You are on page 1of 10

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 1 of 10

HOME
GENERAL INTEREST
EXPLORATION &
DEVELOPMENT
DRILLING & PRODUCTION
REFINING
& PROCESSING
Home
Gas
heated reforming improves Fischer-Tropsch process
PIPELINES &
TRANSPORTATION

Looking for past issues? Click here.

OGJ RESOURCES

Gas heated reforming improves


Fischer-Tropsch process
04/22/2002
Incorporating gas heated reforming (GHR) technology into autothermal reforming
(ATR)-based GTL processes offers combined benefits of significantly higher carbon
efficiency and lower capital cost.

An AGHR and secondary reformer was installed at the Coogee Energy methanol plant,
Melbourne. Photo courtesy of Synetix.
Click here to enlarge image

The two reformers can be linked in different ways; the configuration in which feed gas
passes through the GHR and ATR in series gives the best benefits.
Synetix, in partnership with Methanex Corp., the world's largest producer of methanol,
has constructed a materials demonstration unit (MDU) in New Zealand to establish the
benefits of combining GHR with ATR.

Click here to enlarge image

Engineering work on the project started in mid-2000, and the units were commissioned
in Feb 2002. Preliminary results will be available later in 2002 with final results in 2003.

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 2 of 10

An important objective when making syngas feed for Fischer-Tropsch (FT) liquids
production is to synthesize a gas composition in which the H2:CO ratio= 2:1. This is the
approximate ratio in which these reactants are consumed.
Autothermal reforming

Currently, the most widely proposed syngas technology for GTL production is ATR.
There are many variants of this basic process, some incorporating proprietary
technology. All the processes, however, involve the partial oxidation of natural gas with
steam and oxygen, or air, followed by equilibration over a catalyst bed (Fig. 1).

Oil & Gas Journal


Digital Magazine

Look Inside >

Click here to enlarge image


Current Issue

These catalytic processes have more ideal syngas stoichiometry for FT synthesis and

Finde uns auf Facebook

lower capital cost compared to non-catalytic partial oxidation (POX).

Oil & Gas Journal Online


Gefllt mir 33.368

With ATR, the feed gas and steam mixture is preheated, combusted with an oxidant,
and passed over a catalyst to bring the steam-methane reforming reaction to

Oil & Gas Journal Online

equilibrium at a temperature of 1,790-1,920 F. The product gas is corrosive from 750


to 1,300 F. and must be cooled by creating steam in a waste-heat boiler.
For a constant ATR inlet temperature and steam ratio, a fixed amount of oxygen is

17 Std.

.@Pemex makes shallow-water Gulf of


Mexico #oil find in first post-reform
exploration success http://bit.ly/1cWeefv

combusted to heat the gases and steam reform them to equilibrium at 1,920 F. This
satisfies the ATR molar reaction and adiabatic heat balance according to Eq. 1 (see
Equation box).
This gives a syngas that is too lean in CO (H2:CO = 2.19) since CO2 is not reactive for
FT. The CO2 can be recycled to the ATR, which will enable the correct syngas H2:CO

ratio of 2.0 (Eq. 2).


Soziales Plug-in von Facebook

The balance in Eq. 2 shows that there is a fundamental, inherent process inefficiency.

CAREERS AT TOTAL

For every 100 units of carbon in the feed, 9 units of carbon must be discarded to

More than 600 job


openings are now online,
watch videos and learn
more!

achieve a satisfactory FT feed composition.


Gas heated reforming

Click Here to Watch

GHR was first developed by Synetix in the mid 1980s and has been in continuous
operation in ammonia and methanol plants since 1988. In the 1990s, Synetix
developed the advanced gas heated reformer (AGHR) with a simplified, lower-cost
design and the ability to scale up to the sizes required for world-scale GTL plants.

OTHER OIL & GAS INDUSTRY JOBS

Combining the oxygen-fired reformer with a GHR can substantially improve the
performance of a GTL plant using oxygen-based reforming.1 The GHR recycles highgrade heat from the reformed gas directly back into the reforming process. This

Learning & Development Office Assistant


Chevron
Country: United States

reduces the oxygen requirement and eliminates the need to generate large quantities

others.Strong commitment to Chevron Way

of high-pressure steam from the process train. Fig. 2 shows this configuration.

Behaviors.Preferred Qualifications:Experience in and


and field environment.Demonstrated ability to work
collaboratively with multiple stakeholders across...

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 3 of 10

Search More Job Listings >>

Click here to enlarge image

With the same basis as the preceding ATR example (natural gas composition, steam
ratio, ATR and secondary exit temperature), 18% less oxygen combustion is needed to
satisfy the heat balance and less hydrogen is consumed, leaving more available for FT
liquid synthesis.
Eq. 3 shows that the scheme is now well balanced-for every 100 units of feed carbon,
only 2 units of carbon must be purged, and reaction efficiency to CO improves nearly
8%. This will boost the overall carbon efficiency of a GTL plant.2
Economic benefits

We have completed detailed evaluations of the GHR technology. We compared the


GHR-based process to POX and ATR in terms of process and utility requirements.
Cost estimates are based on detailed equipment lists using established methods. The
estimates include vendor quotes for major equipment items where appropriate.
The studies consistently show significant benefits with the GHR-based process. The
main benefits are reduced:

Total energy per barrel, up to 10%.


Oxygen requirement, up to 25%.
Overall CO2 emissions, up to 45%.

Click here to enlarge image

Table 1 summarizes the results of a study based on a light natural gas feedstock. The
GHR-based process operating at a steam ratio (SR) of 2.0 achieves 5% lower total
energy consumption than POX or ATR. If we lower the SR to less than 1.0, energy
consumption improves by up to 10%.
The maximum efficiency improvement (and the SR at which it occurs) depends on
many factors, such as feed composition, FT conversion and selectivity, LPG recovery,
etc. The optimum is a balance between the feed and fuel requirements for natural gas;
the optimum may be at an intermediate SR.
We configured all the processes for zero power export-any heat that could not be used
in the process was rejected in flue gas or used for air or water cooling. Table 1 also
shows the substantial reductions in oxygen requirement and CO2 emissions.
Capital costs

GHR has lower capital costs compared to competing processes. GHR simplifies the
flowsheet, eliminating some systems and reducing the size and cost of others,
especially regarding utilities. The main benefits are:

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 4 of 10

Smaller air-separation unit.


Elimination of the high-pressure process waste heat boiler.
Simpler, smaller steam and power-generation systems.
Lower cooling duties and smaller cooling systems.

Click here to enlarge image

At an SR of 2.0, capital cost is the same as the ATR-based process (at an SR of 0.6)
and about 5% lower than for a POX-based system. At lower SRs, the capital cost
savings are more than 10% for a complete GTL facility. Table 2 shows typical savings.
Different GHR configurations

There are various options for coupling a GHR with an oxygen-fired reformer. They
require different process and mechanical design considerations and have different
overall effects on GTL process performance.
In Lineup A (Fig. 2), the GHR and oxygen-based reformer (secondary reformer) are in
series. GHR catalyst tube bottoms are sealed within a tubesheet to prevent methane
leakage into the syngas product. This is the design of the Synetix AGHR.

Click here to enlarge image

In Lineup B (Fig. 3), the natural gas and steam mixture is split and fed to the GHR and
ATR, which operate in parallel. The GHR catalyst tubes are open ended. The two
reformed gas streams mix in the GHR shell before they provide heat to reform the gas
in the GHR.

Click here to enlarge image

Lineup C (Fig. 4) has a similar parallel configuration to Lineup B. The difference is that
that the two reformed gas streams do not mix in the GHR. Syngas from the GHR
catalyst is cooled separately in bayonet tubes that are within the annular catalyst beds
in each outer tube.
The relative effect that these lineups have on the FT production process, as well as the
comparative size of GHR needed for each duty, can be simulated for different
reforming conditions.

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 5 of 10

The GHR catalyst exit temperature is a key process parameter. It determines the
reduction in oxygen flow compared to a standalone ATR. It also influences the GHR's
size, because the GHR is simply a heat exchanger with catalyst in the tubes-the higher
the tube exit temperature, the lower the temperature differential driving heat transfer.
Due to less gas passing through the catalyst, Lineups B and C can have a lower
pressure drop than Lineup A. Therefore, they must have a higher GHR exit catalyst
temperature to keep the levels of unreacted methane acceptably low.

Click here to enlarge image

Table 3 and Fig. 5 show a comparison between these schemes. In process terms,
Lineups B and C are identical. An important differentiator between these lineups is the
total concentration of CH4, CO2, N2, and Ar in the syngas product. These gases are
inert in FT synthesis-the higher the inerts level, the worse the FT gas quality.

Click here to enlarge image

Even with GHR catalyst exit temperatures up to 1,650 F., the total inerts level is still
much higher in the parallel lineups than the series configuration. This results in lower
process efficiency and an increased requirement for syngas and oxygen production.
Lineups B and C show the same upward trend in heat transfer area (HTA) with
increasing catalyst (or tube) exit temperature. If the tube exit temperature is 1,560 F.
(process performance not competitive with lineup A), the equipment size will tend to be
the same or larger. At 1,650 F., there is still a 5% efficiency penalty, and the HTA
requirements are more than twice those of the series arrangement.
Altering other variables-such as splitting steam between the GHR and ATR, or
considering a GHR in combination with a non-catalytic partial oxidation reactor rather
than an ATR-can result in minor improvements compared to the parallel schemes, but
they do not affect the overall results.

The materials demonstration unit for GHR and secondaries is in New Plymouth, New
Zealand. Photo courtesy of Synetix.
Click here to enlarge image

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 6 of 10

A series configuration is both smaller and more efficient than a parallel GHR and ATR
combination.
GHR development

Synetix first developed the leading concept ammonia (LCA) process, which
incorporated GHR, in the 1980s. LCA was applied to ammonia production with plants
being commissioned near Bristol, UK, in 1988 and later at Yazoo City, Miss., in 1998.
In the early 1990s Synetix adapted the technology for methanol production as the
leading concept methanol (LCM) process. A demonstration methanol unit has been
operating near Melbourne, Australia, since 1994.
In the latest extension, we have applied GHR technology to the syngas production for
FT-based GTL plants.
Advanced GHR

The early applications of GHR technology were successful. Technology development


continued during the 1990s when it became apparent that there were some features of
the first-generation GHR that could be improved.
For example, catalyst loading was more difficult and time consuming than in a
conventional steam reformer. Some design aspects of the bayonet tube units were
complex, which added to the unit cost and limited the maximum size.
By 1998, Synetix developed an improved and simplified design of GHR known as the
advanced gas heated reformer (AGHR). Synetix installed a demonstration unit in the
methanol plant now operated by Coogee Energy Pty Ltd., Melbourne, to test the novel
features of the new design.

Click here to enlarge image

The AGHR (Fig. 6) has a simplified internal design with a seal system that
accommodates tube expansion without the need to use bayonet tubes.
These changes simplify the design and fabrication and result in a substantial reduction
in unit cost. Catalyst loading and removal is also much easier and performed the same
way as a conventional steam reformer using traditional sock loading or an advanced
catalyst loading system.
Detailed engineering studies show that the AGHR can be scaled up to a capacity of
25,000-30,000 b/d in a single train. The Coogee AGHR has been in operation for more
than 3 years and has proved the unit's new design features.

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 7 of 10

Metal dusting corrosion

AGHR plants for methanol and ammonia production have operated for many years,
and the materials of construction as well as the process and mechanical design are
fully established for these applications.
Using an AGHR for GTL offers a significant improvement in thermal efficiency. Even
more efficiency gains and capital cost benefits result from more severe reforming
conditions, specifically a lower SR. The optimum SR is normally between 0.6 and 1.0,
the exact optimum of which depends on the individual project.
No materials of construction have been commercially demonstrated to operate
successfully at the lower SR conditions required for the optimum use of GHR
technology in GTL plants. Experience shows that, while laboratory and other smallscale testing may provide some limited initial screening of materials, it cannot provide
reliable data on the performance of an alloy under plant conditions.
Materials demonstration unit

The MDU has two GHRs with full-size tubes, each coupled to a secondary reformer
and associated equipment. The two trains operate at different conditions to
demonstrate metallurgy suitable for GTL and enhanced methanol process conditions.
In an experimental program initially lasting 18 months, the MDU will test several
different alloys simultaneously with conditions closely replicating those of a full-scale
commercial unit. The unit will provide long-term data under commercial plant
conditions.
References

1. Chang, T., "New JV markets one-stop GTL package," OGJ, Dec. 18, 2000, p. 49.
2. Steynberg, A.P., Vogel, A.P., Price, J.G., and Nel, H.G., "Technology targets for
gas to liquids applications," presented at the AIChE Spring meeting, Apr. 22-26,
2001, Houston.

The authors

Click here to enlarge image

Jim Abbott is a GTL technology specialist for Synetix, Bill ingham, UK, in which he
focuses on delivering the application of syngas technology to GTL. Recently, he was
engaged in process development of Synetix's refinery business. Abbott joined ICI 22
years ago and joined the Katalco group in 1987. He has worked for 8 years in the
methanol business, in which he played a key role in demonstrating the Synetix leading
concept methanol technology. He has a degree from Cambridge University, UK.
Click here to enlarge image

Bernard J. Crewdson is a business development manager for Synetix's GTL and fuel
cells businesses. He joined joined ICI in 1975 and held a number of posts in process
engineering and production management before joining Synetix (formerly Katalco) in
1987. Crewdson also spent 10 years in catalyst sales and marketing. He graduated
from Cambridge University with a degree in chemical engineering.

More Oil & Gas Journal Current Issue Articles


More Oil & Gas Journal Archives Issue Articles

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 8 of 10

RELATED ARTICLES
Chinese plant commissions propylene unit
01/30/2015 Sanyuan Petrochemical Co. Ltd. (SPCL), a subsidiary of Zhejiang Fuling Holding
Group, has commissioned a 450,000-tonne/year propane dehydrogenation...

BHI: Texas anchors 90-unit plunge in US rig count


01/30/2015 The US drilling rig count plunged 90 unitsa majority of which were in Texasto
settle at 1,543 rigs working during the week ended Jan. 30, Baker H...

BHP to drill first deepwater well off Trinidad in 2016, energy minister says
01/30/2015 BHP Billiton and its partner BP PLC will drill their first well in Trinidad and Tobagos
deep water in 2016 according to the Caribbean twin-island ...

Shell cuts $15 billion in spending for 2015-17


01/30/2015 Royal Dutch Shell PLC has curtailed more than $15 billion in potential spending over
the next 3 years, but is not not overreacting to current low ...

Victoria extends drilling, fracing ban


01/30/2015 The new Victorian Labor government of premier Daniel Andrews has extended the
coal seam gas (CSG) exploration and hydraulic fracturing ban in the s...

Chevrons $35 billion capital budget down 13% from last year
01/30/2015 Chevron Corp. will allocate $35 billion in its capital and exploratory investment
program for 2015, including $4 billion of planned expenditures by...

Shell cancels Arrow LNG project


01/30/2015 Royal Dutch Shell PLC has abandoned its plans for what would have been a fourth
coal seam gas-LNG project at Gladstone in Queensland.

US Senate passes bill approving Keystone XL pipeline project


01/30/2015 The US Senate has passed a bill approving construction of the proposed Keystone XL
crude oil pipeline by a 62-36 vote after 3 weeks of debate. Nine...

Oxy cuts capital budget by a third


01/30/2015 In the midst of falling oil prices, Occidental Petroleum Corp., Houston, expects to
reduce its total capital spending for 2015 to $5.8 billion from...
More Articles >>

WHITE PAPERS

Three Tips to Improve Safety in the Oil Field


Working oil fields will always be tough work with inherent risks. Theres no getting around that.
Ther...
Sponsored by Telogis, Inc.

Pipeline Integrity: Best Practices to Prevent, Detect, and Mitigate Commodity


Releases
Commodity releases can have catastrophic consequences, so ensuring pipeline integrity is crucial
for p...
Sponsored by Schneider Electric

AVEVAs Digital Asset Approach - Defining a new era of collaboration in capital


projects and asset operations
There is constant, intensive change in the capital projects and asset life cycle management. New
chall...
Sponsored by AVEVA Inc

Transforming the Oil and Gas Industry with EPPM


With budgets in the billions, timelines spanning years, and life cycles extending over decades, oil
an...
Sponsored by ORACLE

Asset Decommissioning in Oil & Gas: Transforming Business


Asset intensive organizations like Oil and Gas have their own industry specific challenges when it
com...

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 9 of 10

Sponsored by ORACLE

Squeezing the Green: How to Cut Petroleum Downstream Costs and Optimize
Processing Efficiencies with Enterprise Project Portfolio Management Solutions
As the downstream petroleum industry grapples with change in every sector and at every level,
includin...
Sponsored by ORACLE

7 Steps to Improve Oil & Gas Asset Decommissioning


Global competition and volatile markets are creating a challenging business climate for project
based ...
Sponsored by ORACLE

The impact of aging infrastructure in process manufacturing industries


Process manufacturing companies in the oil and gas, utilities, chemicals and natural resource
industri...
Sponsored by ORACLE
More White Papers >>

AVAILABLE WEBCASTS

OGJ's Midyear Forecast 2015


When Fri, Jul 10, 2015
This webcast is to be presented by OGJ Editor Bob Tippee and Senior Economic Editor Conglin Xu.
They will summarize the Midyear Forecast projections in key categories, note important changes from
Januarys forecasts, and examine reasons for the adjustments.

On Demand

Cognitive Solutions for Upstream Oil and Gas


Fri, Jun 12, 2015
The oil & gas sector is under pressure on all sides. Reserves are limited and its becoming
increasingly expensive to find and extract new resources. Margins are already being squeezed in an
industry where one wrong decision can cost millions. Analyzing data used in energy exploration can
save millions of dollars as we develop ways to predict where and how to extract the worlds massive
energy reserves.
This session with IBM Subject Matter Experts will discuss how IBM Cognitive Solutions contribute to
the oil and gas industry using predictive analytics and cognitive computing, as well as real time
streaming for exploration and drilling.

The Alternative Fuel Movement: Four Need-to-Know Excise Tax Complexities


Thu, Jun 4, 2015
Discussion on how to approach, and ultimately embrace, the alternative fuel market by pulling back
the veil on excise tax complexities. Taxes may be an aggravating part of daily operations, but their
accuracy is crucial in your path towards business success.

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

Gas heated reforming improves Fischer-Tropsch process - Oil & Gas Journal

Page 10 of 10

Prevention, Detection and Mitigation of pipeline leaks in the modern world


Thu, Apr 30, 2015
Preventing, detecting and mitigating leaks or commodity releases from pipelines are a top priority for
all pipeline companies. This presentation will look at various aspects related to preventing, detecting
and mitigating pipeline commodity releases from a generic and conceptual point of view, while at the
same time look at the variety of offerings available from Schneider Electric to meet some of the
requirements associated with pipeline integrity management.

Prev 1 2 3 4 5 Next

Stay Connected

Home

Events

Advertise

About Us

General Interest

Training

Newsletter Subscription

PennWell

Exploration & Development

Market Connection

Book Store

View All Pennwell Websites

Drilling & Production

White Papers

Privacy Policy

View All Pennwell Events

1455 West Loop South

Processing

Webcasts

Terms & Conditions

Site Map

Houston, Texas 77027

Transportation

PennEnergy Jobs

Contact Us

Webmaster

(713) 621-9720

Unconventional

Equipment

Magazine Subscription

GIS Data & Maps

Research

Mobile

RSS

OTC

Copyright 2013: PennWell Corporation


All Rights Reserved.

http://www.ogj.com/articles/print/volume-100/issue-16/processing/gas-heated-reformi... 16.06.2015

You might also like