Department of Public Works and Highways ( DPWH )

Contract ID :
Contract Name :
Location :

15IO0063

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOB
COLLEGE IN STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Brgy. Sta. Elena, Tacloban City, Province of Leyte

SUMMARY OF BID PRICES


(All Parts of Bill of Quantities)
Instruction for completing the Summary of Bid Prices:
1. Part No. - Enter the "Part No." for each section of the BOQ where the unit prices are entered.
2. Part Description - Enter the "Part Description" corresponding to the "Part No."
3. Total Amount - Enter the "Total Amount" in Pesos for all pages having the same "Part Description"

Contract ID:
PART NO.

15IO0063
PART DESCRIPTION

OTHER GENERAL REQUIREMENTS

EARTHWORKS

SUBBASE & BASE COURSE

ELECTRICAL

SURFACE COURSE

BRIDGE CONSTRUCTION(Sructural Concrete Structures)

DRAINAGE & SLOPE PROTECTION STRUCTURES

MISCELLANEOUS STRUCTURE

TOTAL OF AMOUNTS =
TOTAL AMOUNT IN WORDS:

#VALUE!

Submitted by :

Ruben G. Santos
(Name and Signature of Bidder's Representative)
President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

ways ( DPWH )

NAGE LIGHTING SYSTEM at the UPV TACLOBAN


LENA, TACLOBAN CITY, PROVINCE OF LEYTE

RICES

s)

ry of Bid Prices:

are entered.

"Part Description"

TOTAL AMOUNT

969,503.43
43,612,090.52
9,489,540.69
27,257,141.66
55,374,297.30
19,418,040.43
55,193,987.20
29,671,082.78

240,985,684.01

Santos

der's Representative)

AMO

n)

CONCRETE PRODUCTS INC.

dder)

###
6% 13,641,600.00

4%

VARIANCE

9,094,400.00

-0.20
266 C.D.

ABC=
LESS 3%=
BID AMT.=

241,477,285.97
2,414,772.86

239,062,513.11
1,923,170.90

TARGET

213,718,400.00

218,265,600.00

Department of Public Works and Highways (DPWH)


Contract ID.: 15IO0063
Contract
Name:
Location :

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN COLLE
TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE
Brgy. Sta. Elena, Tacloban City, Province of Leyte
BILL OF QUANTITIES
Part No.

Part Description: OTHER GENERAL REQUIREMENTS

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

SPCL II

DPWH Standard Project Billboard

Unit Price (Pesos)


(5)
In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

2.00

Pc.

In Figures: PhP

SPCL III

Construction, Safety and Health

Traffic Management

Mobilization and Demobilization

In Figures: PhP
In words : Pesos

#VALUE!

#VALUE!

1.00

L.s.

404,447.90

In Figures: PhP

In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

1.00

L.s.

In Figures: PhP

SPCL V

3,218.13

In words : Pesos

In Figures: PhP

SPCL IV

Amoun

1.00

L.S.

142,539.26

In Figures: PhP

In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

In Figures: PhP

416,080.00

In Figures: PhP

SUB-TOTAL PART NO. B =


#VALUE!
Part No.

Part Description: EARTHWORKS

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

100(1)

Clearing and Grubbing

Unit Price (Pesos)

In words : Pesos

#VALUE!

#VALUE!

9.78

Ha.

In Figures: PhP

100(2)b

Individual Removal of Trees


(small B, 301-500mm )

Each

Roadway Excavation (Unsuitable)

Cu.m.

Structure Excavation

Cu.m.

In words : Pesos
#VALUE!

422.00

Embankment (from borrow)

Cu.m.

Subgrade Preparation (common


materials)

In words : Pesos
#VALUE!

10,785.00

272.61

In Figures: PhP

In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

29,940.40

257.92

In Figures: PhP

In words : Pesos

In words : Pesos

#VALUE!

#VALUE!

53,394.00

550.20

#VALUE!
Sq.m.

In Figures: PhP

#VALUE!

In Figures: PhP
In words : Pesos

105(1)

775.94

In words : Pesos

In Figures: PhP

104(1)a

In Figures: PhP

#VALUE!

In Figures: PhP

103(1)a

157,904.86

In words : Pesos

In Figures: PhP

102(1)

Amoun

(5)
In words : Pesos

#VALUE!

103,600.00
In Figures: PhP

16.42

SUB-TOTAL PART NO. C =


#VALUE!

In Figures: PhP
In words : Pesos

Part No.

Part Description: SUBBASE & BASE COURSE

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!

200

Aggregate Subbase Course

Cu.m.

Amoun

#VALUE!

9,834.00

964.97
In Figures: PhP
SUB-TOTAL PART NO. D =

In Figures: PhP

#VALUE!
Part No.

Part Description: ELECTRICAL

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!

Spcl 1

Lighting System

Set

#VALUE!

182.00

140,539.68

In Figures: PhP
In words : Pesos

SPCL 6

Installation of Piping Case for


Fiber Optic Lines

#VALUE!
L.m.

Amoun

In Figures: PhP
In words : Pesos
#VALUE!

4,836.00

347.17

In Figures: PhP

In Figures: PhP

SUB-TOTAL PART NO. D =


#VALUE!
Part No.

Part Description: SURFACE COURSE

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

Unit Price (Pesos)

(1)

(2)

(3)

(4)

(5)

311

Portland Cement Concrete


Pavement (T=280mm)

In words : Pesos

In words : Pesos

#VALUE!
Sq.m.

Amoun

#VALUE!

38,903.65

1,423.37
In Figures: PhP
SUB-TOTAL PART NO. E =

In Figures: PhP

#VALUE!

Part No.

Part Description: BRIDGE CONSTRUCTION (Structural Concrete

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!

404

Reinforcing Steel Bar, Grade 40

kg.

Structural Concrete Class "A "


(minor Structure)

#VALUE!

81,800.00
In Figures: PhP
In words : Pesos

405

60.10

#VALUE!
Cu.m.

Amoun

In Figures: PhP
In words : Pesos
#VALUE!

1,197.30
In Figures: PhP

SUB-TOTAL PART NO. F =


#VALUE!

12,112.23

In Figures: PhP

Part No.

Part Description: DRAINAGE & SLOPE PROTECTION STRUCT


(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)

Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Pipe Culvert, 910 mm Dia. (36"


dia.)

500(3)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!
L.m.

#VALUE!

9,616.00

5,120.17

In Figures: PhP
In words : Pesos
#VALUE!

506

Stone Masonry

Cu.m.

Amoun

In Figures: PhP
In words : Pesos
#VALUE!

1,485.45

4,011.19

In Figures: PhP

In Figures: PhP

SUB-TOTAL PART NO. G =


#VALUE!

Part No.

Part Description: MISCELLANEOUS STRUCTURES

(Vol. II, Series of 2004 DPWH Standard Specifications for Highways, Bridges and Airports)
Item #

Description

Unit

Quantity

(1)

(2)

(3)

(4)

Unit Price (Pesos)


In words : Pesos

(5)

In words : Pesos

#VALUE!

600(3)

Concrete Curb and Gutter

L.m.

#VALUE!

10,360.00
In Figures: PhP
In words : Pesos

1,719.16

#VALUE!

601(b)

Side Walk, 100mm thick

Sq.m

14,844.00

638.40

#VALUE!

Reflectorized Thermoplastic
pavement markings (white)

Sq.m

#VALUE!

896.73

#VALUE!

Reflectorized Thermoplastic
pavement markings (yellow)

Sq.m

In Figures: PhP
In words : Pesos

1,209.00
In Figures: PhP
In words : Pesos

612(2)

In Figures: PhP
In words : Pesos
#VALUE!

In Figures: PhP
In words : Pesos

612(1)

Amoun

In Figures: PhP
In words : Pesos
#VALUE!

1,450.80
In Figures: PhP

896.09

In Figures: PhP

SUB-TOTAL PART NO. H =


#VALUE!

TOTAL COST (ALL PARTS)

#VALUE!

Submitted by :

Ruben G. Santos
(Name and Signature of Bidder's Representative)

President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

PV TACLOBAN COLLEGE IN STA. ELENA,


E OF LEYTE

nd Airports)

Amount (Pesos)
(6)
#VALUE!

6,436.27
#VALUE!

404,447.90
#VALUE!

142,539.26
#VALUE!

416,080.00

969,503.43

nd Airports)

Amount (Pesos)
(6)
#VALUE!

1,544,309.55
#VALUE!

327,445.34
#VALUE!

2,940,131.25
#VALUE!

7,722,086.40
#VALUE!

29,377,360.53
#VALUE!

1,700,757.45

43,612,090.52

nd Airports)

Amount (Pesos)
(6)
#VALUE!

9,489,540.69

9,489,540.69

nd Airports)

Amount (Pesos)
(6)
#VALUE!

25,578,222.28
#VALUE!

1,678,919.38

27,257,141.66

nd Airports)

Amount (Pesos)
(6)
#VALUE!

55,374,297.30

55,374,297.30

N (Structural Concrete Structures)

nd Airports)

Amount (Pesos)
(6)
#VALUE!

4,916,069.42
#VALUE!

14,501,971.01

19,418,040.43

E PROTECTION STRUCTURES

nd Airports)

Amount (Pesos)
(6)
#VALUE!

49,235,561.80
#VALUE!

5,958,425.40

55,193,987.20

nd Airports)

Amount (Pesos)
(6)
#VALUE!

17,810,480.21
#VALUE!

9,476,403.62
#VALUE!

1,084,148.04
#VALUE!

1,300,050.93

29,671,082.78

240,985,684.01

16.49

16.49

62.13

2.70

842.64

842.64

842.64

842.64

842.64

32.31

32.31

32.31

32.31

-5.71

10,326.38

ABC=

68,208,112.48

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :

Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
100(1)
Item Description: Clearing and Grubbing
Ha.
Unit:
Quantity:
9.78
Output per hour:
DESIGNATION
Construction Foreman
Unskilled Laborer

0.05

OUTPUT/DAY =
NUMBER of DAYS =

No. of Person

No. of Days

1
3

23.50
23.50

Daily Rate
565.00
295.00
Sub-Total

Name and Capacity


Dump Truck (10 Cu.M.)
Bulldozer
Payloader, (1.5 Cu.M.)

No. of Units

No. of Days

Daily Rate

2
1
1

23.50
23.50
23.50

10,900.00
18,150.00
13,500.00
Sub-Total

Name and Specification

Unit

Quantity

Unit Cost
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
100(2)b
Item Description: Individual Removal of Trees (small B, 301-500mm )
Each
Unit:
OUTPUT/DAY =
Quantity:
422.00
Output per hour:
DESIGNATION

3.00

NUMBER of DAYS =
No. of Person

No. of Days

Daily Rate

Construction Foreman

19.00

565.00

Skilled Laborer

19.00

415.00

Unskilled Laborer

19.00

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Dump Truck (10 Cu.M.)

10.00

10,900.00

Backhoe (0.80 Cu.M.) w/ Breaker

10.00

12,000.00

Chainsaw

10.00

Name and Capacity

450.00
Sub-Total

Name and Specification


Rope, 1" diameter

Unit

Quantity

L.m.

20.00

Unit Cost
6.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
102(1)
Item Description: Roadway Excavation (Unsuitable)
Cu.m.
Unit:
Quantity: 10,785.00
Output per hour:
DESIGNATION

20.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of Person

No. of Days

Construction Foreman

67.00

Unskilled Laborer

67.00

Daily Rate
565.00
295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Dump Truck (10 Cu.M.)

67.00

10,900.00

Payloader, (1.5 Cu.M.)

7.00

13,500.00

Backhoe (0.80 Cu.M.) w/ Breaker

67.00

Name and Capacity

12,000.00
Sub-Total

Name and Specification

Unit

Quantity

Unit Cost
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:


Project Name

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
103(1)a
Item Description: Structure Excavation (Common Soil)
Cu.m.
Unit:
OUTPUT/DAY =
Quantity: 29,940.40
Output per hour:
DESIGNATION

20.00

NUMBER of DAYS =
No. of Person

No. of Days

Construction Foreman

180.00

Unskilled Laborer

180.00

Daily Rate
565.00
295.00
Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate
10,900.00

Dump Truck (10 Cu.M.)

180.00

Backhoe (0.80 Cu.M.) w/ Breaker

180.00

12,000.00
Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
104(1)a
Item Description: Embankment (from borrow)
Cu.m.
Unit:
Quantity: 53,394.00
Output per hour:

50.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Construction Foreman

133.00

565.00

Unskilled Laborer

133.00

295.00

DESIGNATION

Daily Rate

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Water Truck (Cap. 1000 Gal.)

35.00

8,600.00

Road Grader

133.00

16,950.00

Road Roller, Vibratory

133.00

11,100.00
Sub-Total

Name and Specification


Common Borrow

Unit
Cu.M.

Quantity

Unit Cost

66,745.00

305.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
105(1)
Item Description: Subgrade Preparation (common materials)
Sq.m.
Unit:
OUTPUT/DAY =
Quantity: 103,600.00
Output per hour:

300.00

NUMBER of DAYS =
No. of
Person

No. of Days

Construction Foreman

43.50

Unskilled Laborer

43.50

DESIGNATION

Daily Rate
565.00
295.00
Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Motorized Road Grader, G710A

43.50

16,950.00

Vibratory Roller (10 m.t.), SP56

43.50

11,100.00

Water Truck (1000 gal.)

16.00

8,600.00
Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
200
Item Description: Aggregate Subbase Course
Cu.m.
Unit:
Quantity:
9,834.00
Output per hour:

50.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Construction Foreman

22.00

Unskilled Laborer

22.00

DESIGNATION

Daily Rate
565.00
295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Road Grader

22.00

16,950.00

Road Roller, Vibratory

22.00

11,100.00

Water Truck (Cap. 1000 Gal.)

5.50

Name and Capacity

8520.00
Sub-Total

Name and Specification


Aggregate Subbase Course

Unit

Quantity

Unit Cost

cu.m.

11,310.00

640.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
311
Item Description: Portland Cement Concrete Pavement (T=280mm)
Sq.m.
Unit:
OUTPUT/DAY =
Quantity: 38,903.65

70.00
DESIGNATION

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

83.00

565.00

Skilled Laborer

83.00

415.00

12

83.00

Laborer

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Transit Mixer (5 cu.m.)

83.00

10,000.00

Concrete Vibrator

83.00

1,330.00

Water Truck (1000 gal)

83.00

8,600.00

Concrete Screeder (5.5 Hp)

83.00

1,680.00

Payloader (1.50 cu.m.), LX80-2C

83.00

13,500.00

Concrete Saw, Blade 14" (7.5 Hp)

83.00

1,330.00

Batching Plant (30 cu.m.)

83.00

9,500.00

8.30

950.00

Name and Capacity

Bar Cutter, Single Phase

Sub-Total

Name and Specification


Asphalt Sealant

Unit

Quantity

lit.

4,680.00

44.00

8,948.00

900.00

kg.

16,729.00

42.00

lit.

11,284.50

78.00

l.m.

17,895.50

62.00

cu.m.

4,921.50

800.00

Portland Cement

bag

85,200.00

285.00

Concrete Saw (diamond blade 14")

pc.

6.00

8,900.00

l.m.

278.00

120.00

lit.

340.00

Reinforcing Steel Bar


Curing Compound
Steel Forms (Rental)
Sand

Pipe Sleeve, 2" dia.


Grease/Tar

Unit Cost

cu.m.

Gravel

305.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
404
Item Description: Reinforcing Steel Bar, Grade 40
kg.
Unit:
Quantity: 81,800.00
Output per hour:

180.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Construction Foreman

59.50

565.00

Skilled Laborer

59.50

415.00

59.50

DESIGNATION

Laborer

Daily Rate

295.00
Sub-Total

Name and Capacity


Bar Bender

No. of
Units

No. of Days

Daily Rate

33.00

1150.00

Cargo Truck (10 T,270 Hp)

10.00

7400.00

Bar Cutter, Single Phase

33.00

950.00
Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Reinforcing Steel Bar, Grade 60

kg.

85,895.50

42.00

Tie Wire #16

kg.

1,718.00

67.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
405
Item Description: Structural Concrete Class "A " (minor Structure)
Cu.m.
Unit:
OUTPUT/DAY =
Quantity:
1,197.30
Output per hour:

1.40

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

45.00

565.00

Skilled Laborer

45.00

415.00

12

45.00

DESIGNATION

Unskilled Laborer

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

One Bagger Mixer

45.00

1,400.00

Concrete Vibrator

45.00

1,330.00

10.00

Name and Capacity

Water Truck (1000 gal.)

8,600.00
Sub-Total

Name and Specification


Lumber, Good - 4 uses
Marine Plywood (1/2"x4'x8') - 4 uses

Unit

Quantity

bd. Ft.

83,822.00

66.00

pc.

1,916.00

635.00

kg.

839.00

68.00

Portland Cement

bag

11,375.00

285.00

cu.m.

600.00

800.00

cu.m.

1,202.00

900.00

Gravel

Unit Cost

Assorted CWN (1kg/100 bd ft of Lumber)


Sand

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
500(3)
Item Description: Pipe Culvert, 910 mm Dia. (36" dia.)
L.m.
Unit:
OUTPUT/DAY =
Quantity:
9,616.00
Output per hour:

DESIGNATION
Construction Foreman

1.75

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

69.00

565.00

Skilled Laborer

69.00

415.00

Laborer

69.00

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Backhoe (0.80 cu.m.)

49.00

12,000.00

Plate Compactor (5 Hp)

49.00

1,854.00

Name and Capacity

incidental/Misc. Espenses
Sub-Total

Name and Specification


Portland Cement
Sand
R.C. Pipes (910mm dia.)
Sand Bedding/Selected Sandy Soil

Unit

Quantity

Unit Cost
285.00

bag

10,390.000

cu.m.

590.000

800.00

pc.

9,620.000

3,740.00

cu.m.

1,240.00

590.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
506
Item Description: Stone Masonry
Cu.m.
Unit:
Quantity:
1,485.45
Output per hour:

DESIGNATION

OUTPUT/DAY =

1.56

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

88.00

565.00

Skilled Laborer

88.00

415.00

Unskilled Laborer

88.00

295.00
Sub-Total

Name and Capacity


Backhoe (0.80 cu.m.)

No. of
Units

No. of Days

Daily Rate

20.00

12,000.00

Concrete Mixer, 1.5-2 Bagger

88.00

1,400.00

Water Truck (Cap. 1000 Gal.)

12.00

8,600.00
Sub-Total

Name and Specification


Portland Cement

Unit

Quantity

Unit Cost

bag

8,179.00

285.00

Sand

cu.m.

450.00

800.00

Gravel

cu.m.

38.00

900.00

Boulders

cu.m.

1,565.00

900.00

Filter Cloth

Sq.M.

23.00

180.00

L.m.

449.00

PVC Pipe 2" dia.

96.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
600(3)
Item Description: Concrete Curb and Gutter
L.m.
Unit:
Quantity: 10,360.00
Output per hour:

10.30

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Construction Foreman

55.00

Skilled Laborer

55.00

Unskilled Laborer

55.00

DESIGNATION

Daily Rate
565.00
415.00
295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Water Truck (Cap. 1000 Gal.)

14.00

8,600.00

Concrete Vibrator

55.00

1,330.00

Concrete Mixer, 1.5-2 Bagger

55.00

1,400.00

Name and Capacity

Sub-Total

Name and Specification


Portland Cement

Unit

Quantity

Unit Cost

bag

13,365.00

285.00

Sand

cu.m.

726.00

800.00

Gravel

cu.m.

1,451.00

900.00

pc.

1,087.00

635.00

Bd.ft.

119,000.00

66.00

kg.

1,140.00

Marine Plywood
Good Lumber
CW Nails, Assorted

68.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
601(b)
Item Description: Side Walk, 100mm thick
Sq.m
Unit:
Quantity: 14,844.00
Output per hour:

20.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

87.50

565.00

Skilled Laborer

87.50

415.00

12

87.50

DESIGNATION

Unskilled Laborer

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Water Truck (Cap. 1000 Gal.)

44.00

8,600.00

Concrete Mixer, 1.5-2 Bagger

87.50

1,400.00

Concrete Vibrator

87.50

1,330.00

Concrete Saw

87.50

Name and Capacity

1,330.00
Sub-Total

Name and Specification


Portland Cement

Unit

Quantity

Unit Cost

bag

14,102.00

285.00

Sand

cu.m.

820.00

800.00

Gravel

cu.m.

1,490.00

900.00

Form Lumber, Coco

Bd.ft.

6,830.00

14.00

Curing Compound

ltr.

4,305.00

78.00

Asphalt Sealant

ltr.

1,785.00

44.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
612(1)
Item Description: Reflectorized Thermoplastic pavement markings (white)
Sq.m
Unit:
OUTPUT/DAY =
Quantity:
1,209.00
Output per hour:

25.00

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

9.00

565.00

Skilled Laborer

9.00

415.00

Laborer

9.00

DESIGNATION

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Cargo Truck/Stake Truck

9.00

7,400.00

Applicator Machine

9.00

750.00

Kneading Machine

9.00

1,200.00

Name and Capacity

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Thermoplastic Paint, White

bag

393.00

1,645.00

Glass Beads

bags

40.00

850.00

Primer

Gal.

156.00

550.00

LPG (50kg.)

Cylinder

5.00

3,490.00

LPG (12kg.)

Cylinder

3.00

835.00

Calsumine

kg.

152.00

3.00
Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
612(2)
Item Description: Reflectorized Thermoplastic pavement markings (yellow)
Sq.m
Unit:
OUTPUT/DAY =
Quantity:
1,450.80
Output per hour:

25.00

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

10.00

565.00

Skilled Laborer

10.00

415.00

Laborer

10.00

DESIGNATION

295.00
Sub-Total

No. of
Units

No. of Days

Daily Rate

Cargo Truck/Stake Truck

10.00

7,400.00

Applicator Machine

10.00

750.00

Kneading Machine

10.00

1,200.00

Name and Capacity

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Thermoplastic Paint, Yellow

bag

480.00

1,690.00

Glass Beads

bags

50.00

850.00

#REF!

175.00

550.00

LPG (50kg.)

Cylinder

6.00

3,490.00

LPG (12kg.)

Cylinder

3.00

835.00

Calsumine

kg.

182.00

Primer

3.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
SPCL 6
Item Description: Installation of Piping Case for Fiber Optic Lines
L.m.
Unit:
OUTPUT/DAY =
Quantity:
4,836.00
Output per hour:

20.00

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

Construction Foreman

35.00

565.00

Skilled Laborer

35.00

415.00

Laborer

35.00

DESIGNATION

295.00

Sub-Total

Name and Capacity


Concrete Mixer, 1.5-2 Bagger

No. of
Units

No. of Days

Daily Rate

35.00

1,400.00

Sub-Total

Name and Specification


Portland Cement

Unit

Quantity

Unit Cost

bag

155.00

285.00

Sand

cu.m.

9.00

800.00

Gravel

cu.m.

15.00

900.00

PVC pipe 101m dia.

Sq.M.

1,616.00

600.00

PVC Coupling 101m dia. w/ O-ring

Pc.

1,621.00

72.00

Reinforcing Steel Bar, Grade 60

kg.

526.00

42.00

Bd.ft.

2,322.00

14.00

kgs.

182.00

67.00

Form Lumber, Coco


Tie Wire #16

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
Spcl 1
Item Description: Lighting System
Set
Unit:
Quantity:
182.00
Output per hour:

OUTPUT/DAY =

0.25

DESIGNATION
Construction Foreman
Skilled Laborer
Laborer

NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

110.00

565.00

110.00

415.00

12

110.00

295.00

Sub-Total

No. of
Units

No. of Days

Daily Rate

Water Truck (Cap. 1000 Gal.)

110.00

8,600.00

Concrete Mixer, 1.5-2 Bagger

110.00

Name and Capacity

1,400.00

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Panel feeder 1-4 (nema 4x) w/ magnetic Contractors, Main 50AT,


2P,230V, 22Kaic branches:4-50 AT,2P,230V

Set

4.00

41,950.00

2.0 Sq.m. THHN Wire

L.m.

550.00

16.25

3.5 Sq.m. THHN Wire

L.M.

7,805.00

21.50

14 Sq.m. THHN Wire

L.M.

43.00

91.75

38 Sq.m. THHN Wire

L.M.

15,545.00

272.00

IMC Pipe 15mm dia. X 3m

length

185.00

460.00

Grounding Rod 20mm x 3m copper weld

Pc.

188.00

1,715.00

Lamp Post, 9.5M Height Post w/ double Arm

Set

27.00

37,200.00

Lamp Post, 9.5M Height Post w/ Single Arm

Set

157.00

33,500.00

40 mmdia. IMPC Pipe

length

95.00

1,400.00

40mmdia. X 3m MPVC Pipe, orange w/ hub

length

2,045.00

263.00

40mm dia. PVC Elbow

Pc.

730.00

62.75

Service Entrance Cap. 40mm dia.

Pc.

185.00

271.00

Eye Nut w/ bolt & washer 19mm dia.

Pc.

730.00

131.50

photocell Switch, 2 Amphere

Pc.

188.00

1,805.00

Grounding Clamp 20 mm

P.c.

190.00

500.00

14 Sq.m. Bare Copper Wires

L.M.

1,120.00

75.00

Electrical Tape

Pc.

120.00

24.00

Rubber Tape

P.c.

62.00

64.00

LED Outdoor Street Light

set

186.00

35,780.00

Solderless Connector for 38 Sq.m.

Pc.

366.00

186.00

Solderless Connector for 14 Sq.m.

Pc.

189.00

86.00

Cable Tie 6" long

Pc.

2,190.00

10.00

Tie Wire #16

kgs.

558.00

67.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
SPCL II
Item Description: DPWH Standard Project Billboard
Pc.
Unit:
Quantity:
2.00
Output per hour:

DESIGNATION
Construction Foreman
Skilled Laborer
Laborer

1.00

OUTPUT/DAY =
NUMBER of DAYS =

No. of
Person

No. of Days

Daily Rate

1.00

565.00

1.00

415.00

1.00

295.00

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Minor Tools/Misc. Expenses

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Tarpauline

pc.

1.00

870.00

Marine Plywood

pc.

1.00

635.00

Form Lumber, Coco

bd. Ft.

CW Nails, Assorted

kg.

84.00

14.00

2.00

68.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.14% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=
Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
SPCL V
Item Description: Mobilization and Demobilization
L.S.
Unit:
Quantity:
1.00

No. of
Units

No. of Days

Bulldozer

18,150.00

Truck Mounted Crane (45T)


Low Bed Trailer
Backhoe (0.80 Cu.M.) w/ Breaker
Batching Plant (30 Cu.M.)
Road Grader
Road Roller, Vibratory
Dump Truck (10 Cu.M.)
Payloader, (1.5 Cu.M.)
Transit Mixer (5 Cu.M.)
Water Truck (Cap. 1000 Gal.)
Vibro Hammer w/ Hydraulic Power Pack
Applicator Machine
Kneading Machine
Rebar Cutter
Rebar Bender
Concrete Screeder
Concrete Saw
Chainsaw
Concrete Mixer, 1.5-2 Bagger

2
2
2
2
2
2
1
1
2
1
1

Plate Compactor

1
1
1
1
3
1
1
2
4
1
1
1
1
2
2
1
2
2
1
2

12,900.00
8,000.00
12,000.00
9,500.00
16,950.00
11,100.00
10,900.00
13,500.00
10,000.00
8,600.00
5,000.00
750.00
1,200.00
950.00
1,150.00
1,680.00
1,330.00
450.00
1,400.00
1,854.00

Cargo Truck/Stake Truck


Jack Hammer
Cutting Outfit
Concrete Vibrator

1
1
1
1

CIVIL WORKS W/ EQUIPMENT

Daily Rate

_
_
_
_
_
_
_
_
_
_

7,400.00
1,600.00
300.00
1,330.00

_
_
_

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
SPCL IV
Item Description: Traffic Management
L.s.
Unit:
Quantity:
1.00

DESIGNATION
Unskilled Laborer

No. of
Person

No. of Days

90.00

Daily Rate
295.00

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Incidental/Misc. Expenses

Sub-Total

Name and Specification


Warning Devices, Barricades, Signages, etc.

Unit

Quantity

Unit Cost

L.s.

1.00

10,100.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.08% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DETAILED ESTIMATES

15IO0063

Contract I.D. No.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Project Name :
Location

Brgy. Sta. Elena, Tacloban City, Province of Leyte

Item No.:
SPCL III
Item Description: Construction, Safety and Health
L.s.
Unit:
Quantity:
1.00

DESIGNATION

No. of
Person

No. of Days

Daily Rate

First Aider

225.00

765.00

Part-time Safety Practitioner

120.00

855.00

Sub-Total

Name and Capacity

No. of
Units

No. of Days

Daily Rate

Incidental/Misc. Expenses

Sub-Total

Name and Specification

Unit

Quantity

Unit Cost

Safety Helmets, Safety Shoes and Safety Gloves

set

12.00

4,550.00

First Aid Kit

set

1.00

3,560.00

Sub-Total

ESTIMATED DIRECT COST=


INDIRECT COST=
MARK-UP OF (EDC) 0.08% =
VALUE ADDED TAX [ 5% OF (EDC+OCM+PROFIT)]=
TOTAL COST OF ITEM =
UNIT COST OF ITEM=

Submitted by :

Ruben G. Santos

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

0.40

24.45
Amount
13,277.50
20,797.50

34,075.00

Amount
512,300.00
426,525.00
317,250.00

1,256,075.00

Amount

0.00
0.00

1,290,150.00
254,159.55
180,621.00
73,538.55

1,544,309.55
157,904.86

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

24.00

17.58
Amount
10,735.00
7,885.00
16,815.00

35,435.00

Amount
109,000.00
120,000.00
9,000.00

238,000.00

Amount
120.00

120.00

273,555.00
53,890.34
38,297.70
15,592.64

327,445.34
775.94

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

160.00

67.41
Amount
37,855.00
59,295.00

97,150.00

Amount
1,460,600.00
94,500.00
804,000.00

2,359,100.00

Amount
0.00

2,456,250.00
483,881.25
343,875.00
140,006.25

2,940,131.25
272.61

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

160.00

187.13
Amount
101,700.00
265,500.00

367,200.00

Amount
3,924,000.00
2,160,000.00

6,084,000.00

Amount

0.00

6,451,200.00
1,270,886.40
903,168.00
367,718.40

7,722,086.40
257.92

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

400.00

133.49
Amount
75,145.00
78,470.00

153,615.00

Amount
301,000.00
2,254,350.00
1,476,300.00

4,031,650.00

Amount
20,357,225.00

20,357,225.00

24,542,490.00
4,834,870.53
3,435,948.60
1,398,921.93

29,377,360.53
550.20

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

2,400.00

43.17
Amount
24,577.50
38,497.50

63,075.00

Amount
737,325.00
482,850.00
137,600.00

1,357,775.00

Amount

0.00

1,420,850.00
279,907.45
198,919.00
80,988.45

1,700,757.45
16.42

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

400.00

24.59
Amount
12,430.00
12,980.00

25,410.00

Amount
372,900.00
244,200.00
46,860.00

663,960.00

Amount
7,238,400.00

7,238,400.00

7,927,770.00
1,561,770.69
1,109,887.80
451,882.89

9,489,540.69
964.97

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

560.00

69.47
Amount
46,895.00
137,780.00
293,820.00

478,495.00

Amount
3,320,000.00
220,780.00
713,800.00
139,440.00
1,120,500.00
110,390.00
788,500.00
7,885.00

6,421,295.00

Amount
205,920.00
8,053,200.00
702,618.00
880,191.00
1,109,521.00
3,937,200.00
24,282,000.00
53,400.00
33,360.00
103,700.00

39,361,110.00

46,260,900.00
9,113,397.30
6,476,526.00
2,636,871.30

55,374,297.30
1,423.37

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

1,440.00

56.81
Amount
33,617.50
49,385.00
157,972.50

240,975.00

Amount
37,950.00
74,000.00
31,350.00

143,300.00

Amount
3,607,611.00
115,106.00

3,722,717.00

4,106,992.00
809,077.42
574,978.88
234,098.54

4,916,069.42
60.10

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

11.20

106.90
Amount
25,425.00
112,050.00
159,300.00

296,775.00

Amount
63,000.00
59,850.00
86,000.00

208,850.00

Amount
5,532,252.00
1,216,660.00
57,052.00
3,241,875.00
480,000.00
1,081,800.00

11,609,639.00

12,115,264.00
2,386,707.01
1,696,136.96
690,570.05

14,501,971.01
12,112.23

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

14.00

686.86
Amount
38,985.00
85,905.00
183,195.00

308,085.00

Amount
588,000.00
90,846.00
1,985.00

680,831.00

Amount
2,961,150.00
472,000.00
35,978,800.00
731,600.00

40,143,550.00

41,132,466.00
8,103,095.80
5,758,545.24
2,344,550.56

49,235,561.80
5,120.17

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

12.50

118.84
Amount
49,720.00
73,040.00
207,680.00

330,440.00

Amount
240,000.00
123,200.00
103,200.00

466,400.00

Amount
2,331,015.00
360,000.00
34,200.00
1,408,500.00
4,140.00
43,104.00

4,180,959.00

4,977,799.00
980,626.40
696,891.86
283,734.54

5,958,425.40
4,011.19

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

82.40

125.73
Amount
31,075.00
114,125.00
146,025.00

291,225.00

Amount
120,400.00
73,150.00
77,000.00

270,550.00

Amount
3,809,025.00
580,800.00
1,305,900.00
690,245.00
7,854,000.00
77,520.00

14,317,490.00

14,879,265.00
2,931,215.21
2,083,097.10
848,118.11

17,810,480.21
1,719.16

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

160.00

92.78
Amount
49,437.50
181,562.50
309,750.00

540,750.00

Amount
378,400.00
122,500.00
232,750.00
116,375.00

850,025.00

Amount
4,019,070.00
656,000.00
1,341,000.00
95,620.00
335,790.00
78,540.00

6,526,020.00

7,916,795.00
1,559,608.62
1,108,351.30
451,257.32

9,476,403.62
638.40

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

200.00

6.05
Amount
5,085.00
11,205.00
18,585.00

34,875.00

Amount
66,600.00
6,750.00
10,800.00

84,150.00

Amount
646,485.00
34,000.00
85,800.00
17,450.00
2,505.00
456.00

786,696.00

905,721.00
178,427.04
126,800.94
51,626.10

1,084,148.04
896.73

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

200.00

7.25
Amount
5,650.00
4,150.00
8,850.00

18,650.00

Amount
74,000.00
7,500.00
12,000.00

93,500.00

Amount
811,200.00
42,500.00
96,250.00
20,940.00
2,505.00
546.00

973,941.00

1,086,091.00
213,959.93
152,052.74
61,907.19

1,300,050.93
896.09

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

160.00

30.23
Amount
19,775.00
43,575.00
72,275.00

135,625.00

Amount
49,000.00

49,000.00

Amount
44,175.00
7,200.00
13,500.00
969,600.00
116,712.00
22,092.00
32,508.00
12,194.00

1,217,981.00

1,402,606.00
276,313.38
196,364.84
79,948.54

1,678,919.38
347.17

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

2.00

91.00
Amount
62,150.00
228,250.00
389,400.00

679,800.00

Amount
946,000.00
308,000.00

1,254,000.00

Amount
167,800.00
8,937.50
167,807.50
3,945.25
4,228,240.00
85,100.00
322,420.00
1,004,400.00
5,259,500.00
133,000.00
537,835.00
45,807.50
50,135.00
95,995.00
339,340.00
95,000.00
84,000.00
2,880.00
3,968.00
6,655,080.00
68,076.00
16,254.00
21,900.00
37,386.00

19,434,806.75

21,368,606.75
4,209,615.53
2,991,604.95
1,218,010.58

25,578,222.28
140,539.68

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

1.00

1.00
Amount
565.00
415.00
590.00

1,570.00

Amount
990.00

990.00

Amount
870.00
635.00
1,176.00
136.00

2,817.00

5,377.00
1,059.27
752.78
306.49

6,436.27
3,218.13

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

Estimated Direct
Cost
36,300.00
25,800.00
16,000.00
24,000.00
19,000.00
101,700.00
22,200.00
10,900.00
27,000.00
80,000.00
8,600.00
_
_
_
_
_
_
_
_
_
_
_
_
_
_

371,500.00

44,580.00

416,080.00
416,080.00

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

Amount
106,200.00

106,200.00

Amount
1,540.00
1,540.00

Amount
10,100.00

10,100.00

117,840.00
24,700.26
9,427.20
15,272.06

142,539.26
142,539.26

STEM at the UPV TACLOBAN COLLEGE IN


CITY, PROVINCE OF LEYTE

Amount
172,125.00
102,600.00

274,725.00

Amount
1,480.00

1,480.00

Amount
54,600.00
3,560.00

58,160.00

334,365.00
70,082.90
26,749.20
43,333.70

404,447.90
404,447.90

#VALUE! GRAND TOTAL

###

#VALUE! GRAND TOTAL

804.90

11.00

276.72

266.35

1.25

546.95

66,742.50

16.35

1.15

11,309.10

DUPA

X
924.01

BID AMOUNT=

0.120

240,985,684.01

4,668.44

0.230

8,947.84

0.430

16,728.57

0.290

11,282.06

0.460

17,895.68

0.127

4,921.31

2.190

85,198.99

0.000

5.84

0.0071

276.22

0.0087

338.46

1,479.08

0.50
0.15
0.50

1.05

85,890.00

0.02

1,717.80

60.82

70.00

83,811.00

1.60

1,915.68

0.70

838.11

9.50

11,374.35

0.50

598.65

1.00

1,197.30

8,639.43

310.00
1.080

10,385.28

3,225.00

0.061

586.58

3,750.00

1.000

9,616.00

3,325.00

0.13

1,230.85

5,834.03

0.10
1.00
0.05

310.00
5.50

8,169.98

3,225.00

0.30

445.64

3,750.00

0.02

29.71

3,325.00

1.05

1,559.72

0.02

22.28

0.30

445.64

3,965.66

0.05
1.00
1.00

310.00
1.29

13,364.40

3,225.00

0.07

725.20

3,750.00

0.14

1,450.40

3,325.00

0.24

2,486.40

11.47

118,829.20

0.11

1,139.60

1,116.80

310.00
0.95

14,101.80

3,225.00

0.06

816.42

3,750.00

0.10

1,484.40

3,325.00

0.46

6,828.24

0.29

4,304.76

0.12

1,781.28

639.06

310.00
0.33

392.93

3,225.00

0.03

39.90

3,750.00

0.12

145.08

3,325.00

0.00

4.84

0.00

2.42

0.13

151.13

883.57

310.00
0.33

471.51

3,225.00

0.03

47.88

3,750.00

0.12

174.10

3,325.00

0.00

5.80

0.00

2.90

0.13

181.35

890.83

310.00
0.03

154.75

3,225.00

0.00

8.22

3,750.00

0.00

14.51

3,325.00

0.33

1,615.22

0.34

1,620.06

0.11

525.19

0.48

2,321.28

0.00

10.64

344.94

310.00
0.02

###

3.64

3,225.00

3.00

546.00

3,750.00

42.86

7,800.52

42.70

7,771.40

85.40

15,542.80

1.00

182.00

1.02

185.64

0.14

26.12

0.86

155.97

0.50

91.00

11.22

2,042.04

4.00

728.00

1.00

182.00

4.00

728.00

1.00

182.00

1.02

185.64

6.13

1,115.66

0.65

118.30

0.32

58.24

1.00

182.00

2.00

364.00

1.00

182.00

12.00

2,184.00

3.00

546.00

3,325.00

2,981.48

###

76.00

66,125.45

#VALUE!

#VALUE!

#VALUE!
#VALUE!

#REF!
#VALUE!

###

Contract ID.:

15IO0063

Contract
Name.:

CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV


TACLOBAN COLLEGE IN STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY,
PROVINCE OF LEYTE

Location .:

Brgy. Sta. Elena, Tacloban City, Province of Leyte

EQUIPMENT
Grinder
Electric Drill
Bulldozer
Truck Mounted Crane (45T)
Low Bed Trailer
Backhoe (0.80 Cu.M.) w/ Breaker
Batching Plant (30 Cu.M.)
Road Grader
Road Roller, Vibratory
Crawler Crane (45T)
Crane w/ Bucket
Truck Mounted Crane (45T)
High Bed Trailer
Dump Truck (10 Cu.M.)
Payloader, (1.5 Cu.M.)
Transit Mixer (5 Cu.M.)
Water Truck (Cap. 1000 Gal.)
Vibro Hammer w/ Hydraulic Power Pack
Applicator Machine
Kneading Machine
Rebar Cutter
Rebar Bender
Concrete Screeder
Drop Hammer w/ Accessories
Welding Machine
Wood/Steel Ladder
Generator Set
Water Pump
Vibro Hammer
Diesel Hammer
Electric Grinder
Air Compressor (42 Hp)
Concrete Vibrator
Oxygen Outfit
Acetylene Outfit
Concrete Saw
Chainsaw
Concrete Mixer, 1.5-2 Bagger
Welding Outfit
Concrete Cart
Plate Compactor
Concrete Bucket
Stressing (Jack) Machine
Drop Hammer w/ Accessories
Grouting Machine
Boom Truck
Cargo Truck/Stake Truck
Jack Hammer
Cutting Outfit
Concrete Vibrator
Electric Grinder

Ruben G. Santos
MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

DAILY RATE
228.00
220.00
18,150.00
12,900.00
8,000.00
12,000.00
9,500.00
16,950.00
11,100.00
12,580.00
11,954.00
11,500.00
7,900.00
10,900.00
13,500.00
10,000.00
8,600.00
5,000.00
750.00
1,200.00
950.00
1,150.00
1,680.00
1,230.00
860.00
770.00
1,860.00
1,340.00
11,280.00
1,000.00
850.00
1,450.00
1,330.00
500.00
500.00
1,330.00
450.00
1,400.00
500.00
210.00
1,854.00
500.00
76,880.00
1,430.00
3,900.00
5,900.00
7,400.00
1,600.00
300.00
1,330.00
550.00

Contract ID.:

Contract
Name.:
Location .:

15IO0063
CONSTRUCTION OF ROADWAY NETWORK WITH DRAINAGE LIGHTING SYSTEM at the UPV TACLOBAN
COLLEGE IN STA. ELENA, TACLOBAN, BRGY. STA. ELENA, TACLOBAN CITY, PROVINCE OF LEYTE

Brgy. Sta. Elena, Tacloban City, Province of Leyte


MATERIALS DESCRIPTION

Personal Protective Equipment (Safety Helmets, & Gloves)

Firs Aid Kit


Tarpauline
Marine Plywood
Good Lumber
Coco Lumber
Form Lumber, Coco
CW Nails, Assorted
Rope, 1" diameter
Common Borrow
Tie Wire #16
Portland Cement
Sand
Gravel
Aggregate Subbase Course
Reinforcing Steel Bar, Grade 60
Curing Compound
Concrete Saw Blade
Asphalt Sealant
Steel Forms
Pipe Sleeve, 2" dia.

Grease/Tar
Boulders
R.C. Pipes (910mm dia.)
Sand Bedding/Selected Sandy Soil

Filter Cloth
PVC Pipe 2" dia.
LPG (50kg.)
LPG (12kg.)
Glass Beads
Calsumine
Primer
Thermoplastic Paint, White
Thermoplastic Paint, Yellow
PVC pipe 101m dia.
PVC Coupling 101m dia. w/ O-ring
Lamp Post, 9.5M Height Post w/ double Arm
Lamp Post, 9.5M Height Post w/ Single Arm
40 mmdia. IMPC Pipe
40mmdia. X 3m MPVC Pipe, orange w/ hub
40mm dia. PVC Elbow
Service Entrance Cap. 40mm dia.
Eye Nut w/ bolt & washer 19mm dia.
photocell Switch, 2 Amphere

UNIT

set
set

pc.
pc.
Bd.ft.
Bd.ft.

Bd.ft.
kg.
L.m.
Cu.M.
kgs.
bags
cu.m.
cu.m.
Cu.M.
kg.
ltr.
Pcs.
ltr.
L.M.
L.m.

ltr.
Cu.M.

pc.
cu.m.
Sq.M.
L.m.
Cylinder
Cylinder
bags
kg.
Gal.
bags
bags
Sq.M.
Pc.
Set
Set
length
length
Pc.
Pc.
Pc.
Pc.

2.0 Sq.m. THHN Wire


IMC Pipe 15mm dia. X 3m
Grounding Rod 20mm x 3m copper weld
Panel feeder 1-4 (nema 4x) w/ magnetic Contractors, Main
50AT, 2P,230V, 22Kaic branches:4-50 AT,2P,230V
2.0 Sq.m. THHN Wire
3.5 Sq.m. THHN Wire
14 Sq.m. THHN Wire
38 Sq.m. THHN Wire
IMC Pipe 15mm dia. X 3m
Grounding Rod 20mm x 3m copper weld
Lamp Post, 9.5M Height Post w/ double Arm
Lamp Post, 9.5M Height Post w/ Single Arm
40 mmdia. IMPC Pipe
40mmdia. X 3m MPVC Pipe, orange w/ hub
40mm dia. PVC Elbow
Service Entrance Cap. 40mm dia.
Eye Nut w/ bolt & washer 19mm dia.
photocell Switch, 2 Amphere
Grounding Clamp 20 mm
14 Sq.m. Bare Copper Wires
Electrical Tape
Rubber Tape
LED Outdoor Street Light
Solderless Connector for 38 Sq.m.
Solderless Connector for 14 Sq.m.
Cable Tie 6" long

Tie Wire #16


Warning Devices, Barricades, Signages, etc.

L.m.
length
Pc.
Set
L.m.
L.M.
L.M.
L.M.
length
Pc.
Set
Set
length
length
Pc.
Pc.
Pc.
Pc.
P.c.
L.M.
Pc.
P.c.
set
Pc.
Pc.
Pc.
kgs.
L.s.

Submitted by :

Ruben G. Santos
MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.

HTING SYSTEM at the UPV TACLOBAN


LOBAN CITY, PROVINCE OF LEYTE

72,565,621.13

UNIT COST

4,550.00
3,560.00
870.00
635.00
66.00
24.00

14.00
68.00
6.00
305.00
67.00
285.00
800.00
900.00
640.00
42.00
78.00
8,900.00
44.00
62.00
120.00

305.00
900.00
3,740.00
590.00
180.00
96.00
3,490.00
835.00
850.00
3.00
550.00
1,645.00
1,690.00
600.00
72.00
36,398.00
32,388.00
1,307.00
258.00
69.75
269.00
135.25
1,885.00

-5.71

ETE PRODUCTS INC.

17.00
470.00
1,722.00
41,950.00
16.25
21.50
91.75
272.00
460.00
1,715.00
37,200.00
33,500.00
1,400.00
263.00
62.75
271.00
131.50
1,805.00
500.00
75.00
24.00
64.00
35,780.00
186.00
86.00
10.00
67.00
10,100.00

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve,

Pipe Sleeve, 2" dia.

16IO0001

Contract ID.:

IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG DAANG


MAHARLIKA, KO903+198-KO904+000, KO904+000-KO904+342'
KO905+200-KO907+184, S00002LT, Tacloban City

Contract
Name.:

Location .:

PERSONNEL

Construction Foreman
Skilled Laborer
Unskilled Laborer
Safety Officer
First Aider

Submitted by :
Ruben G. Santos
(Name and Signature of Bidder's Representative)
President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

L ROAD ALONG DAANG


KO904+000-KO904+342'
LT, Tacloban City

UCTS INC.

RATE/DAY

565.00
415.00
295.00
855.00
765.00

71.02

568.16

51.51

412.08

39.73

317.84

tract ID

: 16IO0001

Contract IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG DAANG MAHARLIKA, KO903+198-KO904+000, KO904+000-KO904+342' KO905+200-KO907+18
Name : City
Location : Tacloban City

CASH FLOW BY QUARTER AND PAYMENT SCHEDULE


Y

PARTICULARS

2016

1ST QTR

Project Duration

90 Calendar Days

Y
2ND QTR
90 Calendar Days

3RD QTR
64 Calendar Days

Accomplishment, (%)

35.29%

35.29%

25.10%

Cash Flow, (Php)

85,053,770.83

85,053,770.83

60,482,681.48

Cumulative Accomplishment, (%)

139.61%

174.90%

100.00%

Cumulative Cash Flow, (Php)

336,434,915.72

421,488,686.54

240,985,684.01

Submitted by :

Ruben G. Santos
(Name and Signature of Bidder's Representative)
President/AMO
( Position)

MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS INC.


(Name of Bidder)

2015

905+200-KO907+184, S00002LT, Tacloban

2015
4TH QTR
11 Calendar Days
4.31%

10,395,460.88
104.31%

251,381,144.89

15
15

25
40

240,985,684.01

10,395,460.88

4.31%

85,053,770.83

35.29%

85,053,770.83

35.29%

60,482,681.48

25.10%

240,985,684.01

100.00%

240,985,684.01
11
90
90
64
255

BID AMOUNT

4TH QTR
1ST QTR
2ND QTR
3RD QTR
DURATION

0.00%
4.31%

4.31%

40

40