When the Commission completes a equitable portion of the annual charges owners of non-federal hydropower
study of a river basin, it determines for interest, maintenance, and projects to file for determining annual
headwater benefits charges that will be depreciation of the headwater project to charges is specified in 18 Code of
apportioned among the various the U.S. Treasury. The regulations Federal Regulations (CFR) part 11.
downstream beneficiaries. A headwater provide for apportionment of these costs
Action: The Commission is requesting
benefits charge, and the cost incurred by between the headwater project and
a three-year extension of the current
the Commission to complete an downstream projects based on
evaluation are paid by downstream downstream energy gains and propose expiration date, with no changes to the
hydropower project owners. In essence, equitable apportionment methodology existing collection of data.
the owners of non-federal hydropower that can be applied to all rivers basins Burden Statement: Public reporting
projects that directly benefit from a in which headwater improvements are burden for this collection is estimated
headwater(s) improvement must pay an built. The data the Commission requires as:
3 ..................................................................... 1 40 120
Estimated cost burden to respondents clarity of the information to be 888 First Street, NE., Washington, DC
is $6,262.00. (120 hours/2080 hours per collected; and (4) ways to minimize the 20426, in accordance with Rules 211
year times $108,558 per year average per burden of the collection of information and 214 of the Commission’s Rules of
employee = $ 6,263). The cost per on those who are to respond, including Practice and Procedure. 18 CFR 385.211,
respondent is $191.00. the use of appropriate automated, 385.214 (2004).
The reporting burden includes the electronic, mechanical, or other
total time, effort, or financial resources Notice is hereby given that the
technological collection techniques or
expended to generate, maintain, retain, other forms of information technology, deadline for filing motions to intervene
disclose, or provide the information e.g., permitting electronic submission of or protest, is April 18, 2005.
including: (1) Reviewing instructions; responses. Absent a request to be heard in
(2) developing, acquiring, installing, and opposition by the deadline above,
Linda Mitry,
utilizing technology and systems for the JPMorgan is authorized to issue
Deputy Secretary.
purposes of collecting, validating, securities and assume obligations or
verifying, processing, maintaining, [FR Doc. E5–1298 Filed 3–24–05; 8:45 am]
liabilities as a guarantor, indorser,
disclosing and providing information; BILLING CODE 6717–01–P
surety, or otherwise in respect of any
(3) adjusting the existing ways to security of another person; provided
comply with any previously applicable that such issuance or assumption is for
instructions and requirements; (4) DEPARTMENT OF ENERGY
some lawful object within the corporate
training personnel to respond to a Federal Energy Regulatory purposes of JPMorgan, compatible with
collection of information; (5) searching Commission the public interest, and is reasonably
data sources; (6) completing and necessary or appropriate for such
reviewing the collection of information; [Docket Nos. ER05–283–000, ER05–283–001
and ER05–283–002] purposes.
and (7) transmitting, or otherwise
disclosing the information. The Commission reserves the right to
JPMorgan Chase Bank, N.A.; Notice of require a further showing that neither
The estimate of cost for respondents
Issuance of Order public nor private interests will be
is based upon salaries for professional
and clerical support, as well as direct March 18, 2005. adversely affected by continued
and indirect overhead costs. Direct costs JPMorgan Chase, N.A. (JPMorgan) approval of JPMorgan’s issuances of
include all costs directly attributable to filed an application for market-based securities or assumptions of liability.
providing this information, such as rate authority, with an accompanying Copies of the full text of the
administrative costs and the cost for rate schedule. The proposed rate Commission’s Order are available from
information technology. Indirect or schedule provides for wholesale sales of the Commission’s Public Reference
overhead costs are costs incurred by an energy, capacity and ancillary services Room, 888 First Street, NE.,
organization in support of its mission. at market-based rates. JPMorgan also
Washington, DC 20426. The Order may
These costs apply to activities which requested waiver of various Commission
benefit the whole organization rather also be viewed on the Commission’s
regulations. In particular, JPMorgan
than any one particular function or Web site at http://www.ferc.gov, using
requested that the Commission grant
activity. blanket approval under 18 CFR part 34 the eLibrary link. Enter the docket
Comments are invited on: (1) Whether of all future issuances of securities and number excluding the last three digits in
the proposed collection of information assumptions of liability by JPMorgan. the docket number filed to access the
is necessary for the proper performance On March 17, 2005, the Commission document. Comments, protests, and
of the functions of the Commission, granted the request for blanket approval interventions may be filed electronically
including whether the information will under part 34, subject to the following: via the Internet in lieu of paper. See 18
have practical utility; (2) the accuracy of Any person desiring to be heard or to CFR 385.2001(a)(1)(iii) and the
the agency’s estimate of the burden of protest the blanket approval of instructions on the Commission’s Web
the proposed collection of information, issuances of securities or assumptions of site under the ‘‘e-Filing’’ link. The
including the validity of the liability by JPMorgan should file a
methodology and assumptions used; (3) motion to intervene or protest with the
ways to enhance the quality, utility and Federal Energy Regulatory Commission,
VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\25MRN1.SGM 25MRN1
15314 Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices
VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\25MRN1.SGM 25MRN1