up rig
ABS
Cantilever Jack Up Rig
ABS
Cantilever Jack Up Rig
ABS
Jack up rig
ABS
Jack up rig
ABS
Jack up rig
ABS
Jack up rig
ABS
Jack up rig
ABS
Jack up rig
ABS
Jack up rig
ABS
Platform Rig
ABS
Platform Rig
ABS
Jackup
ABS
Jackup
ABS
Semisubmersible
ABS
Platform Rig
ABS
Jackup
ABS
DRILLSHIP 1
ABS
DRILLSHIP 2
ABS
DRILLSHIP 3
ABS
JACK UP
ABS
T-AKE Ammunition Ship
ABS
Fast Missile Patrol (6 Ships)
ABS
Liftboat class 265'
ABS - SO
Liftboat class 265'
ABS - SO
IMR VESSEL (inspection, mainte ABS
IMR VESSEL (inspection, mainte ABS
IMR VESSEL (inspection, mainte ABS
190' SSV (seismic support vessel) ABS
190' SSV (seismic support vessel) ABS
Pipelay / Derrick Barge
ABS
Pipelay / Derrick Barge
ABS
Catamaran Crane Vessel
ABS
Pipelay / Derrick Barge
ABS
Pipelay / Derrick Barge
ABS
Pipelay / Derrick Barge
ABS
Pipelay / Derrick Barge
ABS
Pipelay / Derrick Barge
ABS

Classified
FPSO
Offshore Support Vessel
Offshore Stimulation Vessel
Reel Pipe lay Vessel
Geo. Tech.Drill and Survey
Jack up Rig
Research Ship
Kahreef Class Patrol Vessel
Kahreef Class Patrol Vessel
Kahreef Class Patrol Vessel
Kahreef Class Patrol Vessel
Kahreef Class Patrol Vessel
Kahreef Class Patrol Vessel
DP Well Testing Vessel
DP Construction
Diving Support Vessel
Sub Sea Support/Platform
Sub Sea Support/Platform
Sub Sea Support/Platform
Offshore Support Vessel
Tanker
Production Rig

PEMEX

NIPPON OIL
BP
BP
PETROBRAS
PRESTOIL
US Navy
VT Halter Marine

PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PETRO SA

ONGC
ONGC
ConocoPhillips
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
PEMEX
CABINDA GULF
PETROBRAS
PETROBRAS
PETROBRAS
WALTER O&G

OSG USA
Talisman Energy UK

BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding
BVT Shipbuilding

A.P. Moeller / Maersk

05/01/2010

Thursday, August 12, 2010

GENERAL TERMS AND CONDITONS OF SALE


These General Terms and Conditions of Sale (Terms) apply to all deliveries of products and services (Products) from Danfoss A/S or its Affiliates (each of which is referred to
as Danfoss) to any customer (Customer). In these Terms Affiliate shall mean an entity directly or indirectly controlled by Danfoss A/S whether by shares or voting rights.
No terms and conditions other than the Terms shall be binding upon Danfoss and the Customer unless agreed in writing by both Danfoss and Customer. All terms and conditions
contained in any prior communication which are different from or in addition to the Terms shall not be binding on Danfoss unless otherwise expressly agreed in writing by both
Danfoss and Customer.
1. Confirmation of Order
Danfoss shall not be deemed to have accepted a purchase order until written, including electronic, confirmation of the order from Danfoss is received by Customer or Danfoss has
received written, including electronic, timely and unconditional acceptance from Customer of Danfoss quotation.
2. Terms of Delivery
The Products are delivered EXW from, at Danfoss option, any of Danfoss factories or places of business. Failing special instructions, Danfoss will dispatch the Products to
Customer, at the risk and expense of Customer by a transport method chosen by Danfoss. EXW shall be interpreted in accordance with the version of Incoterms valid on the time
of acceptance of the purchase order or quotation.
3. Delay
If Danfoss does not deliver at the agreed time, Customer is entitled to request delivery in writing and fix a final, reasonable, time limit for delivery. If delivery is not made within
this time limit, the Customer is entitled to rescind the agreement of sale and claim compensation for its documented, direct loss. No further claims can be made by the Customer as
a result of the delay.
4. Price Adjustments
Prices for Products are exclusive of VAT and/or other taxes or duties. Danfoss reserves the right to adjust accepted prices for non-delivered Products in the event of alterations in
rates of exchange, variations in costs of materials, sub-suppliers price increases, changes in wages, state requisitions or similar conditions over which Danfoss has no or limited
control.
5. Packing
Disposable packing is included in the price and will not be credited if returned. Returnable packing is not included in the price, but will be credited if immediately returned in
undamaged condition, at Customers expense in accordance with Danfoss instructions.
6. Terms of Payment
From due date, an interest rate of the lesser of 2 % per month or the highest rate allowable under applicable law will be payable.
7. Group Set-off
Danfoss and its Affiliates shall be entitled to set off own claims against the Customer, in the Customers possible claims against any of said companies.
8. Product Information
Any information irrespective of derivation from Danfoss or a Danfoss business contact including but not limited to information on weight, dimensions, capacity or any other
technical data in catalogues descriptions, advertisements, etc. shall be considered informative, and are only binding if and to the extent, explicit reference on this is made in offer
and/or order confirmation. Specific demands from the Customer are only binding if and to the extent they have been confirmed by Danfoss in writing.
9. Proprietary Information and Confidentiality
Any non-public information, including but not limited to, drawings, descriptions and any other technical documents which Danfoss has made or may make available to the
Customer (Technical Information) shall remain the property of Danfoss and shall be treated as confidential by Customer and its representatives and must not, without the written
consent of Danfoss, be copied, reproduced, or transferred to third parties or be used for other purposes than those intended when the Confidential Information was made available.
Confidential Information shall be returned upon Danfoss request.
10. Alterations
Danfoss reserves the right to make alterations to Products which do not materially affect agreed specifications or the Products form, fit or function, without notice.
11. Cost-free Repairs
Danfoss agrees to repair or replace, at the discretion of Danfoss, such Products that on Danfoss examination are found to be defective at the time of delivery due to faulty
manufacture, design and/or defective materials, provided the Customer makes a claim to Danfoss within 12 months from the date of delivery. If defects occur within the above
mentioned period, the Product shall be forwarded to Danfoss according to prior agreement with Danfoss. A description of the reason for returning the Product shall be enclosed.
Freight and insurance is paid by the Customer. Products returned shall be free of extraneous equipment. If Danfoss examination shows that the Product is not faulty, the Product
shall be returned to the Customer. Freight and insurance shall be paid by the Customer. If Danfoss ascertains that the Product is faulty, Danfoss shall send the repaired or a
replacement Product to the Customer. Danfoss may choose the method of dispatch and pays freight and insurance. Products or product parts which have been replaced shall be the
property of and retained by Danfoss.
ANY OTHER LIABILITIES ARE NOT ACCEPTED. WITHOUT LIMITING THE GENERALITY OF THE FOREGOING, UNLESS OTHERWISE EXPRESSLY SET FORTH
HEREIN, THE PRODUCTS ARE SUPPLIED AS IS, WHERE IS AND WITH ALL FAULTS AND DANFOSS MAKES NO WARRANTIES, EITHER EXPRESS OR
IMPLIED AT LAW OR OTHERWISE (INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE).
12. Product Liability
Danfoss shall not be liable for any damage to real property or chattels caused by the Product after it has been delivered and whilst it is in the possession of the Customer. Nor shall
Danfoss be liable for any damage to products manufactured by the Customer or to products of which the Customers products form a part. If Danfoss incurs liability towards any
third party for such damage as described in the preceding paragraph, the Customer shall indemnify, defend and hold Danfoss harmless. Customer shall indemnify and hold Danfoss
harmless for all claims arising from damage resulting from the use or operation of the Products because of the improper repair, maintenance or operation of the Products by
Customer, the failure of Customer to adequately train personnel in the operation of the Products, Customers failure to comply with applicable laws or regulations or otherwise. If a
claim for damage as described in this clause is lodged by a third party against either Danfoss or the Customer, the respondent party shall immediately inform the other party thereof
in writing. The Customer shall be obliged to let itself be summoned to the court or arbitral tribunal examining claims for damages lodged against one of them on the basis of
damage allegedly caused by the Product.
13. Secondary Damage
DANFOSS SHALL NOT BE HELD RESPONSIBLE FOR ANY SPECIAL, INDIRECT, CONSEQUENTIAL, PUNITIVE OR EXEMPLARY DAMAGE OR LOSS, WHICH
MIGHT ARISE OUT OF ANY BREACH OF WARRANTY, FAULTY PRODUCTS, DELAY IN THE DELIVERY OF THE PRODUCTS, PRODUCT LIABILITY, RECALL
OR OTHERWISE, IRRESPECTIVE OF THE CAUSE, INCLUDING BUT NOT LIMITED TO, LOSS OF PRODUCTION, LOSS OF PROFIT AND LOSS OF GOODWILL.
14. Mandatory liability
Nothing in these Terms (including but not limited to the exclusions and limitations in clause 11 to 13) shall operate so as to exclude or limit the liability of either party to the other
for death or personal injury arising out of its negligence, fraudulent misrepresentation or for any other liability which cannot be excluded or limited by law.
15. Notice of Claims
Claims or complaints as to defects and/or delay in delivery of the Products or other claims shall be submitted in writing by Customer to Danfoss without undue delay.
16. Intellectual Property Rights
If the Product is delivered with embedded software, Customer obtains a non-exclusive, software license in form of a right of use to the software solely for the purposes set out in
the applicable specification of the Product. Aside from this, Customer obtains no rights in form of license, patent, copyright, trademark or other proprietary right connected to the
Products. Customer shall not obtain any rights to source codes to such software.
17. Restraint on Resale and Use for Certain Purposes
Danfoss products are produced for civilian use. Customer is not allowed to use or to resell the Products for purposes which have any connection to chemical, biological or nuclear
weapons or for missiles which are capable of delivering such weapons. Customer is not allowed to sell the Products to persons, companies or any other kind of organization if
Customer has knowledge of or suspects that said persons or entities are related to any kind of terrorist or narcotics activities. The Products may be subject to legal regulations and
restrictions and may therefore be subject to restrictions in case of sale to countries/customers covered by export and import ban. These restrictions shall be observed in case of
resale of the Products to such countries/customers. Customer is not allowed to resell the Products if there is doubt or suspicion that the Products can be used for the purposes
mentioned in the preceding paragraph. If Customer receives knowledge of or suspects that the conditions in this clause have been violated, Customer shall immediately inform
Danfoss.

Thursday, August 12, 2010

18. Force Majeure


Danfoss is entitled to cancel orders or suspend delivery of Products and shall not be liable for any non-delivery, faulty or delayed delivery which partly or wholly is caused by
circumstances beyond Danfoss reasonable control, including, but not limited to, riots, civil unrest, war, terrorism, fire, insurrection, requisition, seizure, embargo or defects or
delays in deliveries by sub-contractors, strikes, lockouts, slow downs, lack of transportation, scarcity of materials, sickness accidents in product testing, and insufficient supplies of
energy. Any of Customers contractual rights are suspended or become void in any such circumstances referred to in this clause. Customer is not entitled to any kind of damages or
to make a claim whatsoever in case of cancellation or delayed delivery due to such circumstances.
19. Global Compact
Danfoss has joined the United Nations Global Compact initiative which means that Danfoss has undertaken to live up to 10 principles on human rights, employees rights, the
environment and corruption. These principles are listed in Danfoss Code of Conduct for Suppliers to be seen on www.danfoss.com. Therefore Danfoss encourages the Customer
to comply with these fundamental principles. For further information on Global Compact: http://www.unglobalcompact.org
20. Partial Invalidity
If one or more of the terms and conditions in these Terms or any part of a term is deemed invalid, unenforceable, illegal or inoperable, the validity, enforceability, legality or
operability of all further terms and conditions shall not be affected or diminished thereby.
21. Disputes
Any dispute between the parties arising from or in connection with a purchase agreement governed by these Terms shall be settled pursuant to United States of America law
including the United Nations Convention for the International Sales of Goods (CISG), with the exception of the conflict of law provisions. Any dispute arising from or in
connection with a purchase agreement governed by these Terms and which the parties themselves are unable to resolve shall be referred to and settled by arbitration under the
Rules of Arbitration of the International Chamber of Commerce, Paris (Rules) by one or more arbitrators appointed in accordance with said Rules. Each Party shall be entitled to
seek appropriate injunction relief or any other temporary measures. The Parties may refer the enforcement of any arbitral award to any competent court. The seat of arbitration
shall be Los Angeles California. English shall be the language to be used in the arbitration proceedings unless otherwise agreed between the parties. The arbitration proceedings
and the arbitral award shall be confidential and involved persons on both sides are pledged to secrecy.

You might also like