You are on page 1of 18

CAR PARKING

Footing
F1

No.

Excavation

conc.work

F2
Excavation
Conc. Work

18
18

Footing reinforcement
F1
10 tor 150 c/c
Bars parallel to length
1/0.15= 7+ 1 BAR= 8
Length=1-0.15-0.15= .7
Bars parallel to breadth
1/0.15= 7+ 1 BAR= 8
Length=1-0.15-0.15= .7
F2
10 tor 150 c/c
Bars parallel to length
1.2/0.15= 8 + 1 Bar = 9
Length= 1.2-0.15-0.15 = .9
Bars parallel to breadth
1.2/0.15= 8 + 1 Bar = 9
Length= 1.2-0.15-0.15 = .9

Surface dressing

Lean Conc
In footing
F1
F2
For plinth beam
H
V

No. of column in
footing

18

18

4
18

Column above plinth level


C1
of Height 2.4 m

22

Reinforcement detail
C1
of Height 2.4 m
Length of Lateral Ties
2*(0.41)+4*(0.19)
Spacing 12 Dia 75c/c
Height of column/75
2.4/0.075 = 32 Bar + 1= 33

22

HOOKS= 8*Dia
8*0.012

Total rmft in stirup of 12 Dia

33

Longitudinal bar length


2.4+.045+1.5+48*0.012(DIA)

12

Plinth beams
PB 1
Excavation
H PB 1

HPB 1

Conc. Work

Reinf. Of 12 Dia
Reinf. Of 16 Dia

2
4

PB 2
Excavation
VPB 2

VPB 2

Conc Work

Reinf. Of 16 Dia

PB 3
Excavation
VPB 3

VPB 3

Conc Work

Reinf. Of 16 Dia
8

Roof Beam
RB 1
HRB 1
Reinf. Of 12 Dia

2
6

RB 2
VRB 2
Reinf. Of 16 Dia
Reinf. Of 20 Dia
9

11
4
2

Shuttering
Ar of roof
Column
C1
of Height 2.4m

22

Plinth Beam
PB 1
HPB 1
PB 2
VPB 2
PB 3
VPB3

Column in footing
F1
F2

4
18

10

Wall
Drawf wall

11

Plaster

12

Roof Slab
RS 1

13

Reinf in roof slab


RS 1
Reinf. Of 8 Dia 150 c/c
Spacing of bars
Length /0.150 = 30.23/0.15
30.23/0.15= 202 Bar + 1 = 203
Breadth /0.15= 6.43/0.15
6.43/0.15= 43 Bar + 1 = 44

14

Flooring
car parking

15

Ramp conc work

203
44

no walls , no
plaster
L

Quantity

Unit

1.1

1.1

1.6

7.744

cum

1.2

1.2

1.5

8.64

1.3
1.2

1.3
1.2

1.6
1.5

48.672
38.88

Total Excavation
Total Conc. Work

56.416
47.52

cum
cum

No. of Bars

0.7

22.4

0.7

22.4

0.9

145.8

0.9

145.8

31.46

9.46

297.6116

sqm

1
1.2

1
1.2

0.15
0.15

0.6
3.888

cum
cum

60.46
70.73

0.23
0.23

0.15
0.15

2.08587
2.440185

cum
cum

0.23

0.45

2.4

5.4648

cum

1.676

1216.776

4.521

1193.544

1.58

0.096

36.86

0.23

0.6

5.08668

cum

60.46

0.23

0.6

8.34348

cum

120.92
241.84

m
m

10.86

0.23

0.6

1.49868

cum

12.86

0.23

0.6

1.77468

cum

102.88

47.07

0.23

0.45

4.871745

cum

57.87

0.23

0.45

5.989545

cum

347.22

6.25761

cum

362.76

7.320555

cum

282.92
141.46

m
m

194.3789

sqm

60.46

0.23

0.45

70.73

0.23

0.45

0.23

0.45

2.4

71.808

2*(lh+bh)

60.46

0.23

0.6

72.828

sqm

12.86

0.23

0.6

15.708

sqm

57.87

0.23

0.45
Total

52.29
140.826

sqm
sqm

1
1.2

1
1.2

1.5
1.5
Total

24
129.6
153.6

sqm

132.99

0.23

0.6

18.35262

cum

30.23

6.43

0.13

25.269257

cum

6.43

1305.29

30.23

1330.12

30.23

6.43

30.23

0.9

0.6

5270.82

194.3789

sqm

8.1621

cum

.1m added
extra

10
336.4

12
2894
16
974.86
20
141.46

8
5270.82

2* becoz of
bottom and top

PRICING OF CAR PARKING AT TUGHALAKABAD


S. No. Description of item
1
Surface dressing not exceeding 15 cm deep in soft/loose soil
2

Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for
foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in
soft/loose soil.

Returning, filling, in including spreading, levelling, watering and well ramming in


layers not exc. 25 cm in soft/loose soil.

M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of
surface area

Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion
per sqm of vertical surface

Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of
surface.

7
8

Treating the soil along with external perimeter of building at the rate of 2.25 litre
of emulsion per meter of perimeter of wall.
Cement concrete in foundation filling and mass concrete type D2 1:4:8

TMT bars 10 mm dia and over cut to length bent to shape required including
cranking bending spirally for hooping for cloumns hooking ends and binding with
mild steel wire not less than 0.9-0 mm dia

10

Formwork to sides of concrete in foundation footings bases of columns and plinth


beams

11

Reinforced cement concrete (design mix) in foundation including footings


foundation beams plinth beams bases of columns etc in M25

12

Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and
similar works

13

Reinforced cement concrete (design mix) in slabs simply supported on walls


beams and columns in floor roof landings and balconies etc in M25

14

Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan
not exc 6 m mean radius

15

Rendering 10mm thick in CM 1:4 second layer of 5 mm in CM 1:4 with water


proofing compund sand finished external plaster

16

Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster

17

Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas
slabs etc

18

20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over
100 mm thick PCC Type D2 over 150 mm thick hard core

19
20
21
22

7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM
1:4 over 100 mm thick PCC 1:2:4
Roof treatment
Dry distemper
Three coats of white wash on ceiling

23

Three coats of lime wash on internal walls

no plaster
Qty
297.6116

Unit
Sqm

Rate
7.9

Amount
2351.1316

SSR
3011

67.873105

Cum

115.2

7818.9817

3006

4.2454

Cum

41.7

177.03318

3009

550.998

Sqm

80.6

44410.439

3047

196.785

Sqm

126.8

24952.338

3048

194.3789

Sqm

80.6

15666.939

3049

297.6116

Sqm

38.6

11487.808

3051

9.014055

Cum

2303.3

20762.073

4025

6715.006

kg

48.6

326349.29

10034

366.234

Sqm

134.2

49148.603

7004

77.20587

Cum

3482.2

268846.28

4053

194.3789

Sqm

211.5

41111.137

7006

25.269257

Cum

3770

95265.099

4055

18.35262

Cum

255.3

4685.4239

5019

Sqm

134.8

14001 & 14004

Sqm

77.3

14001

Sqm

76.3

Sqm

805.69

13013 & others

Sqm

520.4

13074

Sqm
Sqm
Sqm

300
31.1
11.8

0
0
0

Assessed
15010
15006

194.3789

14831.1114001 & 14004

Sqm
Total

11.8

0
927863.69

Add 3% for
unforeseen
items

27835.911

Grand total

955699.6

Plinth area of
building
Plinth area
rate per Sqm

Sqm
#DIV/0!

15006

10

12

16

20

25

0.39

0.61

0.89

1.57

2.46

3.85

5270.82

336.4

2894

974.86

141.46

5270.82

336.4

2894

974.86

141.46

2055.6198

205.204

2575.66

6715.0056

1530.5302 347.9916