You are on page 1of 1

Federal Register / Vol. 72, No.

180 / Tuesday, September 18, 2007 / Notices 53277

Any person may inspect the request Guidelines. Separate schedule DATES: Effective Date: The effective date
in person at the FAA office listed above facilitation is done at the airport level of the start of FAA’s review of the
under FOR FURTHER INFORMATION for international passenger flights associated noise compatibility program
CONTACT. operating at Terminal 5. Carriers also is September 7, 2007. The public
In addition, any person may, upon should file Terminal 5 schedules, if comment period ends November 6,
request, inspect the application, notice appropriate, to the address listed in the 2007.
and other documents relevant to the IATA Worldwide Scheduling FOR FURTHER INFORMATION CONTACT:
application in person at the Dallas/Fort Guidelines, Annex 3. Scott L. Seritt, Federal Aviation
Worth International Airport. DATES: Requests for international Administration, Atlanta Airports
Issued in Fort Worth, Texas on September schedule approval must be submitted no District Office, 1701 Columbia Avenue,
10, 2007. later than October 11, 2007. Suite 2–260, College Park, Georgia
Kelvin L. Solco, ADDRESSES: Requests may be submitted 30337, 404–305–7150. Comments on the
Manager, Airports Division. by mail to Slot Administration Office, proposed noise compatibility program
[FR Doc. 07–4604 Filed 9–17–07; 8:45 am] AGC–240, Office of the Chief Counsel, should also be submitted to the above
BILLING CODE 4910–13–M 800 Independence Ave., SW., office.
Washington, DC 20591; facsimile: 202– SUPPLEMENTARY INFORMATION: This
267–7277; ARINC: DCAYAXD; or by e- notice announces that the FAA is
DEPARTMENT OF TRANSPORTATION mail to: 7–AWA–slotadmin@faa.gov. reviewing a proposed Noise
FOR FURTHER INFORMATION CONTACT: Compatibility Program for Hartsfield-
Federal Aviation Administration Jackson Atlanta International Airport
Komal Jain, Regulations Division, Office
of the Chief Counsel, Federal Aviation which will be approved or disapproved
Notice of Submission Deadline for
Administration, 800 Independence on or before March 4, 2008. This notice
International Arrival Authorizations at
Avenue, SW., Washington, DC 20591; also announces the availability of this
Chicago O’Hare International Airport
telephone number: 202–267–3073. program for public review and
for the Summer 2008 Scheduling
comment.
Season Issued in Washington, DC on September
An airport operator who has
12th 2007.
AGENCY: Department of Transportation, submitted Noise Exposure Maps that are
James W. Whitlow,
Federal Aviation Administration (FAA). found by FAA to be in compliance with
Deputy Chief Counsel. the requirements of 14 CFR part 150,
ACTION: Notice of submission deadline.
[FR Doc. 07–4605 Filed 9–17–07; 8:45 am] promulgated pursuant to the Act, may
SUMMARY: The FAA announces on BILLING CODE 4910–13–M submit a Noise Compatibility Program
October 11, 2007, deadline for for FAA approval which sets forth the
submitting requests for international Measures the operator has taken or
Arrival Authorizations at Chicago DEPARTMENT OF TRANSPORTATION proposes to reduce existing non-
O’Hare International Airport (ORD) for compatible uses and prevent the
Federal Aviation Administration
allocation under 14 CFR 93.29. The introduction of additional non-
deadline coincides with the submission Receipt of Noise Compatibility compatible uses.
deadline established by the Program and Request for Review; The FAA has formally received the
International Air Transport Association Hartsfield-Jackson Atlanta Noise Compatibility Program for
(IATA) for the Summer 2008 Schedules International Airport, Atlanta, GA Hartsfield-Jackson Atlanta International
Conference. Airport, effective on September 7, 2007.
The U.S. summary scheduling season AGENCY: Federal Aviation The airport operator has requested that
is from March 9, 2008 through Administration, DOT. the FAA review this material and that
November 1, 2008, in recognition of the ACTION: Notice. the noise mitigation measures, to be
U.S. daylight saving time dates. The implemented jointly by the airport and
FAA is aware that the IATA summer SUMMARY: The Federal Aviation surrounding communities, be approved
2008 season is March 30, 2008 through Administration (FAA) announces that it as a Noise Compatibility Program under
October 25, 2008. The FAA will accept is reviewing a proposed Noise section 47504 of the Act. Preliminary
schedule changes that coincide with the Compatibility Program that was review of the submitted material
IATA scheduling season, rather than submitted for Hartsfield-Jackson Atlanta indicates that it conforms to the
U.S. daylight saving dates, in order to International Airport under the requirements for the submittal of Noise
ease the administrative burdens on provisions of 49 U.S.C. 47504 et. seq Compatibility Programs, but that further
carriers conducting international (the Aviation Safety and Noise review will be necessary prior to
operations and in order to ensure that Abatement Act hereinafter referred to as approval or disapproval of the program.
FAA has the most accurate schedule ‘‘the Act’’) and 14 CFR part 150 by the The formal review period, limited by
information. Schedules for the City of Atlanta, Georgia. This program law to a maximum of 180 days, will be
beginning or end of a U.S. scheduling was submitted subsequent to a completed on or before March 4, 2008.
season may be reviewed at the winter or determination by FAA that the The FAA’s detailed evaluation will be
summer schedules conference, as associated Noise Exposure Maps conducted under the provisions of 14
appropriate. submitted under 14 CFR part 150 for CFR Part 150, section 150.33. The
The FAA limits arrivals at ORD from Hartsfield-Jackson Atlanta International primary considerations in the
7 a.m. to 9 p.m., Central Time, Monday Airport were in compliance with evaluation process are whether the
through Friday, and 12 p.m. to 9 p.m., applicable requirements effective April proposed measures may reduce the level
pwalker on PROD1PC71 with NOTICES

on Sunday, based primarily on runway 10, 2007, and was published in the of aviation safety or create an undue
capacity limits. The FAA’s restrictions Federal Register on April 23, 2007. The burden on interstate or foreign
at ORD are the equivalent of a Level 3 proposed Noise Compatibility Program commerce, and whether they are
Full Coordinated Airport as used in the will be approved or disapproved on or reasonably consistent with obtaining the
IATA Worldwide Scheduling before March 4, 2008. goal of reducing existing non-

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1

You might also like