Installation on roof

Installation in loft

New a.c. Installation

Issue:
0
23.03.12
Original Issue

Existing house a.c. Installation


DNO
supply

PV array.
Single string of M modules in series

d.c.
Connectors

d.c.
Isolator

String Inverter

a.c.
Isolator

Main
Isolator

Generation
Meter

AHS

1
12.11.12
Revised Main isolator
position

IRB

Labels
1 Phase
String
Inverter
0

I - Do not disconnect d.c. plugs and


sockets under load - turn off a.c. first

Main Consumer Unit


0

0123 kWh

0123 kWh
Utility meter

LABEL I

LABEL II

LABEL III

LABEL IV

LABEL IV

LABEL V

II - P.V. array d.c. isolator. Danger contains live parts during daylight.
III - Inverter - Isolate a.c. and d.c. before
carrying out work
IV - PV System main a.c. isolator

Single string PV array connected in series


G
Voltage rating

M x 90.7V for PV30 (Max M = 11)


M x 60.5V for PV20 (Max M = 16)
M x 45.3V for PV15 (Max M = 22)

Current rating

Connectors must be d.c. rated. They should be touch safe to a standard of


ingress protection not less than IP 21, Class II and shrouded.

Installers are obliged to liaise with the relevant distribution Network Operator
(DNO) in the following manner:
Single installation covered by G83/1 - notification at or before day of
commissioning followed by G83/1 paperwork (G83/1 appendix 3) within 30
days.

N.B. ENSURE THAT MALE AND FEMALE CONNECTORS ARE FULLY AND
SECURELY JOINED.
C

The d.c. isolator must be double pole and rated for the system voltage and
current maxima as calculated from the PV array. It should be load-break rated.

The inverter must be treated as standard electrical apparatus and earthed as


per BS 7671 if Class 1. It must carry a Type Test certificate to the requirements of
Engineering Recommendation G83/1 or comply with all other parts of ER G83/1.
Inverter settings:-

Notes:

10.4 A
H

Generation meter should be installed to display/record energy delivered by the


PV system (kWh). In addition it is highly recommended for instantaneous power
output (kW) to be displayed. A kWh meter approved by OFGEM is
recommended as it may facilitate payment on ROCs and other Electricity
company scheme payments.

V - Do not work on this equipment until it is


isolated from both mains and on-site
generation supplies

Multiple installations covered by G83/1 - application to proceed (G83/1


appendix 2). On commissioning - notification and appendix 3 as above.

D.C. Cable
Cables must be rated, as a minimum, to the voltage and current ratings derived
from the PV array. Standard de-rating factors must also be applied (BS 7671).
Cables should be sized such that overall voltage drop at stc between the array
and the inverter is <3%

Over Voltage

264V

Under Volatage

207V

Over Frequency

50.5Hz

A.C Cable

Under Frequency

47HZ

A.C. cables are to be specified and installed in accordance with BS 7671. The
a.c. cable connecting the inverter(s) to the consumer unit should be oversized
to minimise voltage drop. A 1% drop or less is recommended.

A manual a.c. isolator must be provided located in an accessible position within


the Customer's installation as in G83/1, which is:in accordance with BS 60947-3
must switch all live and neutral conductors.
must be securable in the OFF position only. It must be simple to secure
using a standard padlock- device that require a separate removable
adaptor or special key to enable them to be secured are not acceptable.

Lightning Protection
Where there is a perceived increase in risk of direct strike as a consequence of
the installation of the PV system, specialists in lightning protection should be
consulted with a view to installing a separate lightning protection system in
accordance with BS 6651.

Viridian Solar
Atlas Building,
68 Stirling Way, Papworth,
Cambs. CB23 3GY
T 01480 831501
F 01480 831831
www.viridiansolar.co.uk
TITLE

Viridian Clearline PV Wiring


Diagram - Single String Inverter Single Phase

DRAWN

must clearly show the ON and OFF positions


F

A main isolator must be provided located in an accessible position within the


Customer's installation as in G83/1, which is:in accordance with BS 60947-3
must switch all live and neutral conductors.
must be securable in the OFF position only.
must clearly show the ON and OFF positions

CHECKED

AHS

KTT
SHEET

DRAWING NUMBER

30 002

1 of 4
REVISION

OUTPUT CURRENT

Below 16A/Phase
DATE

SCALE

20.03.12

Disclaimer:

Installation on roof

Installation in loft

This drawing and the information contained


within it are the property of Viridian
Concepts Ltd. and may not be used or
reproduced
without
their
express
permission.

Existing house a.c. Installation

New a.c. Installation

Issue:
0
20.03.12
Original issue

AHS

PV Module 1
L NE

1
12.11.12
Revised Main isolator
position

Micro
Inverter
Main
Isolator

Generation
Meter

IRB

DNO
Supply
PV Module m

Labels
F

Micro
Inverter

G
H

Main Consumer Unit

0123 kWh

0123 kWh
Utility meter
LABEL V

LABEL IV

LABEL IV

I - Do not disconnect d.c. plugs and


sockets under load - turn off a.c. first
II - P.V. array d.c. isolator. Danger contains live parts during daylight.
III - Inverter - Isolate a.c. and d.c. before
carrying out work
IV - PV System main a.c. isolator
V - Do not work on this equipment until it is
isolated from both mains and on-site
generation supplies
Notes:

Single PV module
Voltage rating

F
90.7V for PV30

A main isolator must be provided located in an accessible position within the


Customer's installation as in G83/1, which is:-

60.5V for PV20

in accordance with BS 60947-3

45.3V for PV15

must switch all live and neutral conductors.


must be securable in the OFF position only.

Current rating
B

must clearly show the ON and OFF positions

Connectors must be d.c. rated. They should be touch safe to a standard of ingress
protection not less than IP 21, Class II and shrouded. Provided by Viridian Solar.

The inverter must be treated as standard electrical apparatus and earthed as per BS
7671 if Class 1. It must carry a Type Test certificate to the requirements of Engineering
Recommendation G83/1 or comply with all other parts of ER G83/1.
Inverter settings:Over Voltage

Cables must be rated, as a minimum, to the voltage and current


ratings derived from the PV array. Standard de-rating factors must
also be applied (BS 7671). Cables should be sized such that overall
voltage drop at stc between the array and the inverter is <3%.
Provided by Viridian Solar

10.4 A
A.C Cable
G

Single phase generation meter should be installed to display/record energy


delivered by the PV system (kWh). In addition it is highly recommended for
instantaneous power output (kW) to be displayed. A kWh meter approved by
OFGEM is recommended as it may facilitate payment on ROCs and other Electricity
company scheme payments.

A.C. cables are to be specified and installed in accordance with


BS 7671. The a.c. cable connecting the inverter(s) to the consumer
unit should be oversized to minimise voltage drop. A 1% drop or
less is recommended.

Installers are obliged to liaise with the relevant distribution Network Operator (DNO)
in the following manner:

Lightning Protection

N.B. ENSURE THAT MALE AND FEMALE CONNECTORS ARE FULLY AND
SECURELY JOINED.
D

D.C. Cable

264V

Under Volatage

207V

Over Frequency

50.5Hz

Under Frequency

47HZ

A manual a.c. isolator must be provided located in an accessible position within the
Customer's installation as in G83/1, which is:-

Single installation covered by G83/1 - notification at or before day of


commissioning followed by G83/1 paperwork (G83/1 appendix 3) within 30
days.
Multiple installations covered by G83/1 - application to proceed (G83/1
appendix 2). On commissioning - notification and appendix 3 as above.

Where there is a perceived increase in risk of direct strike as a


consequence of the installation of the PV system, specialists in
lightning protection should be consulted with a view to installing a
separate lightning protection system in accordance with BS 6651.

Viridian Solar
Atlas Building,
68 Stirling Way, Papworth,
Cambs. CB23 3GY
T 01480 831501
F 01480 831831
www.viridiansolar.co.uk
TITLE

in accordance with BS 60947-3


must switch all live and neutral conductors.
must be securable in the OFF position only. It must be simple to secure using a
standard padlock- device that require a separate removable adaptor or
special key to enable them to be secured are not acceptable.
must clearly show the ON and OFF positions

Viridian Clearline PV Wiring


Diagram - Multiple Micro
Inverter - Single Phase

DRAWN

CHECKED

AHS

KTT
SHEET

DRAWING NUMBER

30 002

2 of 4
REVISION

OUTPUT CURRENT

Below 16A/Phase
DATE

SCALE

20.03.12

Installation on roof

Installation in loft

New a.c. Installation

Disclaimer:
This drawing and the information contained
within it are the property of Viridian
Concepts Ltd. and may not be used or
reproduced
without
their
express
permission.

Issue:

PV array A
Single strings of M
modules in series
0

1 Phase
String
Inverter

String A

PV Distribution
Board
L N E

I
Schematic

String B

Labels
LABEL I

LABEL II

LABEL III

I - Do not disconnect d.c. plugs and


sockets under load - turn off a.c. first

LABEL IV

II - P.V. array d.c. isolator. Danger contains live parts during daylight.

PV array n
N strings of M modules
in parallel

III - Inverter - Isolate a.c. and d.c. before


carrying out work

G59 Relay
Proctection

3 pole
contractor

IV - PV System main a.c. isolator


AC Supply
Sensor

1 Phase
String
Inverter

Existing house a.c. Installation


0

I
G

String A

DNO
Supply

LABEL IV

Y-connectors
LABEL I

H
LABEL II

V - Do not work on this equipment until it is


isolated from both mains and on-site
generation supplies

LABEL III

Notes:

Main Consumer Unit

LABEL IV

0123 kWh
0123 kW
Utility meter
LABEL V

Electrical rating for PV arrays (d.c. side)


Voltage rating

Current rating
B

M x 90.7V for PV30 (Max M = 11)

A manual a.c. isolator must be provided located in an accessible position within the
Customer's installation as in G83/1, which is:-

M x 60.5V for PV20 (Max M = 16)

in accordance with BS 60947-3

M x 45.3V for PV15 (Max M = 22)

must switch all live and neutral conductors.

N x 10.4 A

must be securable in the OFF position only. It must be simple to secure using a
standard padlock- device that require a separate removable adaptor or
special key to enable them to be secured are not acceptable.

Connectors must be d.c. rated. They should be touch safe to a standard of ingress
protection not less than IP 21, Class II and shrouded. Provided by Viridian Solar.

must clearly show the ON and OFF positions


N.B. ENSURE THAT MALE AND FEMALE CONNECTORS ARE FULLY AND
SECURELY JOINED.
C

The d.c. isolator must be double pole and rated for the system voltage and current
maxima as calculated from the PV array. It should be load-break rated. Provided by
Viridian Solar.
G

The inverter must be treated as standard electrical apparatus and earthed as per BS
7671 if Class 1. It must carry a Type Test certificate to the requirements of Engineering
Recommendation G83/1 or comply with all other parts of ER G83/1.
Inverter settings:-

G59 Protection relay may be required by DNO to protect against voltage change under and over 240V, frequency change - under and over 50Hz and vector shift - 1
deg increments. If required, this device could be supplied by Viridian Solar at extra
cost.
A main isolator must be provided located in an accessible position within the
Customer's installation as in G83/1, which is:in accordance with BS 60947-3
must switch all live and neutral conductors.

Over Voltage

264V

Under Volatage

207V

Over Frequency

50.5Hz

Under Frequency

47HZ

must be securable in the OFF position only.


must clearly show the ON and OFF positions

Generation meter should be installed to display/record energy delivered by the PV


system (kWh). In addition it is highly recommended for instantaneous power output
(kW) to be displayed. A kWh meter approved by OFGEM is recommended as it may
facilitate payment on ROCs and other Electricity company scheme payments.

Viridian Solar
Atlas Building,
68 Stirling Way, Papworth,
Cambs. CB23 3GY
T 01480 831501
F 01480 831831
www.viridiansolar.co.uk

Written approval must be gained from Distribution Network Operator (DNO) prior to
works. Commissioning in conjunction withDNO engineer, or as required by DNO

D.C. Cable
Cables must be rated, as a minimum, to the voltage and current ratings derived
from the PV array. Standard de-rating factors must also be applied (BS 7671). Cables
should be sized such that overall voltage drop at stc between the array and the
inverter is <3%. Provided by Viridian Solar

TITLE

A.C Cable
A.C. cables are to be specified and installed in accordance with BS 7671. The a.c.
cable connecting the inverter(s) to the consumer unit should be oversized to
minimise voltage drop. A 1% drop or less is recommended.
Lightning Protection
Where there is a perceived increase in risk of direct strike as a consequence of the
installation of the PV system, specialists in lightning protection should be consulted
with a view to installing a separate lightning protection system in accordance with
BS 6651.

Viridian Clearline PV Wiring


Diagram - Multiple String
Inverter - Single Phase

DRAWN

CHECKED

AHS

KTT
SHEET

DRAWING NUMBER

30 002

3 of 4
REVISION

OUTPUT CURRENT

Above 16A/Phase
DATE

SCALE

20.03.12

Installation on roof

Installation in loft

New a.c. Installation

Disclaimer:
This drawing and the information contained
within it are the property of Viridian
Concepts Ltd. and may not be used or
reproduced
without
their
express
permission.

Issue:
PV array A
Single strings of M
modules in series
0

PV Distribution
Board

3 Phase String
Inverter

String A

L1L2 L3 N E
0

Schematic

Labels

String B

LABEL I

LABEL II

LABEL III

I - Do not disconnect d.c. plugs and


sockets under load - turn off a.c. first

LABEL IV

II - P.V. array d.c. isolator. Danger contains live parts during daylight.

4 pole
contractor

III - Inverter - Isolate a.c. and d.c. before


carrying out work

G59 Relay
Proctection

IV - PV System main a.c. isolator


AC Supply
Sensor

V - Do not work on this equipment until it is


isolated from both mains and on-site
generation supplies

Existing house a.c. Installation

PV array n
N strings of M modules
in parallel

I
G

3 Phase String
Inverter
0

DNO
Supply

LABEL IV

Notes:

I
H

Main Consumer Unit


0123 kWh

0123 kW
Utility meter

Y-connectors
LABEL I

Single string PV array connected in series


Voltage rating

Current rating
B

LABEL II

LABEL III

M x 90.7V for PV30 (Max M = 11)

LABEL IV

A manual a.c. isolator must be provided located in an accessible position within the
Customer's installation as in G83/1, which is:-

M x 60.5V for PV20 (Max M = 16)

in accordance with BS 60947-3

M x 45.3V for PV15 (Max M = 22)

must switch all live and neutral conductors.

N x 10.4 A

must be securable in the OFF position only. It must be simple to secure using a
standard padlock- device that require a separate removable adaptor or
special key to enable them to be secured are not acceptable.

Connectors must be d.c. rated. They should be touch safe to a standard of ingress
protection not less than IP 21, Class II and shrouded. Provided by Viridian Solar.

must clearly show the ON and OFF positions


N.B. ENSURE THAT MALE AND FEMALE CONNECTORS ARE FULLY AND
SECURELY JOINED.
C

The d.c. isolator must be double pole and rated for the system voltage and current
maxima as calculated from the PV array. It should be load-break rated. Provided by
Viridian Solar.
The inverter must be treated as standard electrical apparatus and earthed as per BS
7671 if Class 1. It must carry a Type Test certificate to the requirements of Engineering
Recommendation G83/1 or comply with all other parts of ER G83/1.

G59 Protection relay may be required by DNO to protect against voltage change under and over 240V, frequency change - under and over 50Hz and vector shift - 1
deg increments. If required, this device could be supplied by Viridian Solar at extra
cost.
A main isolator must be provided located in an accessible position within the
Customer's installation as in G83/1, which is:in accordance with BS 60947-3
must switch all live and neutral conductors.

Inverter settings:Over Voltage

264V

must be securable in the OFF position only.

Under Volatage

207V

must clearly show the ON and OFF positions

Over Frequency

50.5Hz

Under Frequency

47HZ

LABEL V

Three phase generation meter should be installed to display/record energy


delivered by the PV system (kWh). In addition it is highly recommended for
instantaneous power output (kW) to be displayed. A kWh meter approved by
OFGEM is recommended as it may facilitate payment on ROCs and other Electricity
company scheme payments.

Viridian Solar
Atlas Building,
68 Stirling Way, Papworth,
Cambs. CB23 3GY
T 01480 831501
F 01480 831831
www.viridiansolar.co.uk

Written approval must be gained from Distribution Network Operator (DNO) prior to
works. Commissioning in conjunction withDNO engineer, or as required by DNO

D.C. Cable
Cables must be rated, as a minimum, to the voltage and current ratings derived
from the PV array. Standard de-rating factors must also be applied (BS 7671). Cables
should be sized such that overall voltage drop at stc between the array and the
inverter is <3%. Provided by Viridian Solar

TITLE

Viridian Clearline PV Wiring


Diagram - Multiple String
Inverters - Three Phase

A.C Cable
A.C. cables are to be specified and installed in accordance with BS 7671. The a.c.
cable connecting the inverter(s) to the consumer unit should be oversized to
minimise voltage drop. A 1% drop or less is recommended.
Lightning Protection
Where there is a perceived increase in risk of direct strike as a consequence of the
installation of the PV system, specialists in lightning protection should be consulted
with a view to installing a separate lightning protection system in accordance with
BS 6651.

DRAWN

CHECKED

AHS

KTT
SHEET

DRAWING NUMBER

30 002

4 of 4
REVISION

OUTPUT CURRENT

Above 16A/Phase
DATE

SCALE

20.03.12