LAND TRANSPORTATION OFFICE

MOTOR VEHICLE INSPECTION SYSTEM


MAINTENANCE REPORT
CENTER
LOCATION
LANE NUMBER
PREPARED BY

A.

:
:
:
:

LTO-R3 MVIS
DATE
San Fernando, Pampanga
Lane 2 HV
CAPACITY
Archie Jan Sumayo
ATTESTED BY
HYMEG

: 18-20 January 2013


: 10 tons
:
LTO MVIS Chief

Stage-1 Equipments (Identity and Safety Device Checking)


Vehicle Specification Input Computer Panel
OK
Remarks and Suggestions:
O

Not

Performed cleaning and visual check of the appearance of the panel.

B.

Vehicle Identification and Safety Device Systems


Remarks and Suggestions:

OK
O

Not

OK

Not
X

Checked the software configuration and parameter setting. Performed


cleaning of the computer system.

C.

Process Indicator
Remarks and Suggestions:
Cleaned the process indicator pole and frame. Checked the setting of the
LCD monitor and its connections. The LCD monitor has an erratic color
display and must be replaced.
***Ok transfer from hgv stage 4 process indicator

Stage-2 Equipments (Alignment, Suspension, Brake and Speedometer Tests)


A. Side Slip Tester
OK Not
Remarks and Suggestions:
X
Cleaned the side sip tester and its pit. Inspected the presence sensor,
linear sensor, plate, plate cover and cable. Inspected the tester for any
deformities and mechanical deterioration. Checked its function. The
presence sensor and the plate cover are defective and must be replaced.
***need

to

replace

deform

and

stock

mechanism

B.

Suspension Tester
Remarks and Suggestions:

OK

Not

HV lane has no suspension tester.

C.

Brake Tester
Remarks and Suggestions:

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

Cleaned the brake tester. Removed large amount of dirt from the pit.
Grease and lubricate the mechanical components. Inspected the L/R
motors, brake rollers, chains, force/weight and inductive sensors,
bearings, acquisition modules, cabling system, linkages and covers.
Checked its function.
The center cover is deformed. The rear stopper is damaged that caused the
tester to misalign during the testing of heavy loads. The center cover must
be reformed. The rear stopper should be re-welded to its position on the
frame. The leveling bolts should be re-fixed with the rear stopper.

D.

Bogie Roller Unit


Remarks and Suggestions:
Cleaned the bogie roller. Removed large amount of dirt from the pit.
Grease and lubricate the mechanical parts. Inspected the rollers,
electrovalve, air cylinders, brake pads, bearings, linkages, pneumatic
system and covers. Checked its function. There is air leakage on the Yconnector of the electrovalve. The cover is deformed
Y-connector is defective and must be replaced as soon as possible. Cover
must be reformed.

E.

Speedometer Tester
Remarks and Suggestions:
Cleaned the speedometer tester. Removed large amount of dirt from the
pit. Grease and lubricate the mechanical parts. Inspected the rollers,
magnetic sensors, electrovalve, air bellows, acquisition module, brake
pads, guide rollers, lifting board, linkages and covers. Checked its
function. Checked its function. All brake pads are worn-out and one of the
brake pads is already damaged. Recommend to replace the brake pads.
***Two brake pads damaged

F.

Electro-Mechanical Control System


Remarks and Suggestions:
Cleaned the control panel and its components .Checked the functions of
each component. Inspected the terminals, wirings, switches and
connections.

G.

Process Indicator/IR receiver


Remarks and Suggestions:
Cleaned the process indicator pole and frame. Checked the setting of the
LCD monitor and its connections. Inspected IR receiver function.

H.

Pneumatic Supply System


Remarks and Suggestions:
Inspected the air line, gate valves and hose connections for cracks and

leakages.

I.

Communication/Data/Power Cabling System


Remarks and Suggestions:

OK
O

Not

OK
O

Not

Checked the physical condition of the cables for cracks, cuts, damages
and deteriorations. Inspected the terminals, connectors and plugs for
loose connections.

J.

Pit Condition
Remarks and Suggestions:
Removed the large amount of dirt present in the pit. Cleaned the pit and its
surroundings.
Recommend to clean the pit and its surrounding at least every month.

A.

Stage-3 Equipments (Headlight, Emission and Sound Level Tests)


Automatic Head Light Tester
OK Not
Remarks and Suggestions:
O
Cleaned the headlight tester. Grease and lubricate the mechanical
components of the tester. Inspected the measuring camera, light sensors,
chain, bearings, roller, drive motor and control relays. Checked its
function. The tester is functioning normally during first vehicle
measurement. However, during the second vehicle measurement, the tester
failed to measure the headlight correctly. Found-out that the camera and
its board (DSP board) are both deteriorating and must be replaced.
***Focusing but the reading is 0.00% in all results

B.

Sound Level Tester


Remarks and Suggestions:

OK
O

Not

OK

Not
X

OK
O

Not

Cleaned the sound level tester. Inspected the physical condition of the
tester and its function. Inspected the power supply, tripod, its mounting
and connections.

C.

Automatic 4-Gas Emission Tester


Remarks and Suggestions:
Cleaned the gas emission tester. Inspected the sampling probe/hose,
filters, sensors, IR bench, LCD screen, printer, keyboard, trolley, cables
and its physical appearance. Checked the function of the tester. The
analyzer took longer time to power-on that indicates that the power supply
has a leakage and deteriorating. The O2 sensor is exhausted. Recommend
to replace the power supply and the O2 sensor as soon as possible.
***Working Blurred LCD

D.

Diesel Smoke Tester


Remarks and Suggestions:
Cleaned the smoke tester. Inspected the sampling probe/hose, measuring
chamber, optical sensor, heating system, temperature sensor, exhaust fan,

LCD screen, printer, keyboard function, stand, cables and its physical
appearance. Checked the function of the tester.

E.

Electro-Mechanical Control System


Remarks and Suggestions:

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK

Not
X

OK
O

Not

OK
O

Not

OK

Not

Cleaned the control panel and its components .Checked the functions of
each component. Inspected the terminals, wirings, switches and
connections.

F.

Process Indicator/IR receiver


Remarks and Suggestions:
Cleaned the process indicator pole and frame. Checked the setting of the
LCD monitor and its connections. Inspected IR receiver function.

G.

Communication/Data/Power Cabling System


Remarks and Suggestions:
Checked the physical condition of the cables for cracks, cuts, damages
and deteriorations. Inspected the terminals, connectors and plugs for
loose connections.

H.

HLT Safety Device and Rail Systems


Remarks and Suggestions:
Cleaned the fence and the testers railings. Checked the alignment of the
railings and its level. Checked the home position of the tester.

A.

Stage-4 Equipments (Under-Carriage Checking)


Pit Under-Carriage Computer Panel
Remarks and Suggestions:
Performed cleaning and visual check of the appearance of the panel.

B.

Pit Under-Carriage Checking System


Remarks and Suggestions:
There is no CPU. The computer CPU is used to replace the defective CPU
of Stage 3 computer system.

C.

Joint Play Tester


Remarks and Suggestions:
Cleaned the joint play tester. Inspected the hose, cylinders, pump, bearing,
torch light, electrovalve and motor. Grease and lubricate moving parts.
Checked the function of the tester.

D.

Process Indicator
Remarks and Suggestions:
Cleaned the process indicator pole and frame. Checked the setting of the
LCD monitor and its connections.
***Defective transfer from HGV stage 1

A.

Stage-5 Equipments (Control Room)


System Controller Computer Panel

Remarks and Suggestions:

Performed cleaning and visual check of the appearance of the panel.

B.

Stage-2 Computer System


Remarks and Suggestions:

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

OK
O

Not

Checked the software configuration and parameter setting. Performed


cleaning of the computer system.

C.

Stage-3 Computer System


Remarks and Suggestions:
Checked the software configuration and parameter setting. Performed
cleaning of the computer system.

D.

Master Computer System


Remarks and Suggestions:
Checked the software configuration and parameter setting. Performed
cleaning of the computer system.

E.

Local DB Computer System


Remarks and Suggestions:
Checked the software configuration and parameter setting. Performed
cleaning of the computer system.

F.

Communication/Data/Power Cabling System


Remarks and Suggestions:
Inspected the physical condition of the cables for cracks, cuts, damages
and deteriorations. Inspected the terminals, connectors and plugs for
loose connections.

G.

Remote Controls
Remarks and Suggestions:
Inspected the physical condition of remote controls. Checked the function
of the keys and the transmitter.

H.

Internet Communication System


Remarks and Suggestions:
Inspected and cleaned the modem, router and switch hubs. Checked the
cables, connectors and its function.

I.

Printers (Inspection Report and Certificate of Compliance)


Remarks and Suggestions:
Cleaned the printers. Inspected the mechanical parts of the printer, cables,
connectors and its function.

Other Equipments

A.

Interphone/Two-way Radio System


Remarks and Suggestions:

OK

Not

OK
O

Not

OK

Not

OK
O

Not

OK
O

Not

OK

Not
O

Not inspected. They are not using the 2-way radio system.

B.

Loud Speaker System


Remarks and Suggestions:
Cleaned the loud speaker system. Inspected the connections, cables and its
physical appearance. Checked its function.

C.

TV Monitoring System
Remarks and Suggestions:
Not inspected. They are not using the TV monitoring system.

D.

Air Compressor System


Remarks and Suggestions:
Inspected the motor, belts, oil level, air pressure, switches, valves,
connections and magnetic contactors. Checked its function.

E.

Electric Distribution Panel


Remarks and Suggestions:
Performed cleaning and visual check of the appearance of the panel.
Inspected the switches, breakers, wirings, connections and terminals.

OVER-ALL EQUIPMENT/SYSTEM CHECKING


RESULT
Remarks:

There are defects on the, brake tester, speedometer, side slip bogie roller, headlight tester, gas
analyzer, LCD monitor and CPU due to normal wear-and-tear of the equipment. All equipment is
dirty and presence of foreign materials such as sand, dust and plastics will contribute on the
breakdown of the major components.

Recommendations:
Replacement of defective items. Regular preventive maintenance of the equipment of at least
every month. Regular cleaning of equipment pits and its surrounding.

Requested Items:
Speedometer brake pads, side slip presence sensor,20 LCD monitor, O2 sensor and power
supply of gas analyzer, Y-connector of bogie roller, DSP board and camera of headlight tester,
CPU of stage 4 computer system.