Input Table for RCC Culverts as per IRC SP-13

Basic Design
Parametres

span
1.5

height
1.5

No_of_spans
1

Abut Ment Table

ab_b1
0.15

ab_b2
0.5

ab_b3
0.5

Slab Table

Wing Wall Table

Road_width wearing_coat
6.00
0.075

ab_b4
0

ab_Base1
1.45

slab_bearing overall_slab_thic
300.00
300.00

b_1
0.18

b_2
0.45

BASE_1
1.13

BASE_2 Length-Wing Wall


1.93
2.10

ab_Base2
2.65

DETAILS OF MEASUREMENT OF ABUTMENT WALL & SLAB ( 1x3 m Span)


DESIGN PARAMETERS :
SPAN
HEIGHT
LENGTH OF ABUTMENT
No of Spans
Sl No

(1x3.00 m Span)
FOR ABOVE PARAMETERS
1.50 M
1.50 M
6.00 M
1 Nos
Item of Work

(As per IRC Special Publication no - 13)

Nos

Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing
of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and
subsequent filling around home pipe/masonry in 15 cm layers with compection including disposal of
all surplus soil as directed with in a lead of 30m.

Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and
vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above

DEPTH OF SLAB
DEPTH OF ABUTMENT CAP
B1 =
B2 =
b3 =
Length Breadth
Height

0.300 M
0.15 M
1.45 M
2.65 M
0.50 M
Quantity

Unit

Cum

6.60

2.65

1.50

52.47

Outer Step

6.00

2.65

0.20

6.36

Inner Step

6.00

2.25

0.20

5.40

Below flooring

5.20

5.30

0.10

2.76

Foundation of Curtain Wall

5.30

0.60

0.15

0.95
15.47

6.00

0.00

0.80

0.00

6.00

1.45

0.80

13.92

6.00

0.00

0.80

0.00

6.00

0.40

0.40

0.96

6.00

0.40

0.40

1.92

6.00

1.13

1.80

24.30

6.00

0.50

0.45

-2.70

2
2

5.30
5.30

(40+60)/2
0.50

1.00
1.00

5.30

Ground/Bed level.

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from
Bed/Ground level
Bottom Block
Left Rectangle
Central Rectangle
Right Intermediate Rectangle
Right Most Upper Traingle
Right Most Bottom Rectangle
Intermediate Block upto top
level
Width
Top
Bottom
0.80
1.45
Deduct from above for the top notch
For Curtain wall

BOE Flooring (1:3 Brick work)

5.20

5.30

0.12

3.31
47.01

Cum

DETAILS OF MEASUREMENT OF ABUTMENT WALL & SLAB


Sl No
4

Item of Work

Nos

Length

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size
mechanically mixed and vibrated for bed plates excluding steel reinforcement, but
including
centering shuttering,
laid
in position.
With 2% reinforcement
, equally
distributed
at top & bottom in both directions
Bed Block

6.00

6.00

.15

0.95

Height

Quantity

Unit

0.53

.15

0.95

Cum

2.10

0.375

4.73

Cum

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size
mechanically mixed and vibrated for reinforced concrete work in slab excluding steel
reinforcement, but including centering shuttering, laid in position.
Width of Bearings

Breadth

0.30

Steel reinforcement for R.C.C. works including bending and placing in position
Mild steel bars conforming to IS 432/1966 GRADE I tested steel
For slab
For Bed Block per slab
2
6.00

0.42
0.53

0.01
0.44

M.T.

1.24

Cum

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50
metres from Bed/Ground level
2

3.10

0.40

0.50

Side Faces

0.40

0.50

0.80

Long Faces

3.10

0.50

6.20

Cement pointing 1:2 deep variety (cut weather) on brick and tile work

Providing and laying 11 mm dia PVC pipe to provide weep holes including supply of all
material, labour T&P etc required for propoer completion of work

7.00

Sqm

12

Nos

DETAILS OF MEASUREMENT OF WINGWALLS ( 1x3 m Span)


(1x3.00 m Span)
SPAN LENGTH
HEIGHT , H =
LENGTH OF WINGWALL =
SL NO.

ITEM

Earth work in excavation in


foundation trenches etc. not
exceeding 30 meter depth
including dressing of bottom
and sides of trenches
stacking the excavated soil
lear from the edge of
excavation and subsequent
filling
around
home
pipe/masonry in 15 cm
layers with compection
including disposal of all
surplus soil as directed with
in a lead of 30m.

1.50 M
1.50 M
2.10 M

SLAB THICKNESS
WEARING COAT

X-SECTIONAL AREA AT ABUT. END

X-SECTIONAL AREA AT FAR END

2.530

1.500

3.80

2.25

1.5

1.93

0.4

0.772

1.65

0.4

A1
A2

1.530
1.530

X
+
2

0.400
1.130

0.40

=
=

0.612
0.53

1.25
1.25

X
+
2

0.4
0.85

A3

1.130

+
2

0.500

1.875

1.528

0.85

+
2

0.5

1.575

+
2

0.700

2.10

AVERAGE
AREA

LENGTH

0.300 M
0.075 M

VOLUME
FOR 4 WALLS

3.38

3.59

2.1

30.11 CUM

0.66

0.72

2.1

6.01

0.4

=
=

0.5
0.42

0.56
0.48

2.1
2.1

4.67
4.00

0.68

1.1

2.1

9.25
17.92 CUM

Cement concrete 1:3:6 mix


with
stone
aggregates
40mm
nominal
size
mechanically mixed and
vibrated in foundation upto
a depth of 1.5 metres below
ground level and 1.50
metres above

CUM

First class brick in cement


mortar 1:3 upto a depth of
1.50 below ground and
above 1.50 metres from
Bed/Ground level

Cement pointing 1:2 deep


variety (cut weather) on
brick and tile work

2.39 Sqm

DETAILS OF MEASUREMENT OF PIER WALL ( 2x6 m Span)


DESIGN PARAMETERS :
SPAN
HEIGHT
LENGTH OF PIER WALL
No of Piers

Sl No
1

FOR ABOVE PARAMETERS


1.50
1.50
6.00
0

M
M
M
Nos

Item of Work

TOP WIDTH OF PIER


EXPANSION JOINT GAP
(As per IRC Special publication No 13)
DEPTH OF SLAB
DEPTH OF PIER CAP
B1 =
B2 =
b3 =
Nos
Length Breadth
Height

0.84 M
0.04 M
0.30 M
0.15 M
1.15 M
2.75 M
0.40 M
Quantity

Unit

Cum

Earthwork in excavation in foundation trenches in all types of soil other than


hard rocks as per MOST Specification Clause No. 404
0

8.10

2.75

1.50

0.00

8.10

2.75

0.20

0.00

7.70

2.35

0.20

0.00
0.00

Concrete with 4 cm gauge nominal stone ballast fine sand and cement in
proportion of 1:3:6 (Cement, Sand, and 40 mm nominal stone ballast) in
foundation, under floors including supply of all materials labour, T&P required for
proper completion of work as per Specification No 280
Outer Step
Inner Step

Where

Bottom Step
Straight Portion
Traingular Portion
Intermediate Step
Straight Portion
Traingular Portion
Top Step
Straight Portion
Traingular Portion

0
0

5.35
1.95

1.95
0.98

0.40

0.00
0.00

0
0

5.72
1.15

1.15
0.58

0.40

0.00
0.00

0
0

5.72
0.84

0.84
0.42

1.80

0.00
0.00
0.00

Cum

0.15

0.00

Cum

Concrete with 20 mm gauge nominal stone grit fine sand and cement in proportion
of 1:2:4 (Cement, Sand, and 20 mm nominal stone ballast) in pier cap including
supply of all materials labour, T&P required for proper completion of work
0

5.72

0.84

0
0

5.35
1.38

0.40
0.40

0.00
0.00

0
0

5.72
0.82

0.40
0.40

0.00
0.00

0
0

5.72
0.60

1.80
1.80

0.00
0.00
0.00

Pointing on brick masonry work in cement mortar 1:3 complete as per relevant
Clause of MOST Specification No. 1300
Bottom Step
Straight Portion
Traingular Portion
Intermediate Step
Straight Portion
Traingular Portion
Top Step
Straight Portion
Traingular Portion

Cum

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above
1.50 metres from Bed/Ground level

Steel reinforcement for R.C.C. works including bending and placing in position
Mild steel bars conforming to IS 432/1966 GRADE I tested steel
For slab
For Bed Block per slab
1
5.72

0.84

0.150

0.72

Sqm

0.00

M.T.

BILL OF QUANTITY
(1x3.00 m Span)
Sl No

Item of Work
Abutment/Slab

Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth
including dressing of bottom and sides of trenches stacking the excavated soil lear from
the edge of excavation and subsequent filling around home pipe/masonry in 15 cm

Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically
mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and
1.50 metres above

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above
1.50 metres from Bed/Ground level

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal
size mechanically mixed and vibrated for bed plates excluding steel reinforcement, but
including centering shuttering, laid in position.

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal
size mechanically mixed and vibrated for reinforced concrete work in slab excluding
steel reinforcement, but including centering shuttering, laid in position.

Steel reinforcement for R.C.C. works including bending and placing in position

Quantity
Wing Wall
Pier

0.00

82.58

Cum

51.00

4211.78

15.47

6.01

0.00

21.48

Cum

1508.70

32413.51

47.01

17.92

0.00

64.93

Cum

1465.60

95160.13

0.00

0.95

Cum

2618.00

2474.01

4.73

Cum

2789.10

13178.50

0.44

M.T.

21506.00

9437.62

1.24

Cum

1465.60

1817.34

9.39

Cum

30.70

288.23

No

100.00

1800.00

0.44

Cement pointing 1:2 deep variety (cut weather) on brick and tile work

0.00

1.24

7.00
9

Providing and laying 11 mm dia PVC pipe to provide weep holes including supply of all
material, labour T&P etc required for propoer completion of work

Amount

30.11

4.73

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above
1.50 metres from Bed/Ground level

Rate

52.47

0.95

Unit
Total

12

2.39

0.00
6

18

Total Cost

160781.13
Say

160800.00
Lacs

Section at Abutment
(1x3.00 m Span)

( not to the scale )

0.30
0.53

0.30

.15
0.50
b3

1.5

LOWEST BED LEVEL


0.00
b4

0.00
b4
0.50
b2

0.30

0.50
b3

0.30

0.15
b1

0.40

1.45
B1

0.40

1.5
0.40
0.20
0.20

0.20

0.20
2.65
B2

SECTION OF WINGWALL
0.5

0.50

H+Slabthickness+wearing coat
=
3.550

H+Slabthickness+wearing coat

1.0
Ground level

GL
0.30

0.45
b2

0.50

0.3

0.18
b1

0.25

1.13
B1

0.40

0.5
0.85

0.10
0.4

0.40
0.40
0.20

0.20

0.4
0.2

0.2

0.40

0.4

1.93
B2

WING WALL SECTION AT HIGH END

WING WALL SECTION AT LOW END

#REF!
DRAWING OF PIER

0.84

PIER CAP

0.15

1.50

GROUND LEVEL

GROUND LEVEL
1.15

0.30

0.40
BRICK MASONRY

0.40

0.40

0.20 0.20

1.95

0.20
FOUNDATION CONCRETE

0.20

1.15
2.75

8.10

5.35

5.72

6.56

2.75

7.30

7.7