You are on page 1of 11

RANJAN FERNANDO GEOTECHNICAL SERVICES

| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m
INPUT DATA
SOIL PROFILE
Stratum
Elevation of
no.
top of stratum
1
0.00
2
-0.50
3
-2.00

------------------ Soil types ------------------Active side


Passive side
1 FILL
1 FILL
2
SILTY CLAY
2
SILTY CLAY
3 HW SILTSTONE
3 HW SILTSTONE

SOIL PROPERTIES
-- Soil type -No. Description
(Datum elev.)
1 FILL
2

SILTY CLAY

HW SILTST..
(
0.00 )
SILTY CLAY
(D)

Bulk
Young's
At rest Consol
density Modulus
coeff. state.
kN/m3 Eh,kN/m2
Ko
NC/OC
(dEh/dy ) (dKo/dy) ( Nu )
18.00
10000
0.530
OC
(0.300)
19.00
35000
0.577
OC
(0.490)
24.00
150000
0.426
OC
( 0.2500)
(0.300)
19.00
28000
0.577
OC
(0.400)

Active
limit
Ka
( Kac )
0.318
(0.000)
1.000
(2.389)
0.235
(1.093)
0.361
(1.370)

Passive
limit
Cohesion
Kp
kN/m2
( Kpc ) ( dc/dy )
3.868
( 0.000)
1.000
100.0u
( 2.390)
6.084
20.00d
( 7.261)
3.253
5.000d
( 4.831)

Additional soil parameters associated with Ka and Kp


--- parameters for Ka --- --- parameters for Kp --Soil
Wall
BackSoil
Wall
Back------- Soil type ------- friction adhesion fill
friction adhesion fill
No. Description
angle
coeff.
angle
angle
coeff.
angle
1 FILL
28.00
0.500
0.00
28.00
0.500
0.00
2
SILTY CLAY
0.00
0.500
0.00
0.00
0.500
0.00
3 HW SILTSTONE
35.00
0.500
0.00
35.00
0.500
0.00
4
SILTY CLAY (D)
25.00
0.500
0.00
25.00
0.500
0.00
GROUND WATER CONDITIONS
Density of water = 10.00 kN/m3
Initial water table elevation

Active side
-9.00

Passive side
-9.00

Automatic water pressure balancing at toe of wall : Yes


WALL PROPERTIES
Type of structure
Soldier Pile width
Soldier Pile spacing
Passive mobilisation factor
Elevation of toe of wall
Maximum finite element length
Youngs modulus of wall E
Moment of inertia of wall I
E.I
Yield Moment of wall
STRUTS and ANCHORS
Strut/
anchor
Strut
no.
Elev. spacing
m
1
0.00
1.00
2
-2.95
1.00

X-section
area
Youngs
of strut
modulus
sq.m
kN/m2
0.100000 3.000E+07
0.100000 3.000E+07

=
=
=
=
=
=
=
=
=
=

Soldier Pile Wall


0.45 m
2.40 m
3.00 m
-8.00
0.40 m
2.0000E+07 kN/m2
8.3870E-04 m4/m run
16774 kN.m2/m run
Not defined
Inclin
Free -ation
length (degs)
m
15.00
0.00
15.00
0.00

Prestress
/strut
kN
0
0

Tension
allowed
Yes
Yes

SURCHARGE LOADS
Surch
Distance
Length
-arge
from
parallel
no.
Elev.
wall
to wall
1
0.00
0.40(A)
20.00

Width
Surcharge
Equiv. Partial
perpend. ----- kN/m2 ----- soil factor/
to wall Near edge Far edge type Category
20.00
25.00
=
N/A
1.00 -

Note: A = Active side, P = Passive


Limit State Categories P/U =
P/F =
Var =

side
Permanent Unfavourable
Permanent Favourable
Variable (unfavourable)

CONSTRUCTION STAGES
Construction
Stage description
stage no.
-------------------------------------------------------1
Apply surcharge no.1 at elevation 0.00
2
Excavate to elevation -4.00 on PASSIVE side
FACTORS OF SAFETY and ANALYSIS OPTIONS
Limit State options: Serviceability Limit State
All loads and soil strengths are unfactored
Stability analysis:
Method of analysis - Burland-Potts
Factor on passive for calculating wall depth = 1.00
Parameters for undrained strata:
Minimum equivalent fluid density
Maximum depth of water filled tension crack
Bending moment and displacement
Method - Subgrade reaction
Open Tension Crack analysis?
Non-linear Modulus Parameter

=
=

5.00 kN/m3
0.00 m

calculation:
model using Influence Coefficients
- No
(L) = 8.000 m

Boundary conditions:
Length of wall (normal to plane of analysis) = 30.00 m
Width of excavation on active side of wall
Width of excavation on passive side of wall

= 20.00 m
= 20.00 m

Distance to rigid boundary on active side = 20.00 m


Distance to rigid boundary on passive side = 20.00 m
OUTPUT OPTIONS
Stage ------ Stage description ----------- ------- Output options ------no.
Displacement
Active, Graph.
Bending mom.
Passive output
Shear force
pressures
1 Apply surcharge no.1 at elev. 0.00
Yes
Yes
Yes
2 Excav. to elev. -4.00 on PASSIVE side
Yes
Yes
Yes
* Summary output
Yes
Yes
Program WALLAP - Copyright (C) 2013 by DL Borin, distributed by GEOSOLVE
69 Rodenhurst Road, London SW4, UK. Tel: +44 20 8674 7251

RANJAN FERNANDO GEOTECHNICAL SERVICES


| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m

RANJAN FERNANDO GEOTECHNICAL SERVICES


| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m
Stage No. 2
Excavate to elevation -4.00 on PASSIVE side
STABILITY ANALYSIS of Soldier Pile Wall according to Burland-Potts method
Factor of safety on nett available passive

Stage
No.
2

--- G.L. --Act.


Pass.
0.00

-4.00

Strut
Elev.

FoS for toe


elev. =
-8.00
--------------Factor Moment
of
equilib.
Safety at elev.
5.538
-7.58

Cant.

Toe elev. for


FoS = 1.000
------------Toe
Wall
elev. Penetr
-ation
-5.03
1.03

BENDING MOMENT and DISPLACEMENT ANALYSIS of Soldier Pile Wall


Analysis options
Soldier Pile width = 0.45m; spacing = 2.40m
Passive mobilisation factor = 3.000
Length of wall perpendicular to section = 30.00m
Subgrade reaction model - Boussinesq Influence coefficients
Soil deformations are elastic until the active or passive limit is reached
Rigid boundaries:

Active side 20.00 from wall


Passive side 20.00 from wall
Limit State: Serviceability Limit State
Calculated Bending Moments and Strut Forces are to be multiplied by a factor
of 1.50 to obtain values for structural design. See summary for factored values.
Node
no.

Y
coord

1
2
3

0.00
-0.25
-0.50

4
5
6
7

-0.85
-1.20
-1.60
-2.00

8
9
10
11
12

-2.40
-2.80
-3.20
-3.60
-4.00

13
14
15
16
17
18
19
20
21
22

-4.40
-4.80
-5.20
-5.60
-6.00
-6.40
-6.80
-7.20
-7.60
-8.00

Nett
pressure
kN/m2
0.00
1.99
4.93
2.50
4.25
6.00
8.00
10.00
0.00
0.00
0.00
0.00
0.89
3.19
-79.89
-58.96
6.08
25.09
22.27
13.36
5.68
1.11
-0.91
-1.57
-1.79

Wall
disp.
m
0.015
0.014
0.013
0.013
0.011
0.010
0.008
0.007
0.007
0.005
0.004
0.003
0.002
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Wall
rotation
rad.
3.95E-03
3.95E-03
3.95E-03
3.95E-03
3.94E-03
3.92E-03
3.85E-03
3.71E-03
3.71E-03
3.49E-03
3.17E-03
2.75E-03
2.23E-03
1.61E-03
1.61E-03
9.27E-04
3.57E-04
4.29E-05
-7.45E-05
-8.54E-05
-5.78E-05
-2.80E-05
-8.95E-06
-9.41E-07
7.28E-07

Shear
force
kN/m
0.0
0.2
1.1
1.1
2.3
4.1
6.9
10.5
10.5
10.5
10.5
10.5
10.7
11.5
11.5
-16.3
-26.9
-20.6
-11.2
-4.0
-0.2
1.1
1.2
0.7
0.0

Bending
moment
kN.m/m
0.0
0.0
0.2
0.2
0.8
1.8
4.0
7.4
7.4
11.4
15.5
19.6
23.8
28.2
28.2
29.5
18.3
8.0
1.8
-0.9
-1.4
-1.1
-0.5
-0.1
0.0

Strut
forces
kN/m

Run ID. BP1 UNDRAINED_SLS


| Sheet No.
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------(continued)
Stage No.2
Excavate to elevation -4.00 on PASSIVE side
Node
no.

Y
coord

1
2
3

0.00
-0.25
-0.50

4
5
6
7

-0.85
-1.20
-1.60
-2.00

8
9
10
11
12

-2.40
-2.80
-3.20
-3.60
-4.00

13
14
15
16
17
18
19
20
21
22

-4.40
-4.80
-5.20
-5.60
-6.00
-6.40
-6.80
-7.20
-7.60
-8.00

Node
no.

Y
coord

1
2
3
4
5
6
7
8
9
10
11
12

0.00
-0.25
-0.50
-0.85
-1.20
-1.60
-2.00
-2.40
-2.80
-3.20
-3.60
-4.00

13
14
15
16
17
18
19
20
21
22

-4.40
-4.80
-5.20
-5.60
-6.00
-6.40
-6.80
-7.20
-7.60
-8.00

------------------------ ACTIVE side --------------------------------- Effective stresses ------Total


Soil
Water
Vertic Active
Passive
Earth
earth
stiffness
press.
-al
limit
limit
pressure
pressure
coeff.
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m3
0.00
0.00
0.00
0.00
0.00
0.00
4232
0.00
6.24
1.99
24.13
1.99
1.99a
4232
0.00
15.50
4.93
59.94
4.93
4.93a
4232
Total> 15.50
2.50m
254.49
2.50
2.50a
19592
Total> 27.51
4.25m
266.51
4.25
4.25a
19592
Total> 37.39
6.00m
276.38
6.00
6.00a
19592
Total> 47.21
8.00m
286.21
8.00
8.00a
19592
Total> 56.22
10.00m
295.21
10.00
10.00a
19592
0.00
56.22
0.00
487.24
0.00
0.00a
63485
0.00
66.75
0.00
551.34
0.00
0.00a
63485
0.00
77.00
0.00
613.68
0.00
0.00a
63485
0.00
87.05
0.00
674.82
0.00
0.00a
63485
0.00
96.96
0.89
735.11
0.89
0.89a
63485
0.00 106.76
3.19
794.74
3.19
3.19a
63485
0.00 106.76
3.19
447.04
3.19
3.19a
63485
0.00 116.47
5.47
480.29
22.02
22.02
63485
0.00 126.12
7.73
513.31
41.88
41.88
63485
0.00 135.71
9.98
546.13
50.53
50.53
63485
0.00 145.25
12.22
578.78
53.88
53.88
63485
0.00 154.75
14.45
611.29
55.76
55.76
63485
0.00 164.21
16.67
643.67
57.94
57.94
63486
0.00 173.64
18.88
675.95
60.89
60.89
63486
0.00 183.05
21.09
708.14
64.45
64.45
63486
0.00 192.43
23.29
740.24
68.34
68.34
63486
0.00 201.79
25.49
772.60
72.33
72.33
63486
----------------------- PASSIVE side --------------------------------- Effective stresses ------Total
Soil
Water
Vertic Active
Passive
Earth
earth
stiffness
press.
-al
limit
limit
pressure
pressure
coeff.
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m2
kN/m3
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
83.08
83.08
83.08p
197323
0.00
9.60
0.00
116.93
80.98
80.98
197323
0.00
19.20
0.00
150.78
35.80
35.80
197324
0.00
28.81
0.00
184.64
25.45
25.45
197324
0.00
38.42
0.00
218.51
31.62
31.62
197324
0.00
48.04
0.00
252.40
42.40
42.40
197324
0.00
57.66
0.00
286.31
52.27
52.27
197324
0.00
67.30
0.00
320.26
59.78
59.78
197324
0.00
76.94
0.00
354.24
65.36
65.36
197324
0.00
86.60
0.00
388.26
69.91
69.91
197324
0.00
96.28
0.73
422.33
74.13
74.13
197325

Run ID. BP1 UNDRAINED_SLS


| Sheet No.
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------(continued)
Stage No.2
Excavate to elevation -4.00 on PASSIVE side
Note:
3.19a Soil pressure at active limit
83.08p Soil pressure at passive limit

RANJAN FERNANDO GEOTECHNICAL SERVICES


| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m

RANJAN FERNANDO GEOTECHNICAL SERVICES


| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m
Summary of results
LIMIT STATE PARAMETERS
Limit State: Serviceability Limit State
All loads and soil strengths are unfactored
STABILITY ANALYSIS of Soldier Pile Wall according to Burland-Potts method
Factor of safety on nett available passive

Stage
No.
1
2

--- G.L. --Act.


Pass.
0.00
0.00

0.00
-4.00

Strut
Elev.
--Cant.

FoS for toe


Toe elev. for
elev. =
-8.00
FoS = 1.000
--------------------------Factor Moment
Toe
Wall
of
equilib.
elev. Penetr
Safety at elev.
-ation
Conditions not suitable for FoS calc.
5.538
-7.58
-5.03
1.03

RANJAN FERNANDO GEOTECHNICAL SERVICES


| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m
Summary of results
BENDING MOMENT and DISPLACEMENT ANALYSIS of Soldier Pile Wall
Analysis options
Soldier Pile width = 0.45m; spacing = 2.40m
Passive mobilisation factor = 3.000
Length of wall perpendicular to section = 30.00m
Subgrade reaction model - Boussinesq Influence coefficients
Soil deformations are elastic until the active or passive limit is reached
Rigid boundaries:

Active side 20.00 from wall


Passive side 20.00 from wall
Limit State: Serviceability Limit State
Calculated Bending Moments and Strut Forces have been multiplied by a factor
of 1.50 to obtain values for structural design.
Bending moment, shear force
Node
Y
Displacement
no. coord
max.
min.
m
m
1
0.00 0.015 0.000
2
-0.25 0.014 0.000
3
-0.50 0.013 0.000
4
-0.85 0.011 0.000
5
-1.20 0.010 0.000
6
-1.60 0.008 0.000
7
-2.00 0.007 0.000
8
-2.40 0.005 0.000
9
-2.80 0.004 0.000
10
-3.20 0.003 0.000
11
-3.60 0.002 0.000
12
-4.00 0.001 0.000
13
-4.40 0.000 0.000
14
-4.80 0.000 0.000
15
-5.20 0.000 0.000
16
-5.60 0.000 0.000
17
-6.00 0.000 0.000
18
-6.40 0.000 0.000
19
-6.80 0.000 0.000
20
-7.20 0.000 0.000
21
-7.60 0.000 0.000
22
-8.00 0.000 0.000

and displacement envelopes


---- Bending moment ---------- Shear force -----Calculated
Factored
Calculated
Factored
max.
min.
max.
min.
max.
min.
max.
min.
kN.m/m
kN.m/m
kN/m
kN/m
kN/m
kN/m
0
0
0
0
0
0
0
0
0
-0
0
-0
0
-0
0
-0
0
-0
0
-0
1
-0
2
-1
1
-1
1
-1
2
-2
3
-2
2
-1
3
-1
4
-1
6
-1
4
-1
6
-1
7
0
10
0
7
0
11
0
10
0
16
0
11
0
17
0
10
0
16
0
15
0
23
0
10
-1
16
-1
20
0
29
0
10
-1
16
-2
24
0
36
0
11
-1
16
-2
28
0
42
0
11
-1
17
-1
30
0
44
0
0
-16
0
-24
18
-0
27
-0
0
-27
0
-40
8
-0
12
-0
0
-21
0
-31
2
-0
3
-0
0
-11
0
-17
0
-1
0
-1
0
-4
0
-6
0
-1
0
-2
0
-0
0
-0
0
-1
0
-2
1
0
2
0
0
-1
0
-1
1
0
2
0
0
-0
0
-0
1
0
1
0
0
0
0
0
0
0
0
0

Maximum and minimum bending moment and shear force at each stage
Stage ------------ Bending moment ----------------------- Shear force ------------no.
------- Calculated -----Factored
------- Calculated -----Factored
max. elev.
min. elev.
max.
min.
max. elev.
min. elev.
max.
min.
kN.m/m
kN.m/m
kN.m/m
kN/m
kN/m
kN/m
kN/m
1
2 -2.80
-1 -1.20
2
-1
6 -2.00
-2 -0.85
8
-2
2
30 -4.40
-1 -6.40
44
-2
11 -4.00
-27 -4.80
17
-40
Maximum and minimum displacement at each stage
Stage -------- Displacement --------Stage description
no. maximum elev.
minimum elev.
----------------m
m
1
0.000
0.00
0.000
0.00
Apply surcharge no.1 at elev. 0.00
2
0.015
0.00
0.000
0.00
Excav. to elev. -4.00 on PASSIVE side

Run ID. BP1 UNDRAINED_SLS


| Sheet No.
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Summary of results
(continued)
Calculated Bending Moments and Strut Forces have been multiplied by a factor
of 1.50 to obtain values for structural design.

RANJAN FERNANDO GEOTECHNICAL SERVICES


| Sheet No.
Program: WALLAP Version 6.05 Revision A45.B58.R49
| Job No.
RFXXX
Licensed from GEOSOLVE
| Made by :
RN
Data filename/Run ID: BP1 UNDRAINED_SLS
|
443-445 Lygon Street, East Brunswick
| Date: 4-12-2015
BP1 450@2.4m CC PILE DEPTH 8.0M FOR RH 4.0M UNDRAINED
| Checked :
----------------------------------------------------------------------------Units: kN,m

You might also like