UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

1
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

UTHMANIYA, ALHASA SAUDI ARABIA

Facilities Engineering Group

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

2
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

TABLE OF CONTENTS

YEXECUTIVE SUMMARY..
..3
DESIGN CHECKLIST..4
REVIEW AND APPROVAL .5
ELECTRONIC DISTRIBUTION..5
DESIGN CONSIDERATIONS.6
PROPOSED ACTION PLAN/RECOMMENDATIONS..... 7
COST
ESTIMATE...8
DESIGN SCOPE OF WORK.........................................................................................8
SAFETY AND GENERAL NOTES................................................................................9
DRAWINGS..............................................................................................................10
ATTACHMENT.....10
CERTIFICATE OF COMPLETION..............................................................................11

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

3
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

UTHMANIYA, ALHASA SAUDI ARABIA

Facilities Engineering Group

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

4
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

EXECUTIVE SUMMARY
Category: Communication Building Air Conditioning Problem
Corporate Objective: To evaluate and provide engineering technical report with
recommendation and design scope of work.
Strategy: Site survey technical gathering/ evaluation / SAES standard.
Region: Eastern region

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

5
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

DESIGN CHECKLIST

INITIAL DESIGN TASKS


Review work request / Requirements
Search existing drawings
Kick off meeting
Site survey / Gather technical
information
Gathering of engineering design
criteria and requirements.

PROPONENTS TASKS
Provide site survey assistance
Provide required data/information

DESIGN PACKAGE SUBMITTALS


Provide Design Calculation
Generate design drawing sketches
Provide Scope of Works
Provide Engineering Drawings
Submit the Issued for Construction
(IFC) package

SPACE AND POWER RESERVATIONS


Request for Space and Power
Reservations

DRAWING & DOCUMENTATION


Engg. Drawings Attached to Design

UTHMANIYA, ALHASA SAUDI ARABIA

N/A

N/A

N/A
N/A
N/A
N/A
N/A

N/A

N/A
CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

6
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

Package
Submit the electronic files to EDSD

N/A

Yes ()

Not Applicable (NA)

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

7
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

REVIEW AND APPROVAL

Prepared By

Facilities Engineer

Reviewed by
Facilities Engineer
Approved by

ELECTRONIC DISTRIBUTION
GROUP
UDHILIYAH FACILITIES GROUP
CE&TSD/ FEG GROUP
ENGINEER

UTHMANIYA, ALHASA SAUDI ARABIA

EMAIL

INITIA
L
_______

SEND
DATE
____________

FILE COPY
_______
ELECTRONIC _______
COPY

____________
____________

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

FILE COPY

REV.
NO.

8
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

ELECTRONIC _______
COPY

REVIEWER

____________

DESIGN CONSIDERATIONS
Observations (Uthmaniya DCO):
Site survey was conducted on December 16, 2014 to gather technical
information about the existing air conditioning system at Uthmaniya Digital
Communications Office (DCO) building. The DCO building consists of communication
equipment room, generator room and battery room.
The main cooling for the communication equipment room and the battery room
comes from the duty and standby air conditioning units (AHU1 and AHU2). Both of
AHU1 and AHU2 are located inside the communication equipment room.
In addition to AHU1 and AHU2, there exist two air conditioning units inside the
communication equipment room. These two units are old and obsolete and no longer
in used.
Observations (AlHasa Clinic DCO):
Site survey was conducted on December 22, 2014 to gather technical
information about the existing air conditioning system at AlHasa Clinic Digital
Communications Office (DCO) building. The DCO building consists of communication
equipment room, generator room and battery room.
Findings (Uthmaniya DCO):
Based on the observation during the site survey and analysis performed, the
following are the findings:
1. Indoor temperature measurements were taken during the site survey for the
Communication equipment room and the battery room. The results are as
follows:
a. Communication equipment room: ranging between 72.5 86 degrees F.

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

9
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

b. Battery room: 74 degrees F.


2. Current indoor temperature inside the communication equipment room and
the battery room does not satisfy the temperature requirement of SAES-K-003
and SAES-K-002. The requirement being 72 degrees F for the communication
equipment room and 72.5 degrees F for the battery room.
3. Based on the preliminary calculations and the evaluation of the cooling
capacity of the current air conditioning units, it was found that the current air
conditioning units cannot satisfy the cooling requirement of the building.
4. The main air conditioning units in the DCO (AHU 1 and AHU2) are relatively
newly installed (about 4 years in service).

Findings (AlHasa Clinic DCO):


Based on the observation during the site survey and analysis performed, the
following are the findings:
1. Indoor temperature measurements were taken during the site survey for the
Communication equipment room and the battery room. The results are as
follows:
a. Communication equipment room: ranging between 72.5 86 degrees F.
b. Battery room: 74 degrees F.

PROPOSED ACTION PLAN/RECOMMENDATIONS (Uthmaniya DCO):


1. Since the existing main air conditioning units (AHU 1 and AHU2) are
undersized and no longer able to satisfy the cooling requirements of the
building, it is recommended to add two new air conditioning units (duty and
standby) to satisfy the cooling requirements and to have spare capacity for
future projects.
2. The air conditioning units to be provided should be precision type air
conditioning unit with re heater, humidifier, auto change over, and standard
associated accessories to meet SAES-K-003 standard.
3. Connect all new A/C units to the fire alarm control panel and facility alarm
panel/RTU for remote monitoring.

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

10
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

4. Ensure the new A/C units humidifier piping outlet will be connected to the
potable (sweet) water supply piping and not to the raw water piping.
5. Remove the two old air conditioning units that are no longer in used to make
space for the new units.
6. Perform testing, balancing, and commissioning of the new air conditioning
system.
PROPOSED ACTION PLAN/RECOMMENDATIONS (AlHasa Clinic DCO):

1. Since the existing main air conditioning units (AHU 1 and AHU2) are
undersized

COST ESTMATES (Uthmaniya DCO)


The estimated cost for the engineering design, supply for the materials, construction,
testing and commissioning for the Upgrade of HVAC system at Uthmaniya DCO
building is 410,000 dollars.
Cost Breakdown
Engineering Design 95,000 dollars
Material/Construction Cost. -- 304,000 dollars
PMT Construction Support 11,000 dollars

DESIGN SCOPE OF WORK


1. Provide demolition drawings for the removal of the existing air conditioning
units and associated accessories.

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

11
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

2. Provide design drawings for the installation of the duty and standby precision
type air conditioning units with matching air condenser, re heater, humidifier,
auto change over, and standard associated accessories.
3. Provide design drawings for the installation of the duty and standby centralized
air conditioning units with matching air condenser, electric duct heater,
humidifier, and standard associated accessories.
4. Provide design drawings for the ductwork modifications.
5. Provide design drawings for the installation of DDC panel and its connection
with the centralized air conditioning units and the exhaust fans in the battery
room.
6. Provide design drawings for the connection of the new air conditioning units to
the fire alarm control panel and facility alarm panel/RTU for remote
monitoring.
7. Provide design drawings for the installation of the standby exhaust fan in the
battery room.
8. Provide design drawings for the installation of refrigerant piping, humidifier
potable (sweet) water supply piping, condensate drain piping, piping insulation,
supports and vibration isolators.
9. Provide design drawings for the electrical and civil/structural.
10. Provide construction scope of work, material take off, calculations, and cost
estimates.

SAFETY & GENERAL NOTES:


The Contractor, Vendor/Supplier and Operation employees shall strictly follow the
requirements of SAUDI ARAMCO Construction Safety Manual and Loss Prevention
Manual when performing any work activity. This shall include but not limited to the
following:
1 All personnel are required to wear safety shoes, safety glasses and hard hats.
2 The design of all new or modified electrical equipment to be operated at higher
than 240 volts shall include an arc flash hazard analysis, in accordance with
IEEE 1584, to determine the Arc Flash Protection Boundary, the incident
energy a worker may be subject to, the Hazard/Risk Category, and the PPE to

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

12
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


FOR INTERNAL USE ONLY

Facilities Engineering Group

be worn. This is to ensure the compliance to the Saudi Aramco GI# 2.721 to
mitigate/control Arc Flash Hazards and provide minimum safe work
requirements for protection of personnel against these hazards in the
workplace.
Refer to this link for more details: (http://sharek.aramco.com.sa/cops/GI/Operation
%20Services/Industrial%20Services/Power%20Distribution/0002_721.pdf)

3 All personnel shall strictly follow all SAUDI ARAMCO safety regulations and
standard construction safety practices.
4 All matters relating to safety should be in consultation with the SAUDI
ARAMCO Loss Prevention Unit and the SAUDI ARAMCO Representative.
5 All personnel shall be supplied with approved safety equipment, including but
not limited to, safety helmets, safety glasses, gloves, welding shields and safety
footwear. Safety equipment shall be used where appropriate at all times. SAUDI
ARAMCO Loss Prevention requirements shall be used to determine appropriate
safety equipment areas for its use.
6 The Contractor/Supplier shall exercise extra precautions in the field to avoid
damaging any existing structures, utilities, etc., during the construction works.

DRAWINGS
Not Applicable

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

13
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

ATTACHMENTS
Not Applicable

CERTIFICATE OF COMPLETION
Not Applicable
Notice of Completion
After the completion of the required work in this CRM, please fax a signed copy of this form
to C&FED/FEG at Fax No. 875-8166

UTHMANIYA, ALHASA SAUDI ARABIA

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

14
15

00

Communications Engineering & Technical Support Department


CONFIDENTIAL

Compliance & Facilities Engineering Division


Facilities Engineering Group

FOR INTERNAL USE ONLY

Or email it to the assigned engineer.

This is to inform you that the required work in this CRM has been completed by
CE&TSD/C&FED/Facilities Engineering Group
NAME

COMPLETION
DATE
____________

SIGNATURE

___________________________________
__________________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to inform you that the required work in this engineering package design has been
completed by
CE&TSD/C&FED/Facilities Engineering group
COMPLETION
NAME
SIGNATURE
DATE
___________________________________
__________________
____________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to inform you that the required work completion in this CRM package has been
verified by
Area IT / Udhiliyah Facilities Group
NAME

COMPLETION
DATE
____________

SIGNATURE

___________________________________
__________________
COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.
This is to verify that all as-built changes/corrections have been incorporated into the
appropriate documents and the current document revision number for this Engineering
Service Request is ____.
ENGINEER

SIGNATURE

___________________________________

__________________

UTHMANIYA, ALHASA SAUDI ARABIA

COMPLETION
DATE
____________

CRM REFERENCE NO

PAGE
NO.

ENGINEER

OF

REV.
NO.

15
15

00

You might also like