You are on page 1of 2

Federal Register / Vol. 71, No.

100 / Wednesday, May 24, 2006 / Notices 29933

DEPARTMENT OF ENERGY waiver of various Commission ‘‘e-Filing’’ link. The Commission


regulations. In particular, Rumford LLC strongly encourages electronic filings.
Federal Energy Regulatory requested that the Commission grant
Commission Magalie R. Salas,
blanket approval under 18 CFR part 34
Secretary.
[RT01–99–000, RT01–99–001, RT01–99–002 of all future issuances of securities and
[FR Doc. E6–7897 Filed 5–23–06; 8:45 am]
and RT01–99–003; RT01–86–000, RT01–86– assumptions of liability by Rumford
001 and RT01–86–002; RT01–95–000, RT01– BILLING CODE 6717–01–P
LLC.
95–001 and RT01–95–002; RT01–2–000,
RT01–2–001, RT01–2–002 and RT01–2–003; On May 12, 2006, pursuant to
RT01–98–000; and RT02–3–000] delegated authority, the Director, DEPARTMENT OF ENERGY
Division of Tariffs and Market
Regional Transmission Organizations; Development—West, granted the Federal Energy Regulatory
Bangor Hydro-Electric Company, et al.; request for blanket approval under part Commission
New York Independent System 34. The Director’s order also stated that
Operator, Inc., et al.; PJM the Commission would publish a [Docket No. ER06–759–000]
Interconnection, L.L.C., et al.; PJM separate notice in the Federal Register
Interconnection, L.L.C.; ISO New establishing a period of time for the Selkirk Cogen Partners, L.P.; Notice of
England, Inc., New York Independent filing of protests. Accordingly, any Issuance of Order
System Operator, Inc.; Notice of Filing person desiring to be heard or to protest May 17, 2006.
May 16, 2006. the blanket approval of issuances of Selkirk Cogen Partners, L.P. (Selkirk
Take notice that PJM Interconnection, securities or assumptions of liability by Cogen) filed an application for market-
L.L.C., New York Independent System Rumford LLC should file a motion to based rate authority, with an
Operator, Inc. and ISO New England, intervene or protest with the Federal accompanying tariff. The proposed
Inc. have posted on their internet Energy Regulatory Commission, 888 market-based rate tariff provides for the
websites charts and information First Street, NE., Washington, DC 20426, sale of energy, capacity and ancillary
updating their progress on the in accordance with Rules 211 and 214 services at market-based rates. Selkirk
resolution of ISO seams. of the Commission’s Rules of Practice Cogen also requested waiver of various
Any person desiring to file comments and Procedure. 18 CFR 385.211, 385.214 Commission regulations. In particular,
on this information should file with the (2004). Selkirk Cogen requested that the
Federal Energy Regulatory Commission, Notice is hereby given that the Commission grant blanket approval
888 First Street, NE., Washington, DC deadline for filing motions to intervene under 18 CFR part 34 of all future
20426, in accordance with Rules 211 or protest is June 12, 2006. issuances of securities and assumptions
and 214 of the Commission’s Rules of of liability by Selkirk Cogen.
Practice and Procedure (18 CFR 385.211 Absent a request to be heard in On May 12, 2006, pursuant to
and 385.214). All such comments opposition by the deadline above, delegated authority, the Director,
should be filed on or before the Rumford LLC is authorized to issue Division of Tariffs and Market
comment date. Comments may be filed securities and assume obligations or Development—West, granted the
electronically via the Internet in lieu of liabilities as a guarantor, indorser, request for blanket approval under part
paper; see 18 CFR 385.2001(a)(1)(iii) surety, or otherwise in respect of any 34. The Director’s order also stated that
and the instructions on the security of another person; provided the Commission would publish a
Commission’s Web site under the ‘‘e- that such issuance or assumption is for separate notice in the Federal Register
Filing’’ link. The Commission strongly some lawful object within the corporate establishing a period of time for the
encourages electronic filings. purposes of Rumford LLC, compatible filing of protests. Accordingly, any
Comment Date: June 6, 2005. with the public interest, and is person desiring to be heard or to protest
Magalie R. Salas, reasonably necessary or appropriate for the blanket approval of issuances of
Secretary.
such purposes. securities or assumptions of liability by
The Commission reserves the right to Selkirk Cogen should file a motion to
[FR Doc. E6–7880 Filed 5–23–06; 8:45 am]
require a further showing that neither intervene or protest with the Federal
BILLING CODE 6717–01–P
public nor private interests will be Energy Regulatory Commission, 888
adversely affected by continued First Street, NE., Washington, DC 20426,
DEPARTMENT OF ENERGY approval of Rumford LLC’s issuances of in accordance with Rules 211 and 214
securities or assumptions of liability. of the Commission’s Rules of Practice
Federal Energy Regulatory and Procedure. 18 CFR 385.211, 385.214
Commission Copies of the full text of the Director’s (2004).
Order are available from the Notice is hereby given that the
[Docket No. ER06–784–000] Commission’s Public Reference Room, deadline for filing motions to intervene
888 First Street, NE., Washington, DC or protest is June 12, 2006.
Rumford Falls Hydro LLC; Notice of 20426. The Order may also be viewed
Issuance of Order Absent a request to be heard in
on the Commission’s Web site at opposition by the deadline above,
May 17, 2006. http://www.ferc.gov, using the eLibrary Selkirk Cogen is authorized to issue
Rumford Falls Hydro LLC (Rumford link. Enter the docket number excluding securities and assume obligations or
LLC) filed an application for market- the last three digits in the docket liabilities as a guarantor, indorser,
based rate authority, with an number filed to access the document. surety, or otherwise in respect of any
jlentini on PROD1PC65 with NOTICES

accompanying rate schedule. The Comments, protests, and interventions security of another person; provided
proposed market-based rate schedule may be filed electronically via the that such issuance or assumption is for
provides for the sale of energy, capacity Internet in lieu of paper. See, 18 CFR some lawful object within the corporate
and ancillary services at market-based 385.2001(a)(1)(iii) and the instructions purposes of Selkirk Cogen, compatible
rates. Rumford LLC also requested on the Commission’s Web site under the with the public interest, and is

VerDate Aug<31>2005 17:08 May 23, 2006 Jkt 208001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1
29934 Federal Register / Vol. 71, No. 100 / Wednesday, May 24, 2006 / Notices

reasonably necessary or appropriate for Commission, 888 First Street, NE., This filing is accessible on-line at
such purposes. Washington, DC 20426. http://www.ferc.gov, using the
The Commission reserves the right to This filing is accessible on-line at ‘‘eLibrary’’ link and is available for
require a further showing that neither http://www.ferc.gov, using the review in the Commission’s Public
public nor private interests will be ‘‘eLibrary’’ link and is available for Reference Room in Washington, DC.
adversely affected by continued review in the Commission’s Public There is an ‘‘eSubscription’’ link on the
approval of Selkirk Cogen’s issuances of Reference Room in Washington, DC. Web site that enables subscribers to
securities or assumptions of liability. There is an ‘‘eSubscription’’ link on the receive e-mail notification when a
Copies of the full text of the Director’s Web site that enables subscribers to document is added to a subscribed
Order are available from the receive e-mail notification when a docket(s). For assistance with any FERC
Commission’s Public Reference Room, document is added to a subscribed Online service, please e-mail
888 First Street, NE., Washington, DC docket(s). For assistance with any FERC FERCOnlineSupport@ferc.gov, or call
20426. The Order may also be viewed Online service, please e-mail (866) 208–3676 (toll free). For TTY, call
on the Commission’s Web site at http:// FERCOnlineSupport@ferc.gov, or call (202) 502–8659.
www.ferc.gov, using the eLibrary link. (866) 208–3676 (toll free). For TTY, call Comment Date: 5 p.m. Eastern Time
Enter the docket number excluding the (202) 502–8659. on May 24, 2006.
last three digits in the docket number Comment Date: 5 p.m. Eastern Time
Magalie R. Salas,
filed to access the document. on May 23, 2006.
Comments, protests, and interventions Secretary.
Magalie R. Salas, [FR Doc. E6–7891 Filed 5–23–06; 8:45 am]
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR Secretary. BILLING CODE 6717–01–P
385.2001(a)(1)(iii) and the instructions [FR Doc. E6–7890 Filed 5–23–06; 8:45 am]
on the Commission’s Web site under the BILLING CODE 6717–01–P
‘‘e-Filing’’ link. The Commission DEPARTMENT OF ENERGY
strongly encourages electronic filings.
DEPARTMENT OF ENERGY Federal Energy Regulatory
Magalie R. Salas, Commission
Secretary. Federal Energy Regulatory
[FR Doc. E6–7896 Filed 5–23–06; 8:45 am] Commission [Docket No. RP00–107–010]
BILLING CODE 6717–01–P [Docket No. RP06–217–002]
Williston Basin Interstate Pipeline
Trans-Union Interstate Pipeline, L.P.; Company; Notice of Compliance Filing
DEPARTMENT OF ENERGY Notice of Refund Report
May 16, 2006.
Federal Energy Regulatory May 16, 2006. Take notice that on May 5, 2006,
Commission Take notice that on May 8, 2006, Williston Basin Interstate Pipeline
Trans-Union Interstate Pipeline, L.P. Company (Williston Basin) tendered for
[Docket No. RP04–523–011] filing with the Commission, under
(Trans-Union), submitted its Refund
Southern Natural Gas Company; Report in compliance with the Federal protest, certain revised tariff sheets to
Notice of Refund Report Energy Regulatory Commission’s March Original Volume No. 2 and Second
9, 2006 Letter Order issued in Docket Revised Volume No. 1 of its FERC Gas
May 16, 2006. No. RP06–217–000. Tariff, a non-conforming Rate Schedule
Take notice that on May 1, 2006, Trans-Union further states that it has FT–1 Service Agreement between
Southern Natural Gas Company served copies of its filing on all affected Williston Basin and Northern States
(Southern) tendered for filing a refund customers and all interested state Power Company (NSP), and an amended
report in compliance with the regulatory commissions. Exhibit A to Contract No. FT–00157
Commission’s letter order dated April Any person desiring to protest this between Williston Basin and NSP in
20, 2006. filing must file in accordance with Rule compliance with the Commission’s
Any person desiring to protest this 211 of the Commission’s Rules of Order issued April 20, 2006 in Docket
filing must file in accordance with Rule Practice and Procedure (18 CFR No. RP00–107–009.
211 of the Commission’s Rules of 385.211). Protests to this filing will be Williston Basin states that its filing
Practice and Procedure (18 CFR considered by the Commission in reflects the removal of the Rate
385.211). Protests to this filing will be determining the appropriate action to be Schedule X–13 agreement between
considered by the Commission in taken, but will not serve to make Williston Basin and NSP from its Tariff,
determining the appropriate action to be protestants parties to the proceeding. and that it is filing the provisions of
taken, but will not serve to make Such protests must be filed on or before Rate Schedule X–13 as a non-
protestants parties to the proceeding. the date as indicated below. Anyone conforming Rate Schedule FT–1 Service
Such protests must be filed on or before filing a protest must serve a copy of that Agreement with terms identical to those
the date as indicated below. Anyone document on all the parties to the of the predecessor Rate Schedule X–13
filing a protest must serve a copy of that proceeding. except for the removal of the 25 basis
document on all the parties to the The Commission encourages point reduction in the return on equity
proceeding. electronic submission of protests in lieu component. The effective date of such
The Commission encourages of paper using the ‘‘eFiling’’ link at Service Agreement is May 5, 2006 in
electronic submission of protests in lieu http://www.ferc.gov. Persons unable to compliance with the Commission’s
jlentini on PROD1PC65 with NOTICES

of paper using the ‘‘eFiling’’ link at file electronically should submit an Order. Williston Basin is also filing an
http://www.ferc.gov. Persons unable to original and 14 copies of the protest to amended Exhibit A to Contract No. FT–
file electronically should submit an the Federal Energy Regulatory 00157 between Williston Basin and NSP
original and 14 copies of the protest to Commission, 888 First Street, NE., to reflect the removal of the 50-percent
the Federal Energy Regulatory Washington, DC 20426. ADQ limitation.

VerDate Aug<31>2005 17:08 May 23, 2006 Jkt 208001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1

You might also like