Communications Engineering & Technical Support Department

CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

ENGINEERING
TECHNICAL REPORT

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

1
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

August 7, 2014

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

2
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

TABLE OF CONTENTS

YEXECUTIVE SUMMARY..
..3
DESIGN CHECKLIST..4
REVIEW AND APPROVAL .5
ELECTRONIC DISTRIBUTION..5
DESIGN CONSIDERATIONS.6
PROPOSED ACTION PLAN/RECOMMENDATIONS..... 6
COST
ESTIMATE...6
DESIGN SCOPE OF WORK.........................................................................................7
SAFETY AND GENERAL NOTES................................................................................8
DRAWINGS................................................................................................................9
ATTACHMENT.......9
CERTIFICATE OF COMPLETION..............................................................................10

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

3
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

Facilities Engineering Group

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

4
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

EXECUTIVE SUMMARY
Category: Communication Equipment Container at TCC Data Center, Dhahran
Corporate Objective: To provide engineering technical report with design scope of
work and cost estimate.
Strategy: Site survey technical gathering and SAES standard.
Region: Central Area

The CRM is to provide design scope of work and cost estimate for the installation of
the communication equipment container at TCC data center, Dhahran.

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

5
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

DESIGN CHECKLIST

INITIAL DESIGN TASKS


Review work request / Requirements
Search existing drawings
Kick off meeting
Site survey / Gather technical
information
Gathering of engineering design
criteria and requirements.

PROPONENTS TASKS
Provide site survey assistance
Provide required data/information

DESIGN PACKAGE SUBMITTALS


Provide Design Calculation
Generate design drawing sketches
Provide Scope of Works
Provide Engineering Drawings
Submit the Issued for Construction
(IFC) package

SPACE AND POWER RESERVATIONS


Request for Space and Power
Reservations

DRAWING & DOCUMENTATION


Engg. Drawings Attached to Design

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

N/A
N/A
N/A

N/A

N/A

N/A
N/A
N/A
N/A
N/A

N/A

N/A
CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

6
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

Package
Submit the electronic files to EDSD

N/A

Yes ()

Not Applicable (NA)

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

7
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

REVIEW AND APPROVAL

Prepared By

Reviewed by

Approved by

ELECTRONIC DISTRIBUTION
GROUP
COD/TCC Operation Group
CE&TSD/ FEG GROUP
ENGINEER
REVIEWER

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

EMAIL

INITIA
L
_______

SEND
DATE
____________

FILE COPY
_______
ELECTRONIC _______
COPY
ELECTRONIC _______
COPY

____________
____________

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

FILE COPY

____________

REV.
NO.

8
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

DESIGN CONSIDERATIONS

OBSERVATION:
Site survey was conducted on August 4, 2014 to gather technical information for the
proposed installation of the communication equipment container at the TCC data
center, Dhahran. It was reported during the site survey that the container to be
installed has complete packaged and it is equipped with racks, air conditioning units,
panels and the necessary electrical cables, grounding system and etc. It was
discussed also that the capacity of the communication equipment to be installed in
the containment will be 10 KVA and the electrical power requirement will be fed from
existing power distribution units (PDU). The chilled water requirement of the air
conditioning units installed in the container will be coming from the existing chilled
water piping that were installed under the raised floor.
PROPOSED ACTION PLAN/RECOMMENDATIONS:
1. Ensure that the containment design drawings will be submitted for review.
2. Provide new dual supply chilled water piping, humidifier potable water piping
and condensate drain piping for the air conditioning units that are installed
inside the container. Connect the new piping to the existing chilled water,
potable water and drainage piping.
3. Provide isolation valves, circuit setter, three way valve, balancing valve, flexible
pipe connector, strainer, drain with back flush connection, pressure and
temperature gauge.
4. Provide insulation and support for the piping.
5. Connect the new A/C units to the existing fire alarm control panel to have
automatic shutdown during the activation of the fire alarm.
6. Connect the new A/C units to the facility alarm control panel/RTU to have
remote fault monitoring.
7. Built in duty and standby A/C units in the container should have weekly auto
change over and/or in the event of failure of the operating unit.
8. Provide new electrical cables to connect the container to the existing PDUs.
9. Perform testing, adjusting and balancing for the chilled water system.
10. Perform testing and commissioning for the container.

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

9
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

COST ESTMATES
The estimated cost for the engineering design, supply for the materials, construction,
testing and commissioning for the installation of the communication equipment
container at TCC data center, Dhahran is 125,000 dollars.
Cost Breakdown (Cost does not include the communication equipment container
and air conditioning units)
Engineering Design 50,000 dollars
Material/Construction Cost. -- 74,000 dollars
PMT Construction Support 11,000 dollars
DESIGN SCOPE OF WORK
1. Provide design drawing for the installation of the communication equipment
container.
2. Provide the design drawing for the required chilled water, humidifiers potable
water and condensate drain piping for the built in air conditioning units that
are installed in the communication equipment container. Design for the chilled
water supply piping should be redundant (dual) supply. The new piping shall
be connected to the existing piping.
3. Provide design drawing for the isolation valves, circuit setter, three way valve,
balancing valve, flexible pipe connector, strainer, drain with back flush
connection, pressure and temperature gauge, insulation and piping support.
4. Provide the design drawing for the connection of the new A/C units to the
existing fire alarm control panel to have automatic shutdown during the
activation of the fire alarm.
5. Provide the design drawing for the connection of the new A/C units to the
facility alarm control panel/RTU to have fault remote monitoring.
6. Provide the design drawing for the electrical power supply. The power supply for
the container will be fed from the existing power distribution units.
7. Provide design drawing for the civil/structural support for the communication
equipment container.
8. Provide design drawing for the relocation of the existing lighting, detectors and
etc. to avoid obstruction for the installation of the communication equipment
container.
1. Provide the scope of work for the testing, adjusting and balancing.
1. Provide the scope of work for the testing and commissioning.

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

10
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

2. Provide the required design calculation.


1. Provide the construction scope of work, specifications, material take off and
cost estimates.

SAFETY & GENERAL NOTES:


The Contractor, Vendor/Supplier and Operation employees shall strictly follow the
requirements of SAUDI ARAMCO Construction Safety Manual and Loss Prevention
Manual when performing any work activity. This shall include but not limited to the
following:
1 All personnel are required to wear safety shoes, safety glasses and hard hats.
2 The design of all new or modified electrical equipment to be operated at higher
than 240 volts shall include an arc flash hazard analysis, in accordance with
IEEE 1584, to determine the Arc Flash Protection Boundary, the incident
energy a worker may be subject to, the Hazard/Risk Category, and the PPE to
be worn. This is to ensure the compliance to the Saudi Aramco GI# 2.721 to
mitigate/control Arc Flash Hazards and provide minimum safe work
requirements for protection of personnel against these hazards in the
workplace.
Refer to this link for more details: (http://sharek.aramco.com.sa/cops/GI/Operation
%20Services/Industrial%20Services/Power%20Distribution/0002_721.pdf)

3 All personnel shall strictly follow all SAUDI ARAMCO safety regulations and
standard construction safety practices.

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

11
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

4 All matters relating to safety should be in consultation with the SAUDI


ARAMCO Loss Prevention Unit and the SAUDI ARAMCO Representative.
5 All personnel shall be supplied with approved safety equipment, including but
not limited to, safety helmets, safety glasses, gloves, welding shields and safety
footwear. Safety equipment shall be used where appropriate at all times. SAUDI
ARAMCO Loss Prevention requirements shall be used to determine appropriate
safety equipment areas for its use.
6 The Contractor/Supplier shall exercise extra precautions in the field to avoid
damaging any existing structures, utilities, etc., during the construction works.

DRAWINGS
Not Applicable

ATTACHMENTS
Not Applicable

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

12
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

CERTIFICATE OF COMPLETION
Not Applicable
Notice of Completion
After the completion of the required work in this CRM, please fax a signed copy of this form
to C&FED/FEG at Fax No. 875-8166
Or email it to the assigned engineer.

This is to inform you that the required work in this CRM has been completed by
CE&TSD/C&FED/Facilities Engineering Group.
NAME

SIGNATURE

COMPLETION
DATE
____________

___________________________________
__________________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

13
14

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

This is to inform you that the required work in this engineering package design has been
completed by
CE&TSD/C&FED/Facilities Engineering group
COMPLETION
NAME
SIGNATURE
DATE
___________________________________
__________________
____________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to inform you that the required work completion in this CRM package has been
verified by
COD / TCC Operation Group
NAME

COMPLETION
DATE
____________

SIGNATURE

___________________________________
__________________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to verify that all as-built changes/corrections have been incorporated into the
appropriate documents and the current document revision number for this Engineering
Service Request is ____.
ENGINEER

SIGNATURE

___________________________________

__________________

DATE AUGUST 7, 2014


DHAHRAN, SAUDI ARABIA

COMPLETION
DATE
____________

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

14
14

00