You are on page 1of 7

CURRICULUM VITAE

Name

MOHD KHIR JOHARI BIN MD ARIS

Date of Birth

17th April 1984

Nationality

Malaysian

Position

Structural Engineer

Education

University Putra Malaysia


Bachelor of Engineering (Aerospace/Mechanical)

Board of Engineer Malaysia


Registration no.
:
GE-85000
Passport no.

A28845941

Status

Married

Contact no.

60176892179

Email

khir.johari01@gmail.com

Skype

mohdkhirjohari

SUMMARY OF EXPERIENCE
More than six (6) years of experience in Oil & Gas Industry. Has been working in structural
engineering which is focusing more on the conceptual, FEED and detailed design, basic engineering
and analyses of the structures. Mainly involves in the development of topside such as Central
Processing Platform (CPP), Well Head Platform (WHP) and hull structure FSO.
Familiar with current industrial and companies codes/standards especially AISC, API, Noble
Denton, DNV and BV with vast experience dealing with steel detail calculation for beams and
tubular. Involved extensively in structural studies, layout development and project engineering.

DETAILED WORKING EXPERIENCE

January 2015 Dec 2015: Principia Malaysia Sdn Bhd


Structural Engineer
Project assigned included:
HESS FSO Conversion
Scope of Work:

Attended a 3 weeks of training in Nantes, France for B.V Veristar


Hull and FEMAP (FEA Software), went for another 3 weeks for a
completion of fatigue analysis.

Built course mesh and very fine mesh of FSO by each tank and
compartments by using FEMAP.

Run the very fine mesh for fatigue calculations by using Veristar
Hull.

January 2014 Dec 2014: Principia Malaysia Sdn Bhd


Structural Engineer
Project assigned included:
Emas Gaza Sloug Replacement Project
Secondment in Technip Kuala Lumpur
Client: Mellitah Old and Gas B.V
Scope of Work:

Design of platform clamp and flexible flowline clamp for DP4


platform. This design is for an existing platform and the flowline
is an additional. The design is ROV compliance for the flowline
clamp.

Using Abaqus CAE 6.12 for the finite element analysis (FEA).

Bolt calculation for clamping purposes.

Sacrificial anode calculation for the clamps corrosion protection.

D12 and Laila Field Development


Secondment in Technip Kuala Lumpur
Scope of Work:

Design and seafastening calculations for equipment


transportation.

Prepared MTO for the seafastening.

Panyu PY35-2/25-1 Offshore Gas Field Development Subsea


Epic Services Installations.
Secondment in Technip Kuala Lumpur
Scope of Work:

August 2013 Dec 2013:

Prepared a design and seafastening calculations for SUTU


foundation, SUTU protection and equipment transportations on
steel plate deck type of vessel and also on the deck wood type
of vessel.

Performed SACS analysis on the 10te A-Frame and Air Winch


base for operational and transportation purpose.

Using SACS for spool lifting analysis with or without spreader


bar.

Prepared MTO for rigging and seafastening.

Principia South Asia Sdn Bhd


Structural Engineer
Project assigned included:
Geocean-Franklin Victory barge:
Conversion of an accommodation work barge to a pipe-lay
barge
Ge-ocean, France
Location of work: Singapore, JSML Shipyard
Scope of Work:

Finite Element analysis by using Isymost for the barge deck


strength check during operation, for the davits located on top of
it.

Structural analysis for the modifications to the tunnel for firing


line, angle of stinger, padeye location to hold crawler crane and
local check at the crucial connections.

Lifting calculation for object less than 100 ton.

March 2012 July 2013:

Principia South Asia Sdn Bhd


Structural Engineer
Project assigned included:
Champion Water Flood Project:
Flexible Design and Installation (umbilical and rigid riser)
Brunei Shell Petroleum Company Sendirian Berhad
Intecsea/Swiber
Scope of Work:

Sept 2011 March 2012:

Riser flexibility analysis by using Isymost (Principia in house


software) for the structural integrity check during operation and
storm condition

Riser dynamic span design

Principia South Asia Sdn Bhd


Structural Engineer
Project assigned included:
SOGT Project:
Transportation, Installation Work and Pre-Commissioning
(PLEM, SPM, pipelines)
Samsung Engineering/Petronas Carigali
Alam Maritim Sdn Bhd

Scope of Work:

Lifting analysis by using Isymost (Principia in house software)


for PLEM, spool and floating/submerged hoses

Design of cofferdam, onshore pipeline pulling preparation and


beach pull analysis for the pipelines

Analysis for linepipe transportation and seafastening.


Prepared the basis of design

March 2010 Sept 2011:

Ultimate Engineering Solutions (M) Sdn Bhd


Structural Engineer
Project assigned included:
Wellhead Platform (WHP) Topside
Engineering, Procurement and Construction (EPC) of
wellhead platforms (CDW-B and CDW-C) for Cendor Phase 2
Project, Block PM304
Scope of Work:

Jan 2010 Feb 2011

Prepared and checked structural drawings within assigned area

Engineering detailed design for equipment positioning layout

Modeling and analyses for topsides, including in place, lifting,


load out and transportation.

Performed the lifting analysis by using SACS 5.3 including lifting


arrangement and miscellaneous design. The lifting analysis is for
the 2000 tonne topside both for CDW-B and CDW-C.

Performed engineering analyses mainly for the In-service & Preservice condition by using SACS 5.3.

Ultimate Engineering Solutions (M) Sdn Bhd


Structural Engineer
Project assigned included:
Central Processing Platform (CPP) Topside
PM329 East Piatu Development Project
Scope of Work:

Prepare and check structural drawings within assigned area

Engineering detailed design for equipment layout

Check integrity of structure, deflection and to propose additional


strengthening for the structures

Modeling and analyses for topsides by using SACS

Jan 2009 Dec 2009

Ultimate Engineering Solutions (M) Sdn Bhd


Structural Engineer
Project assigned included:
Muda Living Quarters Building (MLQB)
JDA BLOCK B-17 Field Development Project
CPOC/BHICP
Scope of Work:

Prepare and check structural drawings

Prepare engineering detailed design for equipment positioning


layout

Fabrication of Golok Central Riser Platform,


SK-309/SK-311

GO-RA Topside

Sarawak Gas Development Project/Murphy Sarawak Oil Co.


Ltd
MODULE Tech Sdn Bhd
Scope of Work:

Involved in detail engineering review and verification

Check instrumentation drawings within assigned area

Muda Living Quarters Deck (MLQD)


JDA BLOCK B-17 Field Development Project
CPOC/BHICP
Scope of Work:

Prepare and check structural drawings within assigned area

Preparation of material take-off (MTO) documentations

SKILLS
Extensive knowledge in analysis, design and CAD

SACS Executive 5.2/5.3


Veristar Hull
FEMAP 9.3 and FEMAP 11.2
Abaqus CAE
Isymost 5.04 (Principias software)
NSO (Principias software)
AutoCAD
MathCad
Microsoft office (Word, Excel)

Fluent in both speaking and written in Malay and English

REFERENCE(S)
Name:
Phone No:
Position:
Company:

Remi CRESPO
+33634212755 (Nantes, France)
Lead Structural
Principia, France

Name:
Phone No:
Position:
Company:

Jocelyn LANGLOIS
+60132887238 (Kuala Lumpur, Malaysia)
Engineering Manager
Principia Malaysia Sdn Bhd

Name:
Phone No:
Position :
Company:

Pierre GUERIN
+33649995959 (France)
Business Manager
Bardot Group

You might also like