Professional Documents
Culture Documents
REVIEW/ACCEPT BY:
REVIEW/ACCEPT BY:
NAME:________________________________
NAME:_________________________________
SIGNATURE:__________________________
SIGNATURE:___________________________
DATE:________________________________
DATE:_________________________________
Semarang
ZTE SITE ID:
ZMSMG F5101
SITE NAME:
2015/08/06
Bumiayu
Test Engineer: Chandra S., A. Setiaji
Test date: 2015-08-06
Site ID : ZMSMG_F5101
Site information
Antenna Azimuth Azimuth
Tilt M/E Lat
Long
Height (Actual) (Planed)
52
20
20
2/3
-7.2525 109.004
ZMSMG_F5101 285101 ZSMGFM5101-31 486 2803
285101
ZSMGFM5101-32
487
52
150
150
2/3
-7.2525 109.004
ZMSMG_F5101
2803
52
270
270
2/3
-7.2525 109.004
ZMSMG_F5101 285101 ZSMGFM5101-33 488 2803
Site ID
eNB ID
Cell Name
PCI TAC
Site Address
Site Address
ZMSMG_F5101 - Jl. Kauman Rt 03/ Rw 01.
SEMARANG, Jawa Tengah, Indonesia.
Date
2015/08/04
1 (13)
Site ID : ZMSMG_F5101
1.
Summary:
Summary
Item
Accessibility
Accessibility
Integrity
Retainability
Retainability
Mobility
Mobility
Mobility
Integrity
Integrity
Test
RRC Connection Request Success Rate
VoLTE Setup Success Rate
32 bytes ping RTT
ERAB Drop Rate
Packet Lost
Intra eNB handover
Inter eNB handover
Volte handover
Average Download throughput
Average Upload throughput
Accessibility
SMS functionality one time per eNB
Success
*Three KPIs are excluded from SSV until VoLTE is ready
PCI
ZMSMG_F5101 (S1)
ZMSMG_F5101 (S2)
ZMSMG_F5101 (S3)
486
487
488
Date
2015/08/04
2 (13)
Site ID : ZMSMG_F5101
Google Map
Ite
m
Item
1
12
12
11
11
Date
2015/08/04
100%
100%
Drop Rate %
0%
3 (13)
Site ID : ZMSMG_F5101
2
3
12
0%
11
0%
Test Description
Data Call at ZMSMG_F5101 (S1)
Attempt Count
Success Count
Success
Rate %
Item
1
2
3
Pass/Fail
Pass
Pass
Pass
Item
1
2
3
Pass/Fail
Pass
Pass
Pass
Date
2015/08/04
4 (13)
Site ID : ZMSMG_F5101
ZMSMG_F5101 (S2)
ZMSMG_F5101 (S3)
Date
2015/08/04
5 (13)
Site ID : ZMSMG_F5101
Pass/Fail
Pass
Pass
Pass
Pass/Fail
Pass
Pass
Pass
Date
2015/08/04
6 (13)
Site ID : ZMSMG_F5101
ZMSMG_F5101 (S2)
ZMSMG_F5101 (S3)
Date
2015/08/04
7 (13)
Site ID : ZMSMG_F5101
ZMSMG_F5101 (S2)
Date
2015/08/04
8 (13)
Site ID : ZMSMG_F5101
ZMSMG_F5101 (S3)
Item
1
2
3
Date
2015/08/04
9 (13)
Site ID : ZMSMG_F5101
(S3)
Inter eNB HandOver (S1/S2/S3)(1/1)
Item
Test Description
Source Enodeb/PCI
Target Enodeb/PCI
1
Handover from ZMSMG_F5101 (S1) ZMSMG_F5101 (S1)/486
N/A
2
N/A
N/A
N/A
3
Handover from ZMSMG_F5101 (S2) ZMSMG_F5101 (S2)/487
N/A
4
N/A
N/A
N/A
5
Handover from ZMSMG_F5101 (S3) ZMSMG_F5101 (S3)/488
N/A
6
N/A
N/A
N/A
Date
2015/08/04
10 (13)
Pass/Fail
N/A
N/A
N/A
N/A
N/A
N/A
Site ID : ZMSMG_F5101
SSV_FDD_ZSMG_010
1_20150806.rar
FDD
Site ID / Number
ZMSMG_F5101
Date
2015/08/04
11 (13)
Site ID : ZMSMG_F5101
Location Address
SMART Engineer
RF Optimization Team CJ
ZTE Engineer
ZTE RF Team CJ
Test Date
Start
6-AUGUST-15
End
6-AUGUST-15
2
3
MAJOR
INCOMPLIANCE
PENDING
TEST/PENDING
CHECK
Note:
CLOSED
DATE
SIGNATURE
1
2
1
2
3
Tested/Checked by,
ZTE
SMARTFREN
Date
2015/08/04
12 (13)