Federal Register / Vol. 70, No.

57 / Friday, March 25, 2005 / Notices 15313

When the Commission completes a equitable portion of the annual charges owners of non-federal hydropower
study of a river basin, it determines for interest, maintenance, and projects to file for determining annual
headwater benefits charges that will be depreciation of the headwater project to charges is specified in 18 Code of
apportioned among the various the U.S. Treasury. The regulations Federal Regulations (CFR) part 11.
downstream beneficiaries. A headwater provide for apportionment of these costs
Action: The Commission is requesting
benefits charge, and the cost incurred by between the headwater project and
a three-year extension of the current
the Commission to complete an downstream projects based on
evaluation are paid by downstream downstream energy gains and propose expiration date, with no changes to the
hydropower project owners. In essence, equitable apportionment methodology existing collection of data.
the owners of non-federal hydropower that can be applied to all rivers basins Burden Statement: Public reporting
projects that directly benefit from a in which headwater improvements are burden for this collection is estimated
headwater(s) improvement must pay an built. The data the Commission requires as:

Number of responses Average burden hours


Number of respondents annually Total annual burden hours
per respondent per response
(1) (1) × (2) × (3)
(2) (3)

3 ..................................................................... 1 40 120

Estimated cost burden to respondents clarity of the information to be 888 First Street, NE., Washington, DC
is $6,262.00. (120 hours/2080 hours per collected; and (4) ways to minimize the 20426, in accordance with Rules 211
year times $108,558 per year average per burden of the collection of information and 214 of the Commission’s Rules of
employee = $ 6,263). The cost per on those who are to respond, including Practice and Procedure. 18 CFR 385.211,
respondent is $191.00. the use of appropriate automated, 385.214 (2004).
The reporting burden includes the electronic, mechanical, or other
total time, effort, or financial resources Notice is hereby given that the
technological collection techniques or
expended to generate, maintain, retain, other forms of information technology, deadline for filing motions to intervene
disclose, or provide the information e.g., permitting electronic submission of or protest, is April 18, 2005.
including: (1) Reviewing instructions; responses. Absent a request to be heard in
(2) developing, acquiring, installing, and opposition by the deadline above,
Linda Mitry,
utilizing technology and systems for the JPMorgan is authorized to issue
Deputy Secretary.
purposes of collecting, validating, securities and assume obligations or
verifying, processing, maintaining, [FR Doc. E5–1298 Filed 3–24–05; 8:45 am]
liabilities as a guarantor, indorser,
disclosing and providing information; BILLING CODE 6717–01–P
surety, or otherwise in respect of any
(3) adjusting the existing ways to security of another person; provided
comply with any previously applicable that such issuance or assumption is for
instructions and requirements; (4) DEPARTMENT OF ENERGY
some lawful object within the corporate
training personnel to respond to a Federal Energy Regulatory purposes of JPMorgan, compatible with
collection of information; (5) searching Commission the public interest, and is reasonably
data sources; (6) completing and necessary or appropriate for such
reviewing the collection of information; [Docket Nos. ER05–283–000, ER05–283–001
and ER05–283–002] purposes.
and (7) transmitting, or otherwise
disclosing the information. The Commission reserves the right to
JPMorgan Chase Bank, N.A.; Notice of require a further showing that neither
The estimate of cost for respondents
Issuance of Order public nor private interests will be
is based upon salaries for professional
and clerical support, as well as direct March 18, 2005. adversely affected by continued
and indirect overhead costs. Direct costs JPMorgan Chase, N.A. (JPMorgan) approval of JPMorgan’s issuances of
include all costs directly attributable to filed an application for market-based securities or assumptions of liability.
providing this information, such as rate authority, with an accompanying Copies of the full text of the
administrative costs and the cost for rate schedule. The proposed rate Commission’s Order are available from
information technology. Indirect or schedule provides for wholesale sales of the Commission’s Public Reference
overhead costs are costs incurred by an energy, capacity and ancillary services Room, 888 First Street, NE.,
organization in support of its mission. at market-based rates. JPMorgan also
Washington, DC 20426. The Order may
These costs apply to activities which requested waiver of various Commission
benefit the whole organization rather also be viewed on the Commission’s
regulations. In particular, JPMorgan
than any one particular function or Web site at http://www.ferc.gov, using
requested that the Commission grant
activity. blanket approval under 18 CFR part 34 the eLibrary link. Enter the docket
Comments are invited on: (1) Whether of all future issuances of securities and number excluding the last three digits in
the proposed collection of information assumptions of liability by JPMorgan. the docket number filed to access the
is necessary for the proper performance On March 17, 2005, the Commission document. Comments, protests, and
of the functions of the Commission, granted the request for blanket approval interventions may be filed electronically
including whether the information will under part 34, subject to the following: via the Internet in lieu of paper. See 18
have practical utility; (2) the accuracy of Any person desiring to be heard or to CFR 385.2001(a)(1)(iii) and the
the agency’s estimate of the burden of protest the blanket approval of instructions on the Commission’s Web
the proposed collection of information, issuances of securities or assumptions of site under the ‘‘e-Filing’’ link. The
including the validity of the liability by JPMorgan should file a
methodology and assumptions used; (3) motion to intervene or protest with the
ways to enhance the quality, utility and Federal Energy Regulatory Commission,

VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\25MRN1.SGM 25MRN1
15314 Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices

Commission strongly encourages approvals, including the authority to ENVIRONMENTAL PROTECTION


electronic filings. sell electricity at market-based rates, AGENCY
Linda Mitry,
and the grant of waiver of certain
[ER–FRL–6661–8]
Commission regulations. Premcor Power
Deputy Secretary.
states that it intends to engage in Environmental Impact Statements and
[FR Doc. E5–1299 Filed 3–24–05; 8:45 am]
wholesale electric power and energy Regulations; Availability of EPA
BILLING CODE 6717–01–P
purchases and sales as a marketer. Comments
Premcor Power further states it is not
Availability of EPA comments
DEPARTMENT OF ENERGY engaged in the business of generating or
prepared pursuant to the Environmental
transmitting electric power.
Review Process (ERP), under Section
Federal Energy Regulatory Comment Date: 5 p.m. eastern time on 309 of the Clean Air Act and Section
Commission March 25, 2005. 102(2)(c) of the National Environmental
[Docket No. ER04–230–009, et al.]
Standard Paragraph Policy Act, as amended. Requests for
copies of EPA comments can be directed
New York Independent System Any person desiring to intervene or to to the Office of Federal Activities at
Operator, Inc., et al.; Electric Rate and protest this filing must file in (202) 564–7167. An explanation of the
Corporate Filings accordance with Rules 211 and 214 of ratings assigned to draft environmental
March 18, 2005. the Commission’s Rules of Practice and impact statements (EISs) was published
The following filings have been made Procedure (18 CFR 385.211 and in the Federal Register dated April 2,
with the Commission. The filings are 385.214). Protests will be considered by 2004 (69 FR 17403).
listed in ascending order within each the Commission in determining the Draft EISs
docket classification. appropriate action to be taken, but will ERP No. D–AFS–F65048–WI Rating
1. New York Independent System not serve to make protestants parties to EC2, Lakewood/Laona Plantation
Operator, Inc. the proceeding. Any person wishing to Thinning Project, To Implement
become a party must file a notice of Vegetation Management Activities,
[Docket No. ER04–230–009] intervention or motion to intervene, as Chequamegon-Nicolet National Forest,
Take notice that on March 9, 2005, the appropriate. Such notices, motions, or Lakewood Ranger District, Forest,
New York Independent Operator, Inc. protests must be filed on or before the Langlade, and Oconto Counties, WI.
(NYISO) submitted a request for waiver comment date. Anyone filing a motion Summary: EPA expressed
of tariff provisions as needed to enable to intervene or protest must serve a copy environmental concerns about the
the NYISO to correct errors in price of that document on the Applicant and proposed project’s cumulative and
determinations resulting from certain all parties to this proceeding. indirect impacts.
problems encountered in the ERP No. D–COE–B09801–MA Rating
implementation of the NYISO’s The Commission encourages
3, Cape Wind Energy Project, Construct
Standard Market Design version 2 electronic submission of protests and
and Operate 130 Wind Turbine
software. The NYISO has requested interventions in lieu of paper using the Generators on Horseshoe Shoal in
expedited action. ‘‘eFiling’’ link at http://www.ferc.gov. Nantucket Sound, MA.
Comment Date: 5 p.m. eastern time on Persons unable to file electronically Summary: EPA commented that the
March 28, 2005. should submit an original and 14 copies information and analysis provided in
of the protest or intervention to the the Draft EIS was inadequate, noting
2. PJM Interconnection, L.L.C.
Federal Energy Regulatory Commission, that the DEIS does not provide enough
[Docket No. ER05–626–001] 888 First Street, NE., Washington, DC information to fully characterize
Take notice that on March 4, 2005, 20426. baseline environmental conditions, the
PJM Interconnection, L.L.C. (PJM) environmental impacts of the project,
This filing is accessible on-line at
submitted a clarification to its February and alternatives that avoid or minimize
http://www.ferc.gov, using the
18, 2005, filing submitting revised tariff those impacts.
‘‘eLibrary’’ link and is available for
sheets in compliance with the Order No. ERP No. D–COE–G32057–TX Rating
2003–B issued December 20, 2004, review in the Commission’s Public
LO, Cedar Bayou Navigation Channel
Standardization of Generator Reference Room in Washington, DC.
(CBNC) Improvements Project,
Interconnection Agreements and There is an ‘‘eSubscription’’ link on the
Implementation, Near Baytown in
Procedures, 109 FERC ¶ 61,287 (2004). Web site that enables subscribers to
Harris and Chambers Counties, TX.
PJM states that the revised tariff sheets receive e-mail notification when a Summary: EPA had no objections to
should have an effective date of January document is added to a subscribed the proposed alternative.
19, 2005, not February 18, 2005 as docket(s). For assistance with any FERC ERP No. D–SFW–K99034–CA Rating
previously stated in the notice issued Online service, please e-mail EC2, Coachella Valley Multiple Species
February 24, 2005 in Docket No. ER05– FERCOnlineSupport@ferc.gov, or call Habitat Conservation Plan (MSHCP),
626–000. (866) 208–3676 (toll free). For TTY, call Santa Rosa and San Jacinto Mountains
Comment Date: 5 p.m. eastern time on (202) 502–8659. Trails Plan, Issuance of Incidental Take
March 25, 2005. Permits, Riverside County, CA.
Linda Mitry, Summary: EPA expressed
3. Premcor Power Marketing LLC Deputy Secretary. environmental concerns about water
[Docket No. ER05–680–000] [FR Doc. E5–1302 Filed 3–24–05; 8:45 am] and air quality impacts, and requested
Take notice that on March 4, 2005, BILLING CODE 6717–01–P additional information regarding
Premcor Power Marketing LLC (Premcor consultation with tribal governments,
Power) submitted for filing a petition for environmental justice issues,
acceptance of its initial rate schedule enforcement of the Plan, and impacts to
and the grant of certain blanket cultural resources and migratory birds.