You are on page 1of 6

Federal Register / Vol. 70, No.

46 / Thursday, March 10, 2005 / Notices 11975

FEDERAL COMMUNICATIONS http://www.BCPIWEB.com. When A of the Auction No. 81 Comment


COMMISSION ordering documents from BCPI, please Public Notice have been subject to
provide the appropriate FCC document competition through the opening and
[Report No. AUC–05–81–C (Auction No. 81);
number (for example, DA 05–506 for the closing of the relevant period for filing
DA 05–506]
Auction No. 81 Comment Public competing applications. All
Low Power Television Auction No. 81 Notice). The Auction No. 81 Comment applications within an identified MX
Scheduled for September 14, 2005; Public Notice and related documents are Group are directly mutually exclusive
Auction No. 81 Applicants Must also available on the Internet at the with one another, and therefore a single
Provide Supplemental Information by Commission’s Web site: http:// construction permit will be auctioned
March 18, 2005; Comment Sought on wireless.fcc.gov/auctions/81/.
for each MX Group identified in
Reserve Prices or Minimum Opening I. General Information Attachment A of the Auction No. 81
Bids and Other Auction Procedures Comment Public Notice. An applicant
1. By the Auction No. 81 Comment
AGENCY: Federal Communications Public Notice, the Wireless may submit only one bid per round for
Commission. Telecommunications Bureau (the a construction permit for a particular
ACTION: Notice. ‘‘Bureau’’) and the Media Bureau MX group, even if the applicant has
(collectively referred to as the submitted more than one engineering
SUMMARY: This document announces the ‘‘Bureaus’’) announce the auction of proposal that is included in the MX
auction of construction permits for construction permits for certain LPTV, group.
certain low power television (LPTV), television translator and Class A Note: In no instance will more than a
television translator and Class A Television broadcast stations, scheduled single construction permit be awarded to a
Television broadcast stations scheduled to commence on September 14, 2005 winning bidder for a particular MX group,
to commence on September 14, 2005 (Auction No. 81). The construction even if a winning bidder has submitted more
(Auction No. 81). This document also permits to be auctioned are the subject than one engineering proposal that is
notifies Auction No. 81 applicants that of pending, mutually exclusive included in that MX group.
they must provide their FCC applications for referenced broadcast
Registration Number (FRN) and seeks services for which the Commission has 4. Auction No. 81 will use the FCC’s
comment on reserve prices or minimum not approved settlement agreements or Integrated Spectrum Auction System
opening bids and other procedures for engineering amendments. Participation (‘‘ISAS’’ or ‘‘FCC Auction System’’), an
Auction No. 81. in this auction will be limited to those extensive redesign of the previous
DATES: Comments are due on or before applicants for construction permits auction application and bidding
March 18, 2005, and reply comments identified in Attachment A of the systems. The redesign includes FCC
are due on or before March 25, 2005. Auction No. 81 Comment Public Notice. Form 175 application enhancements
ADDRESSES: Comments and reply Applicants will be eligible to bid only
such as discrete data elements in place
comments must be sent by electronic on those construction permits as set
of free-form exhibits and improved data
mail to the following address: forth in Attachment A of the Auction
No. 81 Comment Public Notice. accuracy through automated checking of
auction81@fcc.gov. FCC Form 175 applications.
2. Supplemental Information
FOR FURTHER INFORMATION CONTACT: For Required: The applicants listed in Enhancements have also been made to
legal questions: Lynne Milne at (202) Attachment A of the Auction No. 81 the FCC Form 175 application search
418–0660. For general auction Comment Public Notice may only function. The auction bidding system
questions: Jeff Crooks at (202) 418–0660 continue to participate in Auction No. has also been updated for easier
or Lisa Stover at (717) 338–2888. For 81 if they provide their FCC Registration navigation, customizable results, and
service rule questions, contact the Video Number (FRN) no later than 5 p.m. improved functionality.
Division, Media Bureau, as follows: Eastern Time (ET) on March 18, 2005,
Shaun Maher or Hossein Hashemzadeh 5. Section 309(j)(3) of the
in accordance with public notice, Communications Act of 1934, as
at (202) 418–1600. Applicants for Low Power Television amended, requires the Commission to
SUPPLEMENTARY INFORMATION: This is a Construction Permits to be Awarded in
summary of the Commission’s Public ‘‘ensure that, in the scheduling of any
Auction No. 81 Must Submit
Notice released February 28, 2005, competitive bidding under this
Supplemental Information by March 18,
Auction No. 81 Comment Public Notice. 2005, DA 05–505, which was released subsection, an adequate period is
The complete text of the Auction No. 81 concurrently with this public notice, allowed * * * before issuance of
Comment Public Notice, including an February 28, 2005. If an applicant fails bidding rules, to permit notice and
attachment and any related Commission to provide this information in the comment on proposed auction
documents is available for public manner and time specified in that procedures * * *.’’ Consistent with the
inspection and copying during regular public notice, its engineering provisions of Section 309(j)(3) and to
business hours at the FCC Reference proposal(s) will be dismissed and it will ensure that potential bidders have
Information Center, Portals II, 445 12th not be permitted to participate in the adequate time to familiarize themselves
Street, SW., Room CY–A257, auction. with the specific rules that will govern
Washington DC 20554. The Auction No. 3. Attachment A of the Auction No. 81 the day-to-day conduct of an auction,
81 Comment Public Notice and related Comment Public Notice sets forth the the Commission directed the Bureaus,
Commission documents may also be mutually exclusive applicant groups under existing delegated authority, to
purchased from the Commission’s (‘‘MX Groups’’) accompanied by their seek comment on a variety of auction-
duplicating contractor, Best Copy and respective minimum opening bids and specific procedures prior to the start of
Printing, Inc. (BCPI), Portals II, 445 12th upfront payments. Attachment A of the each auction. The Bureaus therefore
Street, SW., Room CY–B402, Auction No. 81 Comment Public Notice seek comment on the following issues
Washington, DC, 20554, telephone (202) also lists the names of the applicants for relating to Auction No. 81.
488–5300, facsimile (202) 488–5563, or construction permits in each MX Group.
you may contact BCPI at its Web site: All MX Groups identified in Attachment

VerDate jul<14>2003 18:28 Mar 09, 2005 Jkt 205001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1
11976 Federal Register / Vol. 70, No. 46 / Thursday, March 10, 2005 / Notices

II. Auction Structure provisionally winning bids on) in any its current bidding eligibility. During
single round, and submit an upfront Stage Two, a bidder’s reduced eligibility
A. Simultaneous Multiple-Round
payment amount covering that total for the next round will be calculated by
Auction Design
number of bidding units. Provisionally multiplying the bidder’s current round
6. We propose to award all winning bids are bids that would activity by twenty-nineteenths (20⁄19).
construction permits included in become final winning bids if the auction 12. We seek comment on these
Auction No. 81 in a simultaneous were to close in that given round. We proposals. Commenters that believe
multiple-round auction. As described seek comment on this proposal. these activity rules should be modified
further below, this methodology offers should explain their reasoning and
every construction permit for bid at the C. Activity Rules
comment on the desirability of an
same time with successive bidding 9. In order to ensure that the auction alternative approach. Commenters are
rounds in which bidders may place closes within a reasonable period of advised to support their claims with
bids. We seek comment on this time, an activity rule requires bidders to analyses and suggested alternative
proposal. bid actively throughout the auction, activity rules.
rather than wait until late in the auction
B. Upfront Payment and Bidding D. Activity Rule Waivers and Reducing
before participating. Bidders are
Eligibility Eligibility
required to be active on a specific
7. The Bureaus have delegated percentage of their current bidding 13. Use of an activity rule waiver
authority and discretion to determine an eligibility during each round of the preserves the bidder’s current bidding
appropriate upfront payment for each auction. A bidder that does not satisfy eligibility despite the bidder’s activity
construction permit being auctioned, the activity rule either will lose bidding in the current round being below the
taking into account such factors as the eligibility in the next round or must use required minimum level. An activity
efficiency of the auction process and the an activity rule waiver (if any remain). rule waiver applies to an entire round
potential value of similar spectrum. As 10. We propose to divide the auction of bidding and not to a particular
described further below, the upfront into two stages, each characterized by a construction permit. Activity rule
payment is a refundable deposit made different activity requirement. The waivers can be either proactive or
by each bidder to establish eligibility to auction will start in Stage One. We automatic and are principally a
bid on LPTV, television translator, and propose that the auction generally will mechanism for auction participants to
Class A television station construction advance from Stage One to Stage Two avoid the loss of bidding eligibility in
permits. Upfront payments related to when the auction activity level, as the event that exigent circumstances
the specific spectrum subject to auction measured by the percentage of bidding prevent them from placing a bid in a
protect against frivolous or insincere units receiving new provisionally
bidding and provide the Commission particular round.
winning bids, is approximately twenty
with a source of funds from which to 14. The FCC Auction System assumes
percent or below for three consecutive
collect payments owed at the close of that bidders with insufficient activity
rounds of bidding. However, we further
the auction. With these guidelines in would prefer to apply an activity rule
propose that the Bureaus retain the
mind, we propose the schedule of waiver (if available) rather than lose
discretion to change stages unilaterally
upfront payments contained in bidding eligibility. Therefore, the
by announcement during the auction. In
Attachment A of the Auction No. 81 system will automatically apply a
exercising this discretion, the Bureaus
Comment Public Notice. We seek waiver at the end of any bidding round
will consider a variety of measures of
comment on this proposal. where a bidder’s activity level is below
bidder activity, including, but not
8. We further propose that the amount the minimum required unless: (1) The
limited to, the auction activity level, the
of the upfront payment submitted by a bidder has no activity rule waivers
percentage of construction permits (as
bidder will determine the maximum available; or (2) the bidder overrides the
measured in bidding units) on which
number of bidding units on which a automatic application of a waiver by
there are new bids, the number of new
bidder may place bids. This limit is a reducing eligibility, thereby meeting the
bids, and the percentage increase in
bidder’s initial bidding eligibility. Each minimum requirement.
revenue. We seek comment on these
construction permit is assigned a proposals. Note: If a bidder has no waivers remaining
specific number of bidding units equal 11. For Auction No. 81, we propose and does not satisfy the required activity
to the upfront payment listed in the following activity requirements: level, its eligibility will be permanently
Attachment A of the Auction No. 81 Stage One: In each round of the first reduced, possibly eliminating the bidder
Comment Public Notice, on a bidding from further bidding in the auction.
stage of the auction, a bidder desiring to
unit per dollar basis. Bidding units for maintain its current bidding eligibility 15. A bidder with insufficient activity
a given construction permit do not is required to be active on construction may wish to reduce its bidding
change as prices rise during the auction. permits representing at least 80 percent eligibility rather than use an activity
A bidder’s upfront payment is not of its current bidding eligibility. Failure rule waiver. If so, the bidder must
attributed to specific construction to maintain the requisite activity level affirmatively override the automatic
permits. Rather, a bidder may place bids will result in a reduction in the bidder’s waiver mechanism during the bidding
on any combination of construction bidding eligibility in the next round of round by using the ‘‘reduce eligibility’’
permits as long as the total number of bidding (unless an activity rule waiver function in the FCC Auction System. In
bidding units associated with those is used). During Stage One, a bidder’s this case, the bidder’s eligibility is
construction permits does not exceed its reduced eligibility for the next round permanently reduced to bring the bidder
current eligibility. Eligibility cannot be will be calculated by multiplying the into compliance with the activity rules
increased during the auction; it can only bidder’s current round activity by five- as described above. Once eligibility has
remain the same or decrease. Thus, in fourths (5⁄4). been reduced, a bidder will not be
calculating its upfront payment amount, Stage Two: In each round of the permitted to regain its lost bidding
an applicant must determine the second stage, a bidder desiring to eligibility.
maximum number of bidding units it maintain its current bidding eligibility 16. A bidder may apply an activity
may wish to bid on (or hold is required to be active on 95 percent of rule waiver proactively as a means to

VerDate jul<14>2003 18:28 Mar 09, 2005 Jkt 205001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1
Federal Register / Vol. 70, No. 46 / Thursday, March 10, 2005 / Notices 11977

keep the auction open without placing followed by the release of round results. market size, population covered by the
a bid. If a bidder proactively applies an Details regarding the location and proposed LPTV, television translator or
activity rule waiver (using the ‘‘apply format of round results will be included Class A Television facility, industry
waiver’’ function in the FCC Auction in the same public notice. cash flow data and recent broadcast
System) during a bidding round in 21. The Bureaus have discretion to transactions. We seek comment on this
which no bids or withdrawals are change the bidding schedule in order to proposal.
submitted, the auction will remain open foster an auction pace that reasonably 26. If commenters believe that these
and the bidder’s eligibility will be balances speed with the bidders’ need to minimum opening bid amounts will
preserved. An automatic waiver applied study round results and adjust their result in substantial numbers of unsold
by the FCC Auction System in a round bidding strategies. The Bureaus may construction permits, or are not
in which there are no new bids or increase or decrease the amount of time reasonable amounts, or should instead
withdrawals will not keep the auction for the bidding rounds and review operate as reserve prices, they should
open. rounds, or the number of rounds per explain why this is so, and comment on
Note: Applying a waiver is irreversible;
day, depending upon the bidding the desirability of an alternative
once a proactive waiver is submitted that activity level and other factors. We seek approach. Commenters are advised to
waiver cannot be unsubmitted, even if the comment on this proposal. support their claims with valuation
round has not yet closed. analyses and suggested reserve prices or
B. Reserve Price or Minimum Opening
17. We propose that each bidder in minimum opening bid amount levels or
Bid
formulas. In establishing the minimum
Auction No. 81 be provided with three 22. Section 309(j) calls upon the opening bid amounts, we particularly
activity rule waivers that may be used Commission to prescribe methods for seek comment on such factors as the
at the bidder’s discretion during the establishing a reasonable reserve price potential value of the spectrum being
course of the auction as set forth above. or a minimum opening bid amount auctioned including the type of service
We seek comment on this proposal. when FCC licenses or construction and class of facility offered, market size,
E. Information Relating to Auction permits are subject to auction (i.e., population covered by the proposed
Delay, Suspension, or Cancellation because the Commission has accepted LPTV, television translator or Class A
mutually exclusive applications for television facility, industry cash flow
18. For Auction No. 81, we propose
those construction permits), unless the and recent broadcast transactions and
that, by public notice or by
Commission determines that a reserve other relevant factors that could
announcement during the auction, the
price or minimum opening bid amount reasonably have an impact on valuation
Bureaus may delay, suspend, or cancel
is not in the public interest. Consistent of the broadcast spectrum. We also seek
the auction in the event of natural with this mandate, the Commission has
disaster, technical obstacle, evidence of comment on whether, consistent with
directed the Bureaus to seek comment Section 309(j), the public interest would
an auction security breach, unlawful on the use of minimum opening bid
bidding activity, administrative or be served by having no minimum
amounts and/or reserve price prior to opening bid amount or reserve price.
weather necessity, or for any other the start of each auction of broadcast
reason that affects the fair and efficient construction permits. C. Minimum Acceptable Bid Amounts
conduct of competitive bidding. In such 23. Normally, a reserve price is an and Bid Increments
cases, the Bureaus, in their sole absolute minimum price below which 27. In each round, eligible bidders
discretion, may elect to resume the an item will not be sold in a given will be able to place bids on a given
auction starting from the beginning of auction. Reserve prices can be either construction permit in any of nine
the current round, resume the auction published or unpublished. A minimum different amounts. The FCC Auction
starting from some previous round, or opening bid amount, on the other hand, System interface will list the nine
cancel the auction in its entirety. is the minimum bid price set at the acceptable bid amounts for each
Network interruption may cause the beginning of the auction below which construction permit.
Bureaus to delay or suspend the no bids are accepted. It is generally used 28. The minimum acceptable bid
auction. We emphasize that exercise of to accelerate the competitive bidding amount for a construction permit will be
this authority is solely within the process. Also, the auctioneer often has equal to its minimum opening bid
discretion of the Bureaus, and its use is the discretion to lower the minimum amount until there is a provisionally
not intended to be a substitute for opening bid amount later in the auction. winning bid for the construction permit.
situations in which bidders may wish to It is also possible for the minimum After there is a provisionally winning
apply their activity rule waivers. We opening bid amount and the reserve bid for a construction permit, the
seek comment on this proposal. price to be the same amount. minimum acceptable bid amount for
III. Bidding Procedures 24. In light of Section 309(j)’s that construction permit will be equal to
requirements, the Bureaus propose to the amount of the provisionally winning
A. Round Structure establish minimum opening bid bid plus an additional amount. The
19. The Commission will conduct amounts for Auction No. 81. The minimum acceptable bid amount will be
Auction No. 81 over the Internet. Bureaus believe a minimum opening bid calculated by multiplying the
Alternatively, telephonic bidding will amount, which has been used in other provisionally winning bid amount times
also be available. The toll free telephone auctions, is an effective bidding tool. one plus the minimum acceptable bid
number through which telephonic 25. For Auction No. 81, the proposed percentage—e.g., if the minimum
bidding may be accessed will be minimum opening bid for each MX acceptable bid percentage is 10 percent,
provided to bidders. Group, as listed in Attachment A of the the minimum acceptable bid amount
20. The initial bidding schedule will Auction No. 81 Comment Public Notice, will equal (provisionally winning bid
be announced in a public notice to be was determined by taking into account amount) * * * (1.10), rounded. We will
released at least one week before the various factors related to the efficiency round the result using our standard
start of the auction. The simultaneous of the auction and the potential value of rounding procedures.
multiple-round format will consist of the spectrum, including the type of 29. The nine acceptable bid amounts
sequential bidding rounds, each service and class of facility offered, for each construction permit consist of

VerDate jul<14>2003 18:28 Mar 09, 2005 Jkt 205001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1
11978 Federal Register / Vol. 70, No. 46 / Thursday, March 10, 2005 / Notices

the minimum acceptable bid amount for that construction permit, the Commission’s bid withdrawal
and additional amounts calculated winning bidder would be the one that procedures.
using the minimum acceptable bid placed the selected provisionally 38. Applying this reasoning, we
amount and the bid increment winning bid. However, the remaining propose to limit each bidder in Auction
percentage. We will round the results bidders, as well as the provisionally No. 81 to withdrawing provisionally
using our standard rounding winning bidder, can submit higher bids winning bids in no more than one round
procedures. The first additional in subsequent rounds. If any bids are during the course of the auction. To
acceptable bid amount equals the received on the construction permit in permit a bidder to withdraw bids in
minimum acceptable bid amount times a subsequent round, the provisionally more than one round may encourage
one plus the bid increment percentage, winning bid again will be determined insincere bidding or the use of
rounded—e.g., if the increment by the highest bid amount received for withdrawals for anti-competitive
percentage is 10 percent, the calculation the construction permit. purposes. The round in which
is (minimum acceptable bid amount) 34. A provisionally winning bid will withdrawals may be used will be at the
* * * (1 + 0.10), rounded, or (minimum remain the provisionally winning bid bidder’s discretion; withdrawals
acceptable bid amount) * * * 1.10, until there is a higher bid on the same otherwise must be in accordance with
rounded; the second additional construction permit at the close of a the Commission’s rules. There is no
acceptable bid amount equals the subsequent round, unless the limit on the number of provisionally
minimum acceptable bid amount times provisionally winning bid is withdrawn. winning bids that may be withdrawn in
one plus two times the bid increment Bidders are reminded that provisionally the round in which withdrawals are
percentage, rounded, or (minimum winning bids confer credit for activity. used. Withdrawals will remain subject
acceptable bid amount) * * * 1.20, E. Information Regarding Bid to the bid withdrawal payment
rounded; the third additional acceptable Withdrawal and Bid Removal provisions specified in the
bid amount equals the minimum Commission’s rules. We seek comment
acceptable bid amount times one plus 35. For Auction No. 81, we propose
on this proposal.
three times the bid increment the following bid removal and bid
percentage, rounded, or (minimum withdrawal procedures. Before the close F. Stopping Rule
acceptable bid amount) * * * 1.30, of a bidding round, a bidder has the
39. The Bureaus have discretion ‘‘to
rounded; etc. Note that the bid option of removing any bid placed in
establish stopping rules before or during
increment percentage need not be the that round. By removing selected bids in
multiple round auctions in order to
same as the minimum acceptable bid the FCC Auction System, a bidder may
effectively ‘‘unsubmit’’ any bid placed terminate the auction within a
percentage. reasonable time.’’ For Auction No. 81,
30. In the case of a construction within that round. A bidder removing a
bid placed in the same round is not the Bureaus propose to employ a
permit for which the provisionally simultaneous stopping rule approach. A
winning bid has been withdrawn, the subject to a withdrawal payment. Once
a round closes, a bidder may no longer simultaneous stopping rule means that
minimum acceptable bid amount will all construction permits remain
equal the second highest bid received remove a bid.
36. A bidder may withdraw its available for bidding until bidding
for the construction permit. closes simultaneously on all
31. For Auction No. 81, the Bureaus provisionally winning bids using the
‘‘withdraw bids’’ function in the FCC construction permits.
propose to use a minimum acceptable
bid percentage of 10 percent. This Auction System. A bidder that 40. Bidding will close simultaneously
means that the minimum acceptable bid withdraws its provisionally winning on all construction permits after the first
amount for a construction permit will be bid(s) is subject to the bid withdrawal round in which no bidder submits any
approximately 10 percent greater than payment provisions of the Commission new bids, applies a proactive waiver, or
the provisionally winning bid amount rules. We seek comment on these bid places any withdrawals. Thus, unless
for the construction permit. removal and bid withdrawal circumstances dictate otherwise,
32. The Bureaus retain the discretion procedures. bidding will remain open on all
to change the minimum acceptable bid 37. In the Part 1 Third Report and construction permits until bidding stops
amounts, the minimum acceptable bid Order, 63 FR 770, January 7, 1998, the on every construction permit.
percentage, and the bid increment Commission explained that allowing bid 41. However, the Bureaus propose to
percentage if it determines that withdrawals facilitates efficient retain the discretion to exercise any of
circumstances so dictate. The Bureaus aggregation of licenses and construction the following options during Auction
will do so by announcement in the FCC permits and the pursuit of efficient No. 81:
Auction System during the auction. We backup strategies as information i. Use a modified version of the
seek comment on these proposals. becomes available during the course of simultaneous stopping rule. The
an auction. The Commission noted, modified stopping rule would close the
D. Provisionally Winning Bids however, that, in some instances, auction for all construction permits after
33. At the end of a bidding round, a bidders may seek to withdraw bids for the first round in which no bidder
provisionally winning bid amount for improper reasons. The Bureaus, applies a waiver, places a withdrawal or
each construction permit will be therefore, have discretion, in managing submits any new bids on any
determined based on the highest bid the auction, to limit the number of construction permit for which it is not
amount received for the construction withdrawals to prevent any bidding the provisionally winning bidder. Thus,
permit. In the event of identical high bid abuses. The Commission stated that the absent any other bidding activity, a
amounts being submitted on a Bureaus should assertively exercise bidder placing a new bid on a
construction permit in a given round their discretion, consider limiting the construction permit for which it is the
(i.e., tied bids), we propose to use a number of rounds in which bidders may provisionally winning bidder would not
random number generator to select a withdraw bids, and prevent bidders keep the auction open under this
single provisionally winning bid from from bidding on a particular modified stopping rule. The Bureaus
among the tied bids. If the auction were construction permit if the Bureaus find further seek comment on whether this
to end with no higher bids being placed that a bidder is abusing the modified stopping rule should be used

VerDate jul<14>2003 18:28 Mar 09, 2005 Jkt 205001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1
Federal Register / Vol. 70, No. 46 / Thursday, March 10, 2005 / Notices 11979

at any time or only in stage two of the continue such research during the the accuracy and completeness of
auction. auction. information furnished in its pending
ii. Keep the auction open even if no 45. Potential bidders should note that application and to notify the
bidder submits any new bids, applies a LPTV and TV translator stations are Commission within 30 days of any
waiver or places any withdrawals. In authorized with ‘‘secondary’’ frequency substantial change that may be of
this event, the effect will be the same as use status. These stations may not cause decisional significance to that
if a bidder had applied a waiver. The interference to, and must accept application. Thus, § 1.65 requires an
activity rule, therefore, will apply as interference from, full service television auction applicant to notify the
usual and a bidder with insufficient stations, certain land mobile radio Commission of any violation of the anti-
activity will either lose bidding operations, and other primary services. collusion rules upon learning of such
eligibility or use a remaining activity See, e.g., 47 CFR 74.703, 74.709 and violation. Applicants are therefore
rule waiver. 90.303. required by § 1.65 to make such
iii. Declare that the auction will end IV. Prohibition of Collusion notification to the Commission
after a specified number of additional immediately upon discovery. In
46. Auction No. 81 applicants are addition, § 1.2105(c)(6) requires that any
rounds (‘‘special stopping rule’’). If the
reminded that the anti-collusion rules applicant that makes or receives a
Bureaus invoke this special stopping
found at §§ 1.2105(c) and 73.5002(d) of communication prohibited by
rule, it will accept bids in the specified
the Commission’s rules are in effect. § 1.2105(c) must report such
final round(s) and the auction will
These rules prohibit applicants communication to the Commission in
close. competing for construction permits in
42. The Bureaus propose to exercise writing immediately, and in no case
either the same geographic license area later than five business days after the
these options only in certain or the same MX Group from
circumstances, for example, where the communication occurs.
communicating with each other during
auction is proceeding very slowly, there the auction about bids, bidding V. Conclusion
is minimal overall bidding activity, or it strategies, or settlements unless they Comments are due on or before March
appears likely that the auction will not have identified each other as parties 18, 2005, and reply comments are due
close within a reasonable period of time. with whom they have entered into on or before March 25, 2005. Because of
Before exercising these options, the agreements under § 1.2105(a)(2)(viii). the disruption of regular mail and other
Bureaus are likely to attempt to increase For Auction No. 81, this prohibition deliveries in Washington, DC, the
the pace of the auction by, for example, became effective at the short-form Bureaus require that all comments and
increasing the number of bidding application filing deadline on August 4, reply comments be filed electronically.
rounds per day, and/or increasing the 2000, and will end on the post-auction Comments and reply comments, and
amount of the minimum bid increments down payment deadline, which will be copies of material filed with the
for the limited number of construction announced in a future public notice. Commission pertaining to Auction No.
permits where there is still a high level This prohibition applies to all 81, must be sent by electronic mail to
of bidding activity. We seek comment applicants regardless of whether such the following address:
on these proposals. applicants become qualified bidders or auction81@fcc.gov. The electronic mail
III. Due Diligence actually bid. For purposes of this containing the comments or reply
prohibition, § 1.2105(c)(7)(i) defines comments must include a subject or
43. Potential bidders are solely applicant as including all controlling caption referring to Auction No. 81
responsible for investigating and interests in the entity submitting a Comments and the name of the
evaluating all technical and market short-form application to participate in commenting party. The Bureaus request
place factors that may have a bearing on the auction, as well as all holders of that parties format any attachments to
the value of the broadcast facilities in partnership and other ownership electronic mail as Adobe Acrobat
this auction. The FCC makes no interests and any stock interest (pdf) or Microsoft Word documents.
representations or warranties about the amounting to 10 percent or more of the Copies of comments and reply
use of this spectrum for particular entity, or outstanding stock, or comments will be available for public
services. Applicants should be aware outstanding voting stock of the entity inspection during regular business
that an FCC auction represents an submitting a short-form application, and hours in the FCC Reference Information
opportunity to become an FCC all officers and directors of that entity. Center, Room CY–A257, 445 12th Street,
permittee in the broadcast service, If parties had agreed in principle on all SW., Washington, DC 20554, and will
subject to certain conditions and material terms, those parties must have also be posted on the Web page for
regulations. An FCC auction does not been identified on the short-form Auction No. 81 at http://
constitute an endorsement by the FCC of application under § 1.2105(c), even if wireless.fcc.gov/auctions/81. In
any particular service, technology, or the agreement had not been reduced to addition, the Bureaus request that
product, nor does an FCC construction writing. If parties had not agreed in commenters fax a courtesy copy of their
permit or license constitute a guarantee principle by the filing deadline, an comments and reply comments to the
of business success. Applicants should applicant should not have included the attention of Kathryn Garland at (717)
perform their individual due diligence names of those parties on its 338–2850.
before proceeding as they would with application, and must not have 48. This proceeding has been
any new business venture. continued negotiations with other designated as a ‘‘permit-but-disclose’’
44. Potential bidders are strongly applicants for licenses in the same proceeding in accordance with the
encouraged to conduct their own geographic area. Commission’s ex parte rules. Persons
research prior to Auction No. 81 in 47. By electronically submitting their making oral ex parte presentations are
order to determine the existence of FCC Form 175 short-form applications, reminded that memoranda summarizing
pending proceedings that might affect applicants certified their compliance the presentations must contain
their decisions regarding participation with §§ 1.2105(c) and 73.5002. In summaries of the substance of the
in the auction. Participants in Auction addition, § 1.65 of the Commission’s presentations and not merely a listing of
No. 81 are strongly encouraged to Rules requires an applicant to maintain the subjects discussed. More than a one

VerDate jul<14>2003 18:28 Mar 09, 2005 Jkt 205001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1
11980 Federal Register / Vol. 70, No. 46 / Thursday, March 10, 2005 / Notices

or two sentence description of the views Frequency: On occasion Estimated average hours per response:
and arguments presented is generally Reporters: Households and Aggregate report, 5 hours; policy
required. Other rules pertaining to oral individuals statement, 20 hours
and written ex parte presentations in Annual reporting hours: 658 hours Number of respondents: 935
permit-but-disclose proceedings are set Estimated average hours per response: General description of report: This
forth in § 1.1206(b) of the Commission’s Division of Research & Statistics, 1.33 information collection is mandatory (12
rules. minutes; Division of Consumer & U.S.C. 1828(o)) and is not given
Federal Communications Commission. Community Affairs, 3 minutes; Other confidential treatment.
divisions, 5 minutes; and Non–SRC Abstract: State member banks must
Gary D. Michaels, adopt and maintain a written real estate
Deputy Chief, Auction and Spectrum Access
surveys, 90 minutes.
Number of respondents: 600 lending policy. Also, banks must
Division, WTB. identify their loans in excess of the
[FR Doc. 05–4727 Filed 3–9–05; 8:45 am] General description of report: This
information collection is voluntary (12 supervisory loan–to–value limits and
BILLING CODE 6712–01–P
U.S.C. 225a, 263, and 15 U.S.C. 1691b). report (at least quarterly) the aggregate
No issue of confidentiality normally amount of the loans to the bank’s board
arises because names and any other of directors.
FEDERAL RESERVE SYSTEM characteristics that would permit Board of Governors of the Federal Reserve
personal identification of respondents System, March 4, 2005.
Agency Information Collection
Activities: Announcement of Board are not reported to the Board. However, Jennifer J. Johnson,
Approval Under Delegated Authority exemption 6 of the Freedom of Secretary of the Board.
and Submission to OMB Information Act (5 U.S.C. 552(b)(6)) [FR Doc. 05–4689 Filed 3–9–05; 8:45 am]
would exempt this information from BILLING CODE 6210–01–S
AGENCY: Board of Governors of the disclosure.
Federal Reserve System Abstract: The Federal Reserve uses
SUMMARY: Background. Notice is hereby this voluntary survey to obtain FEDERAL RESERVE SYSTEM
given of the final approval of proposed household–based information
information collections by the Board of specifically tailored to the Federal Change in Bank Control Notices;
Governors of the Federal Reserve Reserve’s policy, regulatory, and Acquisition of Shares of Bank or Bank
System (Board) under OMB delegated operational responsibilities. The Holding Companies
authority, as per 5 CFR 1320.16 (OMB University of Michigan’s Survey The notificants listed below have
Regulations on Controlling Paperwork Research Center (SRC) includes survey applied under the Change in Bank
Burdens on the Public). Board– questions on behalf of the Federal Control Act (12 U.S.C. 1817(j)) and
approved collections of information are Reserve in an addendum to their regular § 225.41 of the Board’s Regulation Y (12
incorporated into the official OMB monthly Survey of Consumer Attitudes CFR 225.41) to acquire a bank or bank
inventory of currently approved and Expectations. The SRC conducts the holding company. The factors that are
collections of information. Copies of the survey by telephone with a sample of considered in acting on the notices are
OMB 83–I’s and supporting statements 500 households and includes questions set forth in paragraph 7 of the Act (12
and approved collection of information of special interest to Board staff U.S.C. 1817(j)(7)).
instrument(s) are placed into OMB’s intermittently, as needed. The frequency The notices are available for
public docket files. The Federal Reserve and content of the questions depend on immediate inspection at the Federal
may not conduct or sponsor, and the changing economic, regulatory, and Reserve Bank indicated. The notices
respondent is not required to respond legislative developments. also will be available for inspection at
to, an information collection that has Current actions: On December 29, the office of the Board of Governors.
been extended, revised, or implemented 2004, the Federal Reserve issued for Interested persons may express their
on or after October 1, 1995, unless it public comment proposed revisions to views in writing to the Reserve Bank
displays a currently valid OMB control allow contractors, either the SRC or indicated for that notice or to the offices
number. others, to use broader surveying of the Board of Governors. Comments
FOR FURTHER INFORMATION CONTACT: techniques, such as mall intercept must be received not later than April 24,
Federal Reserve Board Clearance Officer testing, focus groups, and guided 2005.
– Michelle Long––Division of Research discussions (69 FR 78027). The Federal A. Federal Reserve Bank of Atlanta
and Statistics, Board of Governors of the Reserve did not receive any comments. (Andre Anderson, Vice President) 1000
Federal Reserve System, Washington, The changes will be implemented as Peachtree Street, N.E., Atlanta, Georgia
DC 20551 (202–452–3829). proposed. 30303:
OMB Desk Officer–Mark Menchik–– Final approval under OMB delegated 1. Douglas Williams and Zella Irene
Office of Information and Regulatory authority of the extension for three Williams, both of Portland, Tennessee;
Affairs, Office of Management and years, without revision of the following to acquire additional voting shares of
Budget, New Executive Office Building, report: First Farmers Bancshares, Inc., Portland,
Room 10235, Washington, DC 20503, or Tennessee, and thereby indirectly
email to mmenchik@omb.eop.gov. Report title: Recordkeeping acquire additional voting shares of The
Requirements associated with the Real Farmers Bank, Portland, Tennessee.
Final approval under OMB delegated Estate Lending Standards Regulation for B. Federal Reserve Bank of Chicago
authority of the extension for three State Member Banks (Patrick M. Wilder, Assistant Vice
years, with minor revision of the Agency form number: Reg H–5 President) 230 South LaSalle Street,
following report: OMB control number: 7100–0261 Chicago, Illinois 60690-1414:
Report title: Ongoing Intermittent Frequency: Aggregate report, 1. Everett D. Lawrence, Marshall,
Survey of Households quarterly; policy statement, annually Illinois, Lawrence Gravel, Phyllis
Agency form number: FR 3016 Reporters: State member banks Lawrence, and Kim Schmidt, acting in
OMB Control number: 7100–0150 Annual reporting hours: 19,660 hours concert to retain voting shares of

VerDate jul<14>2003 18:28 Mar 09, 2005 Jkt 205001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\10MRN1.SGM 10MRN1

You might also like