Program Description:
"CLIPCONN" is a spreadsheet program written in MS-Excel for the purpose of analysis of steel beam end
connections using double clip angles either welded or bolted to the beam web, and bolted to either the column
flange, column web, or girder web. The connections may be subjected to end shear reaction and/or axial load.
Specifically, all applicable "limit states" for the end connection analysis pertaining to the clip angles, bolts, beam
web, column flange or web, and girder web are checked.
This program is a workbook consisting of eight (8) worksheets, described as follows:
Worksheet Name
Description
Doc
Welded Clips(Col Flg)
Welded Clips(Col Web)
Welded Clips(Girder)
Bolted Clips(Col Flg)
Bolted Clips(Col Web)
Bolted Clips(Girder)
Uncoped Beam Table
"CLIPCONN.xls" Program
Version 2.2
Using Clip Angles Bolted to Column Flange and Welded to Beam Web
Subjected to Shear and/or Axial Load
Subject:
Originator:
Checker:
###
###
###
###
###
###
###
###
###
###
###
Input Data:
Beam and Column Data:
Beam Size =
Column Size =
Beam Yield Stress, Fyb =
Column Yield Stress, Fyc =
Connection Loadings:
Beam End Reaction (Shear), R =
Beam Axial Force, P =
tf=0.94
W36x160
W14x120
36
36
65.00
30.00
d=14.5
ksi
ksi
kips
4.000
3.500
0.3750
36
0.875
A325
N
Standard
10
3.5000
3.0000
5.500
1.250
0.5000
0.0000
0.0000
0.0000
1/ 4
0.0000
36
Member Properties:
Beam:
A = 47.00
d = 36.000
tw = 0.650
bf = 12.000
tf = 1.020
k = 1.7700
Column:
35.30
14.500
0.590
14.700
0.940
1.5400
A=
d=
tw =
bf =
tf =
k=
D1=3.5
kips
Nr=10
ta=0.375
###
S
S
P=30 k
R= 65 k
in.
in.
Lc=4
s=0.5
Lb=3.5
in.
ksi
in.
###
A325
A490
N
X
General Nomenclature
tw=0.65
Standard
Oversized
c=0
tf=1.02
dc1=0
###
###
###
###
###
in.
in.
in.
d=36
in.
in.
in.
in.
bf=12
dc2=0
###
###
c=0
in.
in.
in.
in.
in.^2
in.
in.
in.
in.
in.
2 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Avn =
Rvn =
Results:
Block Shear (
General Parameters:
Bolt and Material Data:
dh = 0.9375
dhc = 0.9375
Ab = 0.6013
Fua =
58.0
Fub =
58.0
Fuc =
58.0
in.
in.
in.^2
Av =
At =
Rbs =
Clip Angles to
"C-shaped" W
L=
kL =
xL =
ksi
aL =
Clip Angles to Support:
a=
Bolt Tension and Shear:
(Note: eccentricity between C.L.'s of beam and connection is ignored) k =
Nb =
20
Nb = 2*Nr (total number of bolts at support connection)
C1 =
bolts
Tb =
39.0
Tb = Pretension from AISC Table J3.7, page 5-77 (for A325 bolts)
C=
kips
vb =
3.25
vb = R/Nb (actual shear/bolt)
Pr =
kips/bolt
=
fv =
5.40
fv = vb/Ab (actual bolt shear stress)
ksi
Fv = 21.00 ksi
Fv = Allow. shear stress from AISC Table J3.2, page 5-73 (for N bolts)Co =
Vb = 12.63 kips/bolt
Vb = Fv*Ab (allowable shear/bolt)
C(max) =
Rbv = 252.55 kips
Rbv = Nb*Vb (allow. shear load)
Rbv >= R, O.K.
A=
T=
1.50
T = P/Nb (actual tension/bolt)
Ca/Co =
kips/bolt
ft =
2.49
ft = T/Ab (actual bolt tension stress)
Ca =
ksi
Ft = 42.52 ksi
Ft = SQRT(44^2-4.39*fv^2) (allow. tension stress for N bolts) (req'd) =
(min) =
B = 25.57 kips/bolt
B = Ft*Ab (allow. tension/bolt)
(max)
=
Rbt = 511.34 kips
Rbt = Nb*B (allow. tension load)
Rbt >= P, O.K.
Rwr =
Prying Action and Clip Angle Bending at OSL's:
Rwv =
p = 2.7500 in.
p = Min. of: S or S/2+ED (tributary angle length/bolt)
Rwa =
b = 2.0500 in.
b = (g-tw)/2-ta
Gross Shear
b' = 1.6125 in.
b' = b-db/2
Avg =
a = 1.5750 in.
a = minimum of: (bfc-g)/2 , (2*Lc+twb-g)/2 , or 1.25*b
Rvg =
a' = 2.0125 in.
a' = a+db/2
Gross Tensio
= 0.8012
= b'/a'
Atg =
d' = 0.9375
d' = dh
Rtg =
= 0.6591
= 1-d'/p
Eccentric Loads on Weld Groups - TABLE XXIII Coefficients, "C
= 20.025
= (1/)*(B/T-1)
k
' = 1.0000
If >= 1: ' = 1, If < 1: ' = lesser of 1.0 or (1/)*(/(1-))
a
ta(req'd) = SQRT(8*T*b'/(p*Fya*(1+*')))
ta(req'd) = 0.3432 in.
ta >= ta(req'd), O.K.
###
tc = 1.8252 in.
tc = SQRT(8*B*b'/(p*Fya))
###
' = 19.1126
' = 1/(*(1+))*((tc/ta)^2-1)
###
If ' >1: Ra = Nb*B*(ta/tc)^2*(1+) , If ' < 0: Ra = Nb*B
Ra = 35.81 kips
###
If 0 <= ' <= 1: Ra = Nb*B*(ta/tc)^2*(1+*') Ra >= P, O.K.
###
Bolt Bearing Capacity of (2) Clip Angles at OSL's:
###
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
in.
###
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
in.
###
Rpe = 27.19 kips
Rpe = 2*(0.50*Fua*(ED-C2)*ta)*(1)
###
Rps = 411.08 kips
Rps = 2*(1.2*Fua*db*ta)*(Nr-1) (C1 is not applicable for S >= 3*db)
###
Rp = 438.26 kips
Rp = Rpe+Rps <= 2*(1.2*Fua*db*ta)*(Nr)
Rp >= R, O.K.
###
ksi
ksi
(continued)
3 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
###
###
###
###
###
###
###
###
###
###
###
###
k Index:
Beam Checks
Gross Shear
Gross Tensio
Block Shear (
Tension Tear-
Tension Tear-
Beam Checks
Gross Shear
Gross Tensio
Block Shear (
Av =
At =
Rto =
Tension Tear-
Av =
(continued)
4 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rto =
Web Buckling
Beam Checks for Uncoped Flanges:
Gross Shear Capacity of Beam Web:
Avg = 23.400 in.^2
Avg = d*tw
Rvg = 336.96 kips
Rvg = 0.40*Fyb*Avg
Gross Tension Capacity of Beam:
Atg = 47.000 in.^2
Rtg = 977.42 kips
Atg = A
Rtg = (0.60*Fyb*Atg)*(1-(R/Rvg)^2)
ho =
e=
yc =
In =
Sn =
c/ho =
k=
c/d =
f=
Fbc =
Rwb =
Beam Checks
Gross Shear
Avg =
Rvg =
Gross Tensio
Atg =
Rtg =
Block Shear (
Tension Tear-Out ("U-shaped") Capacity of Beam Web:
Av = 3.900 in.^2
Av = 2*(Lb-s)*tw
At = 19.175 in.^2
At = ((Nr-1)*S+2*ED)*tw
Rto = 623.94 kips
Rto = 0.30*Fub*Av+0.50*Fub*At
Av =
At =
Rbs =
Rto >= P, O.K.
Tension TearAv =
At =
Rto =
5 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
=
d' =
=
=
' =
tf(req'd) =
tc =
' =
Ra =
Column Checks:
Prying Action and Column Flange Bending
twc = 0.5900 in.
twc = tw
p = 3.0000 in.
p = S (for bolts in column flange)
b = 2.4550 in.
b = (g-tw)/2
b' = 2.0175 in.
b' = b-db/2
a = 1.5750 in.
a = minimum of: (bfc-g)/2 , (2*Lc+twb-g)/2 , or 1.25*b
a' = 2.0125 in.
a' = a+db/2
= 1.0025
= b'/a'
Bolt Bearing i
d' = 0.9375 in.
d' = dh = db+1/16 (for Standard sized holes in column flange)
Rp =
= 0.6875
= 1-d'/p
Column Web
= 16.005
= (1/)*(B/T-1)
twc =
' = 1.0000
If >= 1: ' = 1, If < 1: ' = lesser of 1.0 or (1/)*(/(1-))
N=
tf(req'd)
=
SQRT(8*T*b'/(p*Fyc*(1+*')))
tf(req'd) = 0.3645 in.
tf >= tf(req'd), O.K. fwy =
tc = 1.9547 in.
tc = SQRT(8*B*b'/(p*Fyc))
Fwy =
' = 2.4146
' = 1/(*(1+))*((tc/tf)^2-1)
Column Web
If ' >1: Ra = Nb*B*(tf/tc)^2*(1+) , If ' < 0: Ra = Nb*B
Ra = 199.55 kips
twc =
If 0 <= ' <= 1: Ra = Nb*B*(tf/tc)^2*(1+*')
Ra >= P, O.K.
N=
Ra =
Bolt Bearing in Column Flange:
Web Doubler
Rp = 1144.92 kips
Rp = 1.2*Fu*tfc*db*Nb
Rp >= R, O.K.
Ldw =
fw =
=
Column Web Yielding:
(max)
=
twc = 0.5900 in.
twc = tw
N = 27.000 in.
Assume: N = (Nr-1)*S
W14x283
fwy =
1.47
fwy = P/(twc*(N+5*k))
ksi
(AISC Eqn. K1-2)
Fwy = 23.76 ksi
Fwy = 0.66*Fyc
Fwy >= fwy, O.K.
W14x233
W14x211
W14x193
twc = tw
W14x176
Assume: N = (Nr-1)*S
in.
(AISC Eqn. K1-4)
Ra = 67.5*twc^2*(1+3*(N/d)*(twc/tf)^1.5)*SQRT(Fyc*tf/twc)
kips
W14x145
Ra >= Rwc, O.K.
W14x132
Web Doubler Plate to Column Flange Welding:
W14x120
Ldw =
N.A.
Ldw = 2*((Nr-1)*S+2*ED)
in.
W14x109
fw =
N.A.
fw = P/Ldw
kips/in.
W14x99
=
= fw/((SQRT(2)/2)*0.30*70)
N.A.
in. (size)
W14x90
(max) =
(max) =
N.A.
0.40*Fyd*td/((SQRT(2)/2)*0.30*70)
in. (size)
W14x82
in.
W14x74
W14x68
W14x61
Comments:
W14x53
W14x48
W14x43
W14x38
W14x34
W14x30
W14x26
6 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Using Clip Angles Bolted to Column Web and Welded to Beam Web
Subjected to Shear and/or Axial Load
Subject:
Originator:
Checker:
###
###
###
###
###
Input Data:
Beam and Column Data:
Beam Size =
Column Size =
Beam Yield Stress, Fyb =
Column Yield Stress, Fyc =
Connection Loadings:
Beam End Reaction (Shear), R =
Beam Axial Force, P =
W14x43
W14x90
50
50
20.00
5.00
tw=0.44
bf=14.5
ksi
kips
4.000
3.500
0.3750
36
0.875
A325
SC
Standard
3
3.0000
3.0000
5.500
1.250
0.5000
7.0000
2.0000
0.0000
3/16
0.0000
36
No
Member Properties:
Beam:
A = 12.60
d = 13.700
tw = 0.305
bf = 8.000
tf = 0.530
k = 1.1200
Column:
26.50
14.000
0.440
14.500
0.710
1.3100
A=
d=
tw =
bf =
tf =
k=
ta=0.375
D1=3
kips
Nr=3
###
###
###
###
ksi
###
S
S
P=5 k
R= 20 k
in.
in.
###
A325
A490
N
X
Lc=4
s=0.5
Lb=3.5
in.
ksi
in.
General Nomenclature
tw=0.305
Standard
Oversized
c=7
tf=0.53
dc1=2
###
###
###
###
###
in.
in.
in.
d=13.7
in.
in.
in.
in.
bf=8
dc2=0
###
###
c=0
in.
in.
in.
in.
in.^2
in.
in.
in.
in.
in.
7 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Avn =
Rvn =
Results:
Block Shear (
General Parameters:
Bolt and Material Data:
dh = 0.9375
dhc = 0.9375
Ab = 0.6013
Fua =
58.0
Fub =
65.0
Fuc =
65.0
in.
in.
in.^2
Av =
At =
Rbs =
Clip Angles to
"C-shaped" W
L=
kL =
xL =
ksi
aL =
Clip Angles to Support:
a=
Bolt Tension and Shear:
(Note: eccentricity between C.L.'s of beam and connection is ignored) k =
Nb =
6
Nb = 2*Nr (total number of bolts at support connection)
C1 =
bolts
Tb =
39.0
Tb = Pretension from AISC Table J3.7, page 5-77 (for A325 bolts)
C=
kips
vb =
3.33
vb = R/Nb (actual shear/bolt)
Pr =
kips/bolt
=
fv =
5.54
fv = vb/Ab (actual bolt shear stress)
ksi
Fv = 16.64 ksi
Fv = (Allow. shear stress from Table J3.2)*(1-ft*Ab/Tb) (for SC bolts) Co =
Vb = 10.00 kips/bolt
Vb = Fv*Ab (allowable shear/bolt)
C(max) =
Rbv = 60.02 kips
Rbv = Nb*Vb (allow. shear load)
Rbv >= R, O.K.
A=
T=
0.83
T = P/Nb (actual tension/bolt)
Ca/Co =
kips/bolt
ft =
1.39
ft = T/Ab (actual bolt tension stress)
Ca =
ksi
(req'd) =
Ft = 44.00 ksi
Ft = Allow. bolt tension stress from AISC Table J3.2 (for SC bolts)
(min) =
B = 26.46 kips/bolt
B = Ft*Ab (allow. tension/bolt)
(max)
=
Rbt = 158.75 kips
Rbt = Nb*B (allow. tension load)
Rbt >= P, O.K.
Rwr =
Prying Action and Clip Angle Bending at OSL's:
Rwv =
p = 2.7500 in.
p = Min. of: S or S/2+ED (tributary angle length/bolt)
Rwa =
b = 2.2225 in.
b = (g-tw)/2-ta
Gross Shear
b' = 1.7850 in.
b' = b-db/2
Avg =
a = 1.4025 in.
a = minimum of: (2*Lc+tw-g)/2 or 1.25*b
Rvg =
a' = 1.8400 in.
a' = a+db/2
Gross Tensio
= 0.9701
= b'/a'
Atg =
d' = 0.9375
d' = dh
Rtg =
= 0.6591
= 1-d'/p
Eccentric Loads on Weld Groups - TABLE XXIII Coefficients, "C
= 31.697
= (1/)*(B/T-1)
k
' = 1.0000
If >= 1: ' = 1, If < 1: ' = lesser of 1.0 or (1/)*(/(1-))
a
ta(req'd) = SQRT(8*T*b'/(p*Fya*(1+*')))
ta(req'd) = 0.2692 in.
ta >= ta(req'd), O.K.
###
tc = 1.9536 in.
tc = SQRT(8*B*b'/(p*Fya))
###
' = 20.1302
' = 1/(*(1+))*((tc/ta)^2-1)
###
If ' >1: Ra = Nb*B*(ta/tc)^2*(1+) , If ' < 0: Ra = Nb*B
Ra =
9.70
kips
###
If 0 <= ' <= 1: Ra = Nb*B*(ta/tc)^2*(1+*') Ra >= P, O.K.
###
Bolt Bearing Capacity of (2) Clip Angles at OSL's:
###
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
in.
###
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
in.
###
Rpe = 27.19 kips
Rpe = 2*(0.50*Fua*(ED-C2)*ta)*(1)
###
Rps = 91.35 kips
Rps = 2*(1.2*Fua*db*ta)*(Nr-1) (C1 is not applicable for S >= 3*db)
###
Rp = 118.54 kips
Rp = Rpe+Rps <= 2*(1.2*Fua*db*ta)*(Nr)
Rp >= R, O.K.
###
ksi
ksi
(continued)
8 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
###
###
###
###
###
###
###
###
###
###
###
###
k Index:
Beam Checks
Gross Shear
Gross Tensio
Block Shear (
Tension Tear-
Tension Tear-
Beam Checks
Gross Shear
Gross Tensio
Block Shear (
Av =
At =
Rto =
Tension Tear-
Av =
(continued)
9 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rto =
Web Buckling
Beam Checks for Top Flange Coped Only:
Gross Shear Capacity of Beam Web for Top Flange Coped:
Avg = 3.569 in.^2
Avg = ho*tw
Rvg = 71.37 kips
Rvg = 0.40*Fyb*Avg
Block Shear ("L-shaped") Capacity of Beam Web for Top Flange Coped:
Av = 2.516 in.^2
Av = ((D1-dc1)+(Nr-1)*S+ED)*tw
At = 0.915 in.^2
At = (Lb-s)*tw
Rbs = 78.80 kips
Rbs = 0.30*Fub*Av+0.50*Fub*At
Tension Tear-Out ("L-shaped") Capacity of Beam Web for Top Flange Coped:
Av = 0.915 in.^2
Av = (Lb-s)*tw
At = 2.516 in.^2
At = ((D1-dc1)+(Nr-1)*S+ED)*tw
Rto = 93.20 kips
Rto = (0.30*Fub*Av+0.50*Fub*At)*(1-(R/Rbs)^2)
Rto >= P, O.K.
Tension Tear-Out ("U-shaped") Capacity of Beam Web for Top Flange Coped:
Av = 1.830 in.^2
Av = 2*(Lb-s)*tw
At = 2.593 in.^2
At = ((Nr-1)*S+2*ED)*tw
Rto = 119.94 kips
Rto = (0.30*Fub*Av+0.50*Fub*At)
Rto >= P, O.K.
ho =
e=
yc =
In =
Sn =
c/ho =
k=
c/d =
f=
Fbc =
Rwb =
Beam Checks
Gross Shear
Avg =
Rvg =
Gross Tensio
Atg =
Rtg =
Block Shear (
Av =
At =
Rbs =
Tension TearAv =
At =
Rto =
10 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
a=
b=
c=
(assume LRFD "yield line" theory and convert results back to ASD)
L=
=
twc = tw+td*(Fyd/Fyc)
Pn =
mp = 0.25*Fyc*twc^2
Tc = dc-2*kc
Pa =
a = (Tc-c)/2
Column Web
b = a = (Tc-c)/2
twc =
c=g
fv =
L = (Nr-1)*S
Fv =
= 0.90
Web Doubler
Pn = *8*mp*(SQRT(2*Tc/(Tc-g))+L/(2*(Tc-g)))
Ldw =
Pa = Pn/1.5 (converting LRFD value back to ASD value)
fw =
=
(max) =
twc = tw+td*(Fyd/Fyc)
W14x665
fv = (P/Nb)/(twc*(S-dhc))
W14x605
Fv = 0.4*Fyc
W14x550
W14x500
W14x455
W14x426
W14x398
W14x370
W14x342
W14x311
W14x283
W14x257
Comments:
W14x233
W14x211
W14x193
W14x176
W14x159
W14x145
W14x132
W14x120
W14x109
W14x99
W14x90
W14x82
W14x74
W14x68
W14x61
W14x53
W14x48
W14x43
W14x38
W14x34
W14x30
W14x26
11 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Using Clip Angles Bolted to Girder Web and Welded to Beam Web
Subjected to Shear and/or Axial Load
Subject:
Originator:
Checker:
###
###
###
###
###
###
Input Data:
Face of Girder Web
g=5.5
ED=1.25
A=
d=
tw =
bf =
tf =
k=
W24x76
W36x280
36
36
65.00
10.00
4.000
3.500
0.3750
36
0.875
A325
SC
Standard
6
3.2500
3.0000
5.500
1.250
0.5000
6.2500
2.0000
0.0000
3/16
0.0000
36
No
Girder:
82.40
36.500
0.885
16.600
1.570
2.5200
ta=0.375
D1=3.25
ksi
Nr=6
ksi
kips
###
S
S
P=10 k
R= 65 k
Lc=4
s=0.5
Lb=3.5
kips
General Nomenclature
in.
A325
A490
in.
tw=0.44
in.
ksi
c=6.25
tf=0.68
dc1=2
X
SC
Standard
Oversized
###
in.
d=23.9
in.
in.
bf=8.99
dc2=0
###
###
c=0
in.
in.
in.
in.
in.
in.
in.
in.
in.
in.^2
in.
in.
in.
in.
in.
###
###
###
###
###
12 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Avn =
Rvn =
Results:
Block Shear (
General Parameters:
Bolt and Material Data:
dh = 0.9375
dhg = 0.9375
Ab = 0.6013
Fua =
58.0
Fub =
58.0
Fug =
58.0
in.
in.
in.^2
Av =
At =
Rbs =
Clip Angles to
"C-shaped" W
L=
kL =
xL =
ksi
aL =
Clip Angles to Support:
a=
Bolt Tension and Shear:
(Note: eccentricity between C.L.'s of beam and connection is ignored) k =
Nb =
12
Nb = 2*Nr (total number of bolts at support connection)
C1 =
bolts
Tb =
39.0
Tb = Pretension from AISC Table J3.7, page 5-77 (for A325 bolts)
C=
kips
vb =
5.42
vb = R/Nb (actual shear/bolt)
Pr =
kips/bolt
=
fv =
9.01
fv = vb/Ab (actual bolt shear stress)
ksi
Fv = 16.64 ksi
Fv = (Allow. shear stress from Table J3.2)*(1-ft*Ab/Tb) (for SC bolts) Co =
Vb = 10.00 kips/bolt
Vb = Fv*Ab (allowable shear/bolt)
C(max) =
Rbv = 120.05 kips
Rbv = Nb*Vb (allow. shear load)
Rbv >= R, O.K.
A=
T=
0.83
T = P/Nb (actual tension/bolt)
Ca/Co =
kips/bolt
ft =
1.39
ft = T/Ab (actual bolt tension stress)
Ca =
ksi
(req'd) =
Ft = 44.00 ksi
Ft = Allow. bolt tension stress from AISC Table J3.2 (for SC bolts)
(min) =
B = 26.46 kips/bolt
B = Ft*Ab (allow. tension/bolt)
(max)
=
Rbt = 317.50 kips
Rbt = Nb*B (allow. tension load)
Rbt >= P, O.K.
Rwr =
Prying Action and Clip Angle Bending at OSL's:
Rwv =
p = 2.7500 in.
p = Min. of: S or S/2+ED (tributary angle length/bolt)
Rwa =
b = 2.1550 in.
b = (g-tw)/2-ta
Gross Shear
b' = 1.7175 in.
b' = b-db/2
Avg =
a = 1.4700 in.
a = minimum of: (2*Lc+tw-g)/2 or 1.25*b
Rvg =
a' = 1.9075 in.
a' = a+db/2
Gross Tensio
= 0.9004
= b'/a'
Atg =
d' = 0.9375
d' = dh
Rtg =
= 0.6591
= 1-d'/p
Eccentric Loads on Weld Groups - TABLE XXIII Coefficients, "C
= 34.151
= (1/)*(B/T-1)
k
' = 1.0000
If >= 1: ' = 1, If < 1: ' = lesser of 1.0 or (1/)*(/(1-))
a
ta(req'd) = SQRT(8*T*b'/(p*Fya*(1+*')))
ta(req'd) = 0.264 in.
ta >= ta(req'd), O.K.
###
tc = 1.916 in.
tc = SQRT(8*B*b'/(p*Fya))
###
' = 20.0494
' = 1/(*(1+))*((tc/ta)^2-1)
###
If ' >1: Ra = Nb*B*(ta/tc)^2*(1+) , If ' < 0: Ra = Nb*B
Ra = 20.17 kips
###
If 0 <= ' <= 1: Ra = Nb*B*(ta/tc)^2*(1+*') Ra >= P, O.K.
###
Bolt Bearing Capacity of (2) Clip Angles at OSL's:
###
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
in.
###
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
in.
###
Rpe = 27.19 kips
Rpe = 2*(0.50*Fua*(ED-C2)*ta)*(1)
###
Rps = 228.38 kips
Rps = 2*(1.2*Fua*db*ta)*(Nr-1) (C1 is not applicable for S >= 3*db)
###
Rp = 255.56 kips
Rp = Rpe+Rps <= 2*(1.2*Fua*db*ta)*(Nr)
Rp >= R, O.K.
###
ksi
ksi
(continued)
13 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
###
###
###
###
###
###
###
###
###
###
###
###
k Index:
Beam Checks
Gross Shear
Gross Tensio
Block Shear (
Tension Tear-
Tension Tear-
Beam Checks
Gross Shear
Gross Tensio
Block Shear (
Av =
At =
Rto =
Tension Tear-
Av =
(continued)
14 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rto =
Web Buckling
Beam Checks for Top Flange Coped Only:
Gross Shear Capacity of Beam Web for Top Flange Coped:
Avg = 9.636 in.^2
Avg = ho*tw
Rvg = 138.76 kips
Rvg = 0.40*Fyb*Avg
Block Shear ("L-shaped") Capacity of Beam Web for Top Flange Coped:
Av = 7.700 in.^2
Av = ((D1-dc1)+(Nr-1)*S+ED)*tw
At = 1.320 in.^2
At = (Lb-s)*tw
Rbs = 172.26 kips
Rbs = 0.30*Fub*Av+0.50*Fub*At
Tension Tear-Out ("L-shaped") Capacity of Beam Web for Top Flange Coped:
Av = 1.320 in.^2
Av = (Lb-s)*tw
At = 7.700 in.^2
At = ((D1-dc1)+(Nr-1)*S+ED)*tw
Rto = 211.20 kips
Rto = (0.30*Fub*Av+0.50*Fub*At)*(1-(R/Rbs)^2)
Rto >= P, O.K.
Tension Tear-Out ("U-shaped") Capacity of Beam Web for Top Flange Coped:
Av = 2.640 in.^2
Av = 2*(Lb-s)*tw
At = 7.700 in.^2
At = ((Nr-1)*S+2*ED)*tw
Rto = 269.24 kips
Rto = (0.30*Fub*Av+0.50*Fub*At)
Rto >= P, O.K.
ho =
e=
yc =
In =
Sn =
c/ho =
k=
c/d =
f=
Fbc =
Rwb =
Beam Checks
Gross Shear
Avg =
Rvg =
Gross Tensio
Atg =
Rtg =
Block Shear (
Av =
At =
Rbs =
Tension TearAv =
At =
Rto =
15 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
a=
b=
Girder Checks (continued):
c=
Girder Web Bending:
(assume LRFD "yield line" theory and convert results back to ASD)
L=
=
twg =
N.A.
twg = tw+td*(Fyd/Fyg)
in.
Pn =
mp =
N.A.
mp = 0.25*Fyg*twg^2
kips
Tc =
N.A.
Tg = dg-2*kg
Pa =
in.
a=
N.A.
a = D1-kg
Girder Web O
in.
b=
N.A.
b = Tg-(a+c)
twg =
in.
c=
N.A.
c = (Nr-1)*S
Rw =
in.
L=
N.A.
L=g
fv =
in.
=
= 0.90
N.A.
Fv =
Pn =
Pn = *2*mp*(((2*SQRT(2*Tg*a*b/(a+b))+g/2)*(a+b))/(a*b))
N.A.
Web Doubler
kips
Pa = Pn/1.5 (converting LRFD value back to ASD value)
Pa =
N.A.
Ldw =
kips
fw =
=
Girder Web Out of Plane Shear:
(max)
=
twg =
N.A.
twg = tw+td*(Fyd/Fyg)
in.
Rw =
N.A.
VOIDED Calc's. in "Red":
kips
fv =
N.A.
fv = Rw/(twg*(g-dhg))
twg =
ksi
Fv =
N.A.
Fv = 0.4*Fyg
Mw =
ksi
fb =
Web Doubler Plate to Girder Flange Welding:
Fb =
Ldw =
N.A.
Ldw = 2*((Nr-1)*S+2*ED)
in.
fw =
N.A.
fw = P/Ldw
a=
kips/in.
=
=
fw/((SQRT(2)/2)*0.30*70)
N.A.
T=
in. (size)
(max) =
(max) =
N.A.
0.40*Fyd*td/((SQRT(2)/2)*0.30*70)
Pb =
in. (size)
##
##
##
Comments:
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
16 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Using Clip Angles Bolted to Column Flange and Bolted to Beam Web
Subjected to Shear and/or Axial Load
Subject:
Originator:
Checker:
###
###
###
###
###
###
###
###
###
###
###
###
Input Data:
Beam and Support Data:
Beam Size =
Column Size =
Beam Yield Stress, Fyb =
Column Yield Stress, Fyc =
Connection Loadings:
Beam End Reaction (Shear), R =
Beam Axial Force, P =
tf=0.94
W36x160
W14x120
36
36
65.00
30.00
d=14.5
ksi
ksi
kips
D1=3.5
kips
Nr=10
4.000
3.500
0.3750
36
0.875
A325
SC
Standard
10
3.5000
2.0000
3.0000
5.500
1.250
0.5000
8.5000
2.7500
0.0000
0.0000
36
Member Properties:
Beam:
A = 47.00
d = 36.000
tw = 0.650
bf = 12.000
tf = 1.020
k = 1.7700
Column:
35.30
14.500
0.590
14.700
0.940
1.5400
A=
d=
tw =
bf =
tf =
k=
ta=0.375
D2 =2
###
S
S
P=30 k
R= 65 k
in.
in.
Lc=4
s=0.5
Lb=3.5
in.
ksi
in.
###
A325
A490
N
X
General Nomenclature
tw=0.65
Standard
Oversized
c=8.5
tf=1.02
dc1=2.75
###
###
###
###
###
in.
in.
in.
d=36
in.
in.
in.
in.
bf=12
dc2=0
###
###
c=0
in.
in.
in.
in.
in.^2
in.
in.
in.
in.
in.
###
###
Yes
No
Bolt Bearing C
C1 =
C2 =
Rpe =
Rps =
Rp =
Gross Shear
Avg =
Rvg =
(continued)
17 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Avn =
Rvn =
Results:
Block Shear (
General Parameters:
Bolt and Material Data:
dh1 = 0.9375
dh2 = 0.9375
Ab = 0.6013
Fua =
58.0
Fub =
58.0
Fuc =
58.0
Av =
At =
Rbs =
Clip Angles to
Bolt Shear (D
Bolt Bearing C
Bolt Bearing C
Gross Shear
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
(continued)
18 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Av =
At =
Rto =
Beam Checks
Bolt Bearing C
Rvg >= R, O.K.
C1 =
C2 =
Rpe =
Rps =
Rpv =
Bolt Bearing C
Block Shear ("L-shaped") Capacity of (2) Clip Angles at OSL's:
Av = 14.508 in.^2
Av = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
At = 0.830 in.^2
At = 2*((2*Lc+tw-g)/2-dh1/2)*ta
Rbs = 276.50 kips
Rbs = 0.30*Fua*Av+0.50*Fua*At
Rbs >= R, O.K.
C1 =
C2 =
Rpe =
Rps =
Rpa =
Gross Shear
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Beam Checks
Bolt Bearing C
Bolt Bearing C
(continued)
19 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rpe =
Rps =
Rpa =
Gross Shear
ho =
Rtg >= P, O.K.
Avg =
(Ref.: "Combined Shear & Tension Stress" by: S.C. Goel, AISC Journal, 3rd Qtr.-1986)Rvg =
Net Tension Capacity of (2) Clip Angles at Beam Web:
Atn = 14.625 in.^2
Atn = Atg-2*(Nr*(dh1+1/16)*ta) <= 0.85*Atg
Avn =
Rtn = 398.15 kips
Rtn = (0.50*Fua*Atn)*(1-(R/Rvn)^2) <= (0.60*Fya*Atg)*(1-(R/Rvn)^2)
Rvn =
Rtn >= P, O.K.
Block Shear ("L-shaped") Capacity of (2) Clip Angles at Beam Web:
Atg =
Av = 14.508 in.^2
Av = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
Rtg =
At = 0.773 in.^2
At = 2*((Lb-D2)-dh/2)*ta
Rbs = 274.87 kips
Rbs = 0.30*Fua*Av+0.50*Fua*At
Rbs >= R, O.K.
Atn =
Rtn =
Tension Tear-Out ("L-shaped") Capacity of (2) Clip Angles at Beam Web:
Av = 0.773 in.^2
Av = 2*((Lb-D2)-dh1/2)*ta
Av =
At = 14.508 in.^2
At = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
At =
Rto = 409.90 kips
Rto = (0.30*Fua*Av+0.50*Fua*At)*(1-(R/Rbs)^2)
Rbs =
Rto >= P, O.K.
Tension Tear-Out ("U-shaped") Capacity of (2) Clip Angles at Beam Web:
Av =
Av = 1.547 in.^2
Av = 2*(2*((Lb-D2)-dh1/2))*ta
At =
At = 13.922 in.^2
At = 2*((Nr-1)*S-(Nr-1)*dh1)*ta
Rto =
Rto = 430.65 kips
Rto = (0.30*Fua*Av+0.50*Fua*At)
Rto >= P, O.K.
Av =
Beam Checks for Top Flange Coped Only:
At =
Bolt Bearing Capacity of Beam Web (for Vertical):
Rto =
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
in.
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
ho =
in.
Rpe = 14.14 kips
Rpe = 0.50*Fub*((D1-dc1)-C2)*tw*(1)
e=
Rps = 356.27 kips
Rps = 1.2*Fub*db*tw*(Nr-1) (C1 is not applicable for S >= 3*db)
yc =
Rpv = 370.40 kips
Rpv = Rpe+Rps <= 1.2*Fub*db*tw*(Nr)
Rpv >= R, O.K.
In =
Sn =
Bolt Bearing Capacity of Beam Web (for Axial):
c/ho =
C1 =
N.A.
C1 = Spacing increment (not applicable for all edge bolts)
k=
in.
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
c/d =
in.
Rpe = 395.85 kips
Rpe = 1.2*Fub*db*tw*(Nr) (C2 is not applicable for (D2-s) >= 1.5*db) f =
Rps =
N.A.
Rps = not applicable, since all are edge bolts for bearing due to axialFbc
load=
kips
Rpa = 383.66 kips
Rpa = (Rpe+Rps)*(1-(R/Rpv)^2) <= 1.2*Fub*db*tw*(Nr)*(1-(R/Rpv)^2)
Rwb =
Rpa >= P, O.K.
Gross Shear Capacity of Beam Web for Top Flange Coped:
ho = 33.250 in.
ho = d-dc1
C1 =
Avg = 21.613 in.^2
Avg = ho*tw
C2 =
Rvg = 311.22 kips
Rvg = 0.40*Fyb*Avg
Rvg >= R, O.K.
Rpe =
Rps =
Net Shear Capacity of Beam Web for Top Flange Coped:
Rpv =
Avn = 15.519 in.^2
Avn = (ho-Nr*dh2)*tw
Rvn = 270.03 kips
Rvn = 0.3*Fub*Avn <= 0.40*Fyb*Avg
Rvn >= R, O.K.
C1 =
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Web Buckling
Beam Checks
Bolt Bearing C
Bolt Bearing C
(continued)
20 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rpe =
Rps =
Rpa =
Gross Shear
Rtg >= P, O.K.
ho =
Avg =
Rvg =
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Web Buckling
Column Check
Prying Action
twc =
p=
b=
b' =
a=
a' =
=
d' =
=
(continued)
21 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
' =
tf(req'd) =
tc =
' =
Ra =
Column Checks:
Prying Action and Column Flange Bending
twc = 0.5900 in.
twc = tw
p = 3.0000 in.
p = S (for bolts in column flange)
b = 2.4550 in.
b = (g-tw)/2
Bolt Bearing i
b' = 2.0175 in.
b' = b-db/2
Rp =
a = 1.5750 in.
a = minimum of: (bfc-g)/2 , (2*Lc+twb-g)/2 , or 1.25*b
Column Web
a' = 2.0125 in.
a' = a+db/2
twc =
= 1.0025
= b'/a'
N=
d' = 0.9375 in.
d' = dh = db+1/16 (for Standard sized holes in column flange)
fwy =
= 0.6875
= 1-d'/p
Fwy =
= 16.597
= (1/)*(B/T-1)
Column Web
' = 1.0000
If >= 1: ' = 1, If < 1: ' = lesser of 1.0 or (1/)*(/(1-))
twc =
tf(req'd) = SQRT(8*T*b'/(p*Fyc*(1+*')))
tf(req'd) = 0.3645 in.
tf >= tf(req'd), O.K. N =
tc = 1.9885 in.
tc = SQRT(8*B*b'/(p*Fyc))
Ra =
' = 2.5241
' = 1/(*(1+))*((tc/tf)^2-1)
Web Doubler
If ' >1: Ra = Nb*B*(tf/tc)^2*(1+) , If ' < 0: Ra = Nb*B
Ra = 199.55 kips
Ldw =
If 0 <= ' <= 1: Ra = Nb*B*(tf/tc)^2*(1+*')
Ra >= P, O.K.
fw =
=
(max) =
Bolt Bearing in Column Flange:
Rp = 1144.92 kips
Rp = 1.2*Fu*tfc*db*Nb
Rp >= R, O.K.
W12x40
W12x35
W12x30
in.
in.
ksi
ksi
twc = tw
Assume: N = (Nr-1)*S
fwy = P/(twc*(N+5*k))
Fwy = 0.66*Fyc
W12x26
W12x22
(AISC Eqn. K1-2)
W12x16
W12x14
W10x112
twc = tw
W10x100
Assume: N = (Nr-1)*S
in.
(AISC Eqn. K1-4)
Ra = 67.5*twc^2*(1+3*(N/d)*(twc/tf)^1.5)*SQRT(Fyc*tf/twc)
kips
W10x77
Ra >= Rwc, O.K.
W10x68
Web Doubler Plate to Column Flange Welding:
W10x60
Ldw =
N.A.
in.
Ldw = 2*((Nr-1)*S+2*ED)
W10x54
fw =
N.A.
kips/in.
fw = P/Ldw
W10x49
=
= fw/((SQRT(2)/2)*0.30*70)
N.A.
in. (size)
W10x45
(max) =
(max) =
N.A.
in. (size)
0.40*Fyd*td/((SQRT(2)/2)*0.30*70)
W10x39
in.
W10x33
W10x30
W10x26
Comments:
W10x22
W10x19
W10x17
W10x15
W10x12
W8x67
W8x58
22 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Using Clip Angles Bolted to Column Web and Bolted to Beam Web
Subjected to Shear and/or Axial Load
Subject:
Originator:
Checker:
###
###
###
###
###
Input Data:
Beam and Column Data:
Beam Size =
Column Size =
Beam Yield Stress, Fyb =
Column Yield Stress, Fyc =
Connection Loadings:
Beam End Reaction (Shear), R =
Beam Axial Force, P =
W14x43
W14x90
50
50
20.00
5.00
tw=0.44
bf=14.5
ksi
kips
4.000
3.500
0.3750
36
0.875
A325
SC
Standard
3
3.0000
2.0000
3.0000
5.500
1.250
0.5000
0.0000
0.0000
0.0000
0.0000
36
No
Member Properties:
Beam:
A = 12.60
d = 13.700
tw = 0.305
bf = 8.000
tf = 0.530
k = 1.1200
Column:
26.50
14.000
0.440
14.500
0.710
1.3100
A=
d=
tw =
bf =
tf =
k=
ta=0.375
D2 =2
D1=3
kips
Nr=3
###
###
###
###
###
ksi
###
S
S
P=5 k
R= 20 k
in.
in.
Lc=4
s=0.5
Lb=3.5
in.
ksi
in.
###
A325
A490
N
X
General Nomenclature
tw=0.305
Standard
Oversized
c=0
tf=0.53
dc1=0
###
###
###
###
###
in.
in.
in.
d=13.7
in.
in.
in.
in.
bf=8
dc2=0
###
###
c=0
in.
in.
in.
in.
in.^2
in.
in.
in.
in.
in.
###
###
Yes
No
Bolt Bearing C
C1 =
C2 =
Rpe =
Rps =
Rp =
Gross Shear
Avg =
Rvg =
(continued)
23 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Avn =
Rvn =
Results:
Block Shear (
General Parameters:
Bolt and Material Data:
dh1 = 0.9375
dh2 = 0.9375
Ab = 0.6013
Fua =
58.0
Fub =
65.0
Fub =
65.0
Av =
At =
Rbs =
Clip Angles to
Bolt Shear (D
Bolt Bearing C
Bolt Bearing C
Gross Shear
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
(continued)
24 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Av =
At =
Rto =
Beam Checks
Bolt Bearing C
Rvg >= R, O.K.
C1 =
C2 =
Rpe =
Rps =
Rpv =
Bolt Bearing C
Block Shear ("L-shaped") Capacity of (2) Clip Angles at OSL's:
Av = 3.680 in.^2
Av = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
At = 0.700 in.^2
At = 2*((2*Lc+tw-g)/2-dh1/2)*ta
Rbs = 84.34 kips
Rbs = 0.30*Fua*Av+0.50*Fua*At
Rbs >= R, O.K.
C1 =
C2 =
Rpe =
Rps =
Rpa =
Gross Shear
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Beam Checks
Bolt Bearing C
Bolt Bearing C
(continued)
25 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rpe =
Rps =
Rpa =
Gross Shear
ho =
Rtg >= P, O.K.
Avg =
(Ref.: "Combined Shear & Tension Stress" by: S.C. Goel, AISC Journal, 3rd Qtr.-1986)Rvg =
Net Tension Capacity of (2) Clip Angles at Beam Web:
Atn = 4.125 in.^2
Atn = Atg-2*(Nr*(dh1+1/16)*ta) <= 0.85*Atg
Avn =
Rtn = 110.94 kips
Rtn = (0.50*Fua*Atn)*(1-(R/Rvn)^2) <= (0.60*Fya*Atg)*(1-(R/Rvn)^2)
Rvn =
Rtn >= P, O.K.
Block Shear ("L-shaped") Capacity of (2) Clip Angles at Beam Web:
Atg =
Av = 3.680 in.^2
Av = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
Rtg =
At = 0.773 in.^2
At = 2*((Lb-D2)-dh/2)*ta
Rbs = 86.46 kips
Rbs = 0.30*Fua*Av+0.50*Fua*At
Rbs >= R, O.K.
Atn =
Rtn =
Tension Tear-Out ("L-shaped") Capacity of (2) Clip Angles at Beam Web:
Av = 0.773 in.^2
Av = 2*((Lb-D2)-dh1/2)*ta
Av =
At = 3.680 in.^2
At = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
At =
Rto = 113.74 kips
Rto = (0.30*Fua*Av+0.50*Fua*At)*(1-(R/Rbs)^2)
Rbs =
Rto >= P, O.K.
Tension Tear-Out ("U-shaped") Capacity of (2) Clip Angles at Beam Web:
Av =
Av = 1.547 in.^2
Av = 2*(2*((Lb-D2)-dh1/2))*ta
At =
At = 3.094 in.^2
At = 2*((Nr-1)*S-(Nr-1)*dh1)*ta
Rto =
Rto = 116.63 kips
Rto = (0.30*Fua*Av+0.50*Fua*At)
Rto >= P, O.K.
Av =
Beam Checks for Uncoped Flanges:
At =
Bolt Bearing Capacity of Beam Web (for Vertical):
Rto =
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
in.
C2 =
N.A.
C2 = Edge distance increment (not applicable for uncoped beam)
ho =
in.
Rpe = 20.82 kips
Rpe = 1.2*Fub*db*tw*(1) (for 1 edge bolt, edge dist. and C2 are N.A.) e =
Rps = 41.63 kips
Rps = 1.2*Fub*db*tw*(Nr-1) (C1 is not applicable for S >= 3*db)
yc =
Rpv = 62.45 kips
Rpv = Rpe+Rps <= 1.2*Fub*db*tw*(Nr)
Rpv >= R, O.K.
In =
Sn =
Bolt Bearing Capacity of Beam Web (for Axial):
c/ho =
C1 =
N.A.
C1 = Spacing increment (not applicable for all edge bolts)
k=
in.
C2 =
N.A.
C2 = Edge distance increment (not applicable for uncoped beam)
c/d =
in.
Rpe = 62.45 kips
Rpe = 1.2*Fub*db*tw*(Nr) (C2 is not applicable for (D2-s) >= 1.5*db) f =
Rps =
N.A.
Rps = not applicable, since all edge bolts for bearing due to axial load
Fbc =
kips
Rpa = 56.04 kips
Rpa = (Rpe+Rps)*(1-(R/Rpv)^2) <= 1.2*Fub*db*tw*(Nr)*(1-(R/Rpv)^2)
Rwb =
Rpa >= P, O.K.
Gross Shear Capacity of Beam Web:
ho =
N.A
ho = not applicable for uncoped beam
C1 =
in.
Avg = 4.179 in.^2
Avg = d*tw
C2 =
Rvg = 83.57 kips
Rvg = 0.40*Fyb*Avg
Rvg >= R, O.K.
Rpe =
Rps =
Net Shear Capacity of Beam Web:
Rpv =
Avn = 3.321 in.^2
Avn = (d-Nr*dh2)*tw
Rvn = 64.75 kips
Rvn = 0.30*Fub*Avn <= 0.40*Fyb*Avg
Rvn >= R, O.K.
C1 =
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Web Buckling
Beam Checks
Bolt Bearing C
Bolt Bearing C
(continued)
26 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rpe =
Rps =
Rpa =
Gross Shear
Rtg >= P, O.K.
ho =
Avg =
Rvg =
Net Shear Ca
Atn = Atg-(Nr*(dh2+1/16))*tw <= 0.85*Atg
Avn =
Rtn = (0.50*Fub*Atn)*(1-(R/Rvn)^2) <= (0.60*Fyb*Atg)*(1-(R/Rvn)^2)
Rvn =
Rtn >= P, O.K.
Gross Tensio
Block Shear ("L-shaped") Capacity of Beam Web:
Atg =
Av =
N.A.
Av = not applicable for uncoped beam
Rtg =
in.^2
At =
N.A.
At = not applicable for uncoped beam
Net Tension C
in.^2
Rbs =
N.A.
Rbs = not applicable for uncoped beam
Atn =
kips
Rtn =
Tension Tear-Out ("L-shaped") Capacity of Beam Web:
Block Shear (
Av =
N.A.
Av = not applicable for uncoped beam
Av =
in.^2
At =
N.A.
At = not applicable for uncoped beam
At =
in.^2
Rto =
N.A.
Rto = not applicable for uncoped beam
Rbs =
kips
Tension TearTension Tear-Out ("U-shaped") Capacity of Beam Web:
Av =
Av = 0.629 in.^2
Av = 2*((D2-s)-dh2/2)*tw
At =
At = 1.258 in.^2
At = ((Nr-1)*S-(Nr-1)*dh2)*tw
Rto =
Rto = 53.16 kips
Rto = 0.30*Fub*Av+0.50*Fub*At
Rto >= P, O.K.
Tension TearAv =
Web Buckling (Flexure) Capacity Not Applicable for Uncoped Beam
At =
ho =
N.A.
ho = d-dc1
Rto =
in.
e=
N.A.
e = c+s
Web Buckling
in.
yc =
N.A.
yc = (bf*tf^2/2+(ho-tf)*tw*(tf+(ho-tf)/2))/((ho-tf)*tw+bf*tf)
ho =
in.
In =
N.A.
In=bf*tf^3/12+bf*tf*(yc-tf/2)^2+tw*(ho-tf)^3/12+(ho-tf)*tw*(tf+(ho-tf)/2-yc)^2
e=
in.^4
Sn =
N.A.
Sn = In/(ho-yc)
yc =
in.^3
c/ho =
N.A.
c/ho = ratio for evaluating plate buckling coefficient (k)
In =
k=
N.A.
If c/ho <= 1.0, then k = 2.2*(ho/c)^1.65, else k = 2.2*(ho/c)
Sn =
c/d =
N.A.
c/d = ratio for evaluating adjustment factor (f) of plate buckling model dc =
f=
N.A.
If c/d <= 1.0, then f = 2*(c/d), else f = 1+(c/d)
fd =
Fbc =
N.A.
Fbc = Min. of: (15,700*f*k*(tw/ho)^2 or 0.60*Fy)*(1-P/(0.60*Fy*Atg))
Fbc =
ksi
Rwb =
N.A.
Rwb = Fbc*Sn/e
Rwb =
kips
Column Check
Column Checks:
Bolt Bearing i
Bolt Bearing in Column Web:
twc =
twc = 0.4400 in.
twc = tw+td*(Fyd/Fyc)
Rp =
Rp = 180.18 kips
Rp = 1.2*Fu*twc*db*Nb
Rp >= R, O.K.
Column Web
twc =
mp =
Tc =
a=
b=
c=
(continued)
27 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
=
Pn =
Pa =
(assume LRFD "yield line" theory and convert results back to ASD)
Column Web
twc = tw+td*(Fyd/Fyc)
twc =
mp = 0.25*Fyc*twc^2
fv =
Tc = dc-2*kc
Fv =
a = (Tc-c)/2
Web Doubler
b = a = (Tc-c)/2
Ldw =
c=g
fw =
=
L = (Nr-1)*S
= 0.90
(max) =
Pn = *8*mp*(SQRT(2*Tc/(Tc-g))+L/(2*(Tc-g)))
W12x106
Pa = Pn/1.5 (converting LRFD value back to ASD value)
W12x96
W12x87
W12x79
twc = tw+td*(Fyd/Fyc)
fv = (P/Nb)/(twc*(S-dhc))
Fv = 0.4*Fyc
W12x72
W12x65
W12x58
W12x53
W12x50
W12x45
W12x40
W12x35
W12x30
W12x26
W12x22
W12x19
Comments:
W12x16
W12x14
W10x112
W10x100
W10x88
W10x77
W10x68
W10x60
W10x54
W10x49
W10x45
W10x39
W10x33
W10x30
W10x26
W10x22
W10x19
W10x17
W10x15
W10x12
W8x67
W8x58
28 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Using Clip Angles Bolted to Girder Web and Bolted to Beam Web
Subjected to Shear and/or Axial Load
Subject:
Originator:
Checker:
###
###
###
###
###
###
###
Input Data:
Beam and Support Data:
Beam Size =
Girder Size =
Beam Yield Stress, Fyb =
Girder Yield Stress, Fyg =
Connection Loadings:
Beam End Reaction (Shear), R =
Beam Axial Force, P =
Connection Data and Parameters:
Angle Leg (OSL) at Girder, Lc =
Angle Leg at Beam Web, Lb =
Angle Leg Thickness, ta =
Yield Stress of Angles, Fya =
Diameter of Bolts, db =
ASTM Bolt Desig. (A325 or A490) =
Bolt Type (N, X, or SC) =
Bolt Hole Type in Clip Angles =
Number of Bolts in Vert. Row, Nr =
Dist. from Top/Beam to Bolts, D1 =
Dist. from Support to Bolts, D2 =
Bolt Vertical Spacing in Angles, S =
Bolt Gage in Angle OSL's, g =
Edge Distance for Angles, ED =
Beam Setback Distance, s =
Length of Flange Cope(s), c =
Depth of Top Flange Cope, dc1 =
Depth of Bottom Flange Cope, dc2 =
Girder Web Doubler Plate Thk., td =
Doubler Plate Yield Stress, Fyd =
Check Girder Web Bending/Shear?
Member Properties:
Beam:
A = 22.40
d = 23.900
tw = 0.440
bf = 8.990
tf = 0.680
k = 1.1800
A=
d=
tw =
bf =
tf =
k=
W24x76
W36x280
36
36
65.00
10.00
4.000
3.500
0.3750
36
0.875
A325
SC
Standard
6
3.2500
2.0000
3.0000
5.500
1.250
0.5000
6.2500
2.0000
0.0000
0.0000
36
No
Girder:
82.40
36.500
0.885
16.600
1.570
2.5200
ta=0.375
D2 =2
D1=3.25
ksi
Nr=6
ksi
kips
###
S
S
P=10 k
R= 65 k
Lc=4
s=0.5
Lb=3.5
kips
General Nomenclature
in.
A325
A490
in.
tw=0.44
in.
ksi
c=6.25
tf=0.68
dc1=2
X
SC
Standard
Oversized
###
in.
d=23.9
in.
in.
bf=8.99
dc2=0
###
###
c=0
in.
in.
in.
in.
in.
in.
in.
in.
in.
in.^2
in.
in.
in.
in.
in.
###
###
###
###
###
###
###
###
###
###
###
###
Yes
No
Bolt Bearing C
C1 =
C2 =
Rpe =
Rps =
Rp =
Gross Shear
Avg =
Rvg =
(continued)
29 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Avn =
Rvn =
Results:
Block Shear (
General Parameters:
Bolt and Material Data:
dh1 = 0.9375
dh2 = 0.9375
Ab = 0.6013
Fua =
58.0
Fub =
58.0
Fuc =
58.0
Av =
At =
dh1 = db+1/16 (Standard hole for 0.875 in. bolts in angles)
Rbs =
in.
dh2 = db+1/16 (Standard hole for 0.875 in. bolts in beam/girder webs)
in.
Ab = *db^2/4
in.^2
Fua = 58 for Fya = 36 (for angles)
Nb =
ksi
Fub = 58 for Fyb = 36 (for beam)
Pr =
ksi
=
Fug = 58 for Fyg = 36 (for girder)
ksi
vb =
Clip Angles to Support:
Fv =
Bolt Tension and Shear:
(Note: eccentricity between C.L.'s of beam and connection is ignored)Vb =
Nb =
12
Nb = 2*Nr (total number of bolts at support connection)
Rbr =
bolts
Tb =
39.0
Tb = Pretension from AISC Table J3.7, page 5-77 (for A325 bolts) Rbv =
kips
vb =
5.42
vb = R/Nb (actual shear/bolt)
Rba =
kips/bolt
fv =
9.01
fv = vb/Ab (actual bolt shear stress)
ksi
Fv = 16.64 ksi
Fv = (Allow. shear stress from Table J3.2)*(1-ft*Ab/Tb) (for SC bolts) C1 =
Vb = 10.00 kips/bolt
Vb = Fv*Ab (allowable shear/bolt)
C2 =
Rbv = 120.05 kips
Rbv = Nb*Vb (allow. shear load)
Rbv >= R, O.K.
Rpe =
T=
0.83
T = P/Nb (actual tension/bolt)
Rps =
kips/bolt
ft =
1.39
ft = T/Ab (actual bolt tension stress)
Rpv =
ksi
Ft = 44.00 ksi
Ft = Allow. bolt tension stress from AISC Table J3.2 (for SC bolts)
B = 26.46 kips/bolt
B = Ft*Ab (allow. tension/bolt)
C1 =
Rbt = 317.50 kips
Rbt = Nb*B (allow. tension load)
Rbt >= P, O.K.
C2 =
Rpe =
Prying Action and Clip Angle Bending at OSL's:
Rps =
p = 2.7500 in.
p = Min. of: S or S/2+ED (tributary angle length/bolt)
Rpa =
b = 2.1550 in.
b = (g-tw)/2-ta
b' = 1.7175 in.
b' = b-db/2
Avg =
a = 1.4700 in.
a = minimum of: (2*Lc+tw-g)/2 or 1.25*b
Rvg =
a' = 1.9075 in.
a' = a+db/2
= 0.9004
= b'/a'
Avn =
d' = 0.9375
d' = dh1
Rvn =
= 0.6591
= 1-d'/p
= 34.151
= (1/)*(B/T-1)
Atg =
' = 1.0000
If >= 1: ' = 1, If < 1: ' = lesser of 1.0 or (1/)*(/(1-))
Rtg =
ta(req'd) = SQRT(8*T*b'/(p*Fya*(1+*')))
ta(req'd) = 0.264 in.
ta >= ta(req'd), O.K.
tc = 1.916 in.
tc = SQRT(8*B*b'/(p*Fya))
Atn =
' = 20.0494
' = 1/(*(1+))*((tc/ta)^2-1)
Rtn =
If ' >1: Ra = Nb*B*(ta/tc)^2*(1+) , If ' < 0: Ra = Nb*B
Ra = 20.17 kips
If 0 <= ' <= 1: Ra = Nb*B*(ta/tc)^2*(1+*') Ra >= P, O.K.
Av =
Bolt Bearing Capacity of (2) Clip Angles at OSL's:
At =
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
Rbs =
in.
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
in.
Rpe = 27.19 kips
Rpe = 2*(0.50*Fua*(ED-C2)*ta)*(1)
Av =
Rps = 228.38 kips
Rps = 2*(1.2*Fua*db*ta)*(Nr-1) (C1 is not applicable for S >= 3*db) At =
Rp = 255.56 kips
Rp = Rpe+Rps <= 2*(1.2*Fua*db*ta)*(Nr)
Rp >= R, O.K.
Rto =
Clip Angles to
Bolt Shear (D
Bolt Bearing C
Bolt Bearing C
Gross Shear
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
(continued)
30 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Av =
At =
Rto =
Beam Checks
Bolt Bearing C
Rvg >= R, O.K.
C1 =
C2 =
Rpe =
Rps =
Rpv =
Bolt Bearing C
Block Shear ("L-shaped") Capacity of (2) Clip Angles at OSL's:
Av = 8.320 in.^2
Av = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
At = 0.751 in.^2
At = 2*((2*Lc+tw-g)/2-dh1/2)*ta
Rbs = 166.55 kips
Rbs = 0.30*Fua*Av+0.50*Fua*At
Rbs >= R, O.K.
C1 =
C2 =
Rpe =
Rps =
Rpa =
Gross Shear
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Beam Checks
Bolt Bearing C
Bolt Bearing C
(continued)
31 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rpe =
Rps =
Rpa =
Gross Shear
ho =
Rtg >= P, O.K.
Avg =
(Ref.: "Combined Shear & Tension Stress" by: S.C. Goel, AISC Journal, 3rd Qtr.-1986)Rvg =
Net Tension Capacity of (2) Clip Angles at Beam Web:
Atn = 8.625 in.^2
Atn = Atg-2*(Nr*(dh1+1/16)*ta) <= 0.85*Atg
Avn =
Rtn = 206.12 kips
Rtn = (0.50*Fua*Atn)*(1-(R/Rvn)^2) <= (0.60*Fya*Atg)*(1-(R/Rvn)^2)
Rvn =
Rtn >= P, O.K.
Block Shear ("L-shaped") Capacity of (2) Clip Angles at Beam Web:
Atg =
Av = 8.320 in.^2
Av = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
Rtg =
At = 0.773 in.^2
At = 2*((Lb-D2)-dh/2)*ta
Rbs = 167.20 kips
Rbs = 0.30*Fua*Av+0.50*Fua*At
Rbs >= R, O.K.
Atn =
Rtn =
Tension Tear-Out ("L-shaped") Capacity of (2) Clip Angles at Beam Web:
Av = 0.773 in.^2
Av = 2*((Lb-D2)-dh1/2)*ta
Av =
At = 8.320 in.^2
At = 2*((ED+(Nr-1)*S)-((Nr-1)*dh1+dh1/2))*ta
At =
Rto = 216.25 kips
Rto = (0.30*Fua*Av+0.50*Fua*At)*(1-(R/Rbs)^2)
Rbs =
Rto >= P, O.K.
Tension Tear-Out ("U-shaped") Capacity of (2) Clip Angles at Beam Web:
Av =
Av = 1.547 in.^2
Av = 2*(2*((Lb-D2)-dh1/2))*ta
At =
At = 7.734 in.^2
At = 2*((Nr-1)*S-(Nr-1)*dh1)*ta
Rto =
Rto = 251.21 kips
Rto = (0.30*Fua*Av+0.50*Fua*At)
Rto >= P, O.K.
Av =
Beam Checks for Top Flange Coped Only:
At =
Bolt Bearing Capacity of Beam Web (for Vertical):
Rto =
C1 =
0
C1 = Spacing increment from AISC Table J3.4, page 5-76
in.
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
ho =
in.
Rpe = 15.95 kips
Rpe = 0.50*Fub*((D1-dc1)-C2)*tw*(1)
e=
Rps = 133.98 kips
Rps = 1.2*Fub*db*tw*(Nr-1) (C1 is not applicable for S >= 3*db)
yc =
Rpv = 149.93 kips
Rpv = Rpe+Rps <= 1.2*Fub*db*tw*(Nr)
Rpv >= R, O.K.
In =
Sn =
Bolt Bearing Capacity of Beam Web (for Axial):
c/ho =
C1 =
N.A.
C1 = Spacing increment (not applicable for all edge bolts)
k=
in.
C2 =
0
C2 = Edge distance increment from AISC Table J3.6, page 5-76
c/d =
in.
Rpe = 160.78 kips
Rpe = 1.2*Fub*db*tw*(Nr) (C2 is not applicable for (D2-s) >= 1.5*db) f =
Rps =
N.A.
Rps = not applicable, since all edge bolts for bearing due to axial load
Fbc =
kips
Rpa = 130.56 kips
Rpa = (Rpe+Rps)*(1-(R/Rpv)^2) <= 1.2*Fub*db*tw*(Nr)*(1-(R/Rpv)^2)
Rwb =
Rpa >= P, O.K.
Gross Shear Capacity of Beam Web for Top Flange Coped:
ho = 21.900 in.
ho = d-dc1
C1 =
Avg = 9.636 in.^2
Avg = ho*tw
C2 =
Rvg = 138.76 kips
Rvg = 0.40*Fyb*Avg
Rvg >= R, O.K.
Rpe =
Rps =
Net Shear Capacity of Beam Web for Top Flange Coped:
Rpv =
Avn = 7.161 in.^2
Avn = (ho-Nr*dh2)*tw
Rvn = 124.60 kips
Rvn = 0.3*Fub*Avn <= 0.40*Fyb*Avg
Rvn >= R, O.K.
C1 =
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Web Buckling
Beam Checks
Bolt Bearing C
Bolt Bearing C
(continued)
32 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
Rpe =
Rps =
Rpa =
Gross Shear
Rtg >= P, O.K.
ho =
Avg =
Rvg =
Net Shear Ca
Gross Tensio
Net Tension C
Block Shear (
Tension Tear-
Tension Tear-
Web Buckling
Girder Checks
Bolt Bearing i
twg = tw+td*(Fyd/Fyg)
Rp = 1.2*Fu*twg*db*Nb
twg =
Rp =
Rp >= R, O.K.
Girder Web B
twg =
mp =
Tg =
a=
b=
c=
(continued)
33 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
=
Pn =
Pa =
(assume LRFD "yield line" theory and convert results back to ASD)
Girder Web O
twg = tw+td*(Fyd/Fyg)
twg =
mp = 0.25*Fyg*twg^2
Rw =
Tg = dg-2*kg
fv =
a = D1-kg
Fv =
b = Tg-(a+c)
Web Doubler
c = (Nr-1)*S
Ldw =
L=g
fw =
= 0.90
=
Pn = *2*mp*(((2*SQRT(2*Tg*a*b/(a+b))+g/2)*(a+b))/(a*b))
(max) =
Pa = Pn/1.5 (converting LRFD value back to ASD
value) Calc's. in "Red":
VOIDED
twg =
Girder Web Out of Plane Shear:
Mw =
twg =
N.A.
twg = tw+td*(Fyd/Fyg)
fb =
in.
Rw =
N.A.
Fb =
kips
fv =
N.A.
fv = Rw/(twg*(g-dhg))
ksi
Fv =
N.A.
Fv = 0.4*Fyg
a=
ksi
T=
Web Doubler Plate to Girder Flange Welding:
Pb =
Ldw =
N.A.
Ldw = 2*((Nr-1)*S+2*ED)
##
in.
fw =
N.A.
fw
=
P/Ldw
##
kips/in.
=
=
fw/((SQRT(2)/2)*0.30*70)
N.A.
##
in. (size)
(max) =
(max) =
N.A.
0.40*Fyd*td/((SQRT(2)/2)*0.30*70)
##
in. (size)
##
##
##
Comments:
##
##
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
W10x15
W10x12
W8x67
W8x58
34 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
###
###
###
###
###
###
###
###
Input Data:
g=5.5
ta=0.375
D1=3
Nr=3
S
S
A490
N
X
SC
Standard
Oversized
###
###
###
Lc=4
tw
s=0.5
Lb=3.5
g=5.5
ta=0.375
D2
D1=3
Nr=3
S
S
Lc=4
tw
s=0.5
Lb=3.5
###
###
###
###
###
###
###
###
###
###
###
###
###
###
a=
k=
C1 =
C=
(max) =
Rw =
Bolted Clip Angles to Beam:
Bolt Shear (Double-Shear):
Ab =
Fv =
Fv =
Vb =
Rb =
Bolt Bearing Capacity of Beam We
Fu =
C2 =
Rpe =
Rps =
Rp =
R(welded) =
R(bolted) =
35 of 36
08/22/2015 04:14:58
"CLIPCONN.xls" Program
Version 2.2
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
k Index:
k Index:
Nr = 1
Interpolate for "C" in Table XXIII
k(table)
###
a Index:
###
###
###
###
###
###
6. Clip Angle to Beam "C-Shaped" Weld (using AISC Table XXIII, page 4-79):
L = (Nr-1)*S+2*ED
kL = Lb-s
xL = ((kL)^2/(2*(kL)+L))
aL = Lb-(xL)
a = (aL)/L
k = (kL)/L
C1 = 1.0 for E70XX electrode
C = Coefficient interpolated from AISC Table XXIII)
(max) = Minimum of: 0.40*Fyb*tw/((SQRT(2)/2)*0.30*70*2) or: 0.40*Fya*ta/((SQRT(2)/2)*0.30*70)
Rw = Minimum of: 2*(*16*C*C1*L) or 2*((max)*16*C*C1*L)
###
###
###
###
###
###
###
###
###
###
###
###
7. Bolt Shear (Double-Shear), where eccentricity = D2 is neglected per AISC Code, Vol. II: "Connections":
Ab = *db^2/4
Fv = Fv from AISC Table J3.2 (for A325N bolts) = 21 ksi
Vb = (2)*Fv*Ab (where 2 is for Double-Shear)
Rb = Nr*Vb
###
###
###
###
###
###
9. Allowable Shear Reaction for Connection Using Clip Angles Shop Welded to Beam Web:
R(allow) = Minimum of items #1,#2, #3, #4, #5, and #6 from above
###
a Index:
###
10. Allowable Shear Reaction for Connection Using Clip Angles Field Bolted to Beam Web:
R(allow) = Minimum of items #1,#2, #3, #4, #5, #7, and #8 from above
###
###
###
###
###
36 of 36
08/22/2015 04:14:58