PLACE: NTSB Conference Center, 429 3. How often the collection is 4. How can the burden of the
L’Enfant Plaza SW., Washington, DC required: There are four activities that information collection be minimized,
20594. occur under this collection: Information including the use of automated
STATUS: The one item is open to the collection activities required by the collection techniques or other forms of
public. IMPEP questionnaire in preparation for information technology?
VerDate Aug<31>2005 17:29 Jan 04, 2007 Jkt 211001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\05JAN1.SGM 05JAN1
586 Federal Register / Vol. 72, No. 3 / Friday, January 5, 2007 / Notices
A copy of the draft supporting (SR–HUP), located in Converse County, Associated with Nuclear Material Safety
statement may be viewed free of charge Wyoming. PRI requested that the SR– and Safeguards Programs’’ (NRC, 2003).
at the NRC Public Document Room, One HUP permit area be modified to include In 40 CFR 1508.9, the Council on
White Flint North, 11555 Rockville the Reynolds Ranch area, which Environmental Quality defines an EA as
Pike, Room O–1 F21, Rockville, encompasses approximately 8700 acres a concise public document that briefly
Maryland 20852. OMB clearance (3521 hectares) and is contiguous with provides sufficient evidence and
requests are available at the NRC World the current northern boundary of the analysis for determining whether to
Wide Web site: http://www.nrc.gov/ SR–HUP permit area. PRI desires to prepare an environmental impact
public-involve/doc-comment/omb/ conduct in-situ leach uranium mining statement or a FONSI.
index.html. The document will be in the Reynolds Ranch area. PRI The NRC staff’s review addressed the
available on the NRC home page site for modified its amendment application by environmental impacts of PRI’s
60 days after the signature date of this letter dated April 7, 2005. currently-approved mining operations at
notice. The NRC staff has prepared an the SR–HUP only insofar as such
Comments and questions about the Environmental Assessment (EA) in operations would be modified by the
information collection requirements support of its review of PRI’s proposed mining at the Reynolds Ranch
may be directed to the NRC Clearance application in accordance with the amendment area.
Officer, Brenda Jo Shelton (T–5 F53), requirements of 10 CFR part 51. Based Proposed Action
U.S. Nuclear Regulatory Commission, on the EA, the NRC has concluded that
Washington, DC 20555–0001, by a Finding of No Significant Impact PRI is proposing to modify its permit
telephone at 301–415–7233, or by (FONSI) is appropriate. area boundary to accommodate the
Internet electronic mail to Reynolds Ranch area, and to conduct
II. EA Summary ISL operations within that area. As part
INFOCOLLECTS@NRC.GOV.
Background of such operations, PRI would construct
Dated at Rockville, Maryland, this 27th day eight wellfields and a satellite ion-
of December 2006. PRI’s SR–HUP is a commercial in-situ exchange facility for the recovery of
For the Nuclear Regulatory Commission. leach (ISL) uranium mining facility uranium and for wellfield restoration
Brenda Jo Shelton, located in the South Powder River following mining operations, and
NRC Clearance Officer, Office of Information Basin, Converse County, Wyoming. The operate a deep disposal well for the
Services. main office and Central Processing Plant disposal of liquid wastes. The ore
[FR Doc. E6–22584 Filed 1–4–07; 8:45 am] complex is located at Smith Ranch, deposits in the SR–HUP and Reynolds
BILLING CODE 7590–01–P about 17 air miles (22 road miles) (27 Ranch amendment area generally occur
air/35 road kilometers (km)) northeast of at depths of 450 feet (137 meters (m)) to
Glenrock, Wyoming, and 23 air miles 1000 feet (305 m) below the surface in
NUCLEAR REGULATORY (25 road miles) (37 air/40 road km) long narrow trends varying from a few
COMMISSION northwest of Douglas, Wyoming. NRC hundred to several thousand feet long
issued PRI’s current NRC license for the and 20 to 300 feet (6 to 91 m) wide. The
[Docket No. 40–8964]
SR–HUP (Source Material License SUA– depth depends on the local topography,
Notice of Availability of Environmental 1548) on August 18, 2003, as part of a the dip of the formation, and the
Assessment and Finding of No license renewal process. Commercial stratigraphic horizon. At the Reynolds
Significant Impact for the Addition of ISL uranium production began at the Ranch amendment area, the shallower
the Reynolds Ranch Area to Power Highland site in January 1988 and at the ore deposits are contained within the U/
Resources, Inc’s Smith Ranch/ Smith Ranch site in June 1997. S-Sand, with the mineable ore in this
Highlands Uranium Project, Converse Under SUA–1548, PRI is authorized, sand occurring at approximate depths of
County, WY through its ISL process, to produce up 380 to 525 feet (116 to 160 m). Most of
to 5.5 million pounds (2.5 million the remaining uranium mineralization
AGENCY: U.S. Nuclear Regulatory kilograms) per year of tri-uranium at the Smith Ranch and Reynolds Ranch
Commission. octoxide (U3O8), also known as areas occurs in the O-Sand formation at
ACTION: Notice of availability. ‘‘yellowcake.’’ PRI’s current annual depths of 700 to 900 feet (213 to 274 m).
production is less than half of this limit. Following uranium recovery in each
FOR FURTHER INFORMATION CONTACT: mining unit, PRI would restore ground-
James Park, Environmental and Review Scope
water conditions in the wellfield.
Performance Assessment Directorate, The NRC staff has reviewed PRI’s Restoration techniques would involve
Division of Waste Management and request in accordance with the NRC’s ground-water sweep, clean water
Environmental Protection, Office of environmental protection regulations in injection, and geochemical stabilization
Federal and State Materials and 10 CFR part 51. Those regulations of the aquifer with a reductant. The goal
Environmental Management Programs, implement section 102(2) of the of groundwater restoration is to return
U.S. Nuclear Regulatory Commission, National Environmental Policy Act of the aquifer to the baseline conditions
Washington, DC 20555. Telephone: 1969, as amended. The EA provides the that existed prior to the start of uranium
(301) 415–5835; Fax number: (301) 415– results of the NRC staff’s environmental recovery; or, if approved, to a secondary
5397; E-mail: jrp@nrc.gov. review; the NRC staff’s radiation safety standard of pre-mining ‘‘class of use.’’
SUPPLEMENTARY INFORMATION: review of PRI’s request will be
documented separately in a Safety Purpose and Need for the Proposed
I. Introduction Evaluation Report. Action
By letter dated January 14, 2005, The NRC staff has prepared the EA in PRI currently conducts commercial-
sroberts on PROD1PC70 with NOTICES
Power Resources, Inc. (PRI) submitted a accordance with NRC requirements in scale ISL uranium mining at the SR–
request to amend its U.S. Nuclear 10 CFR 51.21 and 51.30, and with the HUP permit area. PRI is proposing to
Regulatory Commission (NRC) Source associated guidance in NRC report expand its mining operations and to
Material License SUA–1548 for the NUREG–1748, ‘‘Environmental Review conduct ISL mining in the Reynolds
Smith Ranch-Highland Uranium Project Guidance for Licensing Actions Ranch amendment area. This would