List of Electrical Drawings for 400/220 kV S/S at Banda

Sl. No.

Drawings Descriptions

Drg. No.

Target Date Actual Date

Sheet
(Nos.)

Revision
R0

R1

R2

Remarks

01

Single Line Diagram

CG / 268 / E L/ 101

01

21.05.12 12.07.12

Approved

02

Site Plan (Electrical)

CG / 268 / EL/ 102

01

04.12.12

Approved

21.05.12 12.07.12

Approved

03

*****

*****

04

Electrical Layout Plan (G.A.)

05

Electrical Layout Plan (400Kv Side)

06

Electrical Layout Plan (220Kv Side)

07

Layout Section Detail (400Kv Side)

08

Layout Section Detail (220Kv Side)

09

Structural Loading Diagram

CG / 268 / EL/ 106

05

22.09.12 04.12.12

10

Earthmat Layout & Earthing Calculation

CG / 268 / EL/ 107

01

21.12.12

Sent to CGL

11

Erection Key diagram (400kV Side)

CG / 268 / EL/ 108

10.06.2013

11.06.2013

03

11.06.13

Sent to CGL

12

Erection Key diagram (220kV Side)

CG / 268 / EL/ 109

10.06.2013

11.06.2013

02

11.06.13

Sent to CGL

13

Cable Trench & Foundation Layout

CG / 268 / EL/ 110

20.06.2013

25-.06.2013

01

25.06.13

Sent to CGL

14

66kV LT Switchyard (T/F tertiary side)

08.07.2013

15

33kV LT Switchyard Layout (Line)

08.07.2013

20.07.2013

Under Working

16

Single Line Diagram (ACDB System)

15.07.2013

19.07.2013

Under Working

17

Single Line Diagram (DCDB System)

15.07.2013

19.07.2013

Under Working

18

DSLP Design & Layout

20.08.2013

19
20
21
22

CG / 268 / EL/ 104

CG / 268 / EL/ 105

03

02

do

do

Approved

do

do

Approved

do

do

Approved

do

do

Approved
Approved

Under Working

Under Working

Trench & Panel Placement Layout for Main Control


Room Bldg.
Trench & Panel Placement Layout for Bay Control
Room Bldg. 400kV Side
Trench & Panel Placement Layout for Bay Control
Room Bldg. 220kV Side

10.09.13

Under Working

10.09.14

Under Working

Switchyard Outdoor Lighting Layout

30.09.13

Under Working

Under Working

23

Indoor Lighting Layout - Main Control Room

20.10.13

Under Working

24

Indoor Lighting Layout - BCR 220kV Side

20.10.13

Under Working

25

Indoor Lighting Layout - BCR 400kV Side

20.10.13

Under Working

26

Indoor Lighting Layout - Store Room

20.10.13

Under Working

27

Control Cable Schedule & Interconnection Details

30.12.13

Under Working

28

Power Cable Schedule & Interconnection Details

30.12.13

Under Working

List of Civil Drawings for 400/220 kV S/S at Banda


Sl. No.

Drawings Descriptions

Drg. No.

Target Date Actual Date

Revision

Sheet
(Nos.)

R0

R1

R2

01

Contour Plan

CG / 268 / CVL/ 101

30.04.12

01

30.04.12

02

Switchyard Plot Plan (Soil cutting & filling)

CG / 268 / CVL/ 101 A

31.12.12

01

31.12.12

03

Site Layout Plan (Civil)

CG / 268 / CVL/ 102

30.08.2013

01

04

Boundary Wall ( Position AB & BC)

CG / 268 / CVL/ 103A

21.12.12

02

21.12.12

04

Boundary Wall ( Position CD, DE, EF FG &


GA)

CG / 268 / CVL/ 103B

10.06.13

02

10.06.13

05

Security Hut & Main Gate

CG / 268 / CVL/ 104

30.06.2013

03

06

Test Pile Design With Blub (400mm. &


500mm Dia)

CG / 268 / CVL/ 105

04.12.12

03

04.12.12

07

400kV Tower Foundation Detail

CG / 268 / CVL/ 106

29.05.13

06

12.03.13 16.04.13 29.05.13

08

Working Drawings (Gantry Column Fdn.)

CG / 268 / CVL/ 107

10.05.2013

27.06.13

01

27.06.13

09

220kV Tower Foundation Detail

CG / 268 / CVL/ 108

31.07.2013

14

Foundation Detail of 315mva, TRF.


Foundation

CG / 268 / CVL/ 113

20.07.2013
(Revised)

22.03.13

04

22.03.13

20

6M. Wide Road Details

CG / 268 / CVL/ 114

30.06.2013

28.06.13

01

28.06.13

22

Detail of Road Culvert

CG / 268 / CVL/ 115

20.09.2013

19

Store Room Building Detail

CG / 268 / CVL/ 116

15.09.2013

21

Detail of Cable Trench & Trench Cover

CG / 268 / CVL/ 117

20.09.2013

CG / 268 / CRB/ 101

30.07.2013
(Revised)

16
17
18
38

Architectural & Structural Drawings for Main


Control Room Building
Architectural & Structural Drawings for Bay
Control Room (400kV Side)
Architectural & Structural Drawings for Bay
Control Room (220kV Side)
Foundation Details of 63MVAR, Bus Reactor

15.08.2013
15.08.2013
30.07.2013

21

02.04.13

23

Foundation Detail 400kV LA

10.08.2013

24

Foundation Detail 400kV CT

10.08.2013

25

Foundation Detail 400kV CVT

10.08.2013

26

Foundation Detail 400kV BPI

10.08.2013

27

Foundation Detail 400kV Isolator

10.08.2013

28

Foundation Detail 400kV CB

10.08.2013

29

Foundation Detail 400kV WT

10.09.2013

30

Foundation Detail 220kV LA

31.08.2013

31

Foundation Detail 220kV CT

31.08.2014

32

Foundation Detail 220kV CVT

31.08.2015

33

Foundation Detail 220kV BPI

31.08.2016

34

Foundation Detail 220kV BPI (HL)

31.08.2017

35

Foundation Detail 220kV Isolator

31.08.2018

36

Foundation Detail 220kV CB

31.08.2019

37

Foundation Detail 220kV WT

10.09.2013

39

FFPH Bldg. Detail

15.10.2013

40

Reservoir Detail

15.10.2013

41

Detail of O.H.T.

25.10.2013

42

Detail of Admin. Block

43

Detail of Erector Hostel

44

Detail of Res. Qtr. Type - I

45

Detail of Res. Qtr. Type - II

46

Detail of Res. Qtr. Type - III

47

Detail of Res. Qtr. Type - IV

Remarks
Approved
Approved
Under Working
Approved
Sent to CGL
Sent to CGL
Approved
Sent to CGL
Sent to CGL
Under Working
Approved
Sent to CGL
Under Working
Under Working
Under Working
Approved
Under Working
Under Working
Under Working

Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working
Under Working

You might also like